SPECIFICATIONS

VALVE MAINTENANCE TRAILER, 36 CES, AAFB, GUAM

SCOPE: Contractor shall supply and deliver to building 18001, WFSM Shop, a quantity of one (1) each valve maintenance trailer with GPS tablet as described below.

SCHEDULE OF WORK: Delivery of required equipment shall be accomplished within 90 calendar days from acceptance of submittals.

INSPECTION AND ACCEPTANCE: The 36th Civil Engineer Squadron WFSM shop supervisor will accomplish inspection and acceptance of delivered equipment.

WFSM EQUIPMENT REQUIREMENTS:

Features

Automatic valve turner for preventative maintenance Suction hose with debris holding tank for cleaning valve boxes High pressure spray wand to clean storage tank and tank seals Handheld GPS tablet for locating valves

Valve turning component

Articulating arm must be automated valve operator utilizing industry exclusive intelligent automation to control torque, direction and turns. Twin arms (one telescoping) provide 13' [3.9 m] reach over 270 degrees of freedom while hydraulic disk brakes safely secure exerciser capable of 750 Ft-Lb [1016 Nm] of torque. Must be constructed of 3" [76 mm] square steel tube and powder coated for long life. A light weight, telescoping valve key must be provided. Intelligent automation to control torque, direction, and turns to mitigate chances of broken valves during maintenance

Valve exerciser must be able utilize industry exclusive "no assumption" automation technology to safely and effectively turn valves using AWWA recommended procedures. This technology protects the operators by keeping "hands off" the machine while exercising the valve and protects the valve by not assuming size, direction or current position. Allowing the machine to follow the path of least resistance, the programming and sensors automatically stop the rotation and reverse in half turn increments as to flush calcification from valve gate. This automation always exercises valve at the minimum torque required to turn, then automatically lowers preset threshold once rotation begins so impact at end of valve travel is soft as possible.

Programming sensors to allow technicians to flush calcification from gate valves by automatically stopping the rotation and reversing in half turn increments

Mechanical Specifications

Diesel engine liquid cooled EPA Tier 4F & EU Stage IIIA emission compliant

Minimum vacuum performance of 500 CFM through 3” suction hose Minimum 90 gallon water tank Water pump minimum 2.5 gallons per minute spray capability at 3000 PSI hoses and wands for pressure washer must include at a min. 50’ hose on spring rewind hose reel using quick disconnects to change between wands;

one with a zero degree nozzle for digging and 45 degree, fan wash down “Shorty” wand.

Hydraulic dumping system with direct coupled pump rated 8 GPM at 1800 PSI of continuous duty with pressure gauge and selector valve

Instrumentation must include an oil level gauge, temperature gauge, pressure gauge

250 gallon debris holding tank with top hinged full opening dump door and twin hydraulic remote operation door latches, sure seal gasket, and vacuum break valve hoses and wands for spoils tank must include at a min. 3” x 20’ [76 mm x 6 m] suction hose with 2-1/2” [63 mm], 1¼” [31 mm] and 7/8” [22 mm] x 8' [2.4 m] long steel suction wands.

Must have staged filtration consisting of a heavy material drop out debris tank and a self-contained multi-stage filter canister with a 10 micron polyester reusable cartridge. All filters must be washable and reusable.

Controls

Digital tachometer, engine hour meter, volt meter, vacuum gauge, spoils dump switch, spoils door switch, water/vacuum selector switch, arrow board control and service light switch

Trailer

Frame must be at a min. 7,000 Lb [3175 Kg] GVWR trailer with single axle, independent torsion wheel suspension with electric brakes. All structural steel construction (no tubing) with metal deck.

Lighting must meet DOT approved LED lighting with Weather Pack environmentally sealed connectors.

Pintle with Safety Chains

Tablet Requirements

PDA style handheld controller to operate and collect data for arm or slide Includes built in GPS Water resistant touch screen that meets military specifications

Safety

Compliant with NATM (National Association of Trailer Manufacturers) guidelines which are a compilation of federal safety standards and regulations