VA101-17-R-0413-RFP-01003.pdf

PDF 2 MB Posted

Attached to
National Memorial Cemetery of Arizona Phase 3
Solicitation number
VA10117R0413
Issued by

About this file

VA101-17-R-0413 RFP-01 NMCA Phase 1 Pre-proposal Mtg Scope 02-08-18.pdf

View the file

Other files

File Type Posted
VA101-17-R-0413-RFP-02000.docx DOCX document
VA101-17-R-0413-RFP-02001.pdf PDF
VA101-17-R-0413-RFP-01000.docx DOCX document
VA101-17-R-0413-RFP-01002.pdf PDF
VA101-17-R-0413-RFP-01001.pdf PDF
VA101-17-R-0413-006.docx DOCX document
VA101-17-R-0413-009.pdf PDF
VA101-17-R-0413-005.pdf PDF
VA101-17-R-0413-008.docx DOCX document
VA101-17-R-0413-003.docx DOCX document
VA101-17-R-0413-007.docx DOCX document
VA101-17-R-0413-004.pdf PDF
VA101-17-R-0413-002.docx DOCX document
VA101-17-R-0413-001.docx DOCX document
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Overview

National Memorial Cemetery of Arizona

William Peach, Project Manager

02/08/18 1

Administration Building

Maintenance Complex

Main Entrance

N . B la ck

M ou nt ai n P kw y

National Memorial Cemetery of Arizona Phase 3 Gravesite Expansion Project

Two Phased Design/Build Acquisition Phase 1 – Request for Qualifications

• Past Performance

• Relevant Project Experience

• Technical Qualifications

• 3 Most Qualified Advanced

Phase 2 – Request for Proposals

• Technical Approach

• Project Management

• Price

• Best Value w/ Trade-Offs

02/08/18 2

National Memorial Cemetery of Arizona Phase 3 Gravesite Expansion Project

Program Requirement:

• Gravesite Expansion

Approx. 7,800 pre-placed crypts Approx. 7,000 in-ground cremation sites Approx. 12,000 columbarium niches

• Roadways and Parking

• Site Furnishings, Trash Receptacles, Flower Watering stations

• Grading, Drainage, Landscaping, Security and Ornamental Perimeter Fencing

• Irrigation System + upgrades to the existing system

• Honor Guard Building (approx. 1,196 gsf)

• Expand Administration Building

• Improvements to Maintenance Area

• Security Gate at Main Entrance

• Replace Non-Compliant Signage

Throughout Cemetery

• Repairs to Assembly Area And

Columbarium

• Retrofit/Incorporate Guiding

Principles For High Performance and Sustainable Buildings MOU and Renewable Energy Initiatives into Existing Buildings

• Physical Security Upgrades to All Cemetery Facilities

• Infrastructure Deficiencies Repairs Identified Facility Condition Assessment (FCA)

• Habitat & Wetlands Preservation, and Mitigation

• Geographic Information System (GIS) Site Integration

02/08/18 3

02/08/18 4

02/08/18 5

02/08/18 6

02/08/18 7

02/08/18 8

02/08/18 9

Project Overview
Slide Number 2
National Memorial Cemetery of Arizona�Phase 3 Gravesite Expansion Project
Slide Number 4
Slide Number 5
Slide Number 6
Slide Number 7
Slide Number 8
Slide Number 9