Attachment B - SELF-PERFORMED CALCULATIONS.pdf

PDF 119 KB Posted

Attached to
Y1DA--36C257-22-AP-2820 | 674-19-102 | Upgrade Fire Alarm System Campus Wide Temple
Solicitation number
36C25722B0020
Issued by

About this file

This document contains instructions for calculating self-performed work for a federal contract opportunity to upgrade the fire alarm system campus-wide at the Temple, Texas VA Medical Center. The opportunity requires replacing the existing Simplex fire alarm system in all buildings on campus with a new non-proprietary system, including new control panels and components that are American made. Offerors must calculate the percentage of work they plan to self-perform versus subcontract using the instructions in Attachment B. For construction, offerors cannot subcontract more than 85% of the awarded amount, and for special trade contractors the limit is 75%. The opportunity is solicited under solicitation number 36C25722B0020 from the Department of Veterans Affairs Veterans Health Administration VISN 17.

View the file

Other files

File Type Posted
36C25722B0020 0004.docx DOCX document
Asbestos Report Copy of Bldg 205 Temple.xls XLS spreadsheet
36C25722B0020 0003.docx DOCX document
Asbestos Report Copy of Bldg 204 Temple.xls XLS spreadsheet
Asbstos Report Copy of Bldg 163 Temple.xls XLS spreadsheet
Pre Bid - Sign In Sheet.pdf PDF
36C25722B0020 0002.docx DOCX document
36C25722B0020 0001.docx DOCX document
VA TEMPLE BID SET DRAWINGS-Phase 1.pdf PDF
36C25722B0020_2.docx DOCX document
VA TEMPLE BID SET SPECS-Phase 1.pdf PDF
Attachment A - OSHA - EMR Requirement.pdf PDF
VA TEMPLE PHASE I - BID SET DESIGN NARRATIVE.pdf PDF
Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW

“Limitations on Subcontracting” (VAAR 852.219-10)

OFFEROR’S SELF PERFORMED ESTIMATED CALCULATIONS

At the time of proposal Offeror’s are required to complete.

a) Offeror’s total proposed price: $ __________

b) Amount projected to be paid to non VIP listed SDVOSBs: $ __________

c) Offeror’s percentage of estimated Non VIP work (b/a X 100 = %) __________%

d) Offeror’s percentage of estimated self-performed work (100 – c = %) __________%

A/E-Services. In the case of a contract for services (except construction), it will not pay more than 50% of the amount paid by the government to it to firms that are not VIP-listed VOSBs.

General construction. In the case of a contract for general construction, it will not pay more than 85% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.

Special trade contractors. In the case of a contract for special trade contractors, it will not pay more than 75% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.

INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (VAAR 852.219-10)