VA249-17-R-1047 00004 VA249-17-R-1047 00004.docx

View the file

Other files

File Type Posted
VA249-17-R-1047-00003000.docx DOCX document
VA249-17-R-1047-00002000.docx DOCX document
VA249-17-R-1047-002.pdf PDF
VA249-17-R-1047-001.docx DOCX document
VA249-17-R-1047-004.pdf PDF
VA249-17-R-1047-003.pdf PDF
VA249-17-R-1047-000.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2.

AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE

OF PAGES

10A. MODIFICATION OF

CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV.

11/2016) is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITE

M 10A.

15C. DATE

SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR

43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes r eference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

BY

Contractor

16C. DATE

SIGNED

14.

DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME

AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS

OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 00004 12-01-2017 626-16-201 90C Department of Veterans Affairs Network Contracting Office 9 1639 Medical Center Parkway Suite 400 Murfreesboro TN 37129 90C Department of Veterans Affairs Network Contracting Office - 9 1639 Medical Center Parkway Suite 400 Murfreesboro TN 37129 To all Offerors/Bidders

VA249-17-R-1047

11-28-2017

X X X X This amendment is to post additional questions and answers.

The proposal due date/time is still 12/5/2017 @ 3PM CST.

The questions and answers are attached on the following pages.

NOTE: No further questions will be accepted unless the Government deems it necessary.

Shawn Hendricks Contracting Officer

CONTINUATION PAGE

Nashville Upgrade Electrical Distribution System Project # 626-16-201 Questions and Answers 11-30-2017

1. I attended the Site Visit for the above-named project and have a question on the qualifications for bidding the project as the Prime Contractor. We are certified as a SDVOSB contractor and certified by the State of Tennessee as a General Contractor (23XX) capable of bidding all work as the prime contractor if the required specialty trade contractor is listed as the designated subcontract for that particular specialty code. So, for clarification purposes, will we be able to bid this project as the prime contractor with a qualified 238210 subcontractor as the designated Electrical Contractor and Other Wiring Installation Contractor?

a. No. The prime that is awarded a federal contract is the entity that ALWAYS has to own the NAICS code for the purposes of qualifying as a small business under a small business set-aside.

2. RFP states referenced experience projects should be the same for Factor 3, Sub-factors 3.1 & 3.2, Factor 4, and Factor 5. However these factors/sub-factors have inconsistent relevance criteria (completed in last 5 years vs. completed in last 10 years; provide 3 projects vs. 5 projects). Please provide clarification regarding number of projects required and relevance standards for those projects.

a. Each factor is independently evaluated. Provide the criteria based on each factor to your best knowledge Factor 3 details 3+ projects of similar complexity, completed in Hospitals/Healthcare facilities around $3M Factor 4 details 5 projects involved in major electrical upgrades completed within 10 years anywhere Factor 5 details 3 issues/problems that the Hospital can experience during this Electrical upgrade project and how to mitigate them.

3. RFP states “The offeror’s and electric sub-contractors previous experience will be evaluated on…” Does the Government require us to ensure our past experience examples include projects for both the Prime and electrical subcontractors?

a. Yes.

4. If subcontractor projects are included, does the subcontractor experience need to include performance as a Prime Contractor (as stated in Factor 4 Standard of Acceptability on page 13)?

a. No

5. Evaluation factor on GC license. Kentucky does not require or even have a GC licensure program and we never need it outside of KY because it is not something typically required for Federal contracts since they are not typically bound by state requirements. Our approach on the proposal would be to highlight our American Society of Healthcare Engineer’s CHC certification for Healthcare Constructors. Will this factor be reconsidered?

0. Yes, the GC license is not required for the Prime.

6. There are very few electrical contractors who carry a GC license. I doubt that there are hardly any (and maybe no) SDVOSB electrical contractors who carry both GC and electrical licensure. Will this factor be reconsidered?

0. Partially as addressed in Question 4 above, No GC license is required but the Electrical contractor, whether they are the Prime or sub, must have a valid State Electrical license.

7. The solicitation states period of performance is 210 calendar days for bid items.

However, Amendment 1 state period of performance 120 calendars in his notes on the Pre-Proposal Meeting.

a. 120 Days

8. RFP states proposals “limited to a maximum of fifty (75), single-sided, single-spaced, and numbered pages.” Is the page limit 50 pages or 75 pages? Does this mean we have a 75-page limit for the Technical Proposal and a 75-page limit for the Price Proposal, or is this the combined page limit both proposals?

a. 50 pages