Vault 4 5 CRAC Units Mechnical Dwgs date 6-26-2026.pdf
PDF 1012 KB Posted
- Attached to
- CRAC Vault 4/5 Main Treasury
- Solicitation number
- 2032H326R00018
About this file
This is a set of mechanical engineering design drawings for a HVAC replacement project at the US Treasury building located at Pennsylvania Avenue in Washington, DC. The project involves the replacement of air conditioning units serving Vaults #4 and #5. The work is documented under SRBR Project No. 25111-45 with a pricing set dated June 26, 2026, and includes professional certification by a licensed professional engineer (PE905594, expiration 8-31-2026) from SRBR, an MEP consulting firm based in Catonsville, Maryland.
The drawings include a mechanical cover sheet (M001), demolition plans (M101), new work mechanical plans (M102), and mechanical schedules and details (M201). The scope encompasses the removal and replacement of Computer Room AC (CRAC) units, including associated chilled water piping, condensate lines, humidification systems, and related mechanical components. The three CRAC units specified are: CRAC-4A serving Vault 4, CRAC-5A serving Vault 5, and CRAC-5B also serving Vault 5. All piping is located below the raised floor. The specifications require a complete and operational system installed in accordance with manufacturer requirements and applicable building codes (IMC, IPC, NEC, NFPA, ASHRAE, and SMACNA standards). Equipment startup testing and commissioning by a certified manufacturer representative is required, with all operating parameters to be programmed in coordination with building operations staff.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A001.pdf | ||
| QAs.pdf | ||
| Corporate Experience Worksheet.docx | DOCX document | |
| APU No. 26-01 - Attachment 1 - Fillable.pdf | ||
| APU No. 26-01 - Attachment 2 - Fillable.pdf | ||
| 2032H326R00018.pdf | ||
| Vault 4 5 CRAC Units Electrical Dwgs date 6-26-2026.pdf | ||
| Schedule CRAC Vault 4_5.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VAULT 2
VAULT 3VAULT 8
VAULT 6
VAULT 5
VAULT 4
VAULT 10
V9-E V9-D
V9-B
V9-C
V9-A
VAULT 7
VAULT 1
AREA OF WORK
M001
MECHANICAL
COVER
SHEET
NO SCALE
KEYPLAN
DRAWING NO. :
SRBR NO. :
DATE :
REVISION :
SHEET TITLE :
PR
O
JE
C
T
C L
IE
N
T
E N
G
IN
E E
R
U S
T R
E A
S U
R Y
V A
U L
T S
A
C U
N
IT
U
S T
R E
A S
U R
Y P
E N
N S
Y L
V A
N
IA
A V
E W
A S
H
IN
G T
O N
D
C
SRBR No: 25111-45
PRICING SET 6/26/2026
“Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the state of , License No. , Expiration Date: .”
PE905594
8-31-2026
Washington DC
P h o n e:
.8
.7
F a x:
.8
-7
F re d er ic k
R o d u it e
C a to n sv il le
M a ry la n d
M E
P C o n su lt in g
E n g in ee rs s in ce
S R
B R
W eb w w w
.S R
B R en g in ee rs .c o m
R E
P L
A C
E M
E N
T
25111-45
6-26-2026
Ex.14"x10"
Ex.14"x12"
12"Ø
CRAC-4-A
CRAC-5-A
CRAC-5-B
VAULT 5
VAULT 4
1"
CD
CD
C D
1"
4"
C W
CW
CW
4"
4"
C H
RC
H
S
CHR
CHS
2"
2"
ALL PIPING SHOWN IS LOCATED
BELOW THE RAISED FLOOR
4"
CD
C D
C W
CW
C H
S C
H R
4"
4"
3 3
ALL PIPING SHOWN IS LOCATED
BELOW THE RAISED FLOOR
VAULT 5
VAULT 4
SCALE: 1/4" = 1'-0"
VAULTS 4 AND 5 PLAN - MECHANICAL DEMOLITION
0 1' 2' 4' 8'
M101
VAULTS 4 & 5
NEW WORK
MECHANICAL
GENERAL NOTES
1. CONTRACTOR TO PERFORM A PRE-BALANCE TEST OF BOTH
CHILLED WATER AND SUPPLY AIRFLOW FOR THE ROOM AND EACH
EXISTING CRAC UNIT. DOCUMENT THE READINGS IN A REPORT
AND SUBMIT TO THE ENGINEER FOR REVIEW
2. WORK SHALL BE SCHEDULED WITH THE OCCUPANTS OF THE
ROOM 1 WEEK IN ADVANCE.
3. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS, PIPE
ARRANGEMENTS, SIZES, LOCATION, ETC. BEFORE BIDDING THE
WORK
CUT EXISTING PIPES AT POINT INDICATED AND REMOVE BACK TO
UNIT. PREPARE PIPES FOR CONNECTION OF NEW PIPING
REMOVE EXISTING CRAC UNIT ENTIRELY INCLUDING ALL LOCAL
PIPING, CONTROLS, SUPPORTS, POWER, ETC. PREPARE AREAS
FOR NEW UNIT
EXISTING AIR DEVICE TO REMAIN. CLEAN THE AIR DEVICE.
DEMOLITION PLAN NOTES
DRAWING NO. :
SRBR NO. :
DATE :
REVISION :
SHEET TITLE :
PR
O
JE
C
T
C L
IE
N
T
E N
G
IN
E E
R
U S
T R
E A
S U
R Y
V A
U L
T S
A
C U
T
R E
A S
U R
Y P
E N
N S
Y L
V A
N
IA
A V
E W
A S
H
IN
G T
O N
D
C
SRBR No: 25111-45
PRICING SET 6/26/2026
“Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the state of , License No. , Expiration Date: .”
PE905594
8-31-2026
Washington DC
P h o n e:
.8
.7 x:
.8
-7
F re d er ic k R o it e
C a to n sv il le
M a ry la n d
M E
P C o n su lt in g
E n g in ee rs s in ce
S R
B R
W eb w w w
.S R
B R en g in ee rs
.c
P L
A C
E M
E N
T
Ex.14"x10"
Ex.14"x12"
12"Ø
1"
CD
CD
C D
1"
2"
CW
CW
2"
C H
RC
H
S
CHR
CHS
2"
2"
ALL PIPING SHOWN IS LOCATED
BELOW THE RAISED FLOOR
2"
CD
C D
CW
C H
S C
H R
4"
4"
ALL PIPING SHOWN IS LOCATED
BELOW THE RAISED FLOOR
A
CRAC
4A
CRAC
5A
CRAC
5B
B
B
C
C
C
D
E E
VAULT 5
VAULT 4
SCALE: 1/4" = 1'-0"
VAULTS 4 AND 5 PLAN - MECHANICAL NEW WORK
0 1' 2' 4' 8'
CONNECT NEW 11
4" CHS, 11
4" CHR, 12" CW AND 3 4" CD TO EXISTING
PIPE, EXTEND OVER TO NEW UNIT AND CONNECT. SEE DETAIL
FOR PIPE AND VALVE ARRANGEMENT OF PIPE CONNECTIONS
CONNECT NEW 21
2" CHS, 21
2" CHR, 12" CW AND 1" CD TO EXISTING
PIPE, EXTEND OVER TO NEW UNIT AND CONNECT. SEE DETAIL
FOR PIPE AND VALVE ARRANGEMENT OF PIPE CONNECTIONS
SET NEW UNIT ON FLOOR IN PLACE OF EXISTING. SET UNIT ON
FLOOR NEW FLOOR STAND SET TO THE EXISTING FLOOR HEIGHT.
REPAIR/REPLACE SURROUNDING FLOOR TILES AS NEEDED FOR
A COMPLETE AND CONTIGUOUS FLOOR SYSTEM AROUND THE
UNIT. REMOVE TILES OR MODIFY TILES AS NEEDED.
BALANCE EXISTING AIR DEVICE TO 75 CFM
BALANCE EXISTING AIR DEVICE TO 65 CFM
NEW WORK PLAN NOTES
A
B
C
D
E
M102
VAULTS 4 & 5
NEW WORK
MECHANICAL
GENERAL NOTES
1. CONTRACTOR TO PERFORM A PRE-BALANCE TEST OF BOTH
CHILLED WATER AND SUPPLY AIRFLOW FOR THE ROOM AND EACH
EXISTING CRAC UNIT. DOCUMENT THE READINGS IN A REPORT
AND SUBMIT TO THE ENGINEER FOR REVIEW
2. WORK SHALL BE SCHEDULED WITH THE OCCUPANTS OF THE
ROOM 1 WEEK IN ADVANCE.
3. UNIT CONTROLS SHALL BE INTEGRATED INTO EXISTING BUILDING
MANAGEMENT SYSTEM (BMS). UNIT SHALL BE SET UP TO
MAINTAIN A SPACE TEMPERATURE OF 72 DEGREES AND 50%
RELATIVE HUMIDITY. BMS SHALL MONITOR, AT MINIMUM,
OPERATING STATUS OF THE UNIT, CHILLED WATER POSITION,
SPACE TEMPERATURE, SPACE RH AND ALL ALARMS.
4. CONTRACTOR TO FIELD VERIFY ALL EXISTING CONDITIONS, PIPE
ARRANGEMENTS, SIZES, LOCATION, ETC. BEFORE BIDDING THE
WORK
5. ADD PERFORATED FLOOR TILES AS NEEDED IN VAULT 4 TO
ASSURE ADEQUATE AIRFLOW PASSES FROM UNDER THE FLOOR
TO ABOVE THE FLOOR. THE AGGREGATE AREA OF OPENING IN
THE FLOOR TILES SHALL NOT BE LESS THAN 480 SQUARE INCHES.
6. CONTRACTOR SHALL INCLUDE IN HIS/HER SCOPE TO PATCH
OPENINGS IN WALLS BELOW FLOOR SEPARATING ONE ROOM
FROM ADJACENT ROOMS. WALLS SHALL BE PATCHED USING 20
GAGE METAL STUDS 16" ON CENTER AND 12" GYPSUM BOARD ON
BOTH SIDE OF THE WALL WITH ALL JOINTS TAPED AND SPACKLED.
DRAWING NO. :
SRBR NO. :
DATE :
REVISION :
SHEET TITLE :
PR
O
JE
C
T
C L
IE
N
T
E N
G
IN
E E
R
U S
T R
E A
S U
R Y
V A
U L
T S
A
C U
T
R E
A S
U R
Y P
E N
N S
Y L
V A
N
IA
A V
E W
A S
H
IN
G T
O N
D
C
SRBR No: 25111-45
PRICING SET 6/26/2026
“Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the state of , License No. , Expiration Date: .”
PE905594
8-31-2026
Washington DC
P h o n e:
.8
.7 x:
.8
-7
F re d er ic k R o it e
C a to n sv il le
M a ry la n d
M E
P C o n su lt in g
E n g in ee rs s in ce
S R
B R
W eb w w w
.S R
B R en g in ee rs
.c
P L
A C
E M
E N
T
M201
VAULTS 4 & 5
MECHANICAL
SCHEDULES
& DETAILS
STRAINER WITH THREADED HOSE-
END CONNECTION FOR BLOWDOWN
BALL VALVE - TYPICAL
POSITIVE SHUT-OFF CIRCUIT
SETTER WITH TEST PORTS AND
MEMORY LOCK
CHWS
CHWR
COMPUTER ROOM AC UNIT WITH
TOP RETURN, BOTTOM
DISCHARGE
CONNECT CHILLED WATER LINES
TO UNIT COIL CONNECTIONS
FACTORY FURNISHED
MODULATING TWO-WAY
CONTROL VALVE
RAISE FLOOR
BASEMENT FLOOR
UNIT FLOOR STAND
NO SCALE
COMPUTER ROOM AC UNIT PIPING DETAIL
1" COPPER CONDENSATE LINE
WITH CHECK VALVE
2" COLD WATER
CONNECT COLD WATER TO
UNIT HUMIDIFIER
MECHANICAL SPECIFICATIONS
1. Furnish and install a complete and operational system in accordance with drawings and these specifications. Provide all materials whether specified or not for a complete and operational system that complies with all required codes and standards. All materials and equipment shall be installed in accordance with the manufacturer's instructions and all applicable codes and standards.
Equipment shall be installed complete including power, controls, supports, etc. Equipment and associated controls shall be functionally tested in all operating modes. All equipment and materials shall be new unless otherwise indicated.
2. The contractor shall be responsible for visiting the site prior to bid and becoming familiar with all existing conditions that may affect his work. The contractor shall include in his bid any required labor and materials necessary to modify, remove or relocate existing work to allow for the new work to be installed. If the contactor believes the new work cannot be installed as shown in the drawings, he shall inform the project construction manager immediately. There shall be no additional compensation for failure to include coordination with existing conditions in the scope and cost.
3. All work shall be done in accordance with applicable building, mechanical, plumbing, electrical and energy codes and standards.
These include, but are not limited to the latest International Building Code (IBC), International Mechanical Code (IMC), International Plumbing Code (IPC), International Fuel Gas Code (IFGC), National Fire Protection Association (NFPA), American Society of Refrigeration and Air Conditioning Engineers (ASHRAE), Sheet Metal and Air Conditioning Contractors National Association (SMACNA), National Electrical Code ASME CSD-1.
4. The contractor shall maintain a competent superintendent on site at all times who will oversee all work and ensure the construction is done in a safe, clean and professional manner. He shall ensure the work is done in accordance with the project specifications, all layout is correct and accurate and the quality of the workmanship meets or exceed industry standards. He shall also verify all manufacturer instructions are being followed for installation and setup.
5. The contractor shall submit equipment shop drawings for all major equipment and materials including, but not limited to Computer Room AC units, pipe, valves and insulation. Shop drawings shall indicate materials, dimensions, weights, performance data and warranty information. Equipment shall be as scheduled on the drawings. Alternate manufacturers may be considered provided they meet or exceed the scheduled performance data and are of equal or better quality. Alternate equipment must fit within the allotted space.
6. The contractor shall maintain a set of as-built documents on site at all times. The drawings shall maintain red-line markup of all deviations from the deign documents and include pertinent information such as critical dimensions and elevations.
7. All new equipment and materials shall be reviewed by the contractor before ordering to ensure the equipment will fit in the given space, is suitable for the location, arrangement of duct, piping, etc, and can be serviced once installed. All required service access space shall be maintained and room shall be provided to remove filters and manipulate valves and dampers. Verify equipment electrical characteristics meet the existing available power.
8. The new unit shall be labeled with a phenolic engraved plate that lists the unit ID number, Airflow, Quantity of motors, Motor HP, Motor Amperage, Voltage/Phase, quantity of filters and sizes, chilled water flow in gpm.
9. Computer Room AC units shall be started and tested by a certified representative of the manufacturer. All other equipment shall be started and tested by the installing contractor. The equipment shall be tested in all modes of operation. All operating set points shall be programmed in coordination with the building operating staff. Verify all peripheral components including, but not limited to, control valves, sensors, interlocks, etc operate as intended and specified. The contractor shall provide a one year parts and labor warranty starting from the date the project is accepted and considered substantially complete by the engineer. At the time the equipment is turned over to the owner, all units shall have clean filters.
10. All new air and hydronic systems shall be balanced by a third-party firm certified by AABC or NEBB. Test and balance all fans and the computer room AC unit. All airflows and water flows shall be set to within 10% of that prescribed on the drawings. Submit to the engineer of record a Test and Balance report at the completion of the project indicating information about each piece of equipment and each system. Provide equipment operating data, and individual supply outlet measurement.
11. Chilled water pipe and cold water pipe shall be type L copper with soldered fittings and joints. Pro-Press joints and fittings are also acceptable. Ball valves shall be of bronze construction and full port with extended handles and a drain port placed on the unit side.
Balance valves shall be brass construction and include test ports and memory stops. They shall be equal to “Xylem Circuit Setters”.
Chilled water pipe and cold water pipe shall be insulated with closed cell elastomeric preformed pipe insulation equal to “Armacell”, ½” thick. All joints and plain ends shall be sealed with an appropriate sealant.
12. Condensate drain pipe shall be DWV or type L copper, insulated with closed cell elastomeric preformed pipe insulation equal to “Armacell”, ½” thick. Install check valve in the new or existing condensate line
13. The CRAC unit floor stand shall be provided with the unit, by the manufacturer. The stand shall be constructed out of steel with reinforced, adjustable legs to the set the height needed. the stand shall support eh unit along the entire perimeter and shall have legs at each corner and evenly spaced along the long dimension. The legs shall have enlarged feet to spread the load.
14. The CRAC unit shall be as scheduled, Basis of design is Liebert, 460V-3 phase, down-flow, chilled water units. units shall be provided with a modulating 2-way control valve, floor stand, ECM fan motor, MERV 8 filters, infrared humidifier, electric resistance reheat, alarm contacts, remote shut-down contact, smoke sensor and high temperature sensor, LT410 point leak detection sensor (1 per unit), locking disconnect and complete packaged controls. The controls shall be capable of being integrated into the existing Siemens Building Management System (BMS). The BMS shall provide room operating set points, start/stop signals, and shall monitor various operating parameters such as space temperature, space RH (%), unit control valve position, unit operating status and alarms.
DRAWING NO. :
SRBR NO. :
DATE :
REVISION :
SHEET TITLE :
PR
O
JE
C
T
C L
IE
N
T
E N
G
IN
E E
R
U S
T R
E A
S U
R Y
V A
U L
T S
A
C U
T
R E
A S
U R
Y P
E N
N S
Y L
V A
N
IA
A V
E W
A S
H
IN
G T
O N
D
C
SRBR No: 25111-45
PRICING SET 6/26/2026
“Professional Certification. I hereby certify that these documents were prepared or approved by me, and that I am a duly licensed professional engineer under the laws of the state of , License No. , Expiration Date: .”
PE905594
8-31-2026
Washington DC
P h o n e:
.8
.7 x:
.8
-7
F re d er ic k R o it e
C a to n sv il le
M a ry la n d
M E
P C o n su lt in g
E n g in ee rs s in ce
S R
B R
W eb w w w
.S R
B R en g in ee rs
.c
P L
A C
E M
E N
T
25111-45
6-26-2026
ALL VALVES, FITTINGS AND LOCAL
PIPING SHALL BE NEW.
| Sheets and Views |
| 25111_45_M001-M001 |
| 25111_45_M101-M101 |
| 25111_45_M101-M102 |
| 25111_45_M201-M201 |
File details come from the government source that posted it. Updated .