Project#: 612A4-13-311 Bldg. 700, 1st Floor Renovation, SMC
Solicitation number
VA26117B0515
Issued by

About this file

VA261-17-B-0515 B700 1st Floor Imaging - 100CD Specs_11-30-2017.pdf

View the file

Other files

File Type Posted
36C26118C0089-000.docx DOCX document
VA261-17-B-0515-A00002002.pdf PDF
VA261-17-B-0515-A00002001.docx DOCX document
VA261-17-B-0515-A00002000.docx DOCX document
VA261-17-B-0515-A00002003.pdf PDF
VA261-17-B-0515-A00001001.pdf PDF
VA261-17-B-0515-A00001002.pdf PDF
VA261-17-B-0515-A00001000.docx DOCX document
VA261-17-B-0515-020.pdf PDF
VA261-17-B-0515-018.docx DOCX document
VA261-17-B-0515-022.pdf PDF
VA261-17-B-0515-023.pdf PDF
VA261-17-B-0515-019.docx DOCX document
VA261-17-B-0515-024.pdf PDF
VA261-17-B-0515-001.docx DOCX document
Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA MATHER

BUILDING 700 FIRST FLOOR

RENOVATION – IMAGING DEPARTMENT

100% Construction Document Specifications

VA – Northern California Health Care System Mather, California

DVA Project No.612-A4-13-311 April 28, 2017

BUILDING 700 FIRST FLOOR RENOVATIONS DVA Project No. 612A4-13-311

IMAGING DEPARTMENT

Mather, CA VA Northern California Health Care System

TABLE OF CONTENTS

00 01 00 - 1

SECTION 00 01 00

DIVISION 00 – SPECIAL SECTIONS

00 01 15 List of Drawing Sheets 1

DIVISION 01 – GENERAL REQUIREMENTS

01 00 00 General Requirements 15 01 32 16.15 Project Schedules 7 01 33 23 Shop Drawings, Product Data, and Samples 4 01 35 26 Safety Requirements 21 01 42 19 Reference Standards 8 01 45 29 Testing Laboratory Services 4 01 57 19 Temporary Environmental Controls 4 01 58 16 Temporary Interior Signage 1 01 74 19 Construction Waste Management 5

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 3

DIVISION 03 – CONCRETE

03 10 00 Concrete Forms 4 03 20 00 Concrete Reinforcing 3 03 30 00 Cast-in-Place Concrete 8

DIVISION 04 – MASONRY

Not Used

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 4 05 40 00 Cold-Formed Metal Framing 6 05 50 00 Metal Fabrications 10

DIVISION 06 – WOOD AND PLASTIC

06 10 00 Rough Carpentry 5 06 20 00 Finish Carpentry 11

DIVISION 07 – THERMAL AND MOISTURE PROECTION

07 21 13 Building Insulation 3

00 01 00 - 2

07 71 00 Roof Specialties 4 07 81 00 Applied Fireproofing 6 07 84 00 Firestopping 5 07 92 00 Joint Sealants 8

DIVISION 08 – DOORS AND WINDOWS

08 11 13 Hollow Metal Frames 7 08 14 00 Interior Wood Doors 6 08 31 13 Access Doors and Frames 5 08 36 16.13 Barn (Sliding) Doors 5 08 71 00 Door Hardware 18 08 71 13 Automatic Door Operators 6 08 80 00 Glazing 7

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 7 09 06 00 Schedule for Finishes 13 09 22 16 Non-Structural Metal Framing 7 09 29 00 Gypsum Board 9 09 30 13 Ceramic / Porcelain Tiling 13 09 51 00 Acoustical Ceilings 9 09 54 33 Cleanroom Ceiling Systems 5 09 65 13 Resilient Base and Accessories 4 09 65 16 Resilient Sheet Flooring 9 09 68 00 Carpeting 7 09 72 00 Wall Coverings 7 09 91 00 Painting 18 09 94 00 Special Coatings 6

DIVISION 10 – SPECIALTIES

10 11 13 Markerboards 4 10 14 00 Signage 7 10 21 23 Cubicle Curtain and Tracks 4 10 25 13 Patient Headwall Systems 8 10 26 00 Wall Protection 4 10 28 00 Toilet and Bath Accessories 8 10 44 13 Fire Extinguisher Cabinets 2 10 51 13 Lockers 4

DIVISION 11 – EQUIPMENT

11 70 00 Healthcare Equipment 10 11 73 00 Ceiling Mounted Patient Lift System 4

DIVISION 12 – FURNISHINGS

00 01 00 - 3

12 32 00 Manufactured Wood Casework 7 12 36 00 Countertops 6

DIVISION 13 – SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural Components 6 13 49 00 Radiation Protection 9 13 49 00 Radiation Protection Shielding Report 7

DIVISION 14 – CONVEYING SYSTEMS

DIVISION 21 – FIRE SUPPRESSION

21 13 13 Wet Pipe Sprinkler Systems 7

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 19 22 05 23 General Duty Valves for Plumbing 5 22 07 11 Plumbing Insulation 10 22 11 00 Facility Water Distribution 8 22 13 00 Facility Sanitary and Vent Piping 9 22 40 00 Plumbing Fixtures 6 22 62 00 Vacuum Systems for Healthcare Facilities 13 22 63 00 Gas Systems for Healthcare Facilities 18

DIVISION 23 – HEATING, VENTILATION, AND AIR CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 14 23 05 41 Noise and Vibration Control for HVAC Piping and Equipment 3 23 05 93 Testing, Adjusting, And Balancing for HVAC 5 23 07 11 HVAC Insulation 28 23 09 23 Direct Control Systems for HVAC 29 23 21 13 Hydronic Piping 8 23 31 00 HVAC Ducts and Casings 8 23 36 00 Air Terminal Units 3 23 37 00 Air Outlets and Inlets 3

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 9 26 05 19 Low-Voltage Electrical Power Conductors and Cables 8 26 05 26 Grounding and Bonding for Electrical Systems 6 26 05 33 Raceway and Boxes for Electrical Systems 11 26 05 73 Overcurrent Protective Device Coordination Study 4 26 09 23 Lighting Controls 5 26 24 16 Panelboards 6 4 26 27 26 Wiring Devices 6 26 29 21 Enclosed Switches and Circuit Breakers 4

00 01 00 - 4

26 51 00 Interior Lighting 9

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 6 27 05 26 Grounding and Bonding for Communications Systems 9 27 05 33 Raceways and Boxes for Communications Systems 11 27 15 00 Communications Horizontal Cabling 62 27 52 31 Security Emergency Call, Duress Alarm, and Telecommunications 24

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results For Electronic Safety and Security 57 28 05 13 Conductors and Cables for Electronic Safety and Security 12 28 05 26 Grounding and Bonding for Electronic Safety and Security 6 28 05 28.33 Conduits and Backboxes for Electronic Safety and Security 6 28 31 00 Fire Detection and Alarm 15

DIVISION 31 – EARTHWORK

DIVISION 32 – EXTERIOR IMPROVEMENTS

DIVISION 33 – UTILITIES

- - - E N D - - -

LIST OF DRAWING SHEETS

00 01 15 - 1

SECTION 00 01 15

The drawings listed below accompanying this specification form a part of the contract.

DRAWING NO. TITLE

GENERAL

G0-1 Cover Sheet G0-2 Project Team, Project Data, Abbreviations, Symbols, Materials, and Drawing Index G0-3 Fire Safety & Exiting Plan

ARCHITECTURE

AS1-1 First Floor Construction Phasing Plan AS1-2 First Floor Demolition Plan AS4-1 First Floor Plan AS4-2 First Floor Furniture and Equipment Layout Plan AS4-3 First Floor Partial Roof Plan AS5-1 Interior Elevations AS5-2 Interior Elevations AS5-3 Interior Elevations AS5-4 Interior Elevations AS5-5 Interior Elevations AS5-6 Interior Elevations AS5-7 Interior Elevations AS5-8 Sections @ Cath Labs AS6-1 First Floor Reflected Ceiling Plan AS6-2 First Floor Ceiling Subframe Plan AS9-1 Partition Schedule and Details AS9-1A Typical Interior Framing Details AS9-1B Partition Details AS9-1C Interior Details AS9-2 Interior Door and Window Schedules and Details AS9-3 Ceiling and Soffit Details AS9-3A Ceiling Details AS9-4 Casework Schedules and Details

AS9-4A CASEWORK DETAILS

AS9-5 Headwall Elevations AS10-1 First Floor Finish Plan and Interior Finishes and Color Schedule

SIGNAGE

AG4-1 First Floor Signage Plan AG4-2 Signage Details AG4-3 Signage Details

00 01 15 - 2

STRUCTURAL

S1-1 General Notes S1-2 General Notes, Abbreviations & Symbols S2-1 First Floor Equipment Plan S3-1 Partial Plans S4-1 Equipment Anchorage Details S4-2 Equipment Anchorage Details S4-3 Equipment Anchorage Details

MECHANICAL

MH0-1 Mechanical Symbols, Legends, & General Notes MD1-0 Level 1 HVAC Demo Plan MD2-0 Enlarged Mechanical Piping Demo Plan Level 1 MZ1-0 HVAC Terminal Unit Zoning Plan MZ1-1 Exhaust Fan Zoning Plan MH1-0 HVAC Partial Floor Plan Level 1 MH1-1 Air Balance Partial Floor Plan Level 1 MH2-0 HVAC Enlarged Floor Plan Level 2 MP1-0 Mechanical Piping Partial Floor Plan - Level 1 MH5-0 HVAC Details MH5-1 HVAC Details MH6-0 Mechanical Schedules MH6-1 Mechanical Schedules MH7-0 HVAC Controls

PLUMBING

PL0-1 Plumbing Symbols, Legends & General Notes PD1-0 Foundation Level Waste & Vent Demolition Plan PD1-1 1st Floor Water, Waste & Vent Demolition Plan PL2-0 Water, Waste & Vent Foundation Level Plan PL2-1 Level 1 Water, Waste And Vent Piping Plan PL5-0 Plumbing Details PU1-0 Cold & Hot Water, Waste & Vent Partial Plan Level 1 PG1-2 1st Floor Med Gas Demolition Plan PG2-1 Med Gas Piping Plan PG3-1 Med Gas Piping Diagram

FIRE PROTECTION

FX1-0 Fire Protection Partial Plan Level 1

ELECTRICAL

ES0-1 Symbol Legend, Abbreviations, General Notes & Fixture Schedule

00 01 15 - 3

ES1-0 Site Plan - Electrical ES1-1 First Floor Demolition Plan - Lighting ES1-2 First Floor Demolition Plan - Power ES2-1 Partial Enlarged First Floor Plan – Lighting ES3-1 Partial Enlarged First Floor Plan – Power ES3-2 Partial Enlarged First Floor Plan – Fire Alarm ES5-1 Single Line Diagram – Existing Normal Power ES5-2 Single Line Diagram – Existing Emergency Power ES5-3 Single Line Diagram and Panel Details ES6-1 Panel Schedules ES6-2 Panel Schedules ES6-3 Panel Schedules ES7-1 Details ES7-2 Details ES8-1 Cath Lab 1 Details ES8-2 Cath Lab 1 Details ES8-3 Cath Lab 1 Details ES8-4 Cath Lab 2 Details ES8-5 Cath Lab 2 Details ES8-6 Cath Lab 2 Details ES8-7 Cardiac CT Scan Details ES8-8 Cardiac CT Scan Details ES8-9 Cardiac CT Scan Details ES8-10 Cardiac CT Scan Details

EQUIPMENT

EQ1-1 Equipment Vendor’s Drawings @ Cath Lab 1 1A-009 – For Coordination Use EQ1-2 Equipment Vendor’s Drawings @ Cath Lab 1 1A-009 – For Coordination Use EQ1-3 Equipment Vendor’s Drawings @ Cath Lab 1 1A-009 – For Coordination Use EQ1-4 Equipment Vendor’s Drawings @ Cath Lab 1 1A-009 – For Coordination Use EQ1-5 Equipment Vendor’s Drawings @ Cath Lab 1 1A-009 – For Coordination Use EQ1-6 Equipment Vendor’s Drawings @ Cath Lab 1 1A-009 – For Coordination Use EQ1-7 Equipment Vendor’s Drawings @ Cath Lab 1 1A-009 – For Coordination Use EQ1-8 Equipment Vendor’s Drawings @ Cath Lab 1 1A-009 – For Coordination Use EQ1-9 Equipment Vendor’s Drawings @ Cath Lab 1 1A-009 – For Coordination Use EQ2-1 Equipment Vendor’s Drawings @ Cath Lab 2 1A-019 – For Coordination Use EQ2-2 Equipment Vendor’s Drawings @ Cath Lab 2 1A-019 – For Coordination Use EQ2-3 Equipment Vendor’s Drawings @ Cath Lab 2 1A-019 – For Coordination Use EQ2-4 Equipment Vendor’s Drawings @ Cath Lab 2 1A-019 – For Coordination Use EQ2-5 Equipment Vendor’s Drawings @ Cath Lab 2 1A-019 – For Coordination Use EQ2-6 Equipment Vendor’s Drawings @ Cath Lab 2 1A-019 – For Coordination Use EQ2-7 Equipment Vendor’s Drawings @ Cath Lab 2 1A-019 – For Coordination Use EQ2-8 Equipment Vendor’s Drawings @ Cath Lab 2 1A-019 – For Coordination Use EQ2-9 Equipment Vendor’s Drawings @ Cath Lab 2 1A-019 – For Coordination Use EQ3-1 Equipment Vendor’s Drawings @ Cath Lab 1 1A-009 and Cath Lab 2 1A-019

– For Coordination Use EQ3-2 Equipment Vendor’s Drawings @ Cath Lab 1 & 2 Equipment C1

– For Coordination Use EQ3-3 Equipment Vendor’s Drawings @ Cath Lab 1 & 2 Equipment C1

– For Coordination Use

00 01 15 - 4

EQ3-4 Equipment Vendor’s Drawings @ Cath Lab 1 & 2 Equipment C1

– For Coordination Use EQ3-5 Equipment Vendor’s Drawings @ Cath Lab 1 & 2 Equipment C2

– For Coordination Use EQ3-6 Equipment Vendor’s Drawings @ Cath Lab 1 & 2 Equipment C2

– For Coordination Use EQ3-7 Equipment Vendor’s Drawings @ Cath Lab 1 & 2 Equipment C3

– For Coordination Use EQ3-8 Equipment Vendor’s Drawings @ Cath Lab 1 & 2 Equipment C3

– For Coordination Use EQ4-1 Equipment Vendor’s Drawings @ Cardiac CT Scan 1A-010- For Coordination Use EQ4-2 Equipment Vendor’s Drawings @ Cardiac CT Scan 1A-010- For Coordination Use EQ4-3 Equipment Vendor’s Drawings @ Cardiac CT Scan 1A-010- For Coordination Use

VA Northern CA Health Care System

GENERAL REQUIREMENTS

01 00 00 - i

SECTION 01 00 00

1.01 SAFETY REQUIREMENTS 1

1.02 GENERAL INTENTION 1

1.03 STATEMENT OF BID ITEM(S) 1

1.04 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR 2

1.05 CONSTRUCTION SECURITY REQUIREMENTS 2

1.06 OPERATIONS AND STORAGE AREAS 3

1.07 ALTERATIONS 7

1.08 DISPOSAL AND RETENTION 7

1.09 RESTORATION 8

1.10 LAYOUT OF WORK 9

1.11 AS-BUILT DRAWINGS 9

1.12 USE OF ROADWAYS 9

1.13 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT 9

1.14 TEMPORARY USE OF EXISTING ELEVATORS 10

1.15 TEMPORARY TOILETS 10

1.16 AVAILABILITY AND USE OF UTILITY SERVICES 10

1.17 NEW TELEPHONE EQUIPMENT 11

1.18 TESTS 11

1.19 INSTRUCTIONS 12

1.20 GOVERNMENT-FURNISHED PROPERTY 13

1.21 RELOCATED EQUIPMENT AND ITEMS 14

1.22 CONSTRUCTION SIGN 14

1.23 SAFETY SIGN 14

1.24 HISTORIC PRESERVATION 15

01 00 00 - 1

SECTION 01 00 00

1.01 SAFETY REQUIREMENTS

A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.02 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, mechanical, electrical, plumbing, fire protection systems, fire alarm systems, etc., and furnish labor and materials and perform work for the construction and renovation of existing space in Building 700, VA Mather Division, Mather, California. A brief description of project scope and its locations as follows:

1. BUILDING 700, PARTIAL FIRST FLOOR – Renovate existing space on the first floor, approximately 7,500 square foot, for the Imaging Department. The new space shall include Cath Labs, Cardiac CT Scanner Room and associated control and equipment rooms, Holding/Prep Recovery rooms, Nurse Station, Stress Lab, and other support spaces as required by drawings and specifications.

B. Visits to the VA Campus site by Bidders may be made only by appointment with the

Contracting Officer’s Representative.

C. Offices of MEI Architects, 239 9th Street, San Francisco, California 94103, as

Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.

D. All employees of the Contractor and subcontractors shall comply with the VA security management program and obtain permission for site entry from the VA police, be identified by project and employer, and be restricted from unauthorized access.

E. The Contracting Officer’s Representative will assign specific routes and times for pathways, corridors and elevators for transportation of personnel, materials and equipment. The Contractor will continually clean-up any dust, dirt or debris caused by their jobsite ingress/egress.

F. Dust and fume control will be exercised during all construction operations. Workers will be careful not to operate any vehicles, gas or diesel engines, or to perform any fume or dust generating process near a building air intake system. Noise will be held to a minimum at all times. Jack-hammering, core drilling and other noisy or disturbing operations may have to be rescheduled or accomplished after hours to avoid interfering with surgery or patient care services.

1.03 STATEMENT OF BID ITEM(S)

A. ITEM I, GENERAL CONSTRUCTION: Work includes general construction, alterations, architectural work and finishes, structural, mechanical, plumbing, fire protection, electrical, telephone, data, security, fire alarm work, nurse call, medical equipment, utility systems, necessary removal of existing structures and construction and certain other items as shown on Drawings and Specifications.

01 00 00 - 2

B. ALTERNATE NO. 1: Delete all demolition work in Phase 2 Construction area including

(E) M/W Restroom 1A029, (E) ER Staff Lounge 1A027, (E) G.I. Lab 1A025, (E) ER MD Office 1A227 and (E) Corridor C1-109. Delete all construction work in Phase 2 Construction area associated with the new Cardiac CT Scan 1A-010, Control Room 1A- 010A, and Stress Lab 1A-018.

1.04 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

1.05 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The Security Plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The Contractor is responsible for assuring that all sub-Contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. The Contractor shall create an Employee Daily Log of all personnel working on the site. The Employee Daily Log shall contain the employee’s (a) Full Name, (b) Employer/Company Name and (c) Occupation/Trade. The Employee Daily Log shall be submitted with the Contractor’s Daily Work Report.

4. No photography of VA premises is allowed without written permission of the Contracting Officer.

5. The VA Police are Federal Police Officers with full authority to make arrests, investigate crimes and issue traffic citations. Citations issued require an appearance in the Federal District Court and/or payment of a fine. Speed limits and other driving and parking codes are strictly enforced. Any vehicle left unattended for more than a few minutes may be cited by the VA Police.

6. Sexual harassment is strictly prohibited. This includes deliberate or unsolicited verbal comments or gestures of a sexual nature, unwelcome sexual advances, requests for sexual favors and/or other unwelcome verbal or physical conduct of a sexual nature.

7. Possession or use of non-prescription drugs or alcohol, including beer and wine, on the Health Care System grounds is strictly prohibited. Possession of firearms, knives with blades over 4”, ammunition, explosive devices and any item that may be considered an offensive weapon is strictly prohibited. This includes carrying such items in vehicles.

8. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

C. Key Control:

01 00 00 - 3

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative COR for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71 00, DOOR HARDWARE and coordinate.

D. Document Control:

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document Management Software (EDMS).

a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.

b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

E. Motor Vehicle Restrictions:

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

2. A limited number of two (2) permits shall be issued for General Contractor and its employees for parking in designated areas only.

1.06 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be

01 00 00 - 4 removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

D. Working space and space available for storing materials shall be as determined by the

Contracting Officer’s Representative.

E. Workmen are subject to rules of Medical Center applicable to their conduct.

F. Execute work so as to interfere as little as possible with normal functioning of Medical

Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.

1. Do not store materials and equipment in other than assigned areas.

2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of Veterans Affairs in quantities sufficient for not more than two work days. Provide unobstructed access to Medical Center areas required to remain in operation.

3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.

G. Phasing: The Medical Center must maintain its operation 24 hours a day 7 days a week.

Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:

1. To insure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to insure accomplishment of this work in successive phases mutually agreeable to Medical Center Director, COR and Contractor, as follows:

a. Phase 1 Construction: Complete demolition and construction for entire project area except for the following rooms as shown on sheet AS1-1:

• (E) M/W Restroom 1A029

• (E) ER Staff Lounge 1A027

• (E) G.I. Lab 1A025

• (E) ER MD Office 1A227

01 00 00 - 5

• (E) Corridor C1-109 Exact boundary of Phase 1 Construction to be confirmed and coordinated with COR in field. All existing area outside the boundary of Phase 1 Construction area shall remain operational during the entire period of Phase 1 Construction. At completion of Phase 1 construction, obtain acceptance from Government for Government move-in.

Government shall occupy Phase 1 construction area upon completion and prior to beginning work in Phase 2 construction area.

i. Phase 1A Temporary Construction: Prior to starting any demolition or construction work in Phase 1 Construction area, provide and install new temporary partition and new temporary door assembly at (E) G.I. Lab 1A025 as shown on Drawings to allow continuous operation and access to (E) G.I. Lab. Relocate, extent and reconnect all utilities including, but not limited to, light switches, power receptacles, tele/data outlets, nurse call control and dome light, etc. as affected by the new temporary partition and new temporary door assembly.

b. Phase 2 Construction: Complete demolition and construction for the following rooms as shown on sheet AS1-1:

• (E) M/W Restroom 1A029

• (E) ER Staff Lounge 1A027

• (E) G.I. Lab 1A025

• (E) ER MD Office 1A227

• (E) Corridor C1-109 and any remaining area of the entire project.

Exact boundary of Phase 2 Construction to be confirmed and coordinated with COR in field. At completion of Phase 2 construction, obtain final acceptance from Government for entire project area.

i. Phase 2A Temporary Construction: Prior to starting any demolition or construction work in Phase 2 Construction area, provide and install new temporary partition and temporary door assembly at new Electronics 1A-016 as shown on Drawings to allow access. Verify exact locations of temporary partition and access door with COR in field.

H. Building No. 700 will be occupied during performance of work.

1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting, etc. to facilitate patient and staff access. Coordinate alteration work in areas occupied by Department of Veterans Affairs so that Medical Center operations will continue during the construction period.

I. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company

01 00 00 - 6

(Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.

J. Utilities Services: Maintain existing utility services for Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS

FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR

COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR ELECTRONIC SAFETY AND SECURITY for additional requirements.

2. Contractor shall submit a request to interrupt any such services to COR, in writing, seven (7) days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least fifteen

(15) calendar days prior to the desired time and shall be performed as directed by the COR.

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

K. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

L. To minimize interference of construction activities with flow of Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR

M. Coordinate the work for this contract with other construction operations as directed by

01 00 00 - 7

COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.

N. The Contractor shall not park vehicles in any of the Medical Center parking lots. The Contractor shall arrange and bear the cost of workers, staff and visitors parking.

1.07 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting Officer. This report shall list by rooms and spaces:

1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of the building.

2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.

3. Shall note any discrepancies between drawings and existing conditions at site.

4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by COR.

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR 52.243-4 and VAAR 852.236-88).

C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved.

They shall furnish a report on conditions then existing, of flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:

1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workmen in executing work of this contract.

D. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.

3. Protection of interior of existing structures at all times, from damage, dust and weather. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

1.08 DISPOSAL AND RETENTION

01 00 00 - 8

A. Materials and equipment accruing from work removed from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored.

Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

4. The Contractor is required to alert the VA immediately in the event any known or suspected hazardous materials are disturbed or will need to be disturbed before proceeding with work. Hazardous materials, such as PCB’s, asbestos, lead paint, cleaning solutions and other harmful chemicals shall be disposed of in accordance with federal, state and local laws and regulations. In case of an accidental spill of hazardous materials, the Contractor shall take immediate action to contain the spill and notify the COR. Washing cement, plaster, paint, oil or grease, solvents, etc. into any drains is strictly prohibited. REPORT ANY

ACCIDENTAL SPILLS THAT MAY RUN INTO STORM DRAINS IMMEDIATELY

TO THE COR.

1.09 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the Contracting Officer’s Representative. Existing work to be altered or extended and that which is found to be defective in any way, shall be reported to the Contracting Officer’s Representative before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged. Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4 and VAAR 852.236-88) and

"DIFFERING SITE CONDITIONS" (FAR 52.236-2).

01 00 00 - 9

1.10 LAYOUT OF WORK

A. The Contractor shall lay out the work and shall be responsible for all measurements in connection with the layout. The Contractor shall furnish, at Contractor's own expense, all templates, equipment, tools, materials, and labor required to lay out any part of the work.

The Contractor shall be responsible for executing the work to the lines that may be established or indicated by the Contracting Officer’s Representative. The Contractor shall also be responsible for maintaining and preserving all marks established by the Contracting Officer’s Representative until authorized to remove them. If such marks are destroyed by the Contractor or through Contractor's negligence before their removal is authorized, the Contracting Officer’s Representative may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor.

1.11 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings.

To insure compliance, as-built drawings shall be made available for the COR review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

1.12 USE OF ROADWAYS

A. For hauling, use only established public roads and roads on Medical Center property and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed and restoration performed by the Contractor at Contractor's expense. When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.

1.13 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions:

1. Permission to use each unit or system must be given by COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the COR will withdraw permission for use of the equipment.

2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted. Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded.

The electrical equipment shall be thoroughly cleaned before use and again immediately before final inspection including vacuum cleaning and wiping clean

01 00 00 - 10 interior and exterior surfaces.

3. Units shall be properly lubricated, balanced, and aligned. Vibrations must be eliminated.

4. Automatic temperature control systems for preheat coils shall function properly and all safety controls shall function to prevent coil freeze-up damage.

5. The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be replaced at completion of construction and prior to testing and balancing of system.

6. All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use; maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the Government.

B. Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the Government.

C. This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections.

D. Any damage to the equipment or excessive wear due to prolonged use will be repaired replaced by the contractor at the contractor’s expense.

1.14 TEMPORARY USE OF EXISTING ELEVATORS

A. Use of existing elevator for handling building materials and Contractor's personnel will be permitted subject to following provisions:

1. Contractor makes all arrangements with the COR for use of elevators. The COR will ascertain that elevators are in proper condition. Contractor may use elevators for special nonrecurring time intervals when permission is granted. Personnel for operating elevators will not be provided by the Department of Veterans Affairs.

2. Contractor covers and provides maximum protection of following elevator components:

a. Entrance jambs, heads soffits and threshold plates.

b. Entrance columns, canopy, return panels and inside surfaces of car enclosure walls.

c. Finish flooring.

3. Government will accept hoisting ropes of elevator and rope of each speed governor if they are worn under normal operation. However, if these ropes are damaged by action of foreign matter such as sand, lime, grit, stones, etc., during temporary use, they shall be removed and replaced by new hoisting ropes at the Contractor’s expense.

1.15 TEMPORARY TOILETS

A. Contractor may have for use of Contractor's workmen, such toilet accommodations as may be assigned to Contractor by Medical Center. Contractor shall keep such places clean and be responsible for any damage done thereto by Contractor's workmen. Failure to maintain satisfactory condition in toilets will deprive Contractor of the privilege to use such toilets.

1.16 AVAILABILITY AND USE OF UTILITY SERVICES

01 00 00 - 11

A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. The amount to be paid by the Contractor for chargeable electrical services shall be the prevailing rates charged to the Government. The Contractor shall carefully conserve any utilities furnished without charge.

B. The Contractor, at Contractor's expense and in a workmanlike manner, in compliance with code and as satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of electricity used for the purpose of determining charges. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia and repair restore the infrastructure as required.

C. Contractor shall install meters at Contractor's expense and furnish the Medical Center a monthly record of the Contractor's usage of electricity as hereinafter specified.

D. Heat: Furnish temporary heat necessary to prevent injury to work and materials through dampness and cold. Use of open salamanders or any temporary heating devices which may be fire hazards or may smoke and damage finished work, will not be permitted.

Maintain minimum temperatures as specified for various materials:

1. Obtain heat by connecting to Medical Center heating distribution system.

2. Steam is available at no cost to Contractor

E. Electricity (for Construction and Testing): Furnish all temporary electric services.

1. Obtain electricity by connecting to the Medical Center electrical distribution system. The Contractor shall meter and pay for electricity required for electric cranes and hoisting devices, electrical welding devices and any electrical heating devices providing temporary heat. Electricity for all other uses is available at no cost to the Contractor.

F. Water (for Construction and Testing): Furnish temporary water service.

1. Obtain water by connecting to the Medical Center water distribution system.

Provide reduced pressure backflow preventer at each connection as per code.

Water is available at no cost to the Contractor.

2. Maintain connections, pipe, fittings and fixtures and conserve water-use so none is wasted. Failure to stop leakage or other wastes will be cause for revocation (at COR discretion) of use of water from Medical Center's system.

G. Fuel: Natural and LP gas and burner fuel oil required for boiler cleaning, normal initial boiler-burner setup and adjusting, and for performing the specified boiler tests will be furnished by the Government. Fuel required for prolonged boiler-burner setup, adjustments, or modifications due to improper design or operation of boiler, burner, or control devices shall be furnished and paid by the Contractor at Contractor's expense.

1.17 NEW TELEPHONE EQUIPMENT

A. All telephone and data work including equipment, distribution and cabling shall be completed by the contractor under this contract. This work shall be completed before the building is turned over to VA.

1.18 TESTS

A. As per specification section 23 05 93 TESTING, ADJUSTING AND BALANCING FOR

01 00 00 - 12

HVAC, the Contractor shall provide a written testing and commissioning plan complete with component level, equipment level, sub-system level and system level breakdowns.

The plan will provide a schedule and a written sequence of what will be tested, how and what the expected outcome will be. This document will be submitted for approval prior to commencing work. The Contractor shall document the results of the approved plan and submit for approval with the as built documentation.

B. Pre-test mechanical and electrical equipment and systems and make corrections required for proper operation of such systems before requesting final tests. Final test will not be conducted unless pre-tested.

C. Conduct final tests required in various sections of specifications in presence of an authorized representative of the Contracting Officer. Contractor shall furnish all labor, materials, equipment, instruments, and forms, to conduct and record such tests.

D. Mechanical and electrical systems shall be balanced, controlled and coordinated. A system is defined as the entire system which must be coordinated to work together during normal operation to produce results for which the system is designed. For example, air conditioning supply air is only one part of entire system which provides comfort conditions for a building. Other related components are return air, exhaust air, steam, chilled water, refrigerant, hot water, controls and electricity, etc. Another example of a system which involves several components of different disciplines is a boiler installation. Efficient and acceptable boiler operation depends upon the coordination and proper operation of fuel, combustion air, controls, steam, feedwater, condensate and other related components.

E. All related components as defined above shall be functioning when any system component is tested. Tests shall be completed within a reasonably period of time during which operating and environmental conditions remain reasonably constant and are typical of the design conditions.

F. Individual test result of any component, where required, will only be accepted when submitted with the test results of related components and of the entire system

1.19 INSTRUCTIONS

A. Contractor shall furnish Maintenance and Operating manuals (hard copies and electronic) and verbal instructions when required by the various sections of the specifications and as hereinafter specified.

B. Manuals: Maintenance and operating manuals and one compact disc (four hard copies and one electronic copy each) for each separate piece of equipment shall be delivered to the COR coincidental with the delivery of the equipment to the job site. Manuals shall be complete, detailed guides for the maintenance and operation of equipment.