MASONRY UPGRADES B36 Federal contract opportunity
Solicitation number
VA24217B0803
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

VA242-17-B-0803 S02 Drawings.pdf

View the file

Other files for this federal contract opportunity

Other files attached to MASONRY UPGRADES B36, newest first.
File Type Posted
VA242-17-B-0803-00001001.docx DOCX document
VA242-17-B-0803-015.docx DOCX document
VA242-17-B-0803-013.docx DOCX document
VA242-17-B-0803-018.pdf PDF
VA242-17-B-0803-016.txt TXT text file
VA242-17-B-0803-014.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NO. 528A5-17-517

CANANDAIGUA, NEW YORK 14424

V.A. MEDICAL CENTER

B36 BRICK REPAIR

T-1

COVER SHEET

Date

Project No.

528A5-17-532

6/24/2017

TH

DrawnChecked

Dwg. Of

V A

V A

Date

Drawing Title

Approved: Chief Engineer

Date

Approved: Medical Center Director

Date

Date

Date

Date

Date

Approved: Space Owner

Approved: Fire Chief Date

Approved: Industrial Hygienist Date

Approved: Safety Officer Date

B36 BRICK REPAIR

Project Title

Location

Building No.

CANANDAIGUA, NEW YORK

Date

CODES & O.S.H.A.

N.F.P.A., NATIONAL, STATE AND CITY

ALL WORK TO BE IN ACCORDANCE WITH

Approved: Infection Control Mgr.

Date

Approved: Chief Security

DateRevisions

Approved: Info. Sys.

Approved: Women's Health Rep

Approved: Interior Designer

Approved: A.F.G.E.

SHEETSYMBOL TITLE

LIST OF DRAWINGS

A-1

DETAIL MARKER

SECTION MARKER

BUILDING SECTION MARKER

INTERIOR ELEVATION MARKER

ROOM DESIGNATION

DOOR TAG

WINDOW AND LOUVER TAG

NORTH ARROW

C A

LL

ED

N O

R

TH

N O

R

TH

SHEET NUMBER

DETAIL NUMBER

SECTION NUMBER

SHEET NUMBER

SHEET NUMBER

SECTION NUMBER

COLUMN TAG

ELEVATION NUMBER

SHEET NUMBER

WINDOW/LOUVER NUMBER

DOOR NUMBER

ROOM NAME

ROOM NUMBER

COLUMN No.

PARTITION TYPE

AB ANCHOR BOLT

AC AIR CONDITIONING

ACT ACOUSTICAL CEILING TILE

ADDL ADDITIONAL

ADJ ADJUSTABLE

AFF ABOVE FINISH FLOOR

ALT ALTERNATE

AL ALUMINUM

ARCH ARCHITECTURAL

ASPH ASPHALT

B/ BOTTOM of

BD BOARD

BL BUILDING LINE

BLDG BUILDING

BLK BLOCK

BLKG BLOCKING

BP BEARING PLATE

BR BEDROOM

BSMT BASEMENT

BTWN BETWEEN

BRG BEARING

CB CATCH BASIN

CC CENTER TO CENTER

CEM CEMENT

CG CORNER GUARD

CJ CONSTRUCTION JOINT or CONTROL JOINT

CLG CEILING

CMU CONCRETE MASONRY UNIT

COL COLUMN

COMP COMPACT(ED)

CONC CONCRETE

CONST CONSTRUCTION

CONT CONTINUOUS

COORD COORDINATE

CPT CARPET

CRS COURSE

CT CERAMIC TILE

D DEEP/ DEPTH

DBL DOUBLE

DET DETAIL

DF DOUGLAS FIR

DIA DIAMETER

DIM DIMENSION

DTL DETAIL

DW DISHWASHER

DWG DRAWING

EA EACH

EL ELEVATION

ELEC ELECTRIC

ELEV ELEVATION

EQ EQUAL

EW EACH WAY

EXT EXTERIOR

EXG EXISTING

FBGL FIBERGLASS

FD FLOOR DRAIN

FFE FINISH FLOOR ELEVATION

FIN FIN

FLR FLOOR

FNDN FOUNDATION

FP FIREPLACE

FR FAMILY ROOM

FTG FOOTING

GC GENERAL CONTRACTOR

GL GLASS

G&N GLUE and NAIL

GWB GYPSUM WALL BOARD

GP GYPSUM

H HIGH

HC HOLLOW CORE

HDR HEADER

HDW HARDWARE

HGT HEIGHT

HM HOLLOW METAL

HORZ HORIZONTAL

H.P. HIGH POINT

H.R. HANDRAIL

HW HOT WATER

INS INSULATION

INT INTERIOR

JAN. JANITORIAL

JST JOIST

JT JOINT

K KITCHEN

LF LINEAR FEET

LH LEFT HAND

LOC LOCATION

LVL LAMINATED VENEER LUMBER

MAT MATERIAL

MAX MAXIMUM

MECH MECHANICAL

MFGR MANUFACTURER

MH MAN HOLE

MIN. MINIMUM

MO MASONRY OPENING

MTL METAL

NIC NOT IN CONTRACT

NTS NOT TO SCALE

OC ON CENTER

OHD OVERHEAD DOOR

OPNG OPENING

PL PLATE

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT (D) PAINT (-ED)

PWD PLYWOOD

RA RETURN AIR

RD ROOF DRAIN

REF REFERENCE

REINF REINFORCING

REQ'D REQUIRED

RH RIGHT HAND

RM ROOM

RO ROUGH OPENING

R/S ROUGH SAWN

SC SOLID CORE

SCWD SOLID CORE WOOD DOOR

SD SMOKE DETECTOR

SF SQUARE FEET

SFLR SUB-FLOOR

SIM SIMILAR

SL SLOPE

SOG SLAB-ON-GRADE

SPEC SPECIFICATIONS

STL STEEL

STR STRUCTURAL

SV SHEET VINYL FLOORING

T TOILET

T/ TOP OF

TH THICK/ THICKNESS

T&G TONGUE & GROOVE

TOF TOP OF FOOTING

TOS TOP OF STEEL

TOW TOP OF WALL

TYP TYPICAL

UNO UNLESS NOTED OTHERWISE

VB VAPOR BARRIER

VCT VINYL COMPOSITION TILE

VERT VERTICAL

W WIDE/ WIDTH

W/ WITH

WC WATER CLOSET

WD WOOD

WIND. WINDOW

WWM WELDED WIRE MESH

Date

Approved: Logistics Manager.

Date

Approved: Energy Engineer Date

Date

Approved: Electric Shop Foreman Date

COVER SHEET

NORTH AND SOUTH ELEVATIONS

STAIR AND SE END ELEVATIONS

DETAIL DRAWINGS

T-1 A-1 A-2 D-1

A-100 2

ROOM

A-100

A-100

A-100

CAMPUS SITE PLAN

VAMC Canandaigua

NOT TO SCALE

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

PARKING

WATER TOWER

PA

RK

IN

G

PARKING

P A

R K

IN

G

PARKING

PARKING

PARKING

PARKING

Approved: Utilities Foreman

Approved:

AutoCAD SHX Text

ABBREVIATIONS AND SYMBOLS

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text T-28

AutoCAD SHX Text T-29

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

COURTYARD 1

AutoCAD SHX Text

COURTYARD 2

AutoCAD SHX Text

EAST STREET

AutoCAD SHX Text

GOLF

AutoCAD SHX Text

FORT HILL

AutoCAD SHX Text

SONNENBERG

AutoCAD SHX Text

AutoCAD SHX Text

NORTH

AutoCAD SHX Text

COURSE

AutoCAD SHX Text

GARDENS

AutoCAD SHX Text

AVENUE

AutoCAD SHX Text

COURSE

AutoCAD SHX Text

GOLF

AutoCAD SHX Text

STREET

AutoCAD SHX Text

CHAPEL

AutoCAD SHX Text

PARK

AutoCAD SHX Text

EXERCISE

AutoCAD SHX Text

EAST STREET

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

94 GARAGE (SCHOOL LEASE)

AutoCAD SHX Text

80 S.T.P. CONTROL HOUSE

AutoCAD SHX Text

73 (SCHOOL LEASE)

AutoCAD SHX Text

39 ENGINEERING STORAGE

AutoCAD SHX Text

37 FORMER PATIENT CARE, IS

AutoCAD SHX Text

36 FORMER PATIENT CARE, DAY TREATMENT CENTER

AutoCAD SHX Text

34 SPD, A&MMS, DAYCARES, NETWORK STORAGE

AutoCAD SHX Text

14 VACANT

AutoCAD SHX Text

13 EMERGENCY GENERATOR

AutoCAD SHX Text

5 AUDITORIUM, RECREATION SVC.

AutoCAD SHX Text

NO. BUILDING SCHEDULE

AutoCAD SHX Text

4 ADMINISTRATIVE, CANTEEN

AutoCAD SHX Text

18 (SCHOOL LEASE)

AutoCAD SHX Text

1 OUTPATIENT SERVICES, MAIN ADMIN

AutoCAD SHX Text

2 MAIN KITCHEN & DINING RM., OUTPT PHARM

AutoCAD SHX Text

3 GEC OFFICES, PATIENT CARE

AutoCAD SHX Text

6 SUBSTANCE ABUSE OFFICES, EMS

AutoCAD SHX Text

7 NHCU, VOLUNTARY SVC., HRMS

AutoCAD SHX Text

9 PATIENT CARE/DOM, LIBRARY, MAIL RM.

AutoCAD SHX Text

11 WAREHOUSE

AutoCAD SHX Text

12 BOILER PLANT

AutoCAD SHX Text

16 FIRE STATION, GARAGE, GROUNDS MTN.

AutoCAD SHX Text

24 VALOR HEADQUARTERS

AutoCAD SHX Text

33 PATIENT CARE NHCU, INPATIENT PHARMACY

AutoCAD SHX Text

40 GATE HOUSE

AutoCAD SHX Text

41 OUTDOOR FIREPLACE

AutoCAD SHX Text

42 STONE GRANDSTAND

AutoCAD SHX Text

48 GARAGE

AutoCAD SHX Text

70 MISCELLANEOUS STORAGE

AutoCAD SHX Text

81 SLUDGE DIGESTORS

AutoCAD SHX Text

82 SLUDGE BED

AutoCAD SHX Text

76 STORAGE

AutoCAD SHX Text

8 NHCU, ADULT DAYCARE

AutoCAD SHX Text

10 LAUNDRY

AutoCAD SHX Text

20 VA POLICE

AutoCAD SHX Text

75 OIL HOUSE

AutoCAD SHX Text

77 STORAGE

AutoCAD SHX Text

136 PAVILION BY 36/37

AutoCAD SHX Text

135 REGULATED MEDICAL WASTE STORAGE

AutoCAD SHX Text

134 VAVS PAVILION BY B.7

AutoCAD SHX Text

133 ENGINEERING STORAGE

AutoCAD SHX Text

132 TRASH HUT - B.14

AutoCAD SHX Text

130 BACKFLOW PREVENTOR

AutoCAD SHX Text

129 TRASH HUT - B.1

AutoCAD SHX Text

128 500,000 GALLON ELEVATED WATER TANK

AutoCAD SHX Text

127 TRASH HUT - B.34

AutoCAD SHX Text

125 TRASH HUT - B.36/37

AutoCAD SHX Text

124 TRASH HUT - B.6

AutoCAD SHX Text

123 TRASH HUT - B.8

AutoCAD SHX Text

122 OIL STORAGE TANKS

AutoCAD SHX Text

121 SWITCHGEAR

AutoCAD SHX Text

118 ENGINEERING SHOPS & OFFICES

AutoCAD SHX Text

117 GREENHOUSE DTC

AutoCAD SHX Text

113 PATIENT'S TOILET, COURT 2

AutoCAD SHX Text

112 PATIENT'S TOILET, COURT 1

AutoCAD SHX Text

111 TRANSFORMERS X-RAY B.1

AutoCAD SHX Text

109 AERATION TANKS

AutoCAD SHX Text

108 PRIMARY TANKS

AutoCAD SHX Text

106 TRICKLING FILTER

AutoCAD SHX Text

105 SECONDARY TANKS

AutoCAD SHX Text

T28 STORAGE - Q-HUT

AutoCAD SHX Text

T29 STORAGE - Q-HUT

AutoCAD SHX Text

107 PUMP HOUSE S.T.P.

AutoCAD SHX Text

110 PAVILION COURT 2

AutoCAD SHX Text

114 PAVILION COURT 2

AutoCAD SHX Text

115 RECREATION STORAGE, COURT 1

AutoCAD SHX Text

120 FIRE PUMP BLDG., BKFLOW PREVENTOR

AutoCAD SHX Text

126 TRASH HUT - T-HOUSE - B.3/9/33

AutoCAD SHX Text

131 FLAMMABLE STORAGE

AutoCAD SHX Text

137 CHILLER PLANT @ B.7/8

AutoCAD SHX Text

SMOKING SHELTERS, B.1/3/6/36

AutoCAD SHX Text

AutoCAD SHX Text

PROJECT LOCATION

V A

V A

Scale: AS SHOWN

A-1

Date

Project No.

528A5-17-517

6/24/2017

DrawnChecked

Dwg. Of

Date

Drawing Title

Approved: Chief Engineer

Date

Approved: Medical Center Director

Project Title

Location

Building No.

CANANDAIGUA, NEW YORK

DateRevisions

B36 BRICK REPAIR

36 TH

South and North Elevations

2 4

Replace Brick Bldg. 36

South Elevation 1/4"=1'

Replace Brick Bldg. 36

North elevation 1/4"=1'-0"

Replace Brick Bldg. 36

Work Location

REMOVE SLIT/SPALLING/SHEARED BRICK

BELOW TERRA COTTA CAP. REPLACE WITH

NEW. TUCK POINTED NEW JOINTS SHALL MATCH

EXISTING IN WIDTH, COLOR AND CONSISTENCY.

REINSTALL EXISTING TERRA COTTA CAP AFTER

BRICK HAS BEEN REPAIRED/REPLACED.

APPROX. 60 SQ. FT PER PILASTER(2) and 60 SQ. FT

ON BUILDING CORNER SECTION.

REMOVE SLIT/SPALLING/SHEARED BRICK

BELOW TERRA COTTA CAP TO STRUCTURAL

ROOF DECK ON INTERIOR PARAPET. REMOVE

AND REUSE TERRA COTTA AFTER NEW PARAPET

BUILT. INSTALL NEW FLASHING AND POINT TO

MATCH EXISTING. (APPROX 75 SQ. FT)

(SEE DETAIL 1 ON DRAWING D-1 FOR PARAPET DETAILS AND

DETAIL 2 ON DRAWING D-1 FOR ANCHOR DETAILS)

REMOVE SLIT/SPALLING/SHEARED BRICK

BELOW TERRA COTTA CAP. REPLACE WITH

NEW. TUCK POINTED NEW JOINTS SHALL MATCH

EXISTING IN WIDTH, COLOR AND CONSISTENCY.

REINSTALL EXISTING TERRA COTTA CAP AFTER

BRICK HAS BEEN REPAIRED/REPLACED.

(APPROX. 60 SQ. FT PER PILASTER (2) )

(SEE DETAIL 2 ON DRAWING D-1 FOR

ANCHOR DETAILS AND DETAIL 3 ON

DRAWING D-1 FOR PILASTER DETAILS)

REMOVE SLIT/SPALLING/SHEARED BRICK

BELOW TERRA COTTA CAP TO STRUCTURAL

ROOF DECK ON INTERIOR PARAPET. REMOVE

AND REUSE TERRA COTTA AFTER NEW PARAPET

BUILT. INSTALL NEW FLASHING AND POINT TO

MATCH EXISTING. (APPROX 75 SQ. FT)

(SEE DETAIL 1 ON DRAWING D-1 FOR

PARAPET DETAILS AND DETAIL 2 ON

DRAWING D-1 FOR ANCHOR DETAILS)

REMOVE SLIT/SPALLING/SHEARED BRICK

BELOW TERRA COTTA CAP. REPLACE WITH

NEW. TUCK POINTED NEW JOINTS SHALL MATCH

EXISTING IN WIDTH, COLOR AND CONSISTENCY.

REINSTALL EXISTING TERRA COTTA CAP AFTER

BRICK HAS BEEN REPAIRED/REPLACED.

(APPROX. 60 SQ. FT PER PILASTER(2) and 60 SQ. FT

ON BUILDING CORNER SECTION.)

SEE DRAWING DETAIL 2 ON DRAWING D-1 FOR

ANCHOR DETAILS AND DETAIL 3 ON

DRAWING D-1 FOR PILASTER DETAILS)

A-1

N1

A-2

E1

A-1

S1

A-2

PE1

A-2

PS1

REMOVE SLIT/SPALLING/SHEARED BRICK

BELOW TERRA COTTA CAP. REPLACE WITH

NEW. TUCK POINTED NEW JOINTS SHALL MATCH

EXISTING IN WIDTH, COLOR AND CONSISTENCY.

REINSTALL EXISTING TERRA COTTA CAP AFTER

BRICK HAS BEEN REPAIRED/REPLACED.

(APPROX. 60 SQ. FT PER PILASTER (2) )

(SEE DETAIL 2 ON DRAWING D-1 FOR

ANCHOR DETAILS AND DETAIL 3 ON

DRAWING D-1 FOR PILASTER DETAILS)

AutoCAD SHX Text

NORTH

AutoCAD SHX Text %%uBUILDING #36

AutoCAD SHX Text %%uSECOND FLOOR PLAN

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 214A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S2-1

AutoCAD SHX Text

AutoCAD SHX Text C2-4

AutoCAD SHX Text C2-2

AutoCAD SHX Text

AutoCAD SHX Text 203A

AutoCAD SHX Text C2-1

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 227E

AutoCAD SHX Text 227B

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text S2-2

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 238A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C2-8

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text C2-3

AutoCAD SHX Text C2-4

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 229A

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

DN

AutoCAD SHX Text

UP

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 227D

AutoCAD SHX Text 228A

AutoCAD SHX Text 227F

AutoCAD SHX Text 225A

AutoCAD SHX Text 227A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 204A

AutoCAD SHX Text 227C

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text A-1

AutoCAD SHX Text S1

AutoCAD SHX Text A-1

AutoCAD SHX Text N1

AutoCAD SHX Text A-1

AutoCAD SHX Text

NOTE: SECTIONS ENCLOSED IN BLUE CIRCLED AREAS ( ) OR RED HATCHED AREAS ( ) ARE INCLUDED IN SCOPE OF THE PROJECT.

A

V A

A-2

Date

Project No.

528A5-17-517

6/24/2017

DrawnChecked

Dwg. Of

Date

Drawing Title

Approved: Chief Engineer

Date

Approved: Medical Center Director

Project Title

Location

Building No.

CANANDAIGUA, NEW YORK

DateRevisions

B36 BRICK REPAIR

36 TLH

Stair and SE End Elevations

3 4

Brick Replacement Locations

Main Entrance - East Elevation 3/8"=1'

Brick Replacement Locations

Building Entrance - South Elevation 3/8"=1'

Brick Replacement Locations

NTS

Brick Replacement Locations

SouthEast Wing - East Elevation 3/16"=1'

REMOVE SLIT/SPALLING/SHEARED BRICK

ON CHEEK WALLS TO EXISTING FOOTING

BASE. (APPROX. 75 SQ. FT EACH SIDE TYPICAL)

REINSTALL NEW FLASHING/WEEPS AND BRICK AS

SHOWN IN DETAIL 6 ON DRAWING D-1.

REMOVE ALL TERRA COTTA STAIR RAIL CAPS CAREFULLY

(APPROXIMATELY 15 LINEAR FEET PER SIDE) AND SET ASIDE

FOR RE-INSTALLATION. (BOTH SIDES TYPICAL)

REPAIR/REPLACE ANY SECTIONS THAT ARE NOT SOUND

(SEE CHEEK WALL DETAIL 6 ON DRAWING D-1)

REMOVE ALL GRANITE STAIR SECTIONS CAREFULLY (10) AND SET ASIDE

FOR RE-INSTALLATION. REMOVE RUST STAINS OR ROTATE GRANITE

OVER TO OPPOSITE SIDES (BOTTOM) IF SURFACE IS CLEAN

AND SMOOTH. (SEE DETAILS 4 AND 5 ON DRAWING D-1 FOR EXISTING

FOOTING/STAIR PLACEMENT.)

REMOVE ANY SPLIT/SPALLING/SHEARED BRICK AND REPLACE/REPOINT

AS NEEDED ON PILASTERS/CORNERS AND BRICK SECTIONS ABUTTED TO

TERRA COTTA. (APPROX. 50 SQ. FT PER SIDE)

REMOVE ANY SPLIT/SHEARED/SPALLING BRICK ON ENTRANCE PARAPET.

REPLACE/REPOINT AS NEEDED. (APPROX. 100 SQ. FT TOTAL ALL SIDES) .

REMOVE SLIT/SPALLING/SHEARED BRICK

ON NORTH AND SOUTH ENTRANCE WALLS/PILASTERS

AND CORNER SECTIONS. (APPROX. 200 SQ. FT EACH SIDE TYPICAL)

TUCK POINT AND INSTALL DOVETAIL ANCHORS/WEEPS AS

SHOWN IN DETAIL. REPAIR/REPLACE SPALLED/SPLIT/ CRACKED

TERRA COTTA SECTIONS ON NORTH AND SOUTH ENTRANCE

WALLS. (SEE ANCHOR DETAIL 2 ON DRAWING D-1. )

REPAIR/REPLACE SPLIT/SPALLED/CRACKED TERRA COTTA

ON ENTRANCE ARCHWAY. .

REMOVE TERRA COTTA STAIR BASE SECTIONS AND GRANITE BASES.

SET ASIDE FOR RE-INSTALLATION. .

REMOVE SLIT/SPALLING/SHEARED BRICK

BELOW TERRA COTTA CAP TO STRUCTURAL

ROOF DECK ON INTERIOR PARAPET. REMOVE

AND REUSE TERRA COTTA AFTER NEW PARAPET

BUILT. INSTALL NEW FLASHING AND POINT TO

MATCH EXISTING. (SEE DETAIL 1 ON DRAWING

D-1 FOR PARAPET DETAILS) (APPROX 75 SQ. FT)

D-1

AutoCAD SHX Text A-2

AutoCAD SHX Text

PE1

AutoCAD SHX Text A-2

AutoCAD SHX Text

PS1

AutoCAD SHX Text A-2

AutoCAD SHX Text

AutoCAD SHX Text A-2

AutoCAD SHX Text E1

NOTE: SECTIONS ENCLOSED IN BLUE CIRCLED AREAS ( ) OR RED HATCHED AREAS ( ) ARE INCLUDED IN SCOPE OF THE PROJECT.

A

V A

Scale: ########

D-1

Date

Project No.

528A5-17-517

6/24/2017

DrawnChecked

Dwg. Of

Date

Drawing Title

Approved: Chief Engineer

Date

Approved: Medical Center Director

Project Title

Location

Building No.

CANANDAIGUA, NEW YORK

DateRevisions

B36 BRICK REPAIR

36 TLH

Detail Drawings- B36

4 4

GENERAL NOTES:

ROOFING

1. Protect existing roofing. Maintain weather proof barriers to building.

Provide temporary weatherproofing barriers during the work.

2. Remove and replace flashing at roof at all locations.

Reinstall new flashing, counter-flashing and term bars.

Provide new masonry pointing at new flashing. Provide original manufactures certification for all roofing and flashing upon completion.

3. Furnish and install new copper cap flashing equal to existing as shown.

4. Coordinate with tuck point rework.

TUCK POINTING

1. Tuck point all interior parapet walls. Include all terra cotta masonry joints at interior and exterior cap and crenellations.

2. Tuck point ALL sections of building as described in Drawings/details

Include window headers and sill. Include louvers.

3. Brick with deteriorated or spalled facing shall be replaced.

Cracked brick shall be replaced.

4. Tuck point all elevations on sections of building as described in drawings. Include window headers and sill. Include louvers.

Handrails

1. Contractor will be required to install new stainless steel handrail sections in center of stairway from top landing to bottom landing. Handrails will be 36" above treads for ADA compliance and must be fastened securely to stair sections with stainless steel hardware and caps.

SAFETY

1. Contractor shall provide chain link fencing in areas surrounding repair work for duration of project.

2. Contractor shall restrict entrance to work site from interior entrances for duration of the project.

PARAPET DETAIL

NTS

BRICK ANCHOR DETAIL

NTS

ORIGINAL FINISHED STAIR DETAIL

NTS

REMOVE TERM BAR AND EPDM MEMBRANE TO

STRUCTURAL DECK. REMOVE/REPLACE DAMAGED

BRICK AND REPOINT TO MATCH SURROUNDING.

AREAS TO BE REPOINTED SHALL BE CUT IN OR

REMOVED AT A MINIMUM OF 34" PAST THE BRICK FACE

ON JOINTS TO ALLOW ADHESION OF NEW MORTAR.

REPLACE TERM BAR AND SECURE 8" O.C. LAP SEAL

TO ENSURE WATERPROOF BARRIER

REMOVE/REPLACE BRICK SECTIONS

THAT ARE CRACKED, SPALLED,

CHIPPED ETC. TO WINDOW HEADER

COURSE BELOW PARAPET (TYP)

INSTALL DURAWALL BETWEEN BRICK COURSES

WHERE HEADER COURSE NOT EXISTING.

(2' O.C. VERTICALLY.)

REMOVE TERRA-COTTA CAP PRIOR TO BRICK REPAIR.

REINSTALL CAP AFTER BRICK REPAIR COMPLETED.

(ALL SECTIONS)

INSTALL BRICK TIES EVERY 2' VERTICALLY O.C.

FOR PILASTERS (TYP)

REMOVE/REPLACE BRICK ON PILASTER BELOW TERRA-COTTA CAP.

REPAIR AND REPLACE BRICK AND REINSTALL CAP AFTER BRICK WORK

COMPLETED. (ALL SECTIONS)

PILASTER DETAIL

1/16"=1'-0"

EXISTING EPDM ROOF MEMBRANE

EXISTING POLYISO INSULATION

INSTALL NEW FLASHING UNDER TERRA COTTA

CAP SECTIONS BEFORE RE-INSTALLING. (TYP)

REMOVE SLIT/SPALLING/SHEARED BRICK

ON CORNER SECTIONS OF BUILDING.

TUCK POINTED NEW JOINTS SHALL MATCH

EXISTING IN WIDTH, COLOR AND CONSISTENCY.

INSTALL STAINLESS STEEL DOVETAIL

ANCHORS 24" O.C. HORIZONTALLY

AND 24" O.C. VERTICALLY ON ALL

SECTIONS REQUIRING DOVETAIL

ANCHORS. (STAGGERED SEAM)

24"

EXISTING STAIR SECTION

NTS

INSTALL NEW CORRUGATED

VINYL WEEPS 4' OC BELOW

CAP AND ABOVE BASE

FLASHING ALL SIDES (TYP)

NEW STAINLESS STEEL DOVETAIL

WALL ANCHOR. INSTALL VERTICALLY

2' OC AND 4' OC HORIZONTALLY.(TYP)

ROLLED COPPER FLASHING.

ATTACH TO FOOTING AND

ROLL UNDER BRICK AND

OVER FACE BELOW BOTTOM

WEEP. (TYP)

INSTALL NEW MORTAR NET ALL

SIDES. (TYP)

NEW STAINLESS STEEL DOVETAIL

WALL ANCHOR. INSTALL VERTICALLY

2' OC AND 4' OC HORIZONTALLY.(TYP)

1" AIR GAP BETWEEN BRICK

AND CONCRETE STAIR WALL

EXISTING CONCRETE FOOTING

GRANITE STAIRS

CHEEK WALL/STAIR BRICK DETAIL

NTS

AutoCAD SHX Text D-1

AutoCAD SHX Text

AutoCAD SHX Text D-1

AutoCAD SHX Text

AutoCAD SHX Text D-1

AutoCAD SHX Text

AutoCAD SHX Text D-1

AutoCAD SHX Text

AutoCAD SHX Text

EXISTING STRUCTURE

AutoCAD SHX Text D-1

AutoCAD SHX Text

AutoCAD SHX Text D-1

Sheets and Views
brick repair 36 phase 2-xTitle
FRONT SOFFIT
brick repair 36 phase 2-A-1
brick repair 36 phase 2-A-2
brick repair 36 phase 2-D-1

File details come from the government source that posted it.