Copy of Attachment E Price Schedule Breakdown

15 KB Posted

Attached to
Upgrade Electrical Distribution, 5kV to 15kV, Building 100 NRM 663-15-102 CON
Solicitation number
VA26016R0001
Issued by

About this file

VA260-16-R-0001 Attachments

Text of this file

Instructions

PRICE SCHEDULE BREAKDOWN INSTRUCTIONS
INSTRUCTIONS
1Each Contract Line Item (CLI) corresponds with the items in the Construction Specifications Section 01 00 00 General Requirements 1.3 Statement of Bid Items.
2The term “Division” used with each line item in the Price Schedule refers to the general construction industry term and association with the Construction Specification Institute or common CSI specification breakdown of work actions. These Divisions roughly match those presented to the Contractors when they review the contract document specification binders for this project as created by the architect of record.
3The contract line item price breakdown is for information, evaluation and negotiation purposes only and does not constitute separate billable deliverables.
4Field office overhead and general conditions are considered to represent the same category of costs and the terms are used interchangeably. As such, this category of costs will be applied only once to the contract and to any changes, if applicable.
5All pricing is fixed price.

Price Breakdown

ATTACHMENT E - PRICE SCHEDULE BREAKDOWN
RFP VA260-16-R-0001

Project Number / Title: 653-15-102 Upgrade Electrical Distribution, 5kV to 15kV, Building 100 Project Location: Puget Sound Health Care System, Seattle, WA

CLIN 0001CLIN 0002CLIN 0003CLIN 0004CLIN 0005
A. Normal Power

Upgrade 5kV to 15kV

- Base Item B. Essential Electrical System Upgrade

- Option Item C. Campus Feed Interconnection East/West 15kV Switchgear

- Option Item D. MCC After-Market Controller Replacements

- Option Item E. Automatic Transfer Switch Replacement

- Option Item

PricePricePricePricePrice
Division Item 1 General Requirements (furnish and install)$0.00$0.00$0.00$0.00$0.00
Division Item 2 Existing Conditions (furnish and install)$0.00$0.00$0.00$0.00$0.00
Division Item 3 Concrete (furnish and install)$0.00$0.00$0.00$0.00$0.00
Division Item 4 Masonry (furnish and install)$0.00$0.00$0.00$0.00$0.00
Division Item 5 Metals (furnish and install)$0.00$0.00$0.00$0.00$0.00
Division Item 6 Woods, Plastic and Composites (furnish and install)$0.00$0.00$0.00$0.00$0.00
Division Item 7 Thermal and Moisture Protection (furnish and install)$0.00$0.00$0.00$0.00$0.00
Division Item 8 Openings (furnish and install)$0.00$0.00$0.00$0.00$0.00
Division Item 9 Finishes (furnish and install)$0.00$0.00$0.00$0.00$0.00
Division Item 10 Specialties (furnish and install)$0.00$0.00$0.00$0.00$0.00
Division Item 11 Equipment (furnish and install)$0.00$0.00$0.00$0.00$0.00
Division Item 12 Furnishings (furnish and install)$0.00$0.00$0.00$0.00$0.00
Division Item 13 Special Construction (furnish and install)$0.00$0.00$0.00$0.00$0.00
Division Item 14 Conveying Equipment (furnish and install)$0.00$0.00$0.00$0.00$0.00
Division Item 21 Fire Suppression (furnish and install)$0.00$0.00$0.00$0.00$0.00
Division Item 22 Plumbing (furnish and install)$0.00$0.00$0.00$0.00$0.00
Division Item 23 Heating, Ventilating and A/C (furnish and install)$0.00$0.00$0.00$0.00$0.00
Division Item 25 Integrated Automation-(furnish and install)$0.00$0.00$0.00$0.00$0.00
Division Item 26 Electrical-(furnish and install)$0.00$0.00$0.00$0.00$0.00
Division Item 27 Communications –Data- Telco (furnish and install)$0.00$0.00$0.00$0.00$0.00
Division Item 28 Electronic Safety and Security (furnish and install)$0.00$0.00$0.00$0.00$0.00
Division Item 31 Earthwork (furnish and install)$0.00$0.00$0.00$0.00$0.00
Division Item 32 Exterior Improvements (furnish and install)$0.00$0.00$0.00$0.00$0.00
Division Item 33 Utilities (furnish and install)$0.00$0.00$0.00$0.00$0.00
Division Item 34 Transportation$0.00$0.00$0.00$0.00$0.00
SubTotals$0.00$0.00$0.00$0.00$0.00
Total Direct Costs - Base and All Option Items$0.00

Period of Performance (FAR 52.211-10) 1,090

Mobilization / Demobilization$0.00
Insurance / Bonds / Taxes / Other Fees (provide itemized list)$0.00
Seattle City Light$1,750,000.00
O&M Manuals and Red Line Drawings$0.00
Field Office Overhead (FOOH) ($ per calendar day of POP)Cost / Day ($)$0.00$0.00
Home Office Overhead (HOOH)Rate (%)0.00%$0.00
ProfitRate (%)0.00%$0.00

CONTRACT TOTAL - BASE AND ALL OPTION ITEMS $1,750,000.00

Other files

File Type Posted
VA260-16-R-0001-A00008001.pdf PDF
VA260-16-R-0001-A00008002.docx DOCX document
VA260-16-R-0001-A00008000.docx DOCX document
VA260-16-R-0001-A00007003.xlsx XLSX spreadsheet
VA260-16-R-0001-A00007002.pdf PDF
VA260-16-R-0001-A00007001.pdf PDF
VA260-16-R-0001-A00007004.doc DOC document
VA260-16-R-0001-A00007005.docx DOCX document
VA260-16-R-0001-A00007000.docx DOCX document
VA260-16-R-0001-A00006001.pdf PDF
VA260-16-R-0001-A00006000.docx DOCX document
VA260-16-R-0001-A00005005.pdf PDF
VA260-16-R-0001-A00005004.pdf PDF
VA260-16-R-0001-A00005002.pdf PDF
VA260-16-R-0001-A00005003.pdf PDF
VA260-16-R-0001-A00005001.pdf PDF
VA260-16-R-0001-A00005000.docx DOCX document
VA260-16-R-0001-A00004005.pdf PDF
VA260-16-R-0001-A00004001.pdf PDF
VA260-16-R-0001-A00004003.pdf PDF
VA260-16-R-0001-A00004004.pdf PDF
VA260-16-R-0001-A00004002.pdf PDF
VA260-16-R-0001-A00004000.docx DOCX document
VA260-16-R-0001-A00003009.pdf PDF
VA260-16-R-0001-A00003002.pdf PDF
VA260-16-R-0001-A00003010.docx DOCX document
VA260-16-R-0001-A00003012.pdf PDF
VA260-16-R-0001-A00003011.pdf PDF
VA260-16-R-0001-A00003001.pdf PDF
VA260-16-R-0001-A00003003.pdf PDF
VA260-16-R-0001-A00003000.docx DOCX document
VA260-16-R-0001-A00003004.pdf PDF
VA260-16-R-0001-A00003007.pdf PDF
VA260-16-R-0001-A00003006.pdf PDF
VA260-16-R-0001-A00003005.pdf PDF
VA260-16-R-0001-A00003008.pdf PDF
VA260-16-R-0001-A00002001.pdf PDF
VA260-16-R-0001-A00002000.docx DOCX document
VA260-16-R-0001-A00002002.pdf PDF
VA260-16-R-0001-A00002003.pdf PDF
VA260-16-R-0001-A00001000.docx DOCX document
VA260-16-R-0001-A00001006.pdf PDF
VA260-16-R-0001-A00001005.pdf PDF
VA260-16-R-0001-A00001004.pdf PDF
VA260-16-R-0001-A00001002.pdf PDF
VA260-16-R-0001-A00001001.pdf PDF
VA260-16-R-0001-A00001003.pdf PDF
Attachment F Past Performance Questionnaire —
Attachment C.1 Construction Drawings Volume 1 —
Attachment B Construction Specifications —
Show 40 more

Latest 50 of 55 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .