This document is an industry update presentation for the Northeast Parking Structure project at VA John Cochran Division in St. Louis, Missouri, dated July 14, 2026.

The project involves design-build construction of a 627-space parking structure serving veterans, visitors, and staff at the VA healthcare facility. The structure will include an elevator tower with three elevators, a covered walkway connecting to the main hospital, and optimized traffic flow design. The Construction Cost Limit (CCL) is $55 million, with a mandatory Project Labor Agreement (PLA) required to be submitted with proposals. The procurement requires a minimum Cybersecurity Maturity Model Certification (CMMC) of Level 1 (self-certified) with no Controlled Unclassified Information (CUI). Proposals must be submitted to the Procurement Integrated Enterprise Environment (PIEE) by the deadline specified in the RFP. The program is being executed by the U.S. Army Corps of Engineers with Program Manager Hamze Fares and Contracting Officer David Walsh overseeing the acquisition. The project is scheduled for design-build work beginning in FY27, with construction phasing planned through FY35 to accommodate campus constraints and sequencing with other capital projects including a bed tower, central utility plant, and engineering building.

Evaluation will occur in two phases, with Phase 1 prioritizing Performance Confidence (relevancy, recency, and past performance quality) and Phase 2 emphasizing Concept Design Solution. Offerors must demonstrate three relevant prime projects valued at $25 million or greater (adjusted to present day value with 5% yearly escalation), preferably involving parking structures using design-build delivery, Department of Veterans Affairs experience, and constrained site construction. Projects must be completed within the past eight years with CPARS or PPQ ratings provided. Phase 2 evaluation will assess narrative design solutions addressing project objectives, architecture and aesthetics (minimum two, maximum four renderings), and a construction phasing and logistics plan demonstrating how the proposed solution meets RFP requirements while achieving project intent.

View the file

Other files

File Type Posted
VA NEPS Project Update - June 2026.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

NORTHEAST PARKING STRUCTURE INDUSTRY UPDATE

VA JOHN COCHRAN DIVISION, ST. LOUIS, MO

PROGRAM MANAGER: HAMZE FARES

CONTRACTING OFFICER: DAVID WALSH

July 14, 2026

2VA JOHN COCHRAN DIVISION, ST. LOUIS

Northeast Parking Structure – Industry Update

BUILDING FOR HEROES

AGENDA

Programmatic Overview

Program Phasing & Campus Constraints

Northeast Parking Procurement – Overview

- Scope

- Submission and Evaluation Factors

- Cybersecurity Maturity Model Certification (CMMC)

- CCL and PLA

- 1 on 1

Open Q&A Session

BUILDING FOR HEROES

VA JOHN COCHRAN DIVISION, ST. LOUIS

Program Schedule

2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4 1 2 3 4

Joint Use:

Award:

Construction:

Activation:

PreCon Svs:

Design:

Acquisition:

FY26 FY34 FY35FY28 FY29 FY30 FY31 FY32 FY33FY27

FY35FY29 FY30 FY31 FY32 FY33 FY34

Integrated Design and Construction

Equipment

FY26 FY27 FY28

New Cx SATOC

IPO Revisions

Relocate 54" Waterline

ICT Swing Space

Northeast Parking Structure

New A/E SATOC

Demo

AE SATOC

Bed Tower, OTP, East Site Work

IPO

Pre-Construction Services

CUP, Motor Pool, Engineering Building

Northeast Parking Structure - Design Build

Advertise

ICT

Waterline

CX SATOC

VA Swing Space

South Parking Structure

SD-2

CDSD-2

DD CD

SD-2 DD CD

DD1 DD2

Lead TimeValidate Installation

VA JOHN COCHRAN DIVISION, ST. LOUIS

Early Concept Phasing – Phase 1

Phase 1

• Add 3 levels to N/W Parking Deck

• Vacate Windsor Pl, Bell Ave, Enright Ave.

• Relocate Existing Utility Lines

• Raze 6 residential homes and Sweetie Pies

VA JOHN COCHRAN DIVISION, ST. LOUIS

Early Concept Phasing – Phase 2

Phase 2

• Build CUP and Engineering/Facilities

Building

• Close Bell up to building 2.

• Laydown area next to parking deck

VA JOHN COCHRAN DIVISION, ST. LOUIS

Early Concept Phasing – Phase 3

Phase 3

• Raze all Western Facility and Engineering buildings.

• Prepare site for bed tower.

VA JOHN COCHRAN DIVISION, ST. LOUIS

Current Planned Phasing

More Than Just a Parking Garage

• This project that will drastically improve the daily experience for Veterans, their families, and the dedicated staff at the VA St. Louis Healthcare System.

• Remove constraints for staff and patient population and reduce safety concerns with scattered parking around the campus during congested construction.

• Serves as the first permanent major construction feature across the program.

• Architectural Importance and Aesthetics of Design

CMMC

• To streamline the procurement process and encourage broader participation, minimum Cybersecurity Maturity Model Certification (CMMC) requirement (No CUI, most minimum, Level 1, self cert).

NEPS Scope

• 627 dedicated parking stalls

• Serving Veterans, visitors, and staff.

• Elevator Tower: Equipped with three elevators for rapid access.

• Covered Walkway: Seamless connection to the main hospital, providing protection from the elements.

• Easy Navigation: Thoughtful design specifically tailored for intuitive wayfinding.

• Traffic Flow: Optimized layout intended to minimize campus congestion.

VA JOHN COCHRAN DIVISION, ST. LOUIS

Northeast Parking Structure – Overview

Submission and Evaluation Factors

10VA JOHN COCHRAN DIVISION, ST. LOUIS

Phase 1, Factor 1-1 Performance Confidence (Most Important Phase 1)

RELEVANCY

• 3 relevant projects as Prime.

• Examples of relevancy:

• Projects valued at time of award at $25,000,000 or greater (present day value, utilize 5% yearly escalation factor).

• Demonstrated experience involving parking structures building using the Design-build delivery method.

• Demonstrated experience working with DVA, CFM, TIL, or UFC.

• Demonstrated experience on a constrained site

• Demonstrated compliance with USACE

Contractor Construction Quality Management.

RECENCY

• Completed within the past 8 years

• More recent project performance will typically be a stronger predictor of future success and have more influence on the performance confidence assessment.

QUALITY OF PAST PERFORMANCE

• CPARS or PPQ for each submitted project.

Important Note Solicitation documents mention pre-cast construction. This is not a requirement, cast-in-place can be utilized if the builder determines that is more advantageous.

11VA JOHN COCHRAN DIVISION, ST. LOUIS

Phase 2, Factor 2-1 Concept Design Solution (Most Important in Ph 2)

Design and Construct Construction Cost Limit

(CCL) $55M

BUILDING FOR HEROES

VA JOHN COCHRAN DIVISION, ST. LOUIS

Northeast Parking Structure – Industry Update

Mandatory Project Labor Agreement (PLA) Submitted with proposal

To be responsive, a proposal must be received at the location identified in the RFP, no later than the time identified in the RFP.

Proposals Uploaded to Procurement Integrated

Enterprise Environment (PIEE).

Follow Instructions in the RFP.

CUI

CUI

1 on 1 Interviews and Path Forward

BUILDING FOR HEROES

CUI

CUI

Questions

BUILDING FOR HEROES

northeast parking structure INDUSTRY UPDATE
VA JOHN COCHRAN DIVISION, ST. LOUIS�Northeast Parking Structure – Industry Update
VA JOHN COCHRAN DIVISION, ST. LOUIS�Program Schedule
VA JOHN COCHRAN DIVISION, ST. LOUIS�Early Concept Phasing – Phase 1
VA JOHN COCHRAN DIVISION, ST. LOUIS�Early Concept Phasing – Phase 2
VA JOHN COCHRAN DIVISION, ST. LOUIS�Early Concept Phasing – Phase 3
VA JOHN COCHRAN DIVISION, ST. LOUIS�Current Planned Phasing
VA JOHN COCHRAN DIVISION, ST. LOUIS�Northeast Parking Structure – Overview
VA JOHN COCHRAN DIVISION, ST. LOUIS�Submission and Evaluation Factors
VA JOHN COCHRAN DIVISION, ST. LOUIS�Phase 1, Factor 1-1 Performance Confidence (Most Important Phase 1)
VA JOHN COCHRAN DIVISION, ST. LOUIS�Phase 2, Factor 2-1 Concept Design Solution (Most Important in Ph 2)
Design and Construct Construction Cost Limit (CCL) $55M�
1 on 1 Interviews and Path Forward