Vendor Bid Sheet.xls
XLS spreadsheet 54 KB Posted
- Solicitation number
- RFB 605 2400000227 1
- Issued by
- Kentucky
About this file
This is a Vendor Bid Sheet for District 11 guardrail and safety barrier installation and maintenance services. The bid sheet outlines 110 line items covering a comprehensive range of work including lane and shoulder closures, guardrail installation and removal, guardrail post installation in various heights and materials, offset block installation, terminal section installation, crash cushion installation and repair, end treatment installation and maintenance, bridge guardrail connections, delineators, thrie beam guardrail systems, and aluminum handrail installation. Estimated usage quantities range from 5 units to 100,000 units depending on the specific line item, with units of measure including each (EA), linear feet (LNFT), and other applicable measurements. The bid sheet specifies that vendors are not required to bid all districts but must bid all line items within a district to be considered for award. Vendors must enter actual bid prices for each line item and upload the completed bid sheet into the e-procurement system.
The bid sheet indicates that all prices are currently listed as $0.00, requiring vendors to provide their actual unit pricing for each service. Many line items specify whether materials will be furnished by the Department or the Vendor, which will affect pricing structures. The contract involves an established vendor relationship with Eden Fence (Vendor Customer Code VC0000093662), suggesting this may be a renewal or continuation of existing services. The scope of work encompasses both routine maintenance activities and specialized installation services related to highway safety infrastructure, including various guardrail types, protective devices, and associated components across the designated district.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Final Items List
| Vendor: | Vendor Rep Information (name, phone, email address): | ||||||||||
| DISTRICT ___11___ | Instructions: Vendors do not have to bid all districts but must bid all line items within a district to be considered for an award. Actual bid prices must be entered on this bid sheet and uploaded into the e-procurement system. Specify and complete a bid sheet for each district you wish to bid. | ||||||||||
| VENDOR CUSTOMER CODE | SUPPLIER NAME | MANUFACTURER NAME | MANUFACTURER PART NUMBER | COMMODITY CODE | # | Description | Estimated | ||||
| Usage | Unit | Unit Price | Total | Extended Description | |||||||
| VC0000093662 | Eden Fence | 91223 | 1 | Lane Closure | 500 | EA | $0.00 | Lane Closure | |||
| 2 | Lane Closure for Night Work | 25 | EA | $0.00 | Lane Closure for Night Work. This item includes all lane closures used outside of daylight hours. | ||||||
| 3 | Shoulder Closure | 50 | EA | $0.00 | Shoulder Closure | ||||||
| 4 | Shoulder Closure for Night Work | 25 | EA | $0.00 | Shoulder Closure for Night Work. This item includes all shoulder closures used outside of daylight hours. | ||||||
| 5 | Install Guardrail (Furnished by Department) | 20000 | LNFT | $0.00 | Install Guardrail (Furnished by Department) | ||||||
| 6 | Install Guardrail (Furnished by Vendor) | 100000 | LNFT | $0.00 | Install Guardrail (Furnished by Vendor) | ||||||
| 7 | Install Radius Rail (Furnished by Department) | 500 | LNFT | $0.00 | Install Radius Rail (Furnished by Department) | ||||||
| 8 | Install Radius Rail (Furnished by Vendor) | 1000 | LNFT | $0.00 | Install Radius Rail (Furnished by Vendor) | ||||||
| 9 | Realign Guardrail | 7500 | LNFT | $0.00 | Realign Guardrail | ||||||
| 10 | Remove Guardrail | 30000 | LNFT | $0.00 | Remove Guardrail | ||||||
| 11 | Remove & Reset Guardrail | 5000 | LNFT | $0.00 | Remove & Reset Guardrail | ||||||
| 12 | Install Steel Guardrail Post 6' (Furnished by Department) | 1000 | EA | $0.00 | Install Steel Guardrail Post (Furnished by Department) | ||||||
| 13 | Install Steel Guardrail Post 6' (Furnished by Vendor) | 10000 | EA | $0.00 | Install Steel Guardrail Post (Furnished by Vendor) | ||||||
| 14 | Install Steel Guardrail Post 7' (Furnished by Department) | 500 | EA | $0.00 | Install Steel Guardrail Post (Furnished by Department) | ||||||
| 15 | Install Steel Guardrail Post 7' (Furnished by Vendor) | 2500 | EA | $0.00 | Install Steel Guardrail Post (Furnished by Department) | ||||||
| 16 | Install Steel Guardrail Post 9' (Furnished by Department.) | 300 | EA | $0.00 | Install Steel Guardrail Post 9' (Furnished by Department) | ||||||
| 17 | Install Steel Guardrail Post 9' (Furnished by Vendor) | 1000 | EA | $0.00 | Install Steel Guardrail Post 9' (Furnished by Vendor) | ||||||
| 18 | Install Timber Guardrail Post | 50 | EA | $0.00 | Install Timber Guardrail Post (Furnished by Vendor) | ||||||
| 19 | Remove & Reset Guardrail Post (Timber or Steel) | 10000 | EA | $0.00 | Remove & Reset Guardrail Post (Timber or Steel) | ||||||
| 20 | Remove Guardrail Post (Timber or Steel) | 10000 | EA | $0.00 | Remove Guardrail Post (Timber or Steel) | ||||||
| 21 | Install Offset Block (Furnished by Department) | 5000 | EA | $0.00 | Install Wood Offset (Furnished by Department) | ||||||
| 22 | Install Offset Block (Furnished by Vendor) | 5000 | EA | $0.00 | Install Wood Offset Block (Furnished by Vendor) | ||||||
| 23 | 8” Guardrail Offset Blocks-Composite (Furnished by Department) | 300 | EA | $0.00 | Install 8" Composite Offset Block (Furnished by Department) | ||||||
| 24 | 8" Guardrail Offset Blocks-Composit (Furnished by Vendor) | 5000 | EA | $0.00 | Install 8" Composite Offset Block (Furnished by Vendor) | ||||||
| 25 | Remove & Reset Offset Block | 10000 | EA | $0.00 | Remove & Reset Offset Block | ||||||
| 26 | Remove Offset Block | 10000 | EA | $0.00 | Remove Offset Block | ||||||
| 27 | Install Terminal Section No.1 | 50 | EA | $0.00 | Install Terminal Section No. 1 (Furnished by Department) | ||||||
| 28 | Install Terminal Section No.1 | 50 | EA | $0.00 | Install Terminal Section No. 1 (Furnished by Vendor) | ||||||
| 29 | Install Terminal Section No.2 | 5 | EA | $0.00 | Install Terminal Section No. 2 (Furnished by Vendor) | ||||||
| 30 | Install Terminal Section No.3 | 5 | EA | $0.00 | Install Terminal Section No. 3 (Furnished by Vendor) | ||||||
| 31 | Remove Terminal Section No. 1 | 25 | EA | $0.00 | Remove Terminal Section No. 1 | ||||||
| 32 | Remove Terminal Section No. 2 | 25 | EA | $0.00 | Remove Terminal Section No. 2 | ||||||
| 33 | Remove & Reset Terminal Sections | 50 | EA | $0.00 | Remove & Reset Terminal Sections | ||||||
| 34 | Install Guardrail - Corten | 250 | LNFT | $0.00 | Install Guardrail - Corten (Furnished by Vendor) | ||||||
| 35 | Paint End Treatment to match Core Ten Guardrail | 5 | EA | $0.00 | Paint End Treatment to match Core Ten Guardrail | ||||||
| 36 | Install Bridge Guardrail Post-Case 1 | 50 | EA | $0.00 | Install Bridge Guardrail Post - Case 1 (Furnished by Vendor) | ||||||
| 37 | Install Bridge Guardrail Post-Case 1A | 50 | EA | $0.00 | Install Bridge Guardrail Post - Case 1A (Furnished by Vendor) | ||||||
| 38 | Install Bridge Guardrail Post-Case 1B | 50 | EA | $0.00 | Install Bridge Guardrail Post - Case 1B (Furnished by Vendor) | ||||||
| 39 | Install Bridge Guardrail Post-Case 2 | 50 | EA | $0.00 | Install Bridge Guardrail Post - Case 2 (Furnished by Vendor) | ||||||
| 40 | Remove Bridge Post Case 1 | 50 | EA | $0.00 | Remove Bridge Post Case 2 | ||||||
| 41 | Remove Bridge Post Case 1A | 50 | EA | $0.00 | Remove Bridge Post Case 1A | ||||||
| 42 | Remove Bridge Post Case 1B | 50 | EA | $0.00 | Remove Bridge Post Case 1B | ||||||
| 43 | Remove Bridge Post Case 2 | 50 | EA | $0.00 | Remove Bridge Post Case 3 | ||||||
| 44 | Remove and Reset Case-Post (all type) | 50 | EA | $0.00 | Remove and Reset Case-Post (all type) | ||||||
| 45 | Install Crash Cushion Type IX, IX-A | 6 | EA | $0.00 | Install Crash Cushion Type IX, Type IX-A (Furnished by Vendor) | ||||||
| 46 | Remove & Replace 10g Slotted Rail | 50 | LNFT | $0.00 | Remove and Replace 10 GAGE Slotted Rail for Crash Cushion Type IX or IX-A (Furnished by Vendor) | ||||||
| 47 | Remove & Replace 12g Slotted Rail | 50 | LNFT | $0.00 | Remove and Replace 12 GAGE Slotted Rail for Crash Cushion Type IX or IX-A (Furnished by Vendor) | ||||||
| 48 | Remove & Replace Nose & Side Panels | 10 | EA | $0.00 | Remove and Replace Nose and Side Panels for Crash Cushion Type IX or IX-A (Furnished by Vendor) | ||||||
| 49 | Remove & Replace Post 1 & Offset Block | 10 | EA | $0.00 | Remove and Replace Post 1 and Offset Block for Crash Cushion Type IX or IX-A (Furnished by Vendor) | ||||||
| 50 | Remove & Replace Post 2-6 & Offset Block | 10 | EA | $0.00 | Remove and Replace Post 2-6 and Offset Block for Crash Cushion Type IX or IX-A (Furnished by Vendor) | ||||||
| 51 | Remove Crash Cushion Type IX, IX-A | 10 | EA | $0.00 | Remove Crash Cushion Type IX, IX-A | ||||||
| 52 | Install End Treatment Type 1 (MSKT) | 100 | EA | $0.00 | Install End Treatment Type 1-MSKT (Furnished by Vendor) | ||||||
| 53 | Install End Treatment Type 1 (Soft Stop) | 100 | EA | $0.00 | Install End Treatment Type 1-Soft Stop (Furnished by Vendor) | ||||||
| 54 | Install End Treatment Type 1 | 5 | EA | $0.00 | Install End Treatment Type 1 (Furnished by Department) | ||||||
| 54 | Install End Treatment Type 2A | 25 | EA | $0.00 | Install End Treatment Type 2A (Furnished by Vendor) | ||||||
| 55 | Install End Treatment Type 3 | 10 | EA | $0.00 | Install End Treatment Type 3 (Furnished by Vendor) | ||||||
| 56 | Install End Treatment Type 4A | 100 | EA | $0.00 | Install End Treatment Type 4A (Furnished by Vendor) | ||||||
| 57 | Install End Treatment Type 7 | 50 | EA | $0.00 | Install End Treatment Type 7 (Furnished by Vendor) | ||||||
| 58 | Remove & Replace 10g Guardrail-End Treatment Type 1 | 100 | LNFT | $0.00 | Remove and Replace 10 GAGE Guardrail for End Treatment Type 1 (Furnished by Vendor) | ||||||
| 59 | Install Extruder head for Type 1 End Treatment (MSKT) | 100 | EA | $0.00 | Install Extruder head for Type 1 End Treatment, MSKT (Furnished by Vendor) | ||||||
| 60 | Install Impact head for type 1 End Treatment (Soft Stop) | 10 | EA | $0.00 | Install Impact head for type 1 End Treatment, Soft Stop (Furnished by Vendor) | ||||||
| 61 | Repair End Treatment , Type 1 (MSKT) | 50 | EA | $0.00 | Repair End Treatment (MSKT) , Type 1 (Vendor furnish 1st Rail and Post 1). Removing and resetting the extruder head is incidental to this work. | ||||||
| 62 | Repair End Treatment, Type 1 (Soft Stop) | 5 | EA | $0.00 | Repair End Treatment (Soft Stop), Type 1, (Vendor Furnish 1st Rail and Post 1). Removing and resetting impact head is incidental to this work. | ||||||
| 63 | Remove & Replace Post & Offset Blocks Type 1 | 50 | EA | $0.00 | Remove and Replace Post and Offset Blocks for End Treatment Type 1 (MSKT and Soft Stop) Furnished by Vendor | ||||||
| 64 | Remove & Reset Extruder Head for Type 1 End Treatment (MSKT) | 25 | EA | $0.00 | Remove and Reset Extruder Head for Type 1 End Treatment (MSKT) | ||||||
| 65 | Remove & Reset Impact head for Type 1 End Treatment (Soft Stop) | 5 | EA | $0.00 | Remove and Reset Extruder Head for Type 1 End Treatment (Soft Stop) | ||||||
| 66 | Remove & Replace Post & Offset Blocks Type 4A | 30 | EA | $0.00 | Remove and Replace Post and Offset Blocks for End Treatment Type 4A (Furnished by Vendor) | ||||||
| 67 | Repair End Treatment, Type 4A | 5 | EA | $0.00 | Repair End Treatment, Type 4A (Vendor Furnish 1st Rail, Terminal and Post). Removing and resetting the terminal section for End Treatment Type 4A is incidental to this work. | ||||||
| 68 | Remove & Replace Slotted Guardrail for End Treatment Type 4A | 100 | LNFT | $0.00 | Remove and Replace Slotted Guardrail for End Treatment Type 4A (Furnished by Vendor) | ||||||
| 69 | Remove & Replace Terminal Section for Type 4A | 25 | EA | $0.00 | Remove and Replace Terminal Section for End Treatment Type 4A (Furnished by Vendor) | ||||||
| 70 | Install Wood Post for End Treatment Type 7 | 20 | EA | $0.00 | Install Wood Post for End Treatment Type 7 (Furnished by Vendor) | ||||||
| 71 | Remove End Treatment (All Types) | 100 | EA | $0.00 | Remove End Treatment (All Types) | ||||||
| 72 | Install Guardrail Conn to Bridge End Type A | 10 | EA | $0.00 | Install Guardrail Conn to Bridge End Type A (Furnished by Vendor) | ||||||
| 73 | Install Guardrail Conn to Bridge End Type A1 | 10 | EA | $0.00 | Install Guardrail Conn to Bridge End Type A1 (Furnished by Vendor) | ||||||
| 74 | Install Guardrail Conn to Bridge End Type C | 10 | EA | $0.00 | Install Guardrail Conn to Bridge End Type C (Furnished by Vendor) | ||||||
| 75 | Install Guardrail Conn to Bridge End Type D | 10 | EA | $0.00 | Install Guardrail Conn to Bridge End Type D (Furnished by Vendor) | ||||||
| 76 | Install Delineators for Guardrail-Mono Directional White | 10000 | EA | $0.00 | Install Delineators for Guardrail - Mono Directional White (Furnished by Vendor) | ||||||
| 77 | Install Delineators for Guardrail-Mono Directional Yellow | 10000 | EA | $0.00 | Install Delineators for Guardrail - Mono Directional Yellow (Furnished by Vendor) | ||||||
| 78 | Install Delineators for Guardrail Bi-Directional White | 10000 | EA | $0.00 | Install Delineators for Guardrail - Bi-Directional White (Furnished by Vendor) | ||||||
| 92 | Scrap Metal Credit | 100000 | LNFT | $0.00 | The Vendor shall provide a Scrap Metal Credit of $1.00 per linear foot of damaged guardrail retained by the Vendor. | ||||||
| 93 | Remove Guardrail Connector to Bridge End | 10 | LNFT | $0.00 | Remove Guardrail Connector to Bridge End (All Types) | ||||||
| 94 | Thrie Beam GR – FBV | 500 | LNFT | $0.00 | Thrie Beam GR – Furnished by Vendor | ||||||
| 95 | Thrie Beam Transition to SF GR – FBV | 5 | EA | $0.00 | Thrie Beam Transition to SF GR – Furnished by Vendor | ||||||
| 96 | Install Thrie Beam Offset Block | 50 | EA | $0.00 | Install Thrie Beam Offset Block | ||||||
| 97 | Install Thrie Beam Post (6'9" W6 x 8.5# standard) | 50 | EA | $0.00 | Install Thrie Beam Post (6'9" W6 x 8.5# standard) | ||||||
| 98 | Install Thrie Beam Terminal Section End | 5 | EA | $0.00 | Install Thrie Beam Terminal Section End | ||||||
| 99 | Install Thrie Beam Bridge Post | 50 | EA | $0.00 | Thrie Beam Bridge post (W6 x 15# x 2’1” tall with ¾” x 10”x 14”base plate) for use across bridge applications. | ||||||
| 100 | Install 3.5" OD Aluminum Handrail | 100 | LNFT | $0.00 | Install 3.5" OD Aluminum Handrail (Furnished by Department) | ||||||
| 101 | Install 4" OD Aluminum Handrail | 100 | LNFT | $0.00 | Install 4" OD Aluminum Handrail (Furnished by Department) | ||||||
| 102 | Install 4.5" OD Aluminum Handrail | 100 | LNFT | $0.00 | Install 4.5" OD Aluminum Handrail (Furnished by Department) | ||||||
| 103 | Install 4.5" OD High Strength Aluminum Handrail | 100 | LNFT | $0.00 | Install 4.5" OD High Strength Aluminum Handrail (Furnished by Department) | ||||||
| 104 | Install High Strength Handrail Post | 100 | EA | $0.00 | Install High Strength Handrail Post (Furnished by Department) | ||||||
| 105 | Install One Hole Aluminum Handrail Post | 100 | EA | $0.00 | Install One Hole Aluminum Handrail Post (Furnished by Department) | ||||||
| 106 | Install Two Hole Aluminum Handrail Post | 100 | EA | $0.00 | Install Two Hole Aluminum Handrail Post (Furnished by Department) | ||||||
| 107 | Remove Aluminum Handrail | 100 | LNFT | $0.00 | Remove Aluminum Handrail (Furnished by Department) | ||||||
| 108 | Remove Aluminum Handrail Post | 100 | EA | $0.00 | Remove Aluminum Handrail Post (Furnished by Department) | ||||||
| 109 | Remove and Reset Thrie Beam Guardrail | 100 | LNFT | $0.00 | Remove and Reset Thrie Beam Guardrail | ||||||
| Install 6" Composite Offset Blocks | 50.00 | EA | $0.00 | Install 6" Composite Offset Blocks (Furnished by Vendor) | |||||||
| TOTAL | $0.00 |
File details come from the government source that posted it. Updated .