This is a Statement of Work (SOW) for the USCGC Vigilant (WMEC 210) Main Deck Preservation project scheduled for FY 2026. The contractor shall perform depot-level maintenance on the 210-foot Medium Endurance Cutter to maintain operational readiness and ensure the vessel meets its designated service life. The primary work requirement involves deck preservation and renewal under the specification "VIGILANT FY26 Non-Skid Renewal - Work Specification" dated June 2026, specifically including exterior deck preservation using the MIL-PRF-24667 Non-Skid System and optional deck plating renewal. The period of performance is 06 JUL 2026 through 19 JUL 2026, with work to be performed at CGC Vigilant, 9500 Poseidon Ave., Cape Canaveral, FL 32920.
The contractor must submit a Statement of Capabilities demonstrating relevant experience, technical expertise, personnel qualifications, quality control processes, and past performance on similar efforts. Deliverables include Condition Found Reports (CFRs) submitted within 24 hours of discovery for unforeseen conditions, test and inspection reports submitted within 24 hours of completion, and a final comprehensive report upon project completion. All personnel require valid REAL ID-compliant identification or acceptable DHS alternative to access the vessel. This is a small business set-aside procurement (NAICS 336611, size standard 1,300 employees) issued as a Request for Quote under FAR Part 12 with firm-fixed pricing on an all-or-none award basis, managed by the Department of Homeland Security US Coast Guard Surface Force Logistics Center.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| VIGILANT FY26 Scope of Work.docx | DOCX document | |
| IMG_0185.jpeg | JPEG file | |
| IMG_0186.jpeg | JPEG file | |
| IMG_0188.jpeg | JPEG file | |
| IMG_0183.jpeg | JPEG file | |
| VIGILANT FY26 Non Skid Renewal - Work Specification.doc | DOC document | |
| Smart Matrix.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) USCGC Vigilant Main Deck Preservation FY 2026
1. BACKGROUND
The USCGC Vigilant (WMEC 210) is a 210-foot Medium Endurance Cutter. To maintain operational readiness and ensure the vessel meets its designated service life, the cutter is scheduled for a planned Main Deck Preservation in 2026. This SOW outlines the required depot-level maintenance. The contractor shall furnish the necessary management, labor, materials, and equipment to accomplish the work items listed herein, in accordance with the detailed specifications provided in the applicable reference document.
2. REQUIREMENTS
The contractor shall perform all work identified in the specification "VIGILANT FY26 Non-Skid Renewal – Work Specification” dated June 2026. The work items include the following major items:
1. Decks – Exterior, Preserve, Non-Skid MIL-PRF-24667 System
2. Deck Plating, Renew (Optional)
All work shall be performed in strict accordance with the specification referenced.
3. DELIVERABLES AND REPORTING
The Contractor shall provide the following reports and deliverables to the designated Government Representative(s) in a timely and professional manner. Unless otherwise specified, all deliverables shall be submitted electronically in Microsoft Office or Adobe PDF format.
6.1 WEEKLY PROGRESS REPORTS
N/A
6.2 CONDITION FOUND REPORTS (CFRs)
The Contractor shall submit a Condition Found Report when unforeseen conditions or work requirements are identified that are not covered by the original specification. Each CFR shall include a detailed description of the condition, recommended corrective action, and an estimated cost and schedule impact. CFRs shall be submitted within twenty-four (24) hours of discovery. No work associated with a CFR shall commence without written Government approval.
6.3 TEST AND INSPECTION REPORTS
The Contractor shall submit test and inspection reports documenting the procedures performed and results obtained for all tests required by the specification. Reports shall be submitted within twenty-four (24) hours following completion of each test or inspection.
6.4 FINAL REPORT
The Contractor shall submit a one-time comprehensive final report summarizing all work performed under the contract. At a minimum, the final report shall include a description of completed tasks, test and inspection results, resolution of all CFRs, and final project status. The final report shall be submitted upon completion of all contract requirements.
4. STATEMENT OF CAPABILITIES
The contractor shall submit a Statement of Capabilities demonstrating its ability to fulfil the requirements of this SOW. The Statement of Capabilities shall, at a minimum, describe the Contractor’s relevant experience, technical expertise, personnel qualifications, quality control processes, and past performance on similar efforts.
5. PERIOD OF PERFORMANCE
06 JUL 2026 – 19 JUL 2026
6. PLACE OF PERFORMANCE
The primary place of performance shall be at CGC Vigilant located at below address:
CGC Vigilant 9500 Poseidon Ave.
Cape Canaveral, FL 32920 *The address provided is the closest identifiable address to the pier where the vessel is moored*
7. CONTRACTING OFFICER TECHNICAL REPRESENTATIVE (COR)
N/A
8. SECURITY REQUIREMENTS
All contractor personnel requiring access to the place of performance in order to perform work under this contract must possess a valid-state issued REAL ID-compliant driver’s license or identification card, or an acceptable alternative form of identification as defined by the Department of Homeland Security (DHS) [https://www.dhs.gov/real-id]. It is the contractor’s responsibility to ensure that all personnel are properly credentialed to gain base access. Failure to comply with access requirements may result in delays to performance and will not constitute an excusable delay.