Attachment B - SELF-PERFORMED CALCULATIONS.pdf
PDF 119 KB Posted
- Solicitation number
- 36C25722B0020
About this file
This document contains instructions for calculating self-performed work for a federal contract opportunity to upgrade the fire alarm system campus-wide at the Temple, Texas VA Medical Center. The opportunity requires replacing the existing Simplex fire alarm system in all buildings on campus with a new non-proprietary system, including new control panels and components that are American made. Offerors must calculate the percentage of work they plan to self-perform versus subcontract using the instructions in Attachment B. For construction, offerors cannot subcontract more than 85% of the awarded amount, and for special trade contractors the limit is 75%. The opportunity is solicited under solicitation number 36C25722B0020 from the Department of Veterans Affairs Veterans Health Administration VISN 17.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25722B0020 0004.docx | DOCX document | |
| Asbestos Report Copy of Bldg 205 Temple.xls | XLS spreadsheet | |
| 36C25722B0020 0003.docx | DOCX document | |
| Asbestos Report Copy of Bldg 204 Temple.xls | XLS spreadsheet | |
| Asbstos Report Copy of Bldg 163 Temple.xls | XLS spreadsheet | |
| Pre Bid - Sign In Sheet.pdf | ||
| 36C25722B0020 0002.docx | DOCX document | |
| 36C25722B0020 0001.docx | DOCX document | |
| VA TEMPLE BID SET DRAWINGS-Phase 1.pdf | ||
| 36C25722B0020_2.docx | DOCX document | |
| VA TEMPLE BID SET SPECS-Phase 1.pdf | ||
| Attachment A - OSHA - EMR Requirement.pdf | ||
| VA TEMPLE PHASE I - BID SET DESIGN NARRATIVE.pdf |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW
“Limitations on Subcontracting” (VAAR 852.219-10)
OFFEROR’S SELF PERFORMED ESTIMATED CALCULATIONS
At the time of proposal Offeror’s are required to complete.
a) Offeror’s total proposed price: $ __________
b) Amount projected to be paid to non VIP listed SDVOSBs: $ __________
c) Offeror’s percentage of estimated Non VIP work (b/a X 100 = %) __________%
d) Offeror’s percentage of estimated self-performed work (100 – c = %) __________%
A/E-Services. In the case of a contract for services (except construction), it will not pay more than 50% of the amount paid by the government to it to firms that are not VIP-listed VOSBs.
General construction. In the case of a contract for general construction, it will not pay more than 85% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.
Special trade contractors. In the case of a contract for special trade contractors, it will not pay more than 75% of the amount paid by the government to it to firms that are not VIP-listed SDVOSBs.
INSTRUCTIONS FOR CALCULATION OF SELF-PERFORMED WORK IAW “Limitations on Subcontracting” (VAAR 852.219-10)