27-01 Addendum 1.pdf

PDF 527 KB Posted

Attached to
27-01 Peter Parley Schoolhouse Stone Wall
Solicitation number
1517
Issued by
Fairfield County, Connecticut

About this file

This is Addendum Number 1 to Request for Quotes 27-01 issued by the Town of Ridgefield Office of the Purchasing Manager for construction of a stone boundary wall at the Peter Parley Schoolhouse located on West Lane along Route 35 in Ridgefield, Connecticut. The addendum clarifies specifications and requirements for the project, including details on wall construction materials, walkway specifications, and contractor responsibilities. The project involves construction of a new stone wall in the approximate location of an existing partial wall, approximately 75 feet in length, utilizing local field stone provided by the Town of Ridgefield in a dry-set construction method. Additionally, the contractor must construct an ADA-compliant walkway approximately 80 feet in length and 36 inches in width using bluestone set on an appropriate base material, with the contractor responsible for providing walkway materials. No construction will occur within the state right-of-way, and therefore no DOT encroachment permit is required. All bids must be submitted on company letterhead using a lump-sum pricing format.

The contractor is responsible for obtaining all necessary permits prior to the start of construction, including coordination with the Town of Ridgefield's designated representative who will be available throughout the project duration. Erosion control measures must comply with Town of Ridgefield zoning regulations. Existing stone from the current wall may be reused as appropriate. No estimated contract value, specific award date, or contract term details are provided in this addendum. Inquiries regarding the bid should be directed to David McFate, Ridgefield Town Purchasing, at 203-431-2720 or purchasing@ridgefieldct.gov.

View the file

Other files

File Type Posted
1517_Aug_17_26_solicitation_doc.pdf PDF
1517_Oct_13_26_solicitation_doc.pdf PDF
1517_Sep_24_26_solicitation_doc.pdf PDF
VendorChangeDetailsReport_1517_v1_Aug_5_26.pdf PDF
1517_Sep_1_26_solicitation_doc.pdf PDF
1517_Nov_10_26_solicitation_doc.pdf PDF
1517_Nov_5_26_solicitation_doc.pdf PDF
1517_Nov_12_26_solicitation_doc.pdf PDF
1517_Oct_15_26_solicitation_doc.pdf PDF
1517_Sep_11_26_solicitation_doc.pdf PDF
1517_Sep_4_26_solicitation_doc.pdf PDF
1517_Nov_11_26_solicitation_doc.pdf PDF
1517_Oct_2_26_solicitation_doc.pdf PDF
1517_Sep_16_26_solicitation_doc.pdf PDF
1517_Nov_13_26_solicitation_doc.pdf PDF
1517_Nov_3_26_solicitation_doc.pdf PDF
1517_Nov_18_26_solicitation_doc.pdf PDF
1517_Oct_27_26_solicitation_doc.pdf PDF
1517_Nov_24_26_solicitation_doc.pdf PDF
1517_Nov_25_26_solicitation_doc.pdf PDF
1517_Aug_19_26_solicitation_doc.pdf PDF
1517_Oct_8_26_solicitation_doc.pdf PDF
1517_Aug_3_26_solicitation_doc.pdf PDF
1517_Nov_19_26_solicitation_doc.pdf PDF
1517_Jul_29_26_solicitation_doc.pdf PDF
1517_Oct_7_26_solicitation_doc.pdf PDF
1517_Sep_17_26_solicitation_doc.pdf PDF
1517_Nov_20_26_solicitation_doc.pdf PDF
1517_Sep_10_26_solicitation_doc.pdf PDF
1517_Nov_17_26_solicitation_doc.pdf PDF
1517_Aug_27_26_solicitation_doc.pdf PDF
1517_Nov_6_26_solicitation_doc.pdf PDF
1517_Aug_10_26_solicitation_doc.pdf PDF
1517_Nov_4_26_solicitation_doc.pdf PDF
1517_Oct_23_26_solicitation_doc.pdf PDF
1517_Oct_16_26_solicitation_doc.pdf PDF
27-01 Schoolhouse Stone Wall.pdf.crdownload CRDOWNLOAD file
1517_Aug_28_26_solicitation_doc.pdf PDF
27-01 Schoolhouse Stone Wall.pdf PDF
1517_Aug_21_26_solicitation_doc.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Town of Ridgefield

Office of the Purchasing Manager

Addendum Number 1

Bid Number 27-01

Request for Quotes

Peter Parley Schoolhouse Stone Wall

To All Bidders:

The following questions have been received;

As this property is along Rt35 is a DOT Encroachment permit required? No construction will occur within the state right-of-way. As such, no encroachment permit is required.

Can you provide a detail for the wall? Historical walls do not use concrete. What type of stone do you want to match the area? The wall will be dry-set and will utilize local field stone. Stone for the wall will be provided by the Town of Ridgefield.

What erosion control measures are required? Erosion control measures will be in accordance with Town of Ridgefield zoning regulation, which is available at https://www.ridgefieldct.gov/departments/planning_and_zoning/zoning_regulations.php#outer -132

What type of stone do you want for the ADA walkway? The walkway will be bluestone set on an appropriate process material base. Contractor will provide materials for walkway.

How many square foot is the walkway? The walkway will be approximately 80 feet in length and 36 inches in width.

Is this to be priced lump sum or unit price? Can you please provide a bid form. Bids should be lump sum. Bids will be submitted on company letterhead.

Existing wall is approx 123' long, please clarify as specs indicate to construct a 75' long wall. Will the contractor be reinstalling the existing stone? New wall will be in the approximate location of the existing partial wall along Rte. 35. Existing stone may be reused us appropriate.

Will there be a designate contact person throughout the project duration if direction is needed? The Town of Ridgefield’s designated representative will be available throughout project duration as needed.

Who is responsible for obtaining permits? Per Instructions to Bidders, paragraph 7, it is the Contractor’s responsibility to obtain any necessary permits prior to the start of construction.

https://www.ridgefieldct.gov/departments/planning_and_zoning/zoning_regulations.php#outer-132 https://www.ridgefieldct.gov/departments/planning_and_zoning/zoning_regulations.php#outer-132

27-01 Addendum 1.pdf
scan.pdf
Peter Parley School_ ex conditions_ DD_090624.pdf

File details come from the government source that posted it. Updated .