village of glencoe 26-014 South Entrance Rehabilitation.pdf
PDF 4 MB Posted
- Attached to
- 2026 Downtown Brick Paver Maintenance
- Solicitation number
- 26-014
- Issued by
- Cook County, Illinois
About this file
This is an Invitation for Bidders' Proposals issued by the Village of Glencoe, Illinois for the South Entrance Rehabilitation Project. The work will be performed at 675 Village Court, Glencoe, Illinois 60022. Sealed bid proposals are due on Friday, July 31, 2026 at 11:00 A.M. CST and will be publicly opened and read aloud at Village Hall. The project involves rehabilitation work at the south entrance, with specifications and drawings provided in the bid package. The tentative contract award date is August 20, 2026, with work commencement targeted for August 31, 2026. Substantial completion is scheduled for December 4, 2026, and final project completion by December 31, 2026. Prospective bidders are required to carefully examine the bid package and inspect the work site prior to submission. The bid package includes the invitation for bidders' proposals, general instructions to bidders, bidder's proposal form, sworn acknowledgments and work history statements, bid bond form, notice of award, and the complete contract with specifications and drawings.
Bids shall be submitted on a lump sum price basis with all costs including labor, materials, equipment, permits, licenses, and applicable taxes included in the price proposal. Bid security of at least five percent of the base bid must accompany each proposal in the form of a cashier's check, certified check, or bid bond from a surety company with an A- rating and Class X financial size category in Best's Insurance Guide. The successful bidder must provide performance and payment bonds in the full amount of the contract price and maintain specified insurance coverage. Bids may not include federal excise tax or state sales tax, as the Village is tax-exempt. Prevailing wage rates in accordance with the Illinois Prevailing Wage Act must be paid to all laborers. All bidders must acknowledge that they have reviewed the contract documents and that bid proposals are firm offers for 60 days following the bid opening. Owner reserves the right to award in part or in whole, reject any or all proposals, or reject the low bid based on factors including price, prior experience, and bidder qualifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| city of naperville 2026_Downtown_Brick_Paver_Maintenance_.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Invitation for Bidders’ Proposals- Page 1
Request for Bid Response
Company Name:
Company Contact Name and Title:
Company Email Address:
Company Phone Number:
Mailing Address:
City: State: Zip:
Response Submission Information
Project Name: South Entrance Rehabilitation Project
Bid Number:
Due Date: Time:
Attention: Margaret Schwarz, Assistant CFO Department: Public Works Department
Submit Proposal to: Village of Glencoe, 675 Village Court, Glencoe, Illinois 60022
Friday, July 31, 2026 11:00 A.M., CST Time
26-014
Invitation for Bidders’ Proposals- Page 2
1. Invitation to Bid
Owner invites sealed Bidder's Proposals for the Work described in detail in the Contract and generally described as the South Entrance Rehabilitation Project
The Work shall be performed at the following Work Site: 675 Village Court, Glencoe, Illinois 60022
2. Defined Terms
All terms capitalized in this Invitation for Bidder's Proposals and in the other documents included in the Bid Package are defined in the documents included in the Bid Package and shall have such defined meanings wherever used.
3. The Bid Package
The Bid Package consists of the following documents, all of which are by this reference made a part of this Invitation for Bidder's Proposals as though fully set forth herein:
(1) Invitation for Bidder's Proposals;
(2) General Instructions to Bidders;
(3) Special Instructions to Bidders, if any;
(4) Addenda, if issued;
(5) Bidder's Proposal;
(6) Bidder's Sworn Acknowledgment;
(7) Bidder's Sworn Work History Statement;
(8) Form of Bid Bond;
(9) Other Information Submitted by Bidder, if requested;
(10) Notice of Award; and
(11) Contract, including all of its Special Conditions, Attachments and Appendices, if any.
4. Inspection and Examination
The bid package will be available on the Village website at https://www.villageofglencoe.org/government/departments/finance/Purchasing/bids_and_rfps.php
Each prospective Bidder shall, before submitting its Bidder's Proposal, carefully examine the Bid Package. Each prospective Bidder shall inspect in detail the Work Site and the surrounding area and shall familiarize itself with all local conditions, including subsurface, underground and other concealed conditions, affecting the Contract, the Work and the Work Site. The Bidder whose Bidder's Proposal is accepted will be responsible for all errors in its Bidder's Proposal including those resulting from its failure or neglect to make a thorough examination and investigation of the Bid Package and the conditions of the Work Site and the surrounding area.
5. Bid Opening
Owner will receive sealed Bidder's Proposals for the Work until 11:00 o'clock, a.m., local time, July 31, 2026, at the Village Hall, 675 Village Court, Glencoe, Illinois 60022, and shall be marked “Sealed Bid – South Entrance Rehabilitation Project, 26-014” at which time, or as soon thereafter as possible, all Bidder's Proposals will be publicly opened and read aloud. Bidders or their agents are invited to be present.
Invitation for Bidders’ Proposals- Page 3
6. Bid Security, Bonds and Insurance
A. Bid Security. Each Bidder's Proposal shall be accompanied by a security deposit of at least five percent (5%) of the base bid in the form of (1) a Cashier's Check or Certified Check drawn on a solvent bank insured by the Federal Deposit Insurance Corporation and payable without condition to Owner or (2) a Bid Bond in the form included in the Bid Package from a surety company licensed to do business in the State of Illinois with a general rating of A-and a financial size category of Class X or better in Best's Insurance Guide.
B. Performance and Payment Bonds. The successful Bidder will be required to furnish a Performance Bond and a Labor and Material Payment Bond upon award of the Contract, each in the penal sum of the full amount of the Contract Price, on forms provided by Owner in the Bid Package, from a surety company meeting the requirements set forth above. Each Bidder's Proposal must be accompanied by a letter from such a surety company stating that it will execute Bonds, on forms provided by Owner in the Bid Package, upon award of the Contract to Bidder.
C. Insurance. The successful Bidder will be required to furnish certificates and policies of insurance as required by Section 4.2 of the Contract upon award of the Contract. Each Bidder's Proposal must be accompanied by a letter from Bidder's insurance carrier or its agent certifying that said insurer has read the requirements set forth in the Contract and will issue the required certificates and policies of insurance upon award of the Contract to Bidder.
7. Projected Schedule
Below is the projected schedule for the submission of Bidder’s Proposal and completion of the Work. It is subject to adjustment by Addendum and the final Contract.
A. Tentative Date of Contract Award: August 20, 2026 B. Tentative Commencement of Work: August 31, 2026 C. Substantial Completion Date: December 4, 2026 D. Final Project Completion Date: December 31, 2026
VILLAGE OF GLENCOE
CONTRACT FOR SOUTH ENTRANCE REHABILITATION PROJECT
GENERAL INSTRUCTIONS TO BIDDERS
TABLE OF CONTENTS
Section Page
1. Interpretation of Documents Included in Bid Package 1
2. Calculation of Unit Price Proposals 2
3. Prevailing Wages 2
4. Taxes and Benefits 2
5. Permits and Licenses 2
6. Preparation of Bidder's Proposal 2
7. Signature Requirements 3
8. Bid Security 4
9. Submission of Bidder's Proposals 4
10. Withdrawal of Bidder's Proposals 5
11. Qualification of Bidders 5
12. Disqualification of Bidders 6
13. Award of Contract 6
14. Notice of Award Effective Date of Award 7
15. Closing of Contract 7
16. Failure to Close 8
General Instructions to Bidders - Page 1
1. Interpretation of Documents Included in Bid Package
A. Defined Terms. All terms capitalized in these General Instructions to Bidders and in the other documents included in this Bid Package are defined in the documents included in this Bid Package and shall have such defined meanings wherever used.
B. Implied Terms. If any personnel, equipment, materials, or supplies that are not directly or indirectly set forth in the Contract are nevertheless necessary to the proper provision, performance, and completion of the whole of the Work in accordance with the intent of the Contract, each prospective Bidder shall understand such personnel, equipment, materials, or supplies to be implied and shall provide for such personnel, equipment, materials, or supplies in its Bidder's Proposal as fully as if it were particularly described.
C. Information Provided by Owner. When information pertaining to subsurface, underground or other concealed conditions, soils analysis, borings, test pits, utility locations or conditions, buried structures, condition of existing structures, and other preliminary investigations is distributed with the Bid Package, or such information is otherwise made available to any prospective Bidder by Owner, such information is distributed or made available solely for the convenience of such prospective Bidder and is not part of the Bid Package. Owner assumes no responsibility whatever in respect to the sufficiency or accuracy of any such information, and there is no guaranty or warranty, either expressed or implied, that the conditions indicated are representative of those existing throughout the Work or the Work Site, or that the conditions indicated are representative of those existing at any particular location, or that unanticipated conditions may not be present.
D. Addenda. No interpretation of the documents included within the Bid Package will be made except by written addendum duly issued by Owner ("Addendum"). No interpretation not contained in an Addendum shall be valid or have any force or effect whatever, nor entitle any Bidder to assert any claim or demand against Owner on account thereof.
All Addenda issued prior to the opening of Bidder's Proposals shall become a part of the Bid Package. Each prospective Bidder shall be responsible for inquiring from time to time as to the availability of Addenda.
If any prospective Bidder is in doubt as to the true meaning of any part of the Bid Package, such prospective Bidder shall submit to Owner a written request for an interpretation thereof as far in advance of the scheduled opening of Bidder's Proposals as possible.
Owner shall use its best efforts to issue Addenda in response to all valid, appropriate and timely inquiries, but accepts no responsibility for doing so.
Inquiries not answered by Addenda shall be considered invalid, inappropriate and untimely inquiries.
General Instructions to Bidders - Page 2
2. Calculation of Unit Price Proposals
On all items for which Bidder's Proposals are to be received on a unit price basis, the approximate quantities stated in the Schedule of Prices are Owner's estimate only for Owner's convenience in comparing Bidder's Proposals and shall not be relied upon by Prospective Bidders. Each prospective Bidder shall, before submitting its Bidder's Proposal, make its own estimate of the quantities of Unit Price Items required to complete the Work and shall determine its Price Proposal for each Unit Price Item in light of its own estimate.
3. Prevailing Wages
In accordance with the Prevailing Wage Act, 820 ILCS 130/0.01 et seq., not less than the prevailing rate of wages for similar work in the locality in which the Work is to be performed shall be paid to all laborers. A copy of Owner's ordinance ascertaining the prevailing rate of wages in effect as of the date of the Invitation for Bidder's Proposals, is included in the Bid Package. If the Illinois Department of Labor revises the prevailing rate of hourly wages to be paid, the revised rate shall apply to the Contract.
4. Taxes and Benefits
Owner is exempt from state and local sales, use, and excise taxes. Bidder's Price Proposal shall not include any such taxes. A letter of exemption will be provided to the successful Bidder, if necessary. Owner will not reimburse, nor assist the successful Bidder in obtaining reimbursement for, any state or local sales, use or excise taxes paid by the successful Bidder.
Bidder's Price Proposal shall include all other applicable federal, state, and local taxes of every kind or nature applicable to the Work as well as all taxes, contributions, and premiums for unemployment insurance, old age or retirement benefits, pensions, annuities or other similar benefits.
5. Permits and Licenses
Except as otherwise expressly provided in Attachment A to the Contract, Bidder's Price Proposal shall include the cost of obtaining all permits, licenses, and other approvals and authorizations required by law for performance of the Work. It shall be the sole responsibility of each prospective Bidder to determine the applicable permits, licenses, and other approvals and authorizations and no extra compensation shall be paid by Owner for the successful Bidder's failure to include these costs in its Bidder's Proposal.
6. Preparation of Bidder's Proposal
Bidder's Proposals to enter into the Contract for the Work shall be made only on the blank Bidder's Proposal form furnished by Owner and included in the Bid Package. The Bidder's Proposal form included in the Bid Package shall be removed from the Bid Package prior to preparation for submission.
General Instructions to Bidders - Page 3
Entries on the Bidder's Proposal form shall be typed or legibly written in ink. Price Proposals are to be written by words and by figures as provided on the Bidder's Proposal form. In case of any conflict, words shall prevail. In case of any error in adding or multiplying individual items, the prices listed for individual items shall control over any incorrect total of such items. A Bidder's Proposal may be rejected if it does not contain a requested price for each and every item named in the Bidder's Proposal form or may be interpreted as bidding "no charge" to Owner for any item left blank.
Prospective Bidders are warned against making alterations of any kind to the Bidder's Proposal form or to any entry thereon. Bidder's Proposals that contain omissions, conditions, alterations, or additions not called for may be rejected or interpreted so as to be most favorable to Owner.
Each Bidder shall securely staple into its Bidder's Proposal a copy of each Addendum issued and shall include in the place provided therefor in the Bidder's Proposal form a listing of all such Addenda.
Each Bidder shall complete and securely staple into its Bidder's Proposal the Bidder's Sworn Acknowledgement and the Bidder's Sworn Work History Statement included in the Bid Package and shall staple into its Bidder's Proposal the Bid Security and the surety and insurance commitment letters as specified in the Invitation for Bidder's Proposals.
Every Bidder submitting a Bidder's Proposal shall be conclusively deemed to have evidenced an intention to be bound thereby whether or not the requirements for signing Bidder's Proposals found in Section 7 of these General Instructions to Bidders are satisfied. However, any Bidder's Proposal that fails to comply with Section 7 of these General Instructions to Bidders may nevertheless be rejected.
Bidder's Proposals that are not submitted on the Bidder's Proposal form furnished by Owner or that are not prepared in accordance with these General Instructions to Bidders may be rejected. If a deficiently prepared Bidder's Proposal is not rejected, Owner may demand correction of any deficiency and award the Contract to Bidder upon satisfactory compliance with these General Instructions to Bidders.
7. Signature Requirements
A. Bidder's Proposals. The following requirements shall be observed in the signing of each Bidder's Proposal:
(1) Corporations. Each Bidder's Proposal submitted by a corporation shall be signed by the President or other authorized officer of the corporation and shall also bear the attesting signature of the Secretary or Assistant Secretary of the corporation.
(2) Partnerships. Each Bidder's Proposal submitted by a partnership shall be signed by all of its general partners or by an attorney-in-fact.
General Instructions to Bidders - Page 4
(3) Individuals. Each Bidder's Proposal submitted by an individual shall be signed by such individual or by an attorney-in-fact.
(4) Joint Ventures. Each Bidder's Proposal submitted by a joint venture shall be signed by each signatory of the joint venture agreement by which such joint venture was formed in accordance with the applicable provisions of (1), (2), and (3) above or by an attorney-in-fact.
When requested by Owner, satisfactory evidence of the authority of the person or persons signing on behalf of Bidder shall be furnished.
B. Other Documents. The signature requirements set forth in Subsection 7A shall apply to all other documents in the Bid Package required to be executed by Bidder, Bidder's sureties and Bidder's insurance representatives as well as to the Contract, the Contractor's Certification, and all other required documentation related to the Contract.
8. Bid Security
A. Required Bid Security. Every Bidder's Proposal shall be accompanied by bid security in the form of a Cashier's Check, Certified Check or Bid Bond as specified in the Invitation for Bidder's Proposals ("Bid Security"), which Bid Security shall stand as a guaranty that (1) Bidder will submit all additional information requested by Owner; (2) if such Bidder's Proposal is accepted, Bidder will timely file the Bonds and the certificates and policies of insurance required by the Contract; and (3) if such Bidder's Proposal is accepted, Bidder will timely execute the Contract, the Contractor's Certification, and all other required documentation related to the Contract.
B. Return of Bid Security. Bid Security submitted in the form of Cashier's Checks or
Certified Checks will be returned within five days after execution of the Contract by Owner. Bid Bonds will not be returned unless otherwise requested by Bidder.
C. Liquidated Damages. If a Bidder fails to timely submit all additional information requested by Owner, or if the successful Bidder fails to timely and properly submit all required Bonds, certificates and policies of insurance, or if the successful Bidder fails to timely and properly execute the Contract, the Contractor's Certification, and all other required documentation related to the Contract, it will be difficult and impracticable to ascertain and determine the amount of damage that Owner will sustain by reason of any such failure. For such reason, every Bidder shall, by submitting its Bidder's Proposal, be deemed to agree that Owner shall have the right, at its option in the event of any such default, to retain or recover as reasonably estimated liquidated damages, and not as a penalty, the entire amount of the Bid Security or five percent (5%) of the Bidder's Price Proposal, whichever is greater, or to exercise any and all equitable remedies it may have against the defaulting Bidder.
General Instructions to Bidders - Page 5
9. Submission of Bidder's Proposal
One copy of each Bidder's Proposal, properly signed, together with all other required documents, shall be enclosed in a sealed envelope or package and shall be addressed and delivered to the place, before the time, and in the manner designated in the Invitation for Bidder's Proposals. All Bidder's Proposals received after the time for the opening of bids specified in the Invitation for Bidder's Proposals will be returned unopened.
Each sealed envelope or package containing a Bidder's Proposal shall be identified as such and shall be marked with the title of the Contract and Bidder's full legal name. All Addenda will be considered part of each Bidder's Proposal whether attached or not.
10. Withdrawal of Bidder's Proposal
Any Bidder's Proposal may be withdrawn at any time prior to the opening of any Bidder's Proposal, provided that a request in writing, executed by Bidder in the manner specified in Section 7 of these General Instructions to Bidders, for the withdrawal of such Bidder's Proposal is filed with Owner prior to the opening of any Bidder's Proposal. The withdrawal of a Bidder's Proposal prior to opening of any Bidder's Proposal will not prejudice the right of Bidder to file a new Bidder's Proposal.
No Bidder's Proposal shall be withdrawn without the consent of Owner for a period of 60 days after the opening of any Bidder's Proposal. Any Bidder's Proposal may be withdrawn at any time following the expiration of said 60-day period, provided that a request in writing, executed by Bidder in the manner specified in Section 7 of these General Instructions to Bidders, for the withdrawal of such Bidder's Proposal is filed with Owner after said 60-day period. If no such request is filed, the date for acceptance of such Bidder's Proposal shall be deemed to be extended until such a request is filed or until Owner executes a Contract pursuant to the Invitation for Bidder's Proposals or until Owner affirmatively and in writing rejects such Bidder's Proposal.
11. Qualification of Bidders
A. Factors. Owner intends to award the Contract only to a Bidder that furnishes satisfactory evidence that it has the requisite experience, ability, capital, facilities, plant, organization and staffing to enable it to perform the Work successfully and promptly and to complete the Work for the Contract Price and within the Contract Time.
B. Additional Information. Owner reserves the right to require from any Bidder, prior to award of the Contract, a detailed statement regarding the business and technical organizations and plant of Bidder that is available for the Work. Information pertaining to financial resources, experience of personnel, contract defaults, litigation history, and pending construction projects may also be requested.
C. Final Determination. The final selection of the successful Bidder shall be made on the basis of the amount of the Bidder's Price Proposals, Owner's prior experience
General Instructions to Bidders - Page 6 with the Bidders, Owner's knowledge of the Bidders' performance on other relevant projects, any additional information submitted by Bidders to satisfy Owner that Bidders are adequately prepared to fulfill the Contract, and all other relevant facts or matters mentioned in the Bid Package or that Owner may legally consider in making its determination.
12. Disqualification of Bidders
A. More Than One Bidder's Proposal. No more than one Bidder's Proposal for the Work described in the Contract shall be considered from any single corporation, partnership, individual or joint venture, whether under the same or different names and whether or not in conjunction with any other corporation, partnership, individual or joint venture. Reasonable grounds for believing that any corporation, partnership, individual or joint venture is interested in more than one Bidder's Proposal for the Work may cause the rejection of all Bidder's Proposals in which such corporation, partnership, individual or joint venture is interested. Nothing contained in this Subsection 12A shall prohibit any single corporation, partnership, individual or joint venture, whether under the same or different names and whether or not in conjunction with any other corporation, partnership, individual or joint venture, from submitting a bid or quoting prices to more than one Bidder for equipment, materials and supplies or labor to be furnished as a subcontractor or supplier.
B. Collusion. If there are reasonable grounds for believing that collusion exists among any Bidders, all Bidder's Proposals of the participants in such collusion will not be considered.
C. Default. If a Bidder is or has been in default on a contract with Owner or in the payment of monies due Owner, its Bidder's Proposal will not be considered.
13. Award of Contract
A. Reservation of Rights. Owner reserves the right to accept the Bidder's Proposal that is, in its judgment, the best and most favorable to the interests of Owner and the public; to reject the low Price Proposal; to accept any item of any Bidder's Proposal; to reject any and all Bidder's Proposals; to accept and incorporate corrections, clarifications or modifications following the opening of the Bidder's Proposals when to do so would not, in Owner's opinion, prejudice the bidding process or create any improper advantage to any Bidder; and to waive irregularities and informalities in the bidding process or in any Bidder's Proposal submitted;
provided, however, that the waiver of any prior defect or informality shall not be considered a waiver of any future or similar defects or informalities, and Bidders should not rely upon, or anticipate, such waivers in submitting their Bidder's Proposals or until Owner affirmatively and in writing rejects such Bidder's Proposal.
B. Firm Offers. All Bidder's Proposals are firm offers to enter into the Contract and no
Bidder's Proposals shall be deemed rejected, notwithstanding acceptance of any
General Instructions to Bidders - Page 7 other Bidder's Proposal, until the Contract has been executed by both Owner and the successful Bidder.
C. Time of Award. It is expected that the award of the Contract, if it is awarded, will be made within 60 days following the opening of the Bidder's Proposals. Should administrative difficulties be encountered after the opening of the Bidder's Proposals, including the annulment of any award, that may delay an award or subsequent award beyond such 60-day period, Owner may accept any Bidder's Proposal for which the date for acceptance has been extended as provided in Section 10 of these General Instructions to Bidders in order to avoid the need for readvertisement. No Bidder shall be under any obligation to extend the date for acceptance of its Bidder's Proposal. Failure of one or more of the Bidders or their sureties to extend the date for acceptance of its Bidder's Proposal shall not prejudice the right of Owner to accept any Bidder's Proposal for which the date for acceptance has been extended.
14. Notice of Award; Effective Date of Award
If the Contract is awarded by Owner, such award shall be effective when a Notice of Award in the form included in this Bid Package has been delivered to the successful Bidder ("Effective Date of Award"). Owner will prepare five copies of the Contract based upon Bidder's Proposal and will submit them to the successful Bidder with the Notice of Award.
15. Closing of Contract
A. Closing Date. Unless otherwise stated in the Notice of Award, the successful Bidder shall satisfactorily complete all Conditions Precedent to Closing before, and the Contract and all related documents shall be executed, submitted and exchanged by Owner and Bidder ("Closing") on, the tenth day following the Effective Date of Award or within such extended period as Owner may, in the exercise of its sole discretion, authorize in writing after issuance of the Notice of Award ("Closing Date").
B. Conditions Precedent to Closing. On or before the Closing Date, the successful
Bidder shall: (1) sign (see Section 7), date as of the Closing Date, and submit to Owner all five copies of the Contract, the Contractor's Certification, and all other required documentation related to the Contract on or before the Closing Date; and
(2) submit five executed copies of all required Bonds and all certificates and policies of insurance (see Contract, Article IV) dated as of the Closing Date ("Conditions Precedent to Closing").
Failure to timely execute or submit any of the aforesaid documents shall be grounds for the imposition of liquidated damages as more specifically set forth in Section 8 above. If the submitted documents or any of them fail to comply with these General Instructions to Bidders or the Contract or are not timely executed
General Instructions to Bidders - Page 8 and submitted, Owner may, in its sole discretion, annul the award or allow the successful Bidder an opportunity to correct the deficiencies.
In no event will Owner execute the Contract until any and all such deficiencies have been cured or Owner has received adequate assurances, as determined by Owner, of complete and prompt performance.
C. Closing. At the Closing, and provided that all documents required to be submitted prior to or at the Closing have been reviewed and determined by Owner to be in compliance with these General Instructions to Bidders and the Contract, or assurances of complete and prompt performance satisfactory to Owner have been received, Owner shall execute all copies of the Contract, retain three copies of the completed Contract, and tender two copies to the successful Bidder at the Closing.
The successful Bidder shall tender one copy to its surety company or companies.
The successful Bidder or its agent shall be present at the Closing.
16. Failure to Close
A. Annulment of Award; Liquidated Damages. The failure or refusal of a successful Bidder to comply with the Conditions Precedent to Closing or to Close shall be just cause for the annulment of the award and the imposition of liquidated damages or the exercise of equitable remedies, both as more specifically set forth in Section 8 above.
B. Subsequent Awards. Upon annulment of an award, Owner may accept, and award a Contract based on, any other Bidder's Proposal as Owner, in its sole judgment, deems to be the best or may invite new Proposals or may abandon the bidding process or the Work.
Bidder’s Proposal - Page 1
Full Name of Bidder ("Bidder")
Principal Office Address
Local Office Address
Contact Person Telephone
TO: Village of Glencoe ("Owner") Public Works Department
675 Village Court Glencoe, Illinois 60022
Attention: Public Works Director
Bidder warrants and represents that Bidder has carefully examined the Work Site described below and its environs and has reviewed and understood all documents included, referred to, or mentioned in this bound set of documents, including Addenda Nos: _________, which are securely stapled to the end of this Bidder's Proposal (if none, write "NONE") ("Bid Package").
Bidder acknowledges and agrees that all terms capitalized in this Bidder's Proposal shall have the meaning given to them in the documents included in the Bid Package.
1. Work Proposal
A. Contract and Work. If this Bidder's Proposal is accepted, Bidder proposes, and agrees, that Bidder will contract with Owner, in the form of the Contract included in the Bid Package:
(1) to provide, perform and complete at the Work Site or sites described in the Bid Package ("Work Site") and in the manner described and specified in the Bid Package all necessary work, labor, services, transportation, equipment, materials, apparatus, machinery, tools, fuels, gas, electric, water, waste disposal, information, data and other means and items necessary for the SOUTH ENTRANCE REHABILITATION PROJECT.
(2) to procure and furnish all permits, licenses and other governmental approvals and authorizations necessary in connection therewith except as otherwise expressly provided in Attachment A to the Contract included in the Bid Package;
(3) to procure and furnish all Bonds and all certificates and policies of insurance specified in the Bid Package;
(4) to pay all applicable federal, state and local taxes;
(5) to do all other things required of Contractor by the Contract; and
Bidder’s Proposal - Page 2
(6) to provide, perform and complete all of the foregoing in a proper and workmanlike manner and in full compliance with, and as required by or pursuant to, the Contract; all of which is herein referred to as the "Work."
B. Manner and Time of Performance. If this Bidder's Proposal is accepted, Bidder proposes, and agrees, that Bidder will perform the Work in the manner and time prescribed in the Bid Package and according to the requirements of Owner pursuant thereto.
C. General. If this Bidder's Proposal is accepted, Bidder proposes, and agrees, that Bidder will do all other things required of Bidder or Contractor, as the case may be, by the Bid Package.
2. Contract Price Proposal
If this Bidder's Proposal is accepted, Bidder will, except as otherwise provided in Section 2.1 of the Contract, take in full payment for all Work and other matters set forth under Section 1 above, including overhead and profit; taxes, contributions, and premiums; and compensation to all subcontractors and suppliers, the compensation set forth on the following "Schedule of Prices" ("Price Proposal"), which Schedule of Prices Bidder understands and agrees will be made a part of the Contract:
Bidder’s Proposal - Page 3
SCHEDULE OF PRICES
A. LUMP SUM PRICE CONTRACT
Contractor should submit pricing for the base bid items and supplemental unit prices in accordance with the bid form (or a lump sum price if indicated on the bid form). Bidders’ prices are to include the delivery of all materials; including plant, equipment, supplies, tools, scaffolding, transportation, insurances, bonds, warranties, and all other items and facilities, and the performance of all labor and services, necessary for the proper completion of the work except as may be otherwise expressly provided in the Contract Documents. Bids shall not include federal excise tax or state sales tax for materials to be incorporated in, or totally consumed in the prosecution of, the work. An exemption certificate will be furnished by the Village upon request of the bidder.
The Village reserves the right to award in part or in whole, or to not award, whatever is deemed to be in the best interest of the Village. The statement of quantities is based upon the best information available at the time of bidding, and the actual units constructed may deviate from those listed in the statement of quantities.
BASE BID LUMP SUM PRICE: Bidder will complete the Work for the following lump sum price:
Dollars and cents (in writing) (in writing)
Dollars and cents
(in figures) (in figures)
Bidder’s Proposal - Page 4
This page intentionally left blank.
Bidder’s Proposal - Page 5
B. BASIS FOR DETERMINING PRICES
It is expressly understood and agreed that:
a. Contractor should submit pricing for the base bid items and supplemental unit prices in accordance with the bid form (or a lump sum price if indicated on the bid form). Bidders’ prices are to include the delivery of all materials;
including plant, equipment, supplies, tools, scaffolding, transportation, insurances, bonds, warranties, and all other items and facilities, and the performance of all labor and services, necessary for the proper completion of the work except as may be otherwise expressly provided in the Contract Documents.
b. All other applicable federal, state, and local taxes of every kind and nature applicable to the Work as well as all taxes, contributions, and premiums for unemployment insurance, old age or retirement benefits, pensions, annuities, or other similar benefits are included in this Schedule of Prices; and
c. All costs, royalties, and fees arising from use on, or the incorporation into, the Work of patented equipment, materials, supplies, tools, appliances, devices, processes, or inventions are included in this Schedule of Prices; and
d. All claim or right to dispute or complain of any such estimated quantity, or to assert that there was any misunderstanding in regard to the nature or amount of any Unit Price Item to be provided or performed, or to claim any additional compensation by reason of the payment of any such tax, contribution, or premium or any such cost, royalty or fee is hereby waived and released.
3. Contract Time Proposal
If this Bidder's Proposal is accepted, Bidder will commence the Work not later than the "Commencement Date" set forth in Attachment A to the Contract and will perform the Work diligently and continuously and will complete the Work not later than the "Completion Date" set forth in Attachment A to the Contract.
4. Firm Proposal
All prices and other terms stated in this Bidder's Proposal are firm and shall not be subject to withdrawal, escalation, or change for a period of 60 days after the date on which any Bidder's Proposal is opened or such extended acceptance date for Bidder's Proposals as may be established pursuant to Sections 10 and 13 of the General Instructions to Bidders.
5. Bidder Representations
A. No Collusion. Bidder warrants and represents that the only persons, firms, or corporations interested in this Bidder's Proposal as principals are those named in Bidder's Sworn Acknowledgment attached hereto and that this Bidder's Proposal is made without collusion with any other person, firm or corporation.
Bidder’s Proposal - Page 6
B. Not Barred. Bidder warrants, represents and certifies that it is not barred by law from contracting with Owner or with any unit of state or local government.
C. Qualified. Bidder warrants and represents that it has the requisite experience, ability, capital, facilities, plant, organization and staff to enable Bidder to perform the Work successfully and promptly and to commence and complete the Work within the Contract Price and Contract Time Proposals set forth above. In support thereof, Bidder submits the attached Sworn Work History Statement. In the event Bidder is preliminarily deemed to be one of the most favorable to the interests of Owner, Bidder hereby agrees to furnish upon request, within two business days or such longer period as may be set forth in the request, such additional information as may be necessary to satisfy Owner that Bidder is adequately prepared to fulfill the Contract.
D. Owner's Reliance. Bidder acknowledges that Owner is relying on all warranties, representations and statements made by Bidder in this Bidder's Proposal.
6. Surety and Insurance
Bidder herewith tenders surety and insurance commitment letters as specified in Section 6 of the Invitation for Bidder's Proposals.
7. Bid Security
Bidder herewith tenders a Cashier's Check, Certified Check, or Bid Bond as specified in Section 6 of the Invitation for Bidder's Proposals for the sum of dollars ($ ) which is equal to at least five percent of Bidder's Price Proposal ("Bid Security").
8. Owner's Remedies
Bidder acknowledges and agrees that should Bidder fail to timely submit all additional information that is requested of it; or should Bidder, if Owner awards Bidder the Contract, fail to timely submit all the Bonds and all the certificates and policies of insurance required of it; or should Bidder, if Owner awards Bidder the Contract, fail to timely execute the Contract, Contractor's Certification and all other required documentation related to the Contract, it will be difficult and impracticable to ascertain and determine the amount of damage that Owner will sustain by reason of any such failure and, for such reason, Owner shall have the right, at its option in the event of any such default by Bidder, to retain or recover as reasonably estimated liquidated damages, and not as a penalty, the entire amount of the Bid Security or ten percent of Bidder's Price Proposal, whichever is greater, or to exercise any and all equitable remedies it may have against Bidder.
9. Owner's Rights
Bidder acknowledges and agrees that Owner reserves the right to reject any and all Bidder's Proposals, reserves the right to accept or reject any item of any Bidder's Proposal and reserves such other rights as are set forth in Section 13 of the General Instructions to Bidders.
Bidder’s Proposal - Page 7
10. Bidder's Obligations
In submitting this Bidder's Proposal, Bidder understands and agrees that it shall be bound by each and every term, condition or provision contained in the Bid Package, which are by this reference incorporated herein and made a part hereof.
DATED this day of , 2026.
Attest/Witness: Bidder:
By: By:
Title: Title:
SEE GENERAL INSTRUCTIONS TO BIDDERS, SECTION 7,
FOR SIGNATURE REQUIREMENTS
Bidder’s Proposal - Page 8
Bidder’s Sworn Acknowledgement - Page 1
("Deponent"), being first duly sworn on oath, deposes and states that the undersigned Bidder is organized as indicated below and that all statements herein made are made on behalf of such Bidder in support of its Bidder's Proposal for the above Contract and that Deponent is authorized to make them.
Deponent also deposes and states that Bidder has carefully prepared, reviewed and checked its Bidder's Proposal and that the statements contained in its Bidder's Proposal and in this Acknowledgement are true and correct.
COMPLETE APPLICABLE SECTION ONLY
1. Corporation
Bidder is a corporation that is organized and existing under the laws of the State of , that is qualified to do business in the State of Illinois, and that is operating under the legal name of:
The officers of the corporation are as follows:
TITLE NAME ADDRESS
President
Vice President
Secretary
Treasurer
2. Partnership
Bidder is a partnership that is organized, existing and registered under the laws of the State of pursuant to that certain Partnership Agreement dated as of , that is qualified to do business in the State of Illinois, and that is operating under the legal name of
The general partners of the partnership are as follows:
NAME ADDRESS
Bidder’s Sworn Acknowledgement - Page 2
3. Individual
Bidder is an individual whose full name is , whose residence address is and whose business address is name, said trade or assumed name is as follows:
If operating under a trade or assumed
4. Joint Venture
Bidder is a joint venture that is organized and existing under the laws of the State of pursuant to that certain Joint Venture Agreement dated as of , that is qualified to do business in the State of Illinois, and that is operating under the legal name of The signatories to the aforesaid Joint Venture Agreement are as follows:
NAME (and Entity Type) ADDRESS
[For each signatory, indicate type of entity (Corporation = "C"; Partnership = "P"; and Individual = "I") and provide, on separate sheets, the information required in Paragraph 1, 2 or 3 above, as applicable.]
DATED this day of , 2021.
Attest/Witness:
Bidder
SEE GENERAL INSTRUCTIONS TO BIDDERS, SECTION 7, FOR SIGNATURE REQUIREMENTS
Subscribed and Sworn to before me this day of , 2022.
My Commission expires .
SEAL
Notary Public
Bidder’s Work History Statement - Page 1
("Deponent"), being first duly sworn on oath, deposes and states that all statements made in this Sworn Work History Statement are made on behalf of the undersigned Bidder in support of its Bidder's Proposal for the above Contract and that Deponent is authorized to make them.
Deponent also deposes and states that Bidder has carefully prepared, reviewed and checked this Sworn Work History Statement and that the statements contained in this Sworn Work History Statement are true and correct.
IF NECESSARY FOR FULL DISCLOSURE, ADD SEPARATE SHEETS
JOINT VENTURES MUST SUBMIT SEPARATE
SWORN WORK HISTORY STATEMENTS FOR THE JOINT VENTURE
AND FOR EACH SIGNATORY TO THE JOINT VENTURE AGREEMENT
1. Nature of Business
State the nature of Bidder's business:
2. Composition of Work
During the past three years, Bidder's work has consisted of:
% Federal % As Contractor % Bidder's Forces
% Other Public % As Subcontractor % Subcontractors
% Private % Materials
3. Years In Business
State the number of years that Bidder, under its current name and organization, has been continuously engaged in the aforesaid business:
years.
Bidder’s Work History Statement - Page 2
4. Predecessor Organizations
If Bidder has been in business under its current name and organization for less than five years, list any predecessor organizations:
NAME ADDRESS YEARS
5. Business Licenses
List all business licenses currently held by Bidder:
Issuing Agency Type Number Expiration
6. Related Experience
List 3 projects most comparable to the Work completed by Bidder, or its predecessors, in the past 5 years:
Owner Address
Project 1
Project 2
Project 3
Reference
Telephone Number
Type of Work
Contractor
(If Bidder was Subcontractor)
Amount of Contract
Date Completed
Bidder’s Work History Statement - Page 3
DATED this day of , 2022.
Attest/Witness: Bidder:
SEE GENERAL INSTRUCTIONS TO BIDDERS, SECTION 7, FOR SIGNATURE REQUIREMENTS
Subscribed and Sworn to before me this day of , 2022.
My Commission expires .
SEAL
Notary Public
Bidder’s Work History Statement - Page 4
Bid Bond - Page 1
KNOW ALL MEN BY THESE PRESENTS: that
(Here insert full name and address of Bidder) as Principal, hereinafter called Bidder, and
(Here insert full name and address of Surety) as Surety, a corporation organized and existing under the laws of the State of , hereinafter called Surety, are held and firmly bound unto Village of Glencoe, 675 Village Court, Glencoe, Illinois 60022, as Obligee, hereinafter called Owner, in the full and just sum of Dollars ($ ), for the payment of which sum of money well and truly to be made, Bidder and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
WHEREAS, Bidder has submitted a Bidder's Proposal dated , to Owner entitled "Contract For Terrace Court Stormwater Pump Station Improvement - Bidder's Proposal" (the "Proposal"), the terms and conditions of which are by this reference incorporated herein as though fully set forth herein.
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH THAT if Bidder shall timely submit all additional information that is required of it and, if the Proposal shall be accepted by Owner, Bidder shall
(1) timely submit all the Bonds and all the certificates and policies of insurance required of it, (2) timely execute the Contract Agreement and the Contractor's Certification, in the form included in the bound Bid Package, and all other required documentation related to the Contract, and (3) in all other respects, perform the agreement created by Owner's acceptance of the Proposal, then this obligation shall be null and void; otherwise it shall remain in full force and effect.
Surety, for value received, hereby stipulates and agrees that the obligations of Surety under this bond shall be in no way impaired or affected by any extension of the time within which Owner may accept the Proposal, and Surety does hereby waive notice of any such extension. Owner shall have no obligation to actually incur any expense or correct any deficient performance of Bidder in order to be entitled to receive the proceeds of this bond. No right of action shall accrue on this bond to or for the use of any person or corporation other than Owner or the heirs, executors, administrators or successors of Owner.
Signed and sealed this day of , 2022.
Attest/Witness:
Principal
Attest/Witness: SURETY
Bid Bond - Page 2
CERTIFIED MAIL/RETURN RECEIPT REQUESTED OR PERSONAL DELIVERY
TO: SUCCESSFUL BIDDER FROM: Village of Glencoe
ADDRESS OF Public Works Dept.
OF SUCCESSFUL 675 Village Court
BIDDER Glencoe, Illinois 60022
("Contractor") ("Owner")
On the day of , 2022, Owner found to be most favorable to the interests of Owner the Bidder's Proposal submitted by Contractor and dated on the day of , 2022, in which Contractor proposes to contract with Owner, in the form of the Contract included in the Bid Package to perform the following Work: (1) to provide, perform and complete at the Work Site and in the manner described and specified in the Bid Package all necessary work, labor, services, transportation, equipment, materials, apparatus, machinery, tools, fuels, gas, electric, water, waste disposal, information, data and other means and items necessary for the PROJECT DESCRIPTION; (2) to procure and furnish all permits, licenses and other governmental approvals and authorizations necessary in connection therewith except as otherwise expressly provided in Attachment A to the Contract included in the Bid Package; (3) to procure and furnish all Bonds and all certificates and policies of insurance specified in the Bid Package; (4) to pay all applicable federal, state and local taxes; (5) to do all other things required of the Contractor by the Contract; and (6) to provide, perform and complete all of the foregoing in a proper and workmanlike manner and in full compliance with, and as required by or pursuant to, the Contract.
OWNER ACCORDINGLY AWARDS CONTRACTOR, EFFECTIVE AS OF THE DATE OF DELIVERY OF THIS NOTICE OF AWARD, THE CONTRACT FOR SAID WORK FOR THE LUMP SUM AND/OR UNIT PRICES, AS THE CASE MAY BE, SET FORTH IN THE BIDDER'S PROPOSAL.
A Closing will be held at TIME on the DATE day of MONTH, YEAR at the above listed office of Owner at which time the Contract will be executed by Owner provided that all Conditions Precedent to Closing have been satisfied. Contractor must have complied with all Conditions Precedent to Closing set forth in Section 15 of the General Instructions to Bidders included in the Bid Package, on or before the Closing Date.
The failure or refusal to comply with the Conditions Precedent to Closing on or before the Closing Date or to Close on the Closing Date shall result, at Owner's option, in the imposition of liquidated damages and the annulment of this award, or in Owner's exercise of any or all equitable remedies Owner may have, all as more specifically set forth in Sections 8, 15, and 16 of the General Instructions to Bidders.
DATED this DAY of MONTH, YEAR
By:
Philip A. Kiraly Village Manager
Bid Bond - Page 3
Contract - Page 1
UTABLE OF CONTENTS
Page
ARTICLE I THE WORK 3
1.1 Performance of the Work 3
1.2 Commencement and Completion Dates 3
1.3 Required Submittals 3
1.4 Review and Interpretation of Contract Provisions 4
1.5 Conditions at the Work Site; Record Drawings 4
1.6 Technical Ability to Perform 5
1.7 Financial Ability to Perform 5
1.8 Time 5
1.9 Safety at the Work Site 6
1.10 Cleanliness of the Work Site and Environs 6
1.11 Damage to the Work, the Work Site and Other Property 6
1.12 Subcontractors and Suppliers 6
1.13 Simultaneous Work By Others 7
1.14 Occupancy Prior to Final Payment 7
1.15 Owner's Right to Terminate or Suspend Work for Convenience 7
ARTICLE II CHANGES AND DELAYS 7
2.1 Changes 7
2.2 Delays 8
ARTICLE III CONTRACTOR'S RESPONSIBILITY FOR DEFECTIVE WORK 8
3.1 Inspection; Testing; Correction of Defects 8
3.2 Warranty of Work 8
3.3 Owner's Right to Correct 9
ARTICLE IV FINANCIAL ASSURANCES 9
4.1 Bonds 9
4.2 Insurance 9
4.3 Indemnification 9
ARTICLE V PAYMENT 10
5.1 Contract Price 10
5.2 Taxes and Benefits 10
5.3 Progress Payments 10
5.4 Final Acceptance and Final Payment 10
5.5 Liens 11
5.6 Deductions 11
ARTICLE VI DISPUTES AND REMEDIES 12
6.1 Dispute Resolution Procedure 12
6.2 Contractor's Remedies 12
6.3 Owner's Remedies 12
6.4 Owner's Special Remedy for Delay 13
Contract - Page 2
6.5 Terminations and Suspensions Deemed for Convenience 13
ARTICLE VII LEGAL RELATIONSHIPS AND REQUIREMENTS 14
7.1 Binding Effect 14
7.2 Relationship of the Parties 14
7.3 No Collusion 14
7.4 Assignment 14
7.5 Confidential Information 14
7.6 No Waiver 14
7.7 No Third-Party Beneficiaries 14
7.8 Notices 15
7.9 Governing Laws 15
7.10 Changes in Laws 15
7.11 Compliance with Laws and Grants 15
7.12 Compliance with Patents 16
7.13 Time 16
7.14 Severability 16
7.15 Entire Agreement 17
7.16 Amendments 17
CONTRACTOR'S CERTIFICATION
ATTACHMENT A Supplemental Schedule of Contract Terms
ATTACHMENT B Technical Specifications
ATTACHMENT C Drawing Set (10 sheets)
ATTACHMENT D Prevailing Wage Ordinance
CHANGE ORDER FORM
PERFORMANCE BOND
LABOR AND MATERIAL PAYMENT BOND
Contract - Page 3
In consideration of the mutual promises set forth below, the Village of Glencoe, c/o Village Hall, 675 Village Court, Glencoe, Illinois 60022, a non-home rule municipal corporation ("Owner"), and CONTRACTOR NAME AND ADDRESS, a TYPE OF BUSINESS ("Contractor"), make this Contract as of the CLOSING DATE, and hereby agree as follows:
ARTICLE I
UTHE WORK
1.1 Performance of the Work
Contractor shall, at its sole cost and expense, provide, perform, and complete all of the following, all of which is herein referred to as the "Work":
A. Labor, Equipment, Materials, and Supplies. Provide, perform, and complete, in the manner described and specified in this Contract, all necessary work, labor, services, transportation, equipment, materials, apparatus, machinery, tools, fuels, gas, electric, water, waste disposal, information, data, and other means and items necessary to accomplish the Project at the Work Site, both as defined in Attachment A, in accordance with the specifications…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .