VA TEMPLE PHASE I - BID SET DESIGN NARRATIVE.pdf
PDF 301 KB Posted
- Solicitation number
- 36C25722B0020
About this file
This document package includes a design narrative and federal contract opportunity related to replacing the fire alarm system at the Olin E. Teague VA Medical Center campus in Temple, Texas. The design narrative provides details on the scope of work, which involves replacing the existing Simplex fire alarm system across multiple campus buildings with a new non-proprietary, addressable digital system. It specifies fire codes and standards to be followed and addresses existing building conditions, new fire alarm components and interfaces, zoning plans, and control panels. Individual buildings covered in Phase I of the project are also outlined. The related federal contract opportunity is for solicitation number 36C25722B0020 for project number 674-19-102 to upgrade the fire alarm system campus-wide at the Temple VA Medical Center, involving replacement of all required fire alarm systems and new campus-wide control units.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25722B0020 0004.docx | DOCX document | |
| Asbestos Report Copy of Bldg 205 Temple.xls | XLS spreadsheet | |
| 36C25722B0020 0003.docx | DOCX document | |
| Asbestos Report Copy of Bldg 204 Temple.xls | XLS spreadsheet | |
| Asbstos Report Copy of Bldg 163 Temple.xls | XLS spreadsheet | |
| Pre Bid - Sign In Sheet.pdf | ||
| 36C25722B0020 0002.docx | DOCX document | |
| 36C25722B0020 0001.docx | DOCX document | |
| VA TEMPLE BID SET DRAWINGS-Phase 1.pdf | ||
| 36C25722B0020_2.docx | DOCX document | |
| Attachment B - SELF-PERFORMED CALCULATIONS.pdf | ||
| VA TEMPLE BID SET SPECS-Phase 1.pdf | ||
| Attachment A - OSHA - EMR Requirement.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NOVEMBER 9, 2021
100% BID SET DESIGN NARRATIVE
UPGRADE FIRE ALARM SYSTEM
CAMPUS WIDE: PHASE I
VA Project #674-19-102
PREPARED FOR:
DEPARTMENT OF VETERANS AFFAIRS NETWORK
OLIN E. TEAGUE VA MEDICAL CENTER
1901 Veterans Memorial Drive.
Temple, TX 76504
PREPARED BY:
CB DESIGN GROUP, INC.
421 King St., Suite 301
Alexandria, VA 22314
A/E UPGRADE CAMPUS FIRE ALARM: PHASE I 100% CD Submission
Olin E. Teague VA Medical Center Project No. 674-19-102
November 9, 2021
2 | P a g e
PAGE INTENTIONALLY LEFT BLANK
3 | P a g e
General
This is a campus-wide project to replace the existing fire alarm system at the Temple, TX VA Medical Center. With few exceptions for buildings under active separate projects for renovations or other upgrades or currently vacant buildings that require upgrades prior to occupancy, all buildings required to have a fire alarm system and all buildings with an existing fire alarm system are included in the scope to provide complete building fire alarm system replacement and new campus-wide fire alarm control units. Each building with an active fire alarm system that is not undergoing fire alarm replacement will receive a new panel that monitors and communicates the status of the existing building control panel to the new campus Fire Alarm
Control Units.
Existing system is a Simplex system. The new system must be non-proprietary and all components including but not limited to annunciators, control panels and smoke detectors must be American made and to the latest manufacturer versions.
Codes and Standards
The fire protection design for the area within the scope of work will be done in accordance with, but not limited to, the following VA design standards:
1. Veterans Affairs Fire Protection Design Manual, Seventh Edition, revised December 2015 (VAFPDM)
The fire protection codes and standards planned to be utilized are the latest editions of the National Fire Codes (NFC) published by the National
Fire Protection Association (NFPA). Where fire protection features are not addressed by the NFC, the International Building Code (IBC) or another referenced standard shall be used. NFC standards for the base code references are as follows:
1. NFPA 72 – National Fire Alarm and Signaling Code
2. NFPA 101 – Life Safety Code
Should the codes from the International Code Council (ICC) need to be consulted, the following form the base code references:
1. International Building Code (IBC)
2. International Fire Code (IFC)
3. International Fuel Gas Code (IFGC)
4. International Mechanical Code (IMC)
5. International Plumbing Code (IPC)
4 | P a g e
Existing Conditions
1. Fire Alarm Systems – Existing system is a Simplex system, in some buildings, an older Faraday panel is connected to a Simplex panel for monitoring. A new, fully addressable fire alarm system will be installed in each building on campus requiring a fire alarm system.
Interfaces with the existing systems such as fire suppression systems will be maintained.
2. Fire and Smoke Separation – Review and modification of the existing fire and smoke modifications are not included in this scope of work.
3. Life Safety Code Analysis – Review and analysis of life safety and code compliance in regard to Building Construction Type, Allowable Height and Area, Exit Calculations, Occupancy and Smoke Control Features are not included in this scope of work.
4. Kitchen Extinguishing Systems – Existing kitchen fire extinguishing systems shall remain as is and are not included in this scope of work though interfaces with the fire alarm system will be maintained.
5. Fire Extinguishers and Fire Extinguisher Cabinets – Existing Fire
Extinguishers and Fire Extinguisher Cabinets shall remain as is and are not included in this scope of work.
6. Fireproofing of Structural Members – Review and analysis of existing fireproofing of structural members is not included in this scope of work.
7. Exit Signs and Emergency Lighting – Review and analysis of existing exit signs and emergency lighting are not included in this scope of work.
8. Fire Resistive Ratings – Wall sections indicating fire resistive ratings are not included in this scope of work.
9. Evacuation Plan Signage – Review and analysis of Evacuation Plan signage is not included in this scope of work.
10. Door and Window Schedules – Review and analysis of door and window schedules with fire rating or glazing is not included in this scope of work.
Fire Alarm Systems
A fully addressable digital voice annunciation fire alarm system will be installed where required by NFPA 101 and will be designed to meet the requirements of NFPA 72 and the VAFPDM. The fire alarm system will be
“defend-in-place” in buildings with occupants that are incapable of self-preservation similar to the Staff Response configuration described in
§7.3.F.2 of the VAFPDM. However, audible alarms will activate on floors above and below the floor of alarm initiation while visual strobes will alarm only in the zone of the initiated device. Simultaneously, the fire alarm system will provide a voice message to the rest of the building (and other buildings as necessary and according to individual building fire plans) to announce where the fire or issue is located. In buildings where all occupants are capable of self-preservation activation of the fire alarm system will result in a “General Evacuation” signal throughout the building
5 | P a g e in accordance with §7.3.F.1 of the VAFPDM. The main fire alarm control panel in each building will be equipped with a manual voice messaging microphone and controls. Zoning of the fire alarm system will be in accordance with
NFPA 72, NFPA 101 and the VAFPDM; where possible, fire alarm zones for the new system will match existing zones.
A new campus Fire Alarm Control Unit including computer terminal with touch screen, system printer and manual voice messaging microphone and controls will be provided in Building 58. Graphics and devices will be programmed to zoom in show the location of alarm on the floor plan graphic. A secondary
Fire Alarm Control Unit including a new Digital Alarm Communication
Transmitter to a listed central station for monitoring purposes will be provided in the Police Dispatch area of Building 204. The secondary unit need not include a system printer.
Smoke, Carbon Monoxide and Heat Detection
Smoke detection will be installed only where required by National Fire Codes or the VAFPDM and will be of the photoelectric type only (§7.4.D/VAFPDM).
Heat detectors are only required in conjunction with elevator shutdown, as a substitute for smoke detectors in environments unsuitable for smoke detectors or to protect generators not equipped with automatic sprinklers
(§7.4.E/VAFPDM). Carbon monoxide detection will be provided where required by NFPA 101 and installed per NFPA 72.
Interfaces
The new fire alarm system will interface with existing equipment and systems as required by NFPA 72, NFPA 101 and the VAFPDM. Examples of existing equipment and systems include but are not limited to:
• Fire sprinkler systems
• Kitchen hood extinguishing systems
• Smoke and fire dampers
• Air handling units
• Door locks
• Fire doors
• Elevators
• Fire water storage tanks
• Fire pumps
• Emergency generators
Fire doors only on the floor of the initiating device will activate; however, a fire in a shaft will activate all fire doors.
Monitor and control modules within existing equipment will be replaced as necessary for a complete and functioning new fire alarm system.
6 | P a g e
Buildings Included In This Project
Building 44E – Logistic Service
Building 44W - PAS
Fully sprinklered and 19,475 total square feet over one story, Building 44E and 44W will be provided with a new fire alarm system with one fire alarm zone. This new fire alarm system will be configured for General Evacuation.
This will be included in the final drawing set but was added back into the
SOW after the 100% CD was submitted.
Building 45E – Laundry / EMS
Fully sprinklered and 13,010 total square feet over one story, Building 45E will be provided with a new fire alarm system with one fire alarm zone. This new fire alarm system will be configured for General Evacuation. This will be included in the final drawing set but was added back into the SOW after the 100% CD was submitted.
Building 46 – Engineering Services
Fully sprinklered and 19,668 total square feet over one story, Building 46 will be provided with a new fire alarm system with one fire alarm zone. This new fire alarm system will be configured for General Evacuation. This will be included in the final drawing set but was added back into the SOW after the 100% CD was submitted.
Building 47 – Laundry
Fully sprinklered and 25,200 total square feet over two stories, Building
47 will be provided with a new fire alarm system with one fire alarm zone per floor. This new fire alarm system will be configured for General
Evacuation.
Building 53 - Engineering Shops
Fully sprinklered and 19,183 total square feet over one story, Building 53 will be provided with a new fire alarm system with one fire alarm zone. This new fire alarm system will be configured for General Evacuation.
Building 55 - Radiation Safety
Fully sprinklered and 1,634 total square feet over one story, Building 55
Building 58 - Boiler Plant
Non-sprinklered and 6,484 total square feet over one story, Building 58 will be provided with a new fire alarm system with one fire alarm zone. This new fire alarm system will include smoke detection throughout and be configured for General Evacuation.
7 | P a g e
A new campus Fire Alarm Control Unit including computer terminal with touch screen, system printer and manual voice messaging microphone and controls will be provided. Graphics and devices will be programmed to zoom in show the location of alarm on the floor plan graphic.
Building 62 - Engineering Plumbing Shop
Non-sprinklered and 5,072 total square feet over one story, Building 62 will be provided with a new fire alarm system with one fire alarm zone. This new fire alarm system will include smoke detection throughout and be configured for General Evacuation.
Building 64 - Motor Pool
Fully sprinklered and 6,259 total square feet over one story, Building 64
Building 99 - Chapel
Fully sprinklered and 7,273 total square feet over one story, Building 99
Building 146 - SATP, PCT & Music Therapy
Fully sprinklered and 13,336 total square feet over one story, Building 146
Building 147 - Mental Health
Fully sprinklered and 13,341 total square feet over one story, Building 147
Building 158 - Vocational Rehabilitation
Fully sprinklered and 6,143 total square feet over one story, Building 158
Building 171 - CTVHCS Business Offices
Fully sprinklered and 53,021 total square feet over one story, Building 171 will be provided with a new fire alarm system with one fire alarm zone. This new fire alarm system will be configured for General Evacuation. Existing fire alarm control panels in modular Buildings 208 through 216 are currently monitored by the control panel in Building 171. The new control panel in
Building 171 will continue to monitor existing panels in these modular buildings and forward their status to the new Fire Alarm Control Units in
Buildings 58 and 204.
8 | P a g e
Building 205 - Research / CVI
Fully sprinklered and 54,140 total square feet over three stories, Building
205 will be provided with a new fire alarm system with one fire alarm zone per level. This new fire alarm system will be configured as Staff Response
(defend-in-place).
Building 206 - Warehouse
Fully sprinklered and 7,500 total square feet over one story, Building 206
Building 220 - Safety Building
Fully sprinklered and 6,250 total square feet over one story, Building 222
Building 221 - Community Living Center
Fully sprinklered and 79,190 total square feet over two stories, Building
221 will be provided with a new fire alarm system with eight fire alarm zones per level to match the existing configuration. This new fire alarm system will be configured as Staff Response (defend-in-place).
Building 222 - OI&T Building
Fully sprinklered and 28,453 total square feet over three stories, Building
222 will be provided with a new fire alarm system with one fire alarm zone per level. This new fire alarm system will be configured for General
Evacuation.
File details come from the government source that posted it. Updated .