VGLZ 202014_ West Apron ADAL Access Roads RFIs.pdf

PDF 132 KB Posted

Attached to
Selfridge West Ramp Access Roads W50S85-20-R-0020 Federal contract opportunity
Solicitation number
Not on record
Issued by
Department of the Army Michigan Army National Guard

View the file

Other files for this federal contract opportunity

Other files attached to Selfridge West Ramp Access Roads W50S85-20-R-0020, newest first.
File Type Posted
ADAL Access Roads _ Site Visit _ Sign In Sheet.pdf PDF
Site Visit Minutes _ ADAL Access Roads.pdf PDF
Material Disposal Location.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI Questions / Answers

Project Title: West Ramp ADAL Access Roads Project #: VGLZ 202014 Solicitation #: W50S8520R0020

Item # Question Answer

1 As discussed on the pre-bid meeting today, 8/14/2020, on the west ramp, we are respectfully requesting clarification of quantities of the Chapter 13 partial-depth repairs as found on the SOV. Phase II Pavement Transition Repair Section A-a, as well as the full-depth repair quantities on the above mentioned project.

The government is estimating 450 cubic feet of partial depth repair based on a depth of 4 inches and the area of effect as shown in the provided drawings. The government is not including any full depth repair in the scope of this project.

2 What is the name of the document that contains information or a statement in regards to on site material disposal? Please provide the corresponding section number and section title within the document which contains said information.

General specs SECTION 02 61 00 ‐

REMOVAL AND DISPOSAL OF

CONTAMINATED MEDIA

Concrete to be hauled to location per attached Material Disposal Location.

Disturbed soils to be graded in the local area to promote drainage away from pathways.

3 Is there a dimensional requirement for disposed materials? If so, what is the dimensional requirement? What is the name of the document that the dimensional requirement can be found in? Please provide the corresponding section number and section title within the document which contains said information.

Concrete to be broken down to 6 inches or under.