Vault Toilet Excavation Specifications.pdf
PDF 265 KB Posted
- Solicitation number
- 1240LU25Q0090
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is an Installation Specification for Vault Toilet Excavation, providing detailed instructions for excavating and installing precast concrete vault toilets in outdoor settings. The specification covers three vault toilet types with specific excavation requirements: the "Aspen" Single vault toilet (8' x 16' x 4'-9"), the MCC Double Vault toilet (14' x 16' x 4'-9"), and a Double Vault Toilet with Chase (18' x 16' x 4'-9"). Key requirements include using sand or 3/8" crushed aggregate for bedding, applying 1"x1" Butyl Rubber Sealant between vault and toilet floor, and ensuring proper site access with trucks capable of reaching the installation location. The document emphasizes compliance with OSHA excavation standards, precise floor elevation placement (4-6 inches above natural grade), proper drainage, compaction procedures, and site restoration, including spreading excess excavated material and topsoil while removing rocks over one inch in dimension.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 1240LU25Q0090.pdf | ||
| Sections B-C.pdf | ||
| Sections D-M.pdf | ||
| KNF Food Storage Order.pdf | ||
| Pinkham Falls Map.pdf | ||
| SVT Through Design.pdf | ||
| Vault Toilet Specifications.pdf | ||
| Wage Determination MT20240078 06-06-2025.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Vault Toilet Excavation
INSTALLATION
A. Scope of Work
1. Work specified under this Section includes excavation, backfill and placement of precast concrete vault toilet.
B. Materials
1. Bedding material to be sand or 3/8" minus crushed or screened aggregate (provided by excavator).
2. Sealant between vault and toilet floor to be 1"x1" Butyl Rubber Sealant.
C. Location and Access to the Site
1. The area must be free of overhead or underground obstructions.
2. Care must be taken to not place excavated material in the area where the crane must sit.
3. Verify that bridges/culverts enroute to the site are rated for HS-20 loading.
4. Deliveries may be delayed if road conditions are hazardous or unsuitable for normal trucks and trailers.
5. Trucks must be able to reach the site under their own power.
NOTE: It is the responsibility of the customer to locate the vault toilet in an area that provides safe and reasonable access for trucks and equipment.
D. Excavation and Elevation
1. Comply with all applicable OSHA Standards for excavation.
2. The "Aspen" Single vault toilet requires a hole that is: 8’ x 16’ x 4'-9"
3. The MCC Double Vault toilet requires a hole that is: 14’ x 16’ x 4’-9”
4. Double Vault Toilet with Chase requires a hole that is: 18’ x 16’ x 4’-9”
5. Finish floor elevation will be 4-6 inches above natural grade measured at the front (entrance) of the exterior slab unless otherwise approved by the customer. The customer may specify a finish floor elevation for buildings at some sites. The contractor will install buildings at these sites with the floor elevation within ±0.05 feet of the specified floor elevation. It is very important that the installation provides drainage away from the structure.
E. Bedding and Compaction Compacted with a minimum of two passes with a whacker-type mechanical compactor or equivalent approved by the customer.
1. Spread excess excavated material from the vault around structure. Intended final grade is flush with the top of the front slab. Allow for placement of topsoil to reach that grade. Grade backfill away from structure from structure at maximum slope of five (5) percent unless otherwise approved by the customer.
2. Spread stockpiled topsoil as final layer after rough grading is completed. Areas disturbed by excavation, backfilling and stockpiling of excavated materials will be handed raked to remove exposed rocks over one inch in maximum dimension. Oversized rocks removed from the surface shall be disposed of in a designated area within 200 feet of the site.
F. Finish Grading
1. Spread excess excavated material from the vault around structure. Intended final grade is flush with the top of the front slab. Allow for placement of topsoil to reach that grade. Grade backfill away from structure from structure at maximum slope of five (5) percent unless otherwise approved by the customer.
2. Spread stockpiled topsoil as final layer after rough grading is completed. Areas disturbed by excavation, backfilling and stockpiling of excavated materials will be handed raked to remove exposed rocks over one inch in maximum dimension. Oversized rocks removed from the surface shall be disposed of in a designated area within 200 feet of the site.
chunt Highlight
File details come from the government source that posted it. Updated .