VA101V-17-Q-0442-00002002.pdf

PDF 553 KB Posted

Attached to
Facility Correction Assessment Upgrades (317) Federal contract opportunity
Solicitation number
VA101V17Q0442
Issued by
Department of Veterans Affairs Veterans Benefits Administration

About this file

VA101V-17-Q-0442 00002 Revised SOW to Change Epoxy to Cementitious Urethane Flooring.pdf

View the file

Other files for this federal contract opportunity

Other files attached to Facility Correction Assessment Upgrades (317), newest first.
File Type Posted
VA101V-17-Q-0442-00002004.jpg JPG image
VA101V-17-Q-0442-00002001.pdf PDF
VA101V-17-Q-0442-00002003.dwg DWG drawing
VA101V-17-Q-0442-00002000.docx DOCX document
VA101V-17-Q-0442-00001000.docx DOCX document
VA101V-17-Q-0442-000.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Statement of Work (SOW)(REV.1)

Kitchen Cementitious Urethane Flooring

St Petersburg VARO

11/22/2017

Statement of Work (SOW) Cementitious Urethane Cement Coating of Kitchen Floor

1. Introduction

The Department of Veterans Affairs is seeking a qualified construction firm for the awarding of a Firm Fixed Price contract for the removal of the existing porcelain tile flooring in the kitchen area of the St Petersburg VA Regional Office (VARO) and replaced the flooring with cementitious urethane cement. The purpose for the cementitious urethane cement coating is to remediate the water seepage from the kitchen into room 107 (fire control panel room) directly below the kitchen as well as traversing across the subflooring to the outside of the building.

1.1 Background

For the past year leaking from the roof in room 107 has progressed to the point it is become a risk for the IT equipment as well as the fire control panel in room 107. Directly above room 107 is the kitchen and previous investigation would suggest the floor in the kitchen has deteriorated to the point when water gets on the floor from cleaning operations as well as water being discharged at the drain near the dishwasher is traversing under the tile floor and leaking in room

107. The Investigation also suggests the leaking through the kitchen floor is the primary contributor to the water leak outside the building adjacent room 107. By removing the tile and encapsulating the floor with a cementitious urethane cement coating leaking will be mitigated.

Additionally, the existing trend wall adjacent the storage room that contains a door is beyond repair and after demolition the contractor will replace the trend wall with a new similar trend wall to include door.

1.2 Scope

This project involves removing all kitchen appliances / supplies; removing damaged trend walls;

removing the existing porcelain tile on the floor and base board; floating and leveling the sub floor ensuring transition points are flush with adjacent tiled areas; applying a durable cementitious urethane cement coating that provides an anti-microbial and anti-slip finish that will encapsulate the kitchen floor preventing moisture from getting to the sub flooring; building and replacing trend wall and door leading into storage area; returning all kitchen appliances to original location ensuring fully operational; and returning any removed supplies to original location. The new cementitious urethane floor must traverse up the perimeter wall approximately 6 inches and have an appropriate grade / pitch towards the existing kitchen drains allowing water to flow by gravity to the all floor drains. Contractor will coordinate with the COR the replacement of the trendwalls with a similar product to the original locations.

Period of Performance for this project is 90 days to allow for special ordering of product;

however the kitchen cannot be closed for more than 30 days.

2 General Requirements

2.1 Non-Personal Services

The Government shall neither supervise contractor employees nor control the method by which the contractor performs the required tasks. Under no circumstances shall the Government assign tasks to, or prepare work schedules for, individual contractor employees. It shall be the responsibility of the contractor to manage its employees and to guard against any actions that are of the nature of personal services, or give the perception of personal services. If the contractor believes that any actions constitute, or are perceived to constitute personal services, it shall be the contractor's responsibility to notify the Contracting Officer (CO) immediately.

2.2 Business Relations

The contractor shall successfully integrate and coordinate all activity needed to execute the requirement. The contractor shall manage the timeliness, completeness, and quality of problem identification. The contractor shall provide corrective action plans, proposal submittals, timely identification of issues, and effective management of subcontractors. The contractor shall seek to ensure customer satisfaction and professional and ethical behavior of all contractor personnel.

2.3 Contract Administration and Management

The following subsections specify requirements for contract, management, and personnel administration.

2.3.1 Contract Management

The contractor shall establish clear organizational lines of authority and responsibility to ensure effective management of the resources assigned to the requirement. The contractor must maintain continuity between the support operations at the Saint Petersburg Regional Office and the contractor's corporate offices.

2.3.2 Contract Administration

The contractor shall establish processes and assign appropriate resources to effectively administer the requirement. The contractor shall respond to Government requests for contractual actions in a timely fashion. The contractor shall have a single point of contact between the Government and Contractor personnel assigned to support contracts or task orders. The contractor shall assign work effort and maintaining proper and accurate time keeping records of personnel assigned to work on the requirement.

2.4 Subcontract Management

The contractor shall be responsible for any subcontract management necessary to integrate work performed on this requirement and shall be responsible and accountable for subcontractor performance on this requirement. The prime contractor will manage work distribution to ensure there are no Organizational Conflict of Interest (OCI) considerations. Contractors may add subcontractors to their team after notification to the Contracting Officer (CO) or Contracting Officer Representative (COR). Cross teaming may or may not be permitted.

2.5 Location and Hours of Work

The work will be performed on the second floor (kitchen and cook line) of the Saint Petersburg Regional Office, 9500 Bay Pines Blvd, Saint Petersburg Florida 33708. All work will be after hours. Start time will be no earlier than 6:00 pm and the contractor must vacate by 6:00 am so there is no disruption to employees.

After prior coordination and approval by the COR, Contractors may be able to start at 2:00 pm for disconnect and removal of kitchen equipment, providing there is no disruptions to the Service Center.

POP for this project is 90 days to allow for special ordering of product; however the kitchen cannot be closed for more than 30 days.

3 Performance Requirements The following sections specify the Performance Objectives and Performance Elements for this contract.

3.1 Pre-Construction activities.

3.1.1 Prior performance of this SOW Contractor must complete all training as identified in paragraph 4.1 Security and 4.1.1 Badging and Identification.

Performance Standards

a) Standard: All employees to include subcontractor employees complete training as outlined in Section 4 of this SOW.

AQL: 100% of employees have completed VA Privacy, Information Security and Rules of Behavior; and have submitted a VA Form 20-0344 (attached) prior performance of this SOW / Contract.

Deliverables

A003 10176 VA Privacy, Information Security and Rules of Behavior

A004 30hr OSHA Safety Course

A005 VA Form 20-0344

3.1.2 The Contractor shall provide insurance certificate for pre-award documentation for of insurance.

Performance Standards

a) STD: Contractor must have valid insurance

AQL: Insurance must be in compliance with all, local, state and federal regulations.

Deliverables A002 Copy of construction insurance

3.1.3 The Contractor shall provide 30 hour Supervisor and 10 hour employee OSHA Certificates prior to beginning working.

Performance Standards

a) STD: Completion of OSHA training for supervisor and employees

AQL: 100% completion for the contractor supervisor and employees for the project

Deliverables A003 OSHA Certificates.

3.1.4 Provide dumpster for construction debris.

Performance Standards

a) STD: Completion of OSHA training for supervisor and employees

AQL: 100% completion for the contractor supervisor and employees for the project

Deliverables A003 OSHA Certificates.

3.2 Construction Activities - Contractor will.

3.2.1 Barrier off the kitchen/cook line with dust control measures. Erect plastic sheeting, dust off mats and neg air machine.

Performance Standards

a) STD: Kitchen area is seal off to surrounding work space

AQL: Neg air machine prevents dust and odors from entering surrounding area.

3.2.2 Remove all appliances, racks and sinks in a manner that they are not damaged.

Performance Standards

a) STD: All appliances removed to allow for cementitious urethane cement application

AQL: All appliances removed without damage and stored safely for reinstallation

3.2.3 The contractor will erect an 8’ visqueen barrier around the designated storage area for kitchen equipment.

Performance Standards

a) STD: All kitchen equipment safely removed and stored in area adjacent the kitchen (see drawing).

AQL: No damage to floor tile in storage area. Contractor will replace any damage tile.

3.2.4 Remove tile from the cook line, kitchen and kitchen storeroom will be removed to the concrete slab.

Performance Standards

a) STD: All tile removed to concrete slab

AQL: Concrete tile is smooth and free of any residual tile/glue/sealant, etc..

3.2.5 Remove Trend walls and doors form entrance to the storeroom and Canteen Office.

Performance Standards

a) STD: Trend walls removed

AQL: Area prepared for new trend wall.

3.2.6 Remove floor tile, prep subsurface for cementitious urethane cement application.

Performance Standards

a) STD: All tile removed

AQL: Subsurface clean, level, free of cracks, bumps, dimples, etc.

3.2.7 Ensure that the kitchen perimeter is sealed from the floor up the wall 6 inches.

Performance Standards

a) STD: Thickness of urethane cement is ¼” on flooring as well as up the wall.

AQL: Smooth transition of urethane cement to surrounding tile as well as wall tile.

3.2.8 Ensure final floor is level at transition areas and is anti-microbial and anti-slip.

Performance Standards

a) STD: No visible rises or drops in floor as well as transition areas level at both points.

AQL: No tripping hazards.

3.2.9 Return all kitchen appliances to original location, ensuring all appliances are fully operational.

Performance Standards

a) STD: All appliances returned

AQL: 100% of appliances removed by contractor fully operational.

3.2.10 Erect new trend walls and door locks sets.

Performance Standards

a) STD: Trend walls are same color, texture, type as existing trend wall. Door key lock must be compatible with Cormax Best from Stanley

AQL: No wall blemishes, door functions properly and compatible with Cormax Best from Stanley

3.3 Post Construction Activities – Punch list

The general contractor will prepare an initial punch list towards the completion of the project.

After the contractor has made the corrections to the faults listed on the initial punch list the contractor and COR will jointly conduct a final inspection. The contractor should not schedule the joint final inspection until the work has reached substantial completion. Any faults identified during the joint inspection will be added to the initial punch list. There will only be one punch list.

The punch list should be published within 24 hours of the joint inspection. The punch list will list the subcontractor responsible for each item and anticipated completion date. Each item should be checked, initialed by the prime Contractor and dated on the punch list document when completed. Once the Contractor has completed and re-inspected all the punch list items, the Contractor will request final inspection with the COR. If it becomes clear that the work was not corrected the final inspection will be rescheduled. The final inspection will be signed off on by the COR and Contractor. The Contractors initial work breakdown schedule (WBS) will include punch list activities.

Performance Standards

a) Standard: Identifies and corrects deficiencies

AQL: 100% of all deficiencies corrected by the contractor

Deliverables A002 Punch list

3.4 Salient Characteristics – Cementitious urethane flooring

Also known as cementitious urethane flooring or urethane cement flooring, this material excels over epoxy floor systems in food & beverage plants for numerous reasons; reduces downtime due to single layer system, is durable in harsh environments with thermal shock, and even withstands heavy impact and harsh chemicals. For description of Cementitious Urethane Flooring see: http://www.epfloors.com/urethane-concrete-mortars/ http://www.epfloors.com/urethane-concrete-mortars/

4 Security and Safety

4.1 Security

The contractor is required to enter and exit the Saint Petersburg VARO through the front entrance. Entering or exiting the building through any other door will require VARO approval and an escort will be required. Upon entering the building the contractor and/or contractors employees will be required to show proof of identity (Must have valid photo ID) as well as pass through security screening. Due to the sensitivity and personal information processed at the VARO the Contractor as well as the Contractors employees will be required to complete VA Privacy and Information Security and Rules of Behavior Training. This training we be provided by the COR to all Contractor employees to include sub-contractor employees. The Contractor will coordinate and schedule the Contractor. Certification of completion of training will be submitted to the COR within 10 working days from the contract award date. In addition, in VA Forms 20-0334 must be completed by the Contractor, contractor employees, and sub-contractors and original copies turned into the COR prior to the beginning of construction. See Attachment 1 to this SOW for VA Form 20-0344. After contractor employees have submitted a signed Rules of Behavior certification and submitted a properly completed VA Form 20-0344 the employee will be provided a contractor badge by the COR.

4.2 Safety

The contractor shall provide all safety equipment/Personal protective equipment and clothing as required for their employees.

OSHA - Prior to the commencing work the contractor shall provide proof that an OSHA designated competent person (CP) (29 CFR 1926.20(b)(2) will maintain a presence at the work sire whenever the general or subcontractors are present. The contractor as well as, the on-site supervisor will have completed a 30 hours of OHSA approved safety training. All other contractor employees will have no less than 10 hours of OSHA approved safety training.

Safety Plan, the Contractor will provide a site specific safety plan. As well as, an Activity Hazards Analysis (AHA). An example if the VA Approved AHA van be found at:

http://usace.army.mil/Protals/2/docs/AHA2.pdf

Compliance, the Contractor shall comply with all applicable Federal, State and local legal requirements regarding worker health and safety. The requirements include but not limited to, those found in Federal and State Occupational Safety and Health Act (OSHA) statues and regulations, such as applicable provisions of Title 29, Code of Federal Regulations (CFR) Parts 1910 and 1926. Contractor is solely responsible for determining the legal requirements that apply to activities and shall ensure safe and healthful working conditions for its employees.

http://usace.army.mil/Protals/2/docs/AHA2.pdf

4.3 Government Furnished Materials

The Government shall provide at no cost: Parking spaces and access to the VARO loading docks as necessary.

4.4 Quality Control

The Contractor shall develop a Quality Control Plan, QCP and maintain an effective quality control program to ensure services are performed in accordance with the contract and this SOW. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractors QCP is the means by which performance of work complies with the requirement of the contract.

The finalized QCP will be accepted by the Government at the time of the award of the Contract.

The Contracting Officer may notify the Contractor of required modifications to the plan during the period of performance. The Contractor then shall coordinate suggested modifications and obtain acceptance of the plan by the Contracting Officer. Any modifications to the program during the period of performance shall be provided to the COR for review no later than 10 working days prior to effective date of the change. The QCP shall be subject to the Governments review and approval. The Government may find the QCP "unacceptable" whenever the Contractors procedures do not accomplish quality control objective(s). The Contractor shall revise the QCP within 10 working days from receipt of notice that QCP is found "unacceptable."

4.4.1 Quality Assurance Surveillance Plan (QASP)

The Government shall monitor the Contractors performance under this Contract in accordance with the Governments QASP developed by the COR.

4.5 Environmental Requirements

Non-Hazardous waste disposal

Demolition - The Construction Contractor shall provide all demolition, removal and legal disposal of materials. The Construction Contractor shall ensure that facilities used for recycling, reuse and disposal shall be permitted for the intended use to the extent required by local, state, federal regulations.

Disposal vendors - The Whole Building Design Guide website http://www.cwm.wbdg.org provides a Construction Waste Management Database that contains information on companies that haul, collect, and process recyclable debris from construction projects.

Hazardous waste disposal

Abatement - In order to provide for abatement and control of all environmentally hazardous materials arising from demolition and/or construction activities, the Construction Contractor shall comply with all applicable environmentally hazardous material control and abatement and all applicable provisions of the Corps of Engineers Manual EM 385-1-1, "General Safety Requirements as well as the specific requirements stated elsewhere in the Contract Documents.

EM 385-1-1 can be found at http://federalconstruction.phslegal.com/uploads/file/EM-385-1- 1_2008.pdf.

Manifesto - The Construction Contractor shall provide a waste manifesto for all hazardous waste disposals.

MSDS – Contractor will provide the COR a copy of all MSDS for products and materials applied during the performance of this contract.

4.5 Applicable directives

The contractor shall comply with all documents listed below as mandatory and referenced under paragraph 3.0, Performance Requirements. Compliance with documents listed as non mandatory is the contractors' option.

Mandatory compliance

OSHA - Occupational Safety and Health Administration Department of Labor http://www.osha.gov

NIOSH - The National Institute for Occupational Safety and Health http://www.cdc.gov/niosh/

Non Mandatory document

Corps of Engineers Manual EM 385-1-1

5 Deliverables The contractor shall provide deliverables as described in subsequent task orders. Deliverables shall be specified by the government. Format and delivery schedule for deliverables shall be outlined in CDRLs and/or other means TBD.

Identifier Name Description

A001 List of employees names and email addresses

A002 Copy of construction insurance

A003 OSHA Certificates 30 hour supervisor OSHA Certificate and 10 hour employee OSHA Certificate

A004 Completed VA Form 20-0344 Certification of Veteran status and Veteran-Relatives

6 Related Documents The following Documents are related to this project

VA Handbook 6500.6, Appendix D, Contractor Rules of Behavior -http://www.va.gov/vapubs/viewPublication.asp?Pub_ID=471&FType=2

VA Forms

VA Form20-0344

VA Forms

Kitchen Floor Plan

Kitchen Floor Plan

1. Introduction
1.1 Background
1.2 Scope
2 General Requirements
2.1 Non-Personal Services
2.2 Business Relations
2.3 Contract Administration and Management
2.3.1 Contract Management
2.3.2 Contract Administration
2.4 Subcontract Management
2.5 Location and Hours of Work
3 Performance Requirements
3.1 Pre-Construction activities.
3.1.1 Prior performance of this SOW Contractor must complete all training as identified in paragraph 4.1 Security and 4.1.1 Badging and Identification.
Performance Standards
3.1.2 The Contractor shall provide insurance certificate for pre-award documentation for of insurance.
3.1.3 The Contractor shall provide 30 hour Supervisor and 10 hour employee OSHA Certificates prior to beginning working.
3.1.4 Provide dumpster for construction debris.
3.2 Construction Activities - Contractor will.
3.2.1 Barrier off the kitchen/cook line with dust control measures. Erect plastic sheeting, dust off mats and neg air machine.
3.2.2 Remove all appliances, racks and sinks in a manner that they are not damaged.
3.2.3 The contractor will erect an 8’ visqueen barrier around the designated storage area for kitchen equipment.
3.2.4 Remove tile from the cook line, kitchen and kitchen storeroom will be removed to the concrete slab.
3.2.5 Remove Trend walls and doors form entrance to the storeroom and Canteen Office.
3.2.6 Remove floor tile, prep subsurface for cementitious urethane cement application.
3.2.7 Ensure that the kitchen perimeter is sealed from the floor up the wall 6 inches.
3.2.8 Ensure final floor is level at transition areas and is anti-microbial and anti-slip.
3.2.9 Return all kitchen appliances to original location, ensuring all appliances are fully operational.
3.2.10 Erect new trend walls and door locks sets.
3.3 Post Construction Activities – Punch list
3.4 Salient Characteristics – Cementitious urethane flooring
4 Security and Safety
4.1 Security
4.2 Safety
4.3 Government Furnished Materials
4.4 Quality Control
4.4.1 Quality Assurance Surveillance Plan (QASP)
4.5 Environmental Requirements
4.5 Applicable directives
5 Deliverables
6 Related Documents
VA Form20-0344
Kitchen Floor Plan

File details come from the government source that posted it.