Vicinity_Map.pdf

PDF 3 MB Posted

Attached to
2026 Arterial and Collector Capital Maintenance
Solicitation number
CT227-09
Issued by
Ada County, Idaho

About this file

This is a Vicinity Map for Project 524019, the 2026 Arterial and Collector Capital Maintenance project located in Idaho under Commissioner Alexis Pickering in District 2. The project encompasses pavement rehabilitation and asphalt improvements on Poplar Street from Curtis Road to Cole Road, including irrigation and stormwater work, ADA-compliant pedestrian ramp upgrades, and sidewalk gap filling. Additional scope elements include traffic calming features such as traffic circles at the Eldorado Lane and Liberty Street intersections, an enhanced pedestrian crossing at the Poplar Street and Cole Road intersection, multi-use pathway improvements extending to the Curtis Road intersection, wayfinding signage, sharrows throughout the project limits, and a raised concrete intersection at Poplar Street and Fisk Street. The map is presented at a scale of 1:7,000 on 11x8.5-inch media using 2025 aerial imagery and was exported on October 16, 2026, serving as a visual reference for the project area with delineated road centerlines, waterways, parcels, and project boundaries.

No pricing terms, set-asides, incumbent information, funding sources, or contract renewal details are provided in this vicinity map document.

View the file

Other files

File Type Posted
2026_Arterial_and_Collector_Capital_Maintenance.pdf PDF
Special_Provisions.pdf PDF
Sample_Agreement.pdf PDF
Plan_Sheets_1_-_71.pdf PDF
Cross_Sections.pdf PDF
CAD_FILE_-_FOR_VIEWING_PURPOSES_ONLY.dwg DWG drawing
Bid_Bond.pdf PDF
2026_Arterial_&_Collector_Maintenance_(Poplar)_524019__NMID_LA-Recorded.pdf PDF
SWPPP.pdf PDF
Utility_Information_Sheet.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

31303

Davis

DrainSettlers

Canal

North Slough

N E sq ui re D r

N

Alam o Rd

N Redway Rd

N M cK in ne y

Ln

W Northview St

N D an is h Ln

W Butte Ln

W Fairview Ave

W Waverly Ln

W P oplar

Cir N

B ru in s

A ve

W Petrie St

W N or th vi ew

Ci r

W Butte View Dr

N LynwoodPl

N R ed w ay Ci r

N Fr y C ir

W Cruzen St

W Copenhagen Ln

N F is k

Ln

N Chitwood Cir

W Plymouth St

W Westwood Ln

N Grandee St

W Bond St

W Newman St

W Kingsdale Dr

W Northview St

W Fairview Ave

N M cK in ne y

St

W Wilshire Dr

W Westwood Dr

W Selway St

N C hi tw oo d

W ay

N W ea ve r C ir

W Wesley Dr

W Waverly Ct W Waverly Dr

W Holb ro okLn

N H ai le y Ln

W Lubkin St W El Caballo Dr

W Fairview Ave

W Sw ift Ln

W Folk Dr

W Russett St

N M ountain View

Dr

W Bay St

W Everett St

W Butte Ct

W Chestnut Dr

W York St

W Fairview Ave

W Butte St

W Russett St

W Post St

W Primrose St

W Everett St

W O po ho ng a

St

W Stratton St

N El RanchoD r

N Bruins Cir

N J or et ta D r

W Flamingo DrN E ld or ad o

St N F is k

St

N H ar tm an S t

N C ol e

R d

N E ld or ad o

Ln

W Poplar St N

A llu m ba ug h

St

N C ur ti s R d

N R ay m on d

St

N L ib er ty S tN F ry S t

W Poplar Dr

Project 524019 - 2026 Arterial and Collector Capital Maintenance

VICINITY MAP

Commissioner: Alexis Pickering District: 2

Exported on: 10/16/2026

Map is intended as a visual reference

2025 Aerial Imagery Scale: 1:7,000 @11x8.5

Legend

- Project Area

- Road Centerline

- Waterways

- Parcels

File details come from the government source that posted it. Updated .