VendorChangeDetailsReport_1517_v1_Aug_5_26.pdf

PDF 2 KB Posted

Attached to
27-01 Peter Parley Schoolhouse Stone Wall
Solicitation number
1517
Issued by
Fairfield County, Connecticut

About this file

This is a Solicitation Change Details Report for the Town of Ridgefield, Connecticut, documenting modifications to RFQ 27-01 for the construction of a stone boundary wall at the Peter Parley Schoolhouse located on West Lane in Ridgefield, Connecticut. The report, generated on August 5, 2026, indicates that two documents have been added to the solicitation: the Addendum 1 and the Schoolhouse Stone Wall specification document. Proposals are due on August 11, 2026, at 11:00 a.m. EDT. The scope of work involves construction of a stone boundary wall at the schoolhouse site, with the successful contractor required to coordinate work activities with the Town of Ridgefield and its designated representatives. No line-item specifications or detailed design requirements are provided in the available documentation; complete bid documents are accessible through the Town's purchasing department website.

All qualified contractors are eligible to respond to this RFQ with no stated set-asides or vendor preferences. No estimated contract value is provided in the solicitation materials. Delivery terms are specified as FOB Destination, with payment terms to be vendor-specified. Inquiries regarding the solicitation should be directed to David McFate, Ridgefield Town Purchasing, located at 400 Main Street, Ridgefield, Connecticut 06877, by telephone at 203-431-2720, or by email at purchasing@ridgefieldct.gov.

View the file

Other files

Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Change Details Report Solicitation no.1517

'27-01 Peter Parley Schoolhouse Stone Wall'

Header Information

There are no changes under this section.

Solicitation Fields

Solicitation Questionnaire

Documents Added

1. Document: '27-01 Addendum 1.pdf' was added.

2. Document: '27-01 Schoolhouse Stone Wall.pdf' was added.

Solicitation Group Changes

Report Created: Aug 05, 2026 3:19 PM EDT Page: 2

Solicitation 1517, 27-01 Peter Parley Schoolhouse Stone Wall

Item Specifications and Quantities

File details come from the government source that posted it. Updated .