This is a project manual and bid specifications document for the Village of Oak Lawn, Illinois, issued by Strand Associates, Inc., for a Community Development Block Grant (CDBG) Program Year 25 Sanitary Sewer Rehabilitation Contract. The project involves accessing, cleaning, inspecting, and rehabilitating or repairing sanitary sewers within the specified project area. Work items include sewer cleaning for pipes ranging from 8 to 21 inches in diameter (totaling 2,261 linear feet), sewer televising for the same diameter ranges, sewer lining with full liners for 8, 10, and 21-inch pipes (totaling 1,893 linear feet), sewer chemical sealing for 25 service connections, sewer obstruction removal for 15 locations, and mobilization/demobilization. A cash allowance of $20,000 is included for excavation point repairs. Sealed bids are due by 10 a.m. Central Standard Time on July 28, 2026, at the Village Clerk's Office. No pre-bid conference will be held. Bidders are required to conduct site visits during normal working hours by coordinating with Aaron Osmanski at (312) 505-7110. The Notice of Award will be issued within 65 days after bid opening. The work must be substantially completed by December 1, 2026, and ready for final payment by December 30, 2026.
Bidders must provide a bid security equal to 10 percent of their bid amount in the form of a certified check, bank money order, or bid bond. The project is 100 percent federally funded through Cook County's CDBG Program, with the Village of Oak Lawn serving as the subrecipient. All contractors must comply with Davis-Bacon prevailing wage requirements, the Contract Work Hours and Safety Standards Act, and the Copeland Anti-Kickback Act. Bidders must be registered in the Federal System for Award Management (SAM.gov) with an active Unique Entity Identifier (UEI) number and must comply with the Build America, Buy America Act. Section 3 compliance requiring affirmative action to hire lower-income residents and subcontract with local, small businesses is mandatory. The successful bidder must provide a performance bond equal to 100 percent of the bid amount and sufficient insurance coverage. Bidders must submit a Qualifications Statement with supporting documentation, evidence of authority to do business in Illinois, and state contractor license information if applicable. All required federal certifications, including non-collusion statements, equal employment opportunity certifications, debarment and suspension certifications, and lobbying certifications, must accompany the bid. MBE/WBE utilization plans with letters of intent from participating firms are required at bid submission.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R:\JOL\Documents\Specifications\Active\Oak Lawn, IL\4801.011.2-2026.MRW\Specifications\!Mosaic Cover (Green=Municipal).docx
CDBG PY25
Sanitary Sewer Rehabilitation
Contract 2-2026
PLAN HOLDER: Set No.:
PROJECT MANUAL
VILLAGE OF OAK LAWN
OAK LAWN, ILLINOIS
CDBG PY25 SANITARY SEWER REHABILITATION
CONTRACT 2-2026
Prepared by:
STRAND ASSOCIATES, INC.®
IDFPR No. 184-001273
1170 South Houbolt Road Joliet, IL 60431 www.strand.com
Issued for Bid June 30, 2026
PLAN HOLDER:
PROJECT MANUAL
VILLAGE OF OAK LAWN
OAK LAWN, ILLINOIS
CDBG PY25 SANITARY SEWER REHABILITATION
CONTRACT 2-2026
AEL H. WA
062-050441
LICENSED
PROFESSIONAL
ENGINEER
OF ILLINO
peleeola ExP 11/80/27
Set No.:
Prepared by:
STRAND ASSOCIATES, INC.®
IDFPR No. 184-001273
1170 South Houbolt Road
Joliet, IL 60431 www.strand.com
Issued for Bid
June 30, 2026 SA
STRAND
ASSOCIATES
Excellence in Engineering SM
BIDDING AND CONTRACTING REQUIREMENTS
FORM 4B
INVITATION TO BID
NOTICE IS HEREBY GIVEN by the Mayor and the Board Members of the Village of Oak Lawn, Cook County, Illinois, that the sealed bids will be received for the following improvement(s):
CDBG PY25 Sanitary Sewer Rehabilitation Contract 2-2026
Said bids will be received up to the hour of 10 a.m. Central Standard Time, on the 28th day of July, 2026, at the Village Clerk’s Office in the Village Hall, located at 9446 South Raymond Avenue, Oak Lawn, Illinois, and will be publicly opened and read at that time.
The Project includes the following Work: Access, clean, inspect, and rehabilitate or repair sanitary sewers within the specified project area.
Complete digital Project Bidding Documents are available at oaklawn-il.gov or at bidnetdirect.com/Illinois/thevillageofoaklawn. There is no charge to register. Follow the registration path and select the "Limited Access" option which will provide matching bid notifications and alerts from OWNER. Please contact Bidnet Direct vendor support team at (800) 835-4603, option 2, or support@bidnet.com for assistance with registration.
The Issuing Office is Village of Oak Lawn, 9446 South Raymond Avenue, Oak Lawn, IL 60453.
All Bidders submitting a sealed Bid shall obtain the Bidding Documents from bidnet.com.
Bidders who submit a Bid must be a Plan Holder of record at the Issuing Office. Bids from Bidders who are not on the Plan Holders List may be returned as not being responsive.
All proposals or bids offered must be accompanied by a bid bond, cash, or certified check made payable to the Village in the amount of not less than ten percent (10%) of the total amount of the proposal as a guarantee that if the proposal is accepted a contract will be entered into and the performance of the contract is properly secured.
No bid shall be withdrawn after the opening of the proposals without the consent of the Mayor and Board Members of the Village of Oak Lawn, Illinois, for a period of 90 days after the scheduled time of closing bids.
The Bidder is specifically advised that the Village is a Subrecipient of the County of Cook of a grant pursuant to the Housing and Community Development Act of 1974, as amended, pursuant to an agreement entered into between the County of Cook and the Village. Payments to the contractor will be made by the Village and reimbursed by Cook County’s CDBG Program in accordance with the terms of the aforesaid agreement. Further, in compliance with the Stevens Amendment to the Department of Defense Appropriations Act of 1989, the estimated percentage of the total cost of this Project to be funded with federal dollars is one hundred (100%) and the exact dollar amount of federal funds which will be set aside for this project will be based on the contract amount awarded under this offering.
APPLICABLE FEDERAL REQUIREMENTS
All laborers and mechanics employed by the Contractor or Subcontractor(s) on construction work for this Project shall be paid wages at rates not less than those prevailing on similar construction in the locality as determined by the Secretary of Labor in accordance with the Davis-Bacon Act, as amended, (U.S.C. Sections 76-276a-5), and shall receive overtime compensation in accordance with and subject to the provisions of the Contract Work Hours and Safety Standards Act (40 U.S.C.
Sections327-333), and the Contractor and Subcontractor(s) shall comply with all regulations issued pursuant to these Acts and other applicable Federal laws and regulations pertaining to labor standards. The Secretary of Labor has, with respect to the labor standards specified in this Section, the authority and functions set forth in Reorganization Plan Number 14 of 1950 (5 U.S.C.
Section 133z-15) and Section 2 of the Act of June 13, 1934, as amended, (40 U.S.C. Section 276c).
All contracts and Subrecipients for the construction or repair shall include a provision for compliance with the Copeland “Anti-Kickback Act” (18 U.S.C. Section 874) as supplemented in Department of Labor Regulations (29 CFR Part 3).
Each bidder is required to comply with Equal Employment Opportunity for the Community Development Block Grants, a copy of which is on file with the City/Village Clerk/ Secretary and is available for inspection.
Each bidder is required to be registered in the Federal Government databank for contractors at SAM.gov and have an active Unique Entity Identifier (UEI) number in the system.
Each bidder is required to comply with the Build America, Buy America Act (HUD proposes a waiver for infrastructure projects whose total is an amount equal to or less than $250,000.00).
Compliance with “Section 3”, which calls for affirmative action by the Contractor to train and/ hire lower income residents of the Project area and to subcontract with local, small businesses is required on this Project.
An explanation of the applicable federal requirements previously mentioned is provided in the Special Provisions of the Bid Specifications and Davis-Bacon Packet.
The successful bidder for the construction of the improvement will be required to file a performance bond equal to one hundred percent (100%) of the bid, with sureties to be approved by the Mayor/President and the City Council/Board of Trustees/Board Members, which performance bonds shall be conditioned upon proper and faithful performance by the Contractor of the work specified in accordance with the plans and specifications therefore, according to the time and terms and conditions of the contract; and also that the bidder and contractor shall properly pay all debts incurred by the Contractor in the execution of the work, including those for labor and materials furnished.
The Contractor shall be required to furnish sufficient insurance or guaranty of indemnity to the Village of Oak Lawn, Illinois, and the County of Cook, Illinois, against any or all claims which might arise for damages to persons or property due to the negligence of the Contractor or Subcontractor(s), or their officers, agents, employees or servants, during the construction/demolition of said improvement and until the said improvement has been finally accepted as complete by the Mayor and the Board of Trustees of the Village of Oak Lawn, the right to reject any and all proposals or bids is reserved.
Dated at Oak Lawn, Illinois this 30th day of June, 2026.
Mayor and Board Members of the Village of Oak Lawn, Illinois
By: Terry Vorderer
Mayor/President
Attest: Claire Henning City/Village Clerk/Board Secretary
Revised 03/08/2024
Section 00 21 13-1 4801.011/2-2026
SECTION 00 21 13
INSTRUCTIONS TO BIDDERS
A. These Instructions to Bidders establish requirements for Bidding and Award of Contract.
B. These articles are not necessarily numbered consecutively.
C. Table of Contents
ARTICLE 1–DEFINED TERMS
ARTICLE 2–BIDDING DOCUMENTS
ARTICLE 3–QUALIFICATIONS OF BIDDERS
ARTICLE 4–PRE-BID CONFERENCE
ARTICLE 5–SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION
OF SITE; OWNER’S SAFETY PROGRAM; OTHER WORK AT THE SITE
ARTICLE 6–BIDDER’S REPRESENTATIONS AND CERTIFICATIONS
ARTICLE 7–INTERPRETATIONS AND ADDENDA
ARTICLE 8–BID SECURITY
ARTICLE 9–CONTRACT TIMES
ARTICLE 10–SUBSTITUTE OR “OR EQUAL” ITEMS
ARTICLE 11–SUBCONTRACTORS, SUPPLIERS, AND OTHERS
ARTICLE 12–PREPARATION OF BID
ARTICLE 13–BASIS OF BID
ARTICLE 14–SUBMITTAL OF BID
ARTICLE 15–MODIFICATION AND WITHDRAWAL OF BIDS
ARTICLE 16–OPENING OF BIDS
ARTICLE 17–BIDS TO REMAIN SUBJECT TO ACCEPTANCE
ARTICLE 18–EVALUATION OF BIDS AND AWARD OF CONTRACT
ARTICLE 19–BONDS AND INSURANCE
ARTICLE 20–SIGNING OF AGREEMENT
ARTICLE 21–RETAINAGE
ARTICLE 22–WAGE RATE DETERMINATION
ARTICLE 23–TAXES
ARTICLE 24–LAWS, ORDINANCES, AND REGULATIONS
ARTICLE 26–FUNDING
ARTICLE 1–DEFINED TERMS
1.01 Terms used in these Instructions to Bidders have the meanings indicated in the General Conditions and the Supplementary Conditions. Additional terms used in these Instructions to Bidders have the meanings indicated below which are applicable to both the singular and plural thereof:
A. Issuing Office–The office from which the Bidding Documents are to be issued and which registers planholders.
Section 00 21 13-2
ARTICLE 2–BIDDING DOCUMENTS
2.01 Bidder shall obtain a complete set of Bidding Requirements and proposed Contract Documents (together, the Bidding Documents). See the Agreement for a list of the Contract Documents. It is Bidder's responsibility to determine that it is using a complete set of documents in the preparation of a Bid. Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete documents, by Bidder itself or by its prospective Subcontractors and Suppliers.
2.02 Bidding Documents are made available for the sole purpose of obtaining Bids for completion of the Project and permission to download or distribution of the Bidding Documents does not confer a license or grant permission or authorization for any other use. Authorization to download documents, or other distribution, includes the right for plan holders to print documents solely for their use, and the use of their prospective Subcontractors and Suppliers, provided the plan holder pays all costs associated with printing or reproduction. Printed documents may not be re-sold under any circumstances.
2.03 Electronic Documents
A. When the Bidding Requirements indicate that electronic (digital) copies of the Bidding Documents are available, such documents will be made available to the Bidders as Electronic Documents in the manner specified.
1. Bidding Documents will be provided in Adobe PDF (Portable Document Format) (.pdf) that is readable by Adobe Acrobat Reader Version 6.0 or later. It is the intent of ENGINEER and OWNER that such Electronic Documents are to be exactly representative of the paper copies of the documents. However, because OWNER and ENGINEER cannot totally control the transmission and receipt of Electronic Documents nor CONTRACTOR's means of reproduction of such documents, OWNER and ENGINEER cannot and do not guarantee that Electronic Documents and reproductions prepared from those versions are identical in every manner to the paper copies.
B. Unless otherwise stated in the Bidding Documents, the Bidder may use and rely upon complete sets of Electronic Documents of the Bidding Documents, described in Paragraph 2.03.A above.
However, Bidder assumes all risks associated with differences arising from transmission/receipt of Electronic Documents versions of Bidding Documents and reproductions prepared from those versions and, further, assumes all risks, costs, and responsibility associated with use of the Electronic Documents versions to derive information that is not explicitly contained in printed paper versions of the documents, and for Bidder's reliance upon such derived information.
ARTICLE 3–QUALIFICATIONS OF BIDDERS
3.01 To demonstrate Bidder’s qualifications to perform the Work, Bidder shall submit with its Bid the Qualifications Statement.
3.02 Bidder must be prepared to submit evidence of Bidder’s qualifications to do business in the state where the Project is located prior to award of the Contract.
3.03 A Bidder’s failure to submit required qualification information within the times indicated may disqualify Bidder from receiving an award of the Contract.
3.04 Bidders shall submit the documentation listed in Paragraph 7.01 of the Bid Form (Section 00 41 00).
Section 00 21 13-3
3.05 No requirement in this Article 3 to submit information will prejudice the right of OWNER to seek additional pertinent information regarding Bidder’s qualifications.
3.06 Bidder is advised to carefully review those portions of the Bidding Documents requiring Bidder’s representations and certifications.
ARTICLE 4–PRE-BID CONFERENCE
4.01 A pre-bid conference will not be held for this Project.
ARTICLE 5–SITE AND OTHER AREAS; EXISTING SITE CONDITIONS; EXAMINATION OF SITE;
OWNER’S SAFETY PROGRAM; OTHER WORK AT THE SITE
5.01 Site and Other Areas
A. The Site is identified in the Bidding Documents. By definition, the Site includes rights-of-way, easements, and other lands furnished by OWNER for the use of CONTRACTOR. Any additional lands required for temporary construction facilities, construction equipment, or storage of materials and equipment, and any access needed for such additional lands, are to be obtained and paid for by CONTRACTOR.
5.02 Existing Site Conditions
A. Subsurface and Physical Conditions; Hazardous Environmental Conditions
1. The Supplementary Conditions identify the following regarding existing conditions at or adjacent to the Site:
a. Those reports of explorations and tests of subsurface conditions at or adjacent to the Site that contain Technical Data.
b. Those drawings known to OWNER of existing physical conditions at or adjacent to the Site, including those drawings depicting existing surface or subsurface structures at or adjacent to the Site (except Underground Facilities), that contain Technical Data.
c. Reports and drawings known to OWNER relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site.
d. Technical Data contained in such reports and drawings.
2. OWNER will make copies of reports and drawings referenced above available to any Bidder on request. These reports and drawings are not part of the Contract Documents, but the Technical Data contained therein upon whose accuracy Bidder is entitled to rely, as provided in the General Conditions, has been identified and established in the Supplementary Conditions.
Bidder is responsible for any interpretation or conclusion Bidder draws from any Technical Data or any other data, interpretations, opinions, or information contained in such reports or shown or indicated in such drawings.
3. If the Supplementary Conditions do not identify Technical Data, the default definition of Technical Data set forth in Article 1 of the General Conditions will apply.
Section 00 21 13-4
B. Underground Facilities: Underground Facilities are shown or indicated on the Drawings, pursuant to Paragraph 5.05 of the General Conditions, and not in the drawings referred to in Paragraph 5.02.A of these Instructions to Bidders. Information and data regarding the presence or location of Underground Facilities are not intended to be categorized, identified, or defined as Technical Data.
5.03 Other Site-Related Documents
A. No other Site-related documents are available.
5.04 Site Visit and Testing by Bidders
A. Bidder is required to visit the Site and conduct a thorough visual examination of the Site and adjacent areas. During the visit the Bidder must not disturb any ongoing operations at the Site.
B. Bidders visiting the Site are required to arrange their own transportation to the Site.
C. All access to the Site other than during a regularly scheduled Site visit must be coordinated through the following OWNER contact for visiting the Site: Aaron Osmanski at (312) 505-7110. Bidder must conduct the required Site visit during normal working hours.
D. Bidder is not required to conduct any subsurface testing, or exhaustive investigations of Site conditions.
E. On request, and to the extent OWNER has control over the Site, and schedule permitting, OWNER will provide Bidder general access to the Site to conduct such additional examinations, investigations, explorations, tests, and studies as Bidder deems necessary for preparing and submitting a successful Bid. OWNER will not have any obligation to grant such access if doing so is not practical because of existing operations, security or safety concerns, or restraints on OWNER's authority regarding the Site. Bidder is responsible for establishing access needed to reach specific selected test sites.
F. Bidder must comply with all applicable Laws and Regulations regarding excavation and location of utilities, obtain all permits, and comply with all terms and conditions established by OWNER or by property owners or other entities controlling the Site with respect to schedule, access, existing operations, security, liability insurance, and applicable safety programs.
G. Bidder must fill all holes and clean up and restore the Site to its former condition upon completion of such explorations, investigations, tests, and studies.
5.05 OWNER’s Safety Program
A. Site visits and work at the Site may be governed by an OWNER safety program. If an OWNER safety program exists, it will be noted in the Supplementary Conditions.
5.06 Other Work at the Site
A. Reference is made to Article 8 of the Supplementary Conditions for the identification of the general nature of other work of which OWNER is aware (if any) that is to be performed at the Site by OWNER or others (such as utilities and other prime contractors) and relates to the Work contemplated by these Bidding Documents. If OWNER is party to a written contract for such other work, then on request, Section 00 21 13-5
OWNER will provide to each Bidder access to examine such contracts (other than portions thereof related to price and other confidential matters), if any.
ARTICLE 6–BIDDER’S REPRESENTATIONS AND CERTIFICATIONS
6.01 Express Representations and Certifications in Bid Form, Agreement
A. The Bid Form that each Bidder will submit contains express representations regarding the Bidder's examination of Project documentation, Site visit, and preparation of the Bid, and certifications regarding lack of collusion or fraud in connection with the Bid. Bidder should review these representations and certifications, and assure that Bidder can make the representations and certifications in good faith, before executing and submitting its Bid.
B. If Bidder is awarded the Contract, Bidder (as CONTRACTOR) will make similar express representations and certifications when it executes the Agreement.
ARTICLE 7–INTERPRETATIONS AND ADDENDA
7.01 All questions about the meaning or intent of the Bidding Documents are to be submitted to ENGINEER in writing. Interpretations or clarifications considered necessary by ENGINEER in response to such questions will be issued by Addenda mailed or delivered to all parties recorded by Issuing Office as having received the Bidding Documents.
7.02 All requests for interpretation must be received at least five business days prior to the day set for receiving Bids. Addenda will be issued not later than three business days prior to the time and day set for receiving Bids. Failure of any Bidder to receive any such Addendum or interpretation shall not relieve such Bidder from any obligations under the Bid as submitted. All Addenda so issued shall become part of the Contract Documents.
7.03 Only responses set forth in an Addendum will be binding. Oral and other interpretations or clarifications will be without legal effect. Responses to questions are not part of the Contract Documents unless set forth in an Addendum that expressly modifies or supplements the Contract Documents.
7.04 Receipt of all addenda must be acknowledged in space provided in the Bid.
ARTICLE 8–BID SECURITY
8.01 A Bid must be accompanied by Bid security made payable to OWNER in an amount of 10% of the Bidder’s maximum Bid price and in the form of a certified check, bank money order, or a Bid Bond (on form attached) issued by a surety meeting the requirements of Paragraph 6.01 of the General Conditions.
8.02 The Bid security of the apparent Successful Bidder will be retained until OWNER awards the contract to such Bidder, and such Bidder has executed the Contract, furnished the required Contract security, and met the other conditions of the Notice of Award, whereupon the Bid security will be released. If the Successful Bidder fails to execute and deliver the Contract and furnish the required Contract security within 15 days after the Notice of Award, OWNER may consider Bidder to be in default, annul the Notice of Award, and the Bid security of that Bidder will be forfeited, in whole in the case of a Penal Sum Bid Bond, and to the extent of OWNER's damages in the case of a damages-form bond. Such forfeiture will be OWNER's exclusive remedy if Bidder defaults.
8.03 The Bid security of other Bidders that OWNER believes to have a reasonable chance of receiving the award may be retained by OWNER until the earlier of 7 days after the Effective Date
Section 00 21 13-6 of the Contract or 91 days after the Bid opening, whereupon Bid security furnished by such Bidders will be released.
8.04 Bid security of other Bidders that OWNER believes do not have a reasonable chance of receiving the award will be released within 7 days after the Bid opening.
ARTICLE 9–CONTRACT TIMES
9.01 The number of days within which, or the dates by which, the Work is to be (a) substantially completed and (b) ready for final payment, and (c) Milestones (if any) are to be achieved, are set forth in the Agreement.
9.02 Provisions for liquidated damages, if any, for failure to timely attain a Milestone, Substantial Completion, or completion of the Work in readiness for final payment, are set forth in the Agreement.
ARTICLE 10–SUBSTITUTE OR “OR EQUAL” ITEMS
10.01 The Contract, if awarded, will be on the basis of materials and equipment specified or described in the Bidding Documents without evaluation of Alternative Equipment Manufacturers listed in the Lump Sum Base Bid, if any, and without evaluation of possible substitute or “or equal” items. Whenever it is specified or described in the Bidding Documents that an Alternative Equipment Manufacturers listed in the Lump Sum Base Bid or that a substitute or “or equal” item of material or equipment may be furnished or used by CONTRACTOR if acceptable to ENGINEER, application for such acceptance will not be evaluated by ENGINEER until after the Effective Date of the Contract.
10.02 All prices that Bidder sets forth in its Bid shall be based on the presumption that CONTRACTOR will furnish the materials and equipment specified or described in the Bidding Documents, as supplemented by Addenda. Any assumptions regarding the possibility of post-Bid approvals of “or-equal” or substitution requests are made at Bidder’s sole risk.
ARTICLE 11–SUBCONTRACTORS, SUPPLIERS, AND OTHERS
11.01 A Bidder must be prepared to retain specific Subcontractors and Suppliers for the performance of the Work if required to do so by the Bidding Documents or in the Specifications. If a prospective Bidder objects to retaining any such Subcontractor or Supplier and the concern is not relieved by an Addendum, then the prospective Bidder should refrain from submitting a Bid.
11.02 Subsequent to the submittal of the Bid, OWNER may not require the Successful Bidder or CONTRACTOR to retain any Subcontractor, Supplier, or other individual or entity against which CONTRACTOR has reasonable objection.
11.03 The apparent Successful Bidder, and any other Bidder so requested, shall within five days after Bid opening, submit to OWNER a list of the Subcontractors or Suppliers proposed for the Work. If requested by OWNER, such list shall be accompanied by an experience statement with pertinent information regarding similar projects and other evidence of qualification for each such Subcontractor, Supplier, or other individual or entity. If OWNER or ENGINEER, after due investigation, has reasonable objection to any proposed Subcontractor, Supplier, individual, or entity, OWNER may, before the Notice of Award is given, request apparent Successful Bidder to submit an acceptable substitute, in which case apparent Successful Bidder shall submit a substitute, Bidder’s Bid price will be increased (or decreased) by the difference in cost occasioned by such substitution, and OWNER may consider such price adjustment in evaluating Bids and making the Contract award.
Section 00 21 13-7
11.04 If apparent Successful Bidder declines to make any such substitution, OWNER may award the Contract to the next lowest Bidder that proposes to use acceptable Subcontractors, Suppliers, or other individuals or entities. Declining to make requested substitutions will constitute grounds for forfeiture of the Bid security of any Bidder. Any Subcontractor, Supplier, individual, or entity so listed and against which OWNER or ENGINEER makes no written objection prior to the giving of the Notice of Award will be deemed acceptable to OWNER and ENGINEER subject to subsequent revocation of such acceptance as provided in Paragraph 7.07 of the General Conditions.
ARTICLE 12–PREPARATION OF BID
12.01 The Bid Form is included with the Bidding Documents.
A. All blanks on the Bid Form shall be completed in ink and the Bid Forms shall be signed in ink. Erasures or alterations shall be initialed in ink by the person signing the Bid Form. A Bid price shall be indicated for each section, Bid item, alternate, adjustment unit price item, and unit price item listed therein.
B. If the Bid Form expressly indicates that submitting pricing on a specific alternate item is optional, and Bidder elects to not furnish pricing for such optional alternate item, then Bidder may enter the words “No Bid” or “Not Applicable.”
12.02 A Bid by a corporation shall be executed in the corporate name by a corporate officer (whose title must appear under the signature), accompanied by evidence of authority to sign. The corporate address and state of incorporation shall be shown.
12.03 A Bid by a partnership shall be executed in the partnership name and signed by a partner (whose title must appear under the signature), accompanied by evidence of authority to sign. The official address and state of incorporation shall be shown.
12.04 A Bid by a limited liability company shall be executed in the name of the firm by a member, if the LLC is member-managed, or by a manager, if manager-managed, and accompanied by evidence of authority to sign. The state of formation of the firm and the official address of the firm shall be shown.
12.05 A Bid by an individual shall show the Bidder’s name and official address.
12.06 A Bid by a joint venture must be executed by an authorized representative of each joint venturer in the manner indicated on the Bid Form. The joint venture must have been formally established prior to submittal of a Bid, and the official address of the joint venture must be shown.
12.07 All names shall be printed below the signatures.
12.08 The Bid shall contain an acknowledgment of receipt of all Addenda, the numbers of which must be filled in on the Bid Form.
12.09 Postal and e-mail addresses and telephone number for communications regarding the Bid shall be shown.
12.10 The Bid must contain evidence of Bidder's authority to do business in the state where the Project is located, or Bidder must certify in writing that it will obtain such authority within the time for acceptance of Bids and attach such certification to the Bid.
Section 00 21 13-8
12.11 If Bidder is required to be licensed to submit a Bid or perform the Work in the state where the Project is located, the Bid must contain evidence of Bidder's licensure, or Bidder must certify in writing that it will obtain such licensure within the time for acceptance of Bids and attach such certification to the Bid. Bidder's state contractor license number, if any, must also be shown on the Bid Form.
12.12 All Bids shall be signed in the presence of and be notarized by a Notary Public or other Officer authorized to administer oaths.
ARTICLE 13–BASIS OF BID
13.01 Unit Price
A. Bidders shall submit a Bid on a unit price basis for each item of Work listed in the unit price section of the Bid Form.
B. The “Bid Price” (sometimes referred to as the extended price) for each unit price Bid item will be the product of the “Estimated Quantity” (which OWNER or its representative has set forth in the Bid Form) for the item and the corresponding “Bid Unit Price” offered by the Bidder. The total of all unit price Bid items will be the sum of these “Bid Prices;” such total will be used by OWNER for Bid comparison purposes. The final quantities and Contract Price will be determined in accordance with Paragraph 13.03 of the General Conditions.
13.02 Discrepancies between the multiplication of units of Work and unit prices will be resolved in favor of the unit prices. Discrepancies between the indicated sum of any column of figures and the correct sum thereof will be resolved in favor of the correct sum. For Bids submitted on a Lump Sum basis, discrepancies between words and figures will be resolved in favor of the words.
13.03 For Cash Allowances the Contract Price shall include such amounts as the Bidder deems proper for Contractor's overhead, costs, profit, and other expenses on account of Cash Allowances, if any, named in the Contract Documents as provided for in Paragraph 13.02.B of the General Conditions. The final Contract Price will be adjusted to reflect actual costs on account of Cash Allowances.
13.04 The following Cash Allowances shall be included in the Bid for Contract(s).
Excavation Point Repairs Section 33 01 36–Rehabilitation Requiring Excavation
ARTICLE 14–SUBMITTAL OF BID
14.01 Bids will be received for all divisions of the Specifications and all other provisions of the Bidding Documents.
14.02 Bidder is furnished one copy of the Bidding Documents with one separate unbound copy of the Bid Forms and the Bid Bond form. The Bidding Documents may be retained by Bidder. The unbound copy of the Bid Forms is to be completed and submitted with the Bid security along with any data required by the Bidding Documents to be attached to and made a condition of the Bid.
Additional copies may be obtained from the Issuing Office.
14.03 A Bid shall be submitted no later than the date and time prescribed and at the place indicated in the Advertisement or Invitation to Bid and shall be enclosed in an opaque sealed envelope, plainly marked with the Project title (and, if applicable, the designated portion of the Project for which the Bid is submitted), the name and address of Bidder, and shall be accompanied by the Bid security and other required documents. If the Bid is sent by mail or other delivery system, the sealed envelope containing the Bid shall be enclosed in a separate envelope plainly marked on the outside
Section 00 21 13-9 with the notation “BID ENCLOSED.” A mailed Bid shall be addressed to place indicated in the Advertisement or Invitation to Bid. No relief will be provided for a mailed Bid not being received by the prescribed time.
14.04 Bids received after the date and time prescribed for the opening of Bids, or not submitted at the correct location or in the designated manner, will not be accepted and will be returned to the Bidder unopened.
ARTICLE 15–MODIFICATION AND WITHDRAWAL OF BIDS
15.01 An unopened Bid may be withdrawn by an appropriate document duly executed in the same manner that a Bid must be executed and delivered to the place where Bids are to be submitted prior to that date and time for the opening of Bids. Upon receipt of such notice, the unopened Bid will be returned to the Bidder.
15.02 If a Bidder wishes to modify its Bid prior to Bid opening, Bidder must withdraw its initial Bid in the manner specified in Paragraph 15.01 and submit a new Bid prior to the date and time for the opening of Bids.
15.03 If within 24 hours after Bids are opened any Bidder files a duly signed written notice with OWNER and promptly thereafter demonstrates to the reasonable satisfaction of OWNER that there was a material and substantial mistake in the preparation of its Bid, the Bidder may withdraw its Bid, and the Bid security will be returned. Thereafter, if the Work is rebid, the Bidder will be disqualified from further Bidding on the Work.
ARTICLE 16–OPENING OF BIDS
16.01 Bids will be opened at the time and place indicated in the Advertisement or Invitation to Bid and, unless obviously nonresponsive, read aloud publicly. An abstract of the amounts of the Base Bids and major alternatives and components, if any, will be made available to Bidders after the opening of Bids.
ARTICLE 17–BIDS TO REMAIN SUBJECT TO ACCEPTANCE
17.01 All Bids will remain subject to acceptance for the period of time stated in the Bid Form, but OWNER may, in its sole discretion, release any Bid and return the Bid security prior to the end of this period.
ARTICLE 18–EVALUATION OF BIDS AND AWARD OF CONTRACT
18.01 OWNER reserves the right to reject any or all Bids, including without limitation, nonconforming, nonresponsive, unbalanced, or conditional Bids. OWNER also reserves the right to waive all minor Bid informalities not involving price, time, or changes in the Work.
18.02 OWNER will reject the Bid of any Bidder that OWNER finds, after reasonable inquiry and evaluation, to not be responsible.
18.03 If Bidder purports to add terms or conditions to its Bid, takes exception to any provision of the Bidding Documents, or attempts to alter the contents of the Contract Documents for purposes of the Bid, whether in the Bid itself or in a separate communication to OWNER or ENGINEER, then OWNER will reject the Bid as nonresponsive.
Section 00 21 13-10
18.04 In evaluating Bids, OWNER will consider whether or not the Bids comply with the prescribed requirements, and such alternatives, unit prices, and other data as may be requested in the Bid Form or prior to the Notice of Award.
18.05 In evaluating Bids, OWNER will consider the qualifications of Bidders and may consider the qualifications and experience of Subcontractors, Suppliers, and other individuals or entities proposed for those portions of the Work for which the identity of Subcontractors, Suppliers, and other individuals or entities must be submitted as provided in the Supplementary Conditions.
OWNER also may consider the operating costs, maintenance requirements, performance data, and guarantees of major items of materials and equipment proposed for incorporation in the work when such data is required to be submitted prior to the Notice of Award.
18.06.1 OWNER may conduct such investigations as OWNER deems necessary to assist in the evaluation of any Bid and to establish the responsibility, qualifications, and financial ability of Bidders, proposed Subcontractors, Suppliers, individuals or entities to perform the Work in accordance with the Contract Documents to OWNER’s satisfaction within the prescribed time.
Bidder shall furnish to OWNER all such information and data for this purpose as OWNER may request. OWNER reserves the right to reject any Bid if the evidence submitted by, or investigation of, such Bidder fails to satisfy OWNER that such Bidder is properly qualified to carry out the obligations of the Contract Documents and to complete the work contemplated therein.
18.06.2 OWNER shall be satisfied that Bidder involved (1) maintains a permanent place of business,
(2) has adequate plant and equipment to do the work properly and expeditiously, (3) has a suitable financial status to meet obligations incident to the work, (4) has appropriate technical experience, and (5) can submit a satisfactory performance record.
18.07 If a Contract is to be awarded, it will be awarded to the responsible Bidder with the lowest responsive Bid whose evaluation by OWNER indicates to OWNER that the award will be in the best interests of the Project.
18.08 If a Contract is to be awarded, OWNER will give the successful Bidder a Notice of Award within 65 days after the time set for opening Bids.
ARTICLE 19–BONDS AND INSURANCE
19.01 Article 6 of the General Conditions, as may be modified by the Supplementary Conditions, sets forth OWNER's requirements as to performance and payment bonds, other required bonds (if any), and insurance. When the Successful Bidder delivers the executed Agreement to OWNER, it must be accompanied by required bonds and insurance documentation.
19.02 Article 8, Bid Security, of these Instructions, addresses any requirements for providing Bid Bonds as part of the Bidding process.
ARTICLE 20–SIGNING OF AGREEMENT
20.01 When OWNER gives a Notice of Award to the Successful Bidder, it shall be accompanied by the required number of unexecuted counterparts of the Agreement along with all other Contract Documents which are identified in the Agreement as attached thereto. Within 15 days thereafter, Successful Bidder shall execute and deliver the required number of counterparts of the Agreement and attached documents to ENGINEER with the required Bonds and insurances. Within 10 days after receipt of properly executed documents and Bonds and insurances which meet all
Section 00 21 13-11 requirements of the Contract Documents, ENGINEER will deliver one fully signed counterpart to Successful Bidder.
ARTICLE 21–RETAINAGE
21.01 Provisions concerning retainage are set forth in the Agreement.
ARTICLE 22–WAGE RATE DETERMINATION
22.01 A wage rate determination will be inserted as a part of the Bidding Documents and/or will be on file at the office of OWNER. Bidders shall inspect the wage rate determination and shall incorporate its requirements into their Bid.
22.02 Davis-Bacon federal wage rate determination will be inserted as a part of the Bidding Documents and/or will be on file at the office of OWNER. Bidder shall inspect the wage rate determination and shall incorporate its requirements into its Bid.
22.03 The higher wage rate determination shall apply.
22.04 See Section 01 41 00 of the General Requirements for additional information.
ARTICLE 23–TAXES
23.01 The Bid shall include all taxes in effect at the time the Bid is submitted. No charge will be allowed for taxes from which OWNER is exempt. Bidders who are uncertain as to what items are subject to tax, or who require further explanation or clarification, are requested to contact the Illinois Department of Revenue. Refer to the Supplementary Conditions SC-7.10 for additional information.
ARTICLE 24–LAWS, ORDINANCES, AND REGULATIONS
24.01 Bidder must familiarize itself with all laws, ordinances, and regulations by federal, state, city, or other governmental agency, which by reason of being neglected or violated may affect the Work contemplated and must secure and pay the fee required for any permits which may be necessary unless such fees are otherwise indicated to be paid in the Bidding Documents.
ARTICLE 26–FUNDING
25.01 The Work Described herein is being funded through Cook County's Community Development Block Grant Program (CDBG Program). Bidder shall review and comply with all requirements of the CDBG program and, where applicable, shall be responsible for submitting required forms and/or certifications along with its Bid. Refer to the special provisions for Federal-Funded and Cook County CDBG-Funded Projects and Cook County Davis-Bacon Construction Packet, which are included at the end of the supplementary Conditions.
25.02 If the Bidder does not comply with CDBG Program requirements or submit the necessary forms and/or certifications with its Bid, OWNER reserves the right to reject the Bid as non-responsive.
END OF SECTION
Section 00 41 00-1
SECTION 00 41 00
BID
VILLAGE OF OAK LAWN
OAK LAWN, ILLINOIS
CDBG PY25 SANITARY SEWER REHABILITATION
CONTRACT 2-2026
A. Table of Contents
ARTICLE 1. BID RECIPIENT
ARTICLE 2. BIDDER’S ACKNOWLEDGEMENTS: ACCEPTANCE PERIOD,
INSTRUCTIONS, AND RECEIPT OF ADDENDA
ARTICLE 3. BIDDER’S REPRESENTATIONS
ARTICLE 4. BIDDER’S CERTIFICATIONS
ARTICLE 5. BASIS OF BID
ARTICLE 6. TIME OF COMPLETION
ARTICLE 7. ATTACHMENTS TO THIS BID
ARTICLE 8. DEFINED TERMS
ARTICLE 9. COMMUNICATIONS
ARTICLE 10. BID SUBMITTAL
ARTICLE 1–BID RECIPIENT
1.01 Bids to be received until 10 A.M. local time, July 28, 2026.
1.02 This Bid is submitted to: Village Clerk’s Office, Village Hall Village of Oak Lawn 9446 South Raymond Avenue Oak Lawn, IL 60453
1.03 The undersigned Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with OWNER in the form included in the Bidding Documents to perform all Work as specified or indicated in the Bidding Documents for the prices and within the times indicated in this Bid and in accordance with the other terms and conditions of the Bidding Documents.
ARTICLE 2–BIDDER’S ACKNOWLEDGEMENTS: ACCEPTANCE PERIOD, INSTRUCTIONS, AND
RECEIPT OF ADDENDA
2.01 Bid Acceptance Period
A. This Bid will remain subject to acceptance for 90 days after the Bid opening, or for such longer period of time that Bidder may agree to in writing upon request of OWNER.
2.02 Instructions to Bidders
A. Bidder accepts all of the terms and conditions of the Instructions to Bidders, including without limitation those dealing with the disposition of Bid security.
Section 00 41 00-2
2.03 In submitting this Bid, Bidder represents the following:
A. Bidder has examined and carefully studied the Bidding Documents, and any data and reference items identified in the Bidding Documents, and hereby acknowledges receipt of the following addenda:
Date: Addendum Number:
2.04 Bidder will sign and deliver the required number of counterparts of the Agreement with the bonds, insurance certificates, and other documents required by the Bidding Requirements within 15 days after the date of OWNER’s Notice of Award.
ARTICLE 3–BIDDER’S REPRESENTATIONS
3.01 Bidder’s Representations
A. In submitting this Bid, Bidder represents the following:
1. Bidder has examined and carefully studied the Bidding Documents, including Addenda.
2. Bidder has visited the Site, conducted a thorough visual examination of the Site and adjacent areas, and become familiar with the general, local, and Site conditions that may affect cost, progress, and performance of the Work.
3. Bidder is familiar with all Laws and Regulations that may affect cost, progress, and performance of the Work.
4. Bidder has carefully studied the reports of explorations and tests of subsurface conditions at or adjacent to the Site and the drawings of physical conditions relating to existing surface or subsurface structures at the Site that have been identified in the Supplementary Conditions, with respect to the Technical Data in such reports and drawings.
5. Bidder has carefully studied the reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site that have been identified in the Supplementary Conditions, with respect to Technical Data in such reports and drawings.
6. Bidder has considered the information known to Bidder itself; information commonly known to contractors doing business in the locality of the Site; information and observations obtained from visits to the Site; the Bidding Documents; and the Technical Data identified in the Supplementary Conditions or by definition, with respect to the effect of such information, observations, and Technical Data on (a) the cost, progress, and performance of the Work; (b) the means, methods, techniques, sequences, and procedures of construction to be employed by Bidder, if selected as CONTRACTOR; and (c) Bidder's (CONTRACTOR's) safety precautions and programs.
7. Based on the information and observations referred to in the preceding paragraph, Bidder agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract.
8. Bidder is aware of the general nature of work to be performed by OWNER and others at the Site that relates to the Work as indicated in the Bidding Documents.
Section 00 41 00-3
9. Bidder has given ENGINEER written notice of all conflicts, errors, ambiguities, or discrepancies that Bidder has discovered in the Bidding Documents, and of discrepancies between Site conditions and the Contract Documents, and the written resolution thereof by ENGINEER is acceptable to CONTRACTOR.
10. The Bidding Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work.
11. The submission of this Bid constitutes an incontrovertible representation by Bidder that without exception the Bid and all prices in the Bid are premised upon performing and furnishing the Work required by the Bidding Documents.
ARTICLE 4–BIDDER’S CERTIFICATIONS
4.01 Bidder certifies the following:
A. This Bid is genuine and not made in the interest of or on behalf of any undisclosed individual or entity and is not submitted in conformity with any collusive agreement or rules of any group, association, organization, or corporation.
B. Bidder has not directly or indirectly induced or solicited any other Bidder to submit a false or sham Bid.
C. Bidder has not solicited or induced any individual or entity to refrain from Bidding.
D. Bidder has not engaged in corrupt, fraudulent, collusive, or coercive practices in competing for the Contract. For the purposes of this Paragraph 4.01.D:
1. Corrupt practice means the offering, giving, receiving, or soliciting of anything of value likely to influence the action of a public official in the Bidding process.
2. Fraudulent practice means an intentional misrepresentation of facts made
(a) to influence the Bidding process to the detriment of OWNER, (b) to establish Bid prices at artificial non-competitive levels, or (c) to deprive OWNER of the benefits of free and open competition.
3. Collusive practice means a scheme or arrangement between two or more Bidders, with or without the knowledge of OWNER, a purpose of which is to establish Bid prices at artificial, non-competitive levels.
4. Coercive practice means harming or threatening to harm, directly or indirectly, persons or their property to influence their participation in the Bidding process or affect the execution of the Contract.
Section 00 41 00-4
ARTICLE 5–BASIS OF BID
5.01 Bidder will complete the Work in accordance with the Contract Documents for the following price(s):
The following abbreviations may be used in this Bid:
CIP - Complete in Place LF - Linear Foot CY - Cubic Yard LS - Lump Sum DI - Ductile Iron LT - Left DIA - Diameter MBF - Thousand Board Feet EA - Each MFOB - Thousand Freight-On-Board EBS - Excavation Below Subgrade MH - Manhole EST - Estimate(d) RCP - Reinforced Concrete Pipe EXCL - Excluding RT - Right FT - Feet SF - Square Foot GAL - Gallon STA - Station HERCP - Horizontal Elliptical RCP SY - Square Yard HRS - Hours T - Ton IN - Inch VLF - Vertical Linear Foot INCL - Including W/ - With LBS - Pounds W/O - Without
BIDDERS SHOULD NOT ADD ANY CONDITIONS OR QUALIFYING STATEMENTS TO THIS BID
OR THE BID MAY BE DECLARED IRREGULAR AS NOT BEING RESPONSIVE TO THE
INSTRUCTIONS TO BIDDERS.
Section 00 41 00-5
BID
VILLAGE OF OAK LAWN
OAK LAWN, ILLINOIS
CDBG PY25 SANITARY SEWER REHABILITATION
CONTRACT 2-2026
The following prices per item shall be for furnishing and installing the various items of material and work as specified and shown on the Drawings. Bidder agrees to perform the Work as shown on the Drawings and described in the Specifications for the following listed prices. Bidder acknowledges that unit prices have been computed in accordance with Paragraph 13.03 of the General Conditions.
Bidder acknowledges that estimated quantities are not guaranteed, and are solely for the purpose of comparison of Bids, and final payment for all Unit Price Bid items will be based on actual quantities, determined as provided in the Contract Documents.
NOTE: A price must be bid for each item in the Bid, even though the estimated quantity is zero.
Unbalanced or unreasonable unit prices may cause rejection of the Bid.
See Section 01 29 00–Contract Considerations for discussion of Cash Allowances to include in the Bid.
Item No. Description Estimated Quantity Unit Bid Unit Price Bid Price
1. Mobilization/Demobilization 1 LS $ $
2. Sewer Cleaning, 8-IN 432 LF $ $
3. Sewer Cleaning, 10-IN 223 LF $ $
4. Sewer Cleaning, 18-IN 368 LF $ $
5. Sewer Cleaning, 21-IN 1,238 LF $ $
6. Sewer Televising, 8-IN 432 LF $ $
7. Sewer Televising, 10-IN 223 LF $ $
8. Sewer Televising, 18-IN 368 LF $ $
9. Sewer Televising, 21-IN 1,238 LF $ $
10. Sewer Lining-Full Liner 8-IN 432 LF $ $
11. Sewer Lining-Full Liner 10-IN 223 LF $ $
12. Sewer Lining-Full Liner 21-IN 1,238 LF $ $
13. Cash Allowance for Excavation Point Repairs (Section 33 01 36–Rehabilitation Requiring Excavation)
1 LS $20,000.00 $20,000.00
Section 00 41 00-6
Item No. Description Estimated Quantity Unit Bid Unit Price Bid Price
14. Sewer Chemical Sealing–Seal Service Connections
25 EA $ $
15. Sewer Obstruction Removal 15 EA $ $
COMPUTED TOTAL BID CONTRACT 2-2026 (ITEMS 1 THROUGH 15)
Dollars $ (Words) (Numbers)
Section 00 41 00-7
ARTICLE 6–TIME OF COMPLETION
6.01 Bidder agrees that the Work will be substantially complete on or before December 1, 2026, and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions on or before December 30, 2026.
6.02 Bidder accepts the provisions of the Agreement as to liquidated damages in the event of failure to complete the Work within the Contract Times.
ARTICLE 7–ATTACHMENTS TO THIS BID
7.01 The following documents are attached to and made a condition of this Bid:
A. Required Bid security in the form of (Certified Check, Bank Money Order, or Bond)
B. Bidder’s Certification.
C. Non-Collusion and Certification Statement.
D. MBE/WBE Utilization Plan–Form 1.
E. MBE/WBE Utilization Plan–Form 2.
F. Equal Employment Opportunity Certification.
G. Certification of Bidder Regarding Equal Employment Opportunity.
H. Certification Regarding Disbarment and Suspension.
I. Certification Regarding Lobbying.
J. Evidence of…