VA101-17-R-0413-RFP-01002.pdf
PDF 434 KB Posted
- Attached to
- National Memorial Cemetery of Arizona Phase 3
- Solicitation number
- VA10117R0413
About this file
VA101-17-R-0413 RFP-01 NMCA Phase 1 Pre-Proposal Mtg 02-08-18.pdf
View the file
Other files
| File | Type | Posted |
|---|---|---|
| VA101-17-R-0413-RFP-02000.docx | DOCX document | |
| VA101-17-R-0413-RFP-02001.pdf | ||
| VA101-17-R-0413-RFP-01000.docx | DOCX document | |
| VA101-17-R-0413-RFP-01003.pdf | ||
| VA101-17-R-0413-RFP-01001.pdf | ||
| VA101-17-R-0413-006.docx | DOCX document | |
| VA101-17-R-0413-009.pdf | ||
| VA101-17-R-0413-005.pdf | ||
| VA101-17-R-0413-008.docx | DOCX document | |
| VA101-17-R-0413-003.docx | DOCX document | |
| VA101-17-R-0413-007.docx | DOCX document | |
| VA101-17-R-0413-004.pdf | ||
| VA101-17-R-0413-002.docx | DOCX document | |
| VA101-17-R-0413-001.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
National Memorial Cemetery of Arizona
Phoenix, AZ
Phase 1 Pre-Proposal Meeting February 8, 2018
08/30/2017 1
Agenda
• Contracting & Acquisition Overview Tammiko Newell, Contracting Officer, VA Office of Construction & Facilities
Management
•Project Scope and Overview William Peach, Project Manager, VA Office of Construction & Facilities
Management.
• Question & Answer Session
08/30/2017 2
Project Team
• Project Team Organization
• Project Manager, CFM
• Contracting Officer
• National Cemetery Administration
• Design Build Team
08/30/2017 3
Acquisition & Contracting
• Design/Build Acquisition
– Phase One
• Past Performance
• Relevant Project Experience
• Specialized experience, technical competence, & Capability to perform
• Technical Qualifications
– Phase Two
• Technical Approach
• Project Management
• Price/Cost Proposal
08/30/2017 4
Project Milestones
Estimated Project Schedule
Issue Phase 1 RFQ – January 24, 2018
Issue Phase 2 RFP – April2018
Award D/B Contract – September 2018
NTP – October 2018
Project Completion –January 2022
08/30/2017 5
• Acquisition Strategy
– The VA is still in the process of determining the method of this procurement
– Options
– Set Aside (This includes Set-Aside for SDVOSB and
VOSB)
08/30/2017 6
• Proposal Submission (continued)
– Evaluation Criteria (examples)
– Construction Management
– Past Performance
– Proposed Schedule
– Small Business Participation
– Subcontracting Plan (Large Businesses)
» Meeting VA’s Socioeconomic Goals
• Project Magnitude – $20,000,000.00 to $50,000,000.00
• NAICS 237990 – Other heavy and civil engineering construction; $33.5 Million (SB)
08/30/2017 7
• Bid Guarantee
– 20% of amount offered and/or
– $3,000,000
• Bonds-Required
– Performance
– Payment
• Funding
– FY18 President’s Budget
08/30/2017 8
• Contractor Performance Assessment Reporting System
(CPARS)
– Required for contract awards at $100K or greater
• RFP Solicitation
– Not a public bid opening (Sealed bidding)
• Joint Venture and Teaming Arrangements
– VA’s Information Letter 049-06-4
– Mentor/Protégé – must be approved by SBA prior to submittal of Phase 1 RFQ
• Firm Fixed Price
08/30/2017 9
Office of Small and Disadvantaged Business Utilization
• Supreme Court of the United States Decision on Kingdomware Technologies, Inc v. United States
– Released: June 16, 2016
– Determined that the “Rule of Two” must be applied to all competitive VA contract awards
– Background: VA and lower courts previously interpreted the rule as limited to open market acquisitions only
08/30/2017 10
• What is the “Rule of Two”?
– Provides that “… a contracting officer of the
Department shall award contracts” by restricting competition to Veteran-Owned Small Businesses if the officer reasonably expects that at least two such businesses “… will submit offers and that the award can be made at a fair and reasonable price that offers best value to the United States.” 38 U.
S. C.§8127(d)
08/30/2017 11
Impact of Supreme Court Decision
• Expected increase in opportunities for procurement-ready
VOSBs
• Emphasizes necessity for comprehensive and robust Market
Research that facilitates identification of procurement-ready VOSBs for VA requirements
• Expected increase in volume of Verification applications and increased significance of the Vendor Information Pages (VIP)
08/30/2017 12
MyVA Verification Program
• Implementation of MyVA Verification will improve Veteran experience during the application process
• Increase in demand will create short term stress on the process
08/30/2017 13
What can VOSBs Do to Take Advantage of Increased Opportunities?
• Be Verified
• Have a complete profile in VIP Database
• Register in VA Business Intelligence Tool (VA BIT)
• Obtain Federal Supply Schedule as appropriate
• Register for FedBizOpps (FBO) alerts
• Respond to RFI/Sources Sought
• Attend the National Veterans Small Business Engagement
(NVSBE)
08/30/2017 14
JOINT VENTURE AGREEMENTS
FOR COMPLIANCE WITH FAR, VAAR, AND
FEDERAL REGULATIONS
08/30/2017 15
Joint Ventures VAAR 819.7003 A joint venture may be considered a SDVOSB or VOSB concern if –
At least one member of the joint venture correctly represents itself at the time of offering or quoting as a SDVOSB or VOSB concern Each other concern is small under the size standard corresponding to the
NAICS code assigned to the acquisition The joint venture meets the requirements of paragraph 7 of the size standard explanation of affiliates in Federal Acquisition Regulation
(FAR)19.101
The joint venture meets the requirements of 13 Code of Federal Regulations (CFR) 125.15(b), modified to include veteran-owned small businesses where this CFR section refers to SDVOSB concerns.
Verified for eligibility in the VIP database.
Joint Ventures Continued A. Main Characteristics:
1. Co-management
2. Sharing profits and losses
3. Limited duration B. Competing as a joint venture:
1. Joint ventures should be formed before submitting offer
2. Agreement should provide for contract performance C. Forms of Joint Venture:
1. Partnership
2. Limited Liability Company
3. Corporation (more formalities)
08/30/2017 17
Joint Ventures - Small Business Set-Asides
All partners must be small businesses; and
The contractor must meet certain size requirements:
Revenue-based size standard contract based on NAICS code CVE Certified
08/30/2017 18
Joint Ventures - Small Business Set-Asides A. The Joint Venture may bid on up to three proposals within 2 years B. Government can award to JV if contract:
1. Exceeds ½ of revenue-based size standard
2. Exceeds $10M (employee-based size standard)
3. All partners must be small, except for SBA-approved Mentor-Protégé relationship
AFFILIATION
is a term used to define a business relationship a small business may have with other firms and the affect that relationship has on that firm’s business size status.
It is not Limitation of subcontracting which places limitations on the amount of work that a small business prime contractor can subcontract out.
08/30/2017 19
Some Factors to Consider Regarding Affiliation – The Ostensible Subcontract Rule Unusual Reliance on a
Subcontractor
• Which party will manage the contract?
• Are there discrete tasks to be performed by each party or is there commingling of personnel?
• What party performs the more complex and costly contract functions?
• Which party possesses the requisite background and experience to carry out contract?
• What degree of collaboration was there on the bid or proposal preparation?
• What is the amount of work to be performed by each party?
08/30/2017 20
Ostensible Subcontracting Continued •The Contracting Officer determination includes:
If the prime contractor is not capable of doing the work independently, then an ostensible subcontractor arrangement exists.
In looking at the “totality of circumstances” determine if the subcontractor is performing a significant portion of the work
If the CO considers the prime to be LB, (s)he must refer the matter to the SBA for a formal size determination
Ostensible Subcontracting Continued
• Upon reaching a determination that such an arrangement exists, then the contracting officer must:
Consider the revenue of both firms in determining if they meet the size standard for the procurement
If the combined revenue exceeds the standard, then the company would be considered large business for the purpose of the current procurement.
If the CO considers the prime to be LB, they must refer the matter to the SBA for a formal size determination
Definitions
SDVOSB is eligible for award if…
Disability is service-connected as defined in 38 U.S.C. 101(16) One or more Service-connected Veterans- --Own 51% or more of the firm --Manage and control the daily operations of the firm, or in the case of a service-disabled veteran with permanent and severe disability, the spouse or permanent caregiver of such veteran
Firm meets the small business size standard under relevant industry (NAICS) Code
Listed in VIP
08/30/2017 23
•Socioeconomic status protests (not size status protests) for SDVOSB/VOSB are decided by the Executive Director (ED), VA Office of Small and Disadvantaged Business Utilization (OSDBU) whether raised by the contracting officer or an offeror.
•The OSDBU decision shall be final.
•OSDBU will decide socioeconomic status protests until execution of an interagency agreement with the Small Business Administration.
SDVOSB/VOSB - Small Business Status Protests
VAAR 819.307
General References
• 13 CFR 121.103, What is Affiliation?
• 13 CFR 124.513, Joint Ventures and 8(a) Contracts
• 13 CFR 124.519, Dollar Limits on Sole Source Contracts an 8(a)
Company Can Receive
• 13 CFR 124.520, SBA 8(a) Mentor-Protégé Program
• 13 CFR 125, Government Contracting Programs
08/30/2017
• www.va.gov/osdbu
• 202-461-4300
• VA Center for Veterans Enterprise
• 866-584-2344
• www.VetBiz.gov
• 202-618-3765 (Verification Questions)
• Tyrone.Lassiter@va.gov
• 202-632-5619
08/30/2017 26 http://www.va.gov/osdbu http://www.vetbiz.gov/ mailto:Tyrone.Lassiter@va.gov
Questions & Answers
08/30/2017 27
| �National Memorial Cemetery of Arizona�Phoenix, AZ |
| Agenda |
| Project Team |
| Acquisition & Contracting |
| Project Milestones |
| Acquisition & Contracting |
| Acquisition & Contracting |
| Acquisition & Contracting |
| Acquisition & Contracting |
| Office of Small and Disadvantaged Business Utilization |
| Office of Small and Disadvantaged Business Utilization |
| Office of Small and Disadvantaged Business Utilization |
| Office of Small and Disadvantaged Business Utilization |
| Office of Small and Disadvantaged Business Utilization |
| ��Joint venture agreements �for compliance with FAR, VAAR, and�Federal regulations |
| Slide Number 16 |
| � |
| Slide Number 18 |
| Slide Number 19 |
| Slide Number 20 |
| Slide Number 21 |
| Slide Number 22 |
| Slide Number 23 |
| Slide Number 24 |
| Slide Number 25 |
| Slide Number 26 |
| Questions & Answers |
File details come from the government source that posted it.