About this file

This document is a pre-solicitation notice for a competitive Request for Proposals (RFP) for a firm fixed-price construction project to renovate and expand the existing pharmacy at the Boise VA Medical Center. The project requires a general contractor to renovate approximately 3,600 SF of interior space, including demolition, structural, HVAC, plumbing, electrical, and other construction work. The project is estimated to cost between $1,000,000 and $5,000,000 and is set aside for Service-Disabled Veteran-Owned Small Businesses. The solicitation is anticipated to be posted on SAM.gov no later than June 18, 2024. A bid bond is required, and the project will be awarded on a best value basis under FAR Part 15. All relevant solicitation documents will be available on SAM.gov, and amendments will be posted solely to that website.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--531-22-108 Expand Pharmacy, newest first.
File Type Posted
531-22-108_SOW.pdf PDF
Boise_Pharmacy_-_REV_1__Specs-2024_04_09.pdf PDF
36C26024R0044_1.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GI002

BAJ JME

ARCH. ABBREVIATIONS , SYMBOLS,

LEGENDS, AND GENERAL NOTES

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

Fi le

P at h

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

EXPAND PHARMACY

BOISE, ID

531-22-108

APPROVED:

MARCH 2024REVISIONS: DATE: Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

100% CONSTRUCTION

DOCUMENTS (CD)

DWG. OF

CHIEF ENGINEER

SIGNATURE

DIRECTOR

PPL PEOPLE

PR PAIR

PSF POUNDS PER SQUARE FOOT

PSI POUNDS PER SQUARE INCH

PT CONC POST-TENSIONED CONCRETE

PVC POLYVINYL CHLORIDE

PVDF POLYVINYLIDENE DIFLUORIDE

RAD RADIUS

RB RUBBER BASE

RCP REINFORCED CONCRETE PIPE,

REFLECTED CEILING PLAN

RD ROOF DRAIN

RE REFER TO, REFERENCE

REIN REINFORCE(D)(ING)

RECP RECEPTACLE

RCYL RECYCLE AREA

REFR REFRIGERATOR

RO ROUGH OPENING

ROW RIGHT OF WAY

S SOUTH

SAFB SOUND ATTENUATION FIRE BATTS

SAN SANITARY

SB SPLASH BLOCK

SC SOLID CORE - SEALED CONCRETE

SCH SCHEDULE

SD STORM DRAIN

SECT SECTION

SEW SEWER

SHT SHEET

SIM SIMILAR

SPF SPRAY APPLIED POLYURETHANE FOAM

INSULATION

SPEC SPECIFICATION

SQ SQUARE

SS SERVICE SINK, STORM SEWER,

STAINLESS STEEL, SOLID SURFACE

STM STORM

STD STANDARD

STL STEEL

STRUCT STRUCTURAL

SWBD SWITCHBOARD

T&G TONGUE AND GROOVE

TCU THIN CLAD UNIT

TEL TELEPHONE

THK THICK(NESS)

THRU THROUGH

TJI TRUSJOIST INCORPORATED

T.O. TOP OF

TOB TOP OF BEAM

TOC TOP OF CONCRETE

TOM TOP OF MASONRY

TOS TOP OF STEEL/TOP OF SLAB

TOW TOP OF WALL

TYP TYPICAL

ABV ABOVE

ACI AMERICAN CONCRETE INSTITUTE

ACT ACOUSTICAL CEILING TILE

AFF ABOVE FINISHED FLOOR

AHU AIR HANDLER UNIT

AISC AMERICAN INSTITUTE OF STEEL

CONSTRUCTION

AISI AMERICAN IRON & STEEL INSTITUTE

ALUM ALUMINUM

ALM ALARM

ALT ALTERNATE

ANOD ANODIZED

APPROX APPROXIMATE

ARCH ARCHITECT(URAL)

ASHRAE AMERICAN SOCIETY OF HEATING,

REFRIGERATING & AIR

CONDITIONING ENGINEERS

ASME AMERICAN SOCIETY OF

MECHANICAL ENGINEERS

ASTM AMERICAN SOCIETY FOR TESTING

AND MATERIALS

AWG AMERICAN WIRE GAGE

AWS AMERICAN WELDING SOCIETY

AWWA AMERICAN WATER WORKS

ASSOCIATION

BL BUILDING LINE

BLDG BUILDING

B.O. BOTTOM OF

BRK BRICK

BR BROCHURE RACK

BUR BUILT UP ROOFING

CAB CABINET

CF CUBIC FOOT

CFM CUBIC FEET PER MINUTE

CFS CUBIC FEET PER SECOND

CG CORNER GUARD

CJ CONTROL JOINT

CKT CIRCUIT

CL CENTERLINE

CLOS CLOSET

CLG CEILING

CLR CLEAR(ANCE)

CMP CORRUGATED METAL PIPE

CMU CONCRETE MASONRY UNIT

CND CONDUIT

CO CLEANOUT

COL COLUMN

CONC CONCRETE

COR CONTRACTING OFFICER'S

REPRESENTATIVE

CORR CORRIDOR

CRS COURSE(S)

CTR CENTER

CNTR COUNTER

CU IN CUBIC INCH

CU YD CUBIC YARD

CW CLEAR WIDTH

DEMO DEMOLITION

DET DETAIL

DIAM,Ø DIAMETER

DC DISPLAY CASE

DP DAMP PROOFING

DPR DAMPER

DR DOOR

DS DOWNSPOUT

DSP DRY STANDPIPE

DWG DRAWING

DWS DOMESTIC WATER SUPPLY

E EAST

EA EACH

ELEV ELEVATION

EJ EXPANSION JOINT

ELEC ELECTRIC(AL)

EMER EMERGENCY

EP ELECTRICAL PANEL

EPDM ETHYLENE-PROPYLENE-DIENE-

MONOMER

EF EXHAUST FAN

EQ EQUAL

EQUIP EQUIPMENT

EWC ELECTRIC WATER COOLER

EXIST EXISTING

EXH EXHAUST

EXP EXPOSED

EXT EXTERIOR

FLUOR FLUORESCENT

FMS FACILITY MANAGEMENT SERVICES

FND FEMININE NAPKIN DISPENSER

FO FACE OF

FOC FACE OF CONCRETE / CURB

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF STUDS

FT FOOT / FEET/FLOOR TRANSITION

FTG FOOTING

FURR FURRED(ING)

GA GAGE, GAUGE

GALV GALVANIZE(D)

GFCI GOVERNMENT FURNISHED,

CONTRACTOR INSTALLED

GFGI GOVERNMENT FURNISHED,

GOVERNMENT INSTALLED

GFI GROUND FAULT CIRCUIT INTERRUPTER

GL GLASS, GLAZING

GWB GYPSUM WALL BOARD

GRND GROUND

GRT GROUT

HAC HOUSEKEEPING AIDS CLOSET

HB HOSE BIB

HDPE HIGH DENSITY POLYETHYLENE

HDW HARDWARE

HJT HEAD JOINT

HM HOLLOW METAL

HORZ HORIZONTAL

HP HORSE POWER / HIGH PRESSURE

HSKP HOUSEKEEPING

HT HEIGHT

HVAC HEATING, VENTILATION, AIR

CONDITIONING

HWS HOT WATER SUPPLY

ID INSIDE DIAMETER

IES ILLUMINATING ENGINEERING SOCIETY

IGU INSULATED GLASS UNIT

IN INCH (“)

INC INCORPORATED

INFO INFORMATION

INSUL INSULATION/INSULATE(D)(ING)

INT INTERIOR

INV INVERT

JT JOINT

K KIP (1,000 LB.)

LDR LADDER

LAM LAMINATE

LAV LAVATORY

LB POUND

LAG LAG SCREW

LG LENGTH / LONG

LTG LIGHTING

LVL LAMINATED VENEER LUMBER

LW CONC LIGHTWEIGHT CONCRETE

M METER(S)

MAX MAXIMUM

MECH MECHANIC(AL)

MED MEDIUM

MTL METAL

MFR MANUFACTURE(R)

MH MANHOLE

MIN MINIMUM

MIR MIRROR

MISC MISCELLANEOUS

MM MILLIMETER

MO MASONRY OPENING

UC UNDERCUT

UD UNIT DOSE

UL UNDERWRITERS'

LABORATORIES, INC.

UNO UNLESS NOTED OTHERWISE

V VOLT

VB VAPOR BARRIER

VCT VINYL COMPOSITION TILE

VENT VENTILATE

VERT VERTICAL

VIF VERIFY IN FIELD

VIT VITREOUS

VS VERSUS

VC VERTICAL CURVE

VOL VOLUME

VPT VERTICAL POINT OF

TANGENT

VPI VERTICAL POINT OF

INTERSECTION

VPC VERTICAL POINT OF

CURVATURE

W WEST / WIDTH / WIDE /

W/ WITH

WC WATER CLOSET

WD WOOD

WG WIRE GLASS

WH WATER HEATER

WDW WINDOW

W/O WITHOUT

WT WEIGHT

WTR WATER

WWF WELDED WIRE FABRIC

XFMR TRANSFORMER

XPAN CROSS PAN

XSECT CROSS SECTION

XSTR EXTRA STRONG

ABBREVIATIONS

FA FIRE ALARM

FB FACE BRICK

FC FOOT-CANDLE

FD FLOOR DRAIN

FE FIRE EXTINGUISHER

FEB FIRE EXTINGUISHER BRACKET

FEC FIRE EXTINGUISHER CABINET

FFE FURNITURE, FIXTURES AND EQUIPMENT

FG FIXED GLASS

FIN FL FINISHED FLOOR

FIN FL EL FINISHED FLOOR ELEVATION

N/A NOT APPLICABLE

N NORTH

NIC NOT IN CONTRACT

NOM NOMINAL

NTS NOT TO SCALE

OC ON CENTER

OD OUTSIDE DIAMETER

OFF OFFICE

OFD OVERFLOW DRAIN

OH OVERHEAD

OPNG OPENING

OPOI OWNER PROVIDED, OWNER INSTALLED

OPP OPPOSITE

ORIG ORIGINAL

OVHD OVERHEAD

PA PUBLIC ADDRESS

PCF POUNDS PER CUBIC FOOT

PLF POUNDS PER LINEAL FOOT

PFN PRE-FINISHED

PH PHASE

PL PLATE

PLAM PLASTIC LAMINATE

PLBG PLUMBING

1A

REVISION CLOUD

SECTION

NUMBER

SHEET

NUMBER

ELEVATION

NUMBER

SHEET

NUMBER

DRAWING TITLE

DRAWING SCALE

VIEW TITLE NUMBER

DETAIL NUMBER

SHEET NUMBER

ROOM NUMBER

GRAPHIC SCALE

0' 16'8'4'

SCALE: 1/8" = 1'-0"

MATCH LINE

SEE XX/X-XXX

LEVEL X"=X'-X"

ELEVATION

ELEVATION HEIGHTS

COLUMN GRID LINE

INTERIOR

ELEVATION MARKER

SECTIONS

EXTERIOR

ELEVATION

REFERENCED VIEW TITLES

DETAIL OR

ENLARGED PLAN

NORTH ARROW

ROOM NAME AND

NUMBER

KEY NOTE

WINDOW OPENING

PARTITION TYPE

TAG

DOOR TAG

REVISION NUMBER

MATCHLINE

SYMBOLS LEGEND

AE501

AE502

LOBBY

XXX

A

FRP FIBER GLASS REINFORCED PLASTIC

MPI MASTER PAINTERS

INSTITUTE

HVLS HIGH VOLUME LOW

SPEED

POI POINT OF INTERSECTION

EPS EXPANDED POLYSTYRENE

XPS EXTRUDED POLYSTYRENE

AE405

AE4019

XXX

WPIV WALL POST INDICATOR VALVE

LOC LOCAL OPERATOR CONSOLE

FDC FIRE DEPARTMENT CONNECTION WPIV WALL MOUNTED POST INDICATOR VALVE

UCF UNIFIED FACILITIES CRITERIA

REM REMOTE EQUIPMENT MODULE

N

TRUE N

SCALE:

FLOOR PLAN

1/8"=1'-0"1

GSF GROSS SQUARE FEET

IBC INTERNATIONAL BUILDING CODE

STC SOUND TRANSMISSION SYSTEM

AFFF AQUEOUS FILM FORMING FOAM

PVMT PAVEMENT

PFAS PER-POLYFLUOROALKYL SUBSTANCES

DWGS DRAWINGS

GENERAL NOTES

1. NOTIFY VETERANS AFFAIRS COR OF ANY DISCREPANCIES

BEFORE PROCEEDING WITH ANY WORK.

2. FIELD VERIFY EXISTING CONDITIONS AND DIMENSIONS

PRIOR TO ORDERING OR INSTALLING ANY MATERIALS OR

EQUIPMENT.

3. DAMAGED AREAS CAUSED DURING CONSTRUCTION SHALL

BE REPAIRED TO NEW CONDITION OR REPLACED AT THE

CONTRACTOR'S EXPENSE .

4. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE

REMOVAL AND DISPOSAL OF DEMOLITION AND/OR

CONSTRUCTION DEBRIS ASSOCIATED WITH THE WORK.

DISPOSAL SHALL BE IN COMPLIANCE WITH FEDERAL,

STATE, AND LOCAL REGULATIONS. THE PROJECT SITE

SHALL BE KEPT CLEAN AND FREE FROM WASTE

MATERIALS.

5. THE OWNER SHALL RESERVE THE RIGHT TO SALVAGE ANY

REMOVED MATERIALS.

6. COORDINATE AND INSTALL FIRE-TREATED WOOD

BLOCKING OR SHEET METAL BACKING FOR ANCHORAGE

OF WALL-MOUNTED ITEMS.

7. PENETRATIONS THROUGH WALL CONSTRUCTION SHALL BE

FULLY SEALED AT ALL SIDES AND FIRE-STOPPED WHERE

REQUIRED.

8. COORDINATE MECHANICAL ROOF AND DUCT

PENETRATIONS WITH MECHANICAL SUBCONTRACTOR.

9. FULL HEIGHT NON-BEARING PARTITIONS MUST PROVIDE

FOR ONE INCH VERTICAL MOVEMENT OF THE BUILDING

STRUCTURE WITHOUT THE TRANSFER OF COMPRESSIVE

LOADS TO THE WALL.

10. INSTALL CONTROL JOINTS IN GYPSUM BOARD SURFACES

AS SHOWN ON DRAWINGS AND/OR AS DESCRIBED IN THE

SPECIFICATIONS. ISOLATE GYPSUM BOARD SURFACES

WITH CONTROL JOINTS FOR RUNS THAT EXCEED 30 FEET

IN LENGTH.

11. GYPSUM BOARD PARTITIONS SHALL EXTEND A MINIMUM

OF 6 INCHES ABOVE FINISHED CEILING PLANE UNLESS

NOTED OTHERWISE.

12. NO WORK SHALL BE COVERED OR CONCEALED UNTIL IT

HAS BEEN INSPECTED, TESTED, AND/OR APPROVED BY

THE VETERANS AFFAIRS COR.

SLDG SLIDING

BC BABY CHANGING TABLE

HNDCP HANDICAP

IV INTRAVENOUS

UC UNDERCUT

DETAIL NUMBER

ASSEMBLY

LETTER

PWR POWER

BSC BIO SAFETY CABINET

HSF HOMOGENEOUS SHEET FLOORING

LFH LATERAL FLOW HEAD

LR LOCKERS

P PAINT

RSF RUBBER SHEET FLOORING

RWC RIGID WALL COVERING

WB WALL BASE

WBCC WALL BASE COVE CAP

03/27/2024

(E)EF-24

(E)EF-14

(E)EF-33

(E)AHU-8

(E)CH-3 (E)CH-4

(E)DC-1

(E)EF-31

(E)EF-9

(E)AHU-11

(E)AHU-12

(E)EF-22

(E)L-3 48x48

(E)36x24 SA

(E )3

6x

R A

(E )2

6x

R A

(E)40x10 SA

(E)AHU-17

(E)EF-34

(E)AHU-17 OA INTAKE

(E)AHU-14

CWR CWR CWR

C W

R C

W R

CWS CWS CWS CWS

C W

S

C W

S C

W S

C W

S

CWS CWS

CWR CWR

C W

R C

W R

C W

R

CWR CWR CWR CWR CWR

C W

R

C W

S C

W S

C W

R C

W R

PH

W

S

PH

W S

PH

W

S

PH

W R

PH

W

R

PH

W R

PH

W

S

CWR CWR CWR CWR

CWR

HWR HWR

HWS

H W

H R

H W

H R

H W

H R

H W

H R

H W

R H

W R

H W

S H

W S

H W

S

HWS

HWR HWR

H W

S H

W R

H W

R

HWR HWR HWR

HWS HWS

BB

B

B

H W

R H

W R

H W

S

CWR CWR

CWS CWS

C W

S C

W S

C W

R C

W R

(E)2-1/2" HWH

(E)2-1/2" HWHR

(E)2" CHS

(E)2" CHR

(E)2" CWR

(E)2" CWS

(E)6" CHS ]

(E)6" CHR

(E)3" CHR(E)6" CHS

(E)4" CHS

(E)4" CHR

(E)4" BYPASS WITH

BUTTERFLY VALVE

(E)1" CWS

(E)1-1/2" CWR

(E)6" CHS

(E)2-1/2" CHR

(E)6" CHR

(E)4" CHS

(E)4" CHR(E)2-1/2" CHR

(E)6" CHS

(E)6" CHR

(E)6" DRY COOLER

FUTURES CAPPED

(E)2-1/2" CHS

(E)2-1/2" CHR

(E)1-1/2" HWH

(E)1-1/2" HWHR

(E)2" MOTORIZED

BALL VALVES AT

TAKE-OFFS

(E)4" CHS

(E)4" CHR

(BELOW)

RF1

C W

R C

W R

C W

R C

W R

C W

S C

W S

C W

S C

W S

CWS CWSCWR CWR CWR

HWSHWR HWR

(E)4" HWH

(E)4" HWHR

(E)1" STEAM VENT

85-MAU-1

85-MAU-2

ROOF

B85

ROOF

B85A

3.8

O V

O V

OMNI

CELL

MEDICAL

VENDING

OMNI

CELL

MEDICAL

VENDING

BC

FN

D

VO

INCUB.

REF.

TCGRx

CSM

OM

NICELL

BC

BC

FN

D

INPATIENT

PHARMACY

C11

CORRIDOR

STAIRS

C19

CORRIDOR

LOBBY

C17

CORRIDOR

ELEC.

E F GE1

E F GE1

3.8

3.8

E F GE1

E F GE1

BC

BC

FN

D

NON-STERILE COMPOUNDING AREA

REF.

BLFH - 1

LOCKER - (STAFF)

SHELVING

R

EF

IV

CHECK

TABLE

LF

H

- 1

CA

RT

CART

LF

H

- 2

WBENCH

TABLE

INCUB.

BI

NS

F

OR

IV

s IV

PRINTER

COUNTERTOP / DRAWERS

SHELVING

CART

SH

EL

VI

NG

BS

C

- 1

SHELVING

TABLE

W

CLASSIC RX

STORAGE

CLASSIC RX

STORAGE

CLASSIC RX

STORAGE

CLASSIC RX

STORAGE

W

REF.

SH

EL

VI

NG

INCUB.

REF.

TCGRx

CSM

OM

NICELL

INPATIENT

PHARMACY

C11

CORRIDOR

STAIRS

C19

CORRIDOR

LOBBY

C17

CORRIDOR

ELEC.

3.8

(E)EF-24

(E)EF-14

(E)EF-33

(E)AHU-8

(E)CH-3 (E)CH-4

(E)DC-1

(E)EF-31

(E)EF-9

(E)AHU-11

(E)AHU-12

(E)EF-22

(E)L-3 48x48

(E)36x24 SA

(E )3

6x

R A

(E )2

6x

R A

(E)40x10 SA

(E)AHU-17

(E)EF-34

(E)AHU-17 OA INTAKE

(E)AHU-14

CWR CWR CWR

C W

R C

W R

CWS CWS CWS CWS

C W

S

C W

S C

W S

C W

S

CWS CWS

CWR CWR

C W

R C

W R

C W

R

CWR CWR CWR CWR CWR

C W

R

C W

S C

W S

C W

R C

W R

PH

W

S

PH

W S

PH

W

S

PH

W R

PH

W

R

PH

W R

PH

W

S

CWR CWR CWR CWR

CWR

HWR HWR

HWS

H W

H R

H W

H R

H W

H R

H W

H R

H W

R H

W R

H W

S H

W S

H W

S

HWS

HWR HWR

H W

S H

W R

H W

R

HWR HWR HWR

HWS HWS

BB

B

B

H W

R H

W R

H W

S

CWR CWR

CWS CWS

C W

S C

W S

C W

R C

W R

(E)2-1/2" HWH

(E)2-1/2" HWHR

(E)2" CHS

(E)2" CHR

(E)2" CWR

(E)2" CWS

(E)6" CHR

(E)3" CHR(E)6" CHS

(E)4" CHS

(E)4" CHR

(E)4" BYPASS WITH

BUTTERFLY VALVE

(E)1" CWS

(E)1-1/2" CWR

(E)6" CHS

(E)2-1/2" CHR

(E)6" CHR

(E)4" CHS

(E)4" CHR(E)2-1/2" CHR

(E)6" CHS

(E)6" CHR

(E)6" DRY COOLER

FUTURES CAPPED

(E)2-1/2" CHS

(E)2-1/2" CHR

(E)1-1/2" HWH

(E)1-1/2" HWHR

(E)2" MOTORIZED

BALL VALVES AT

TAKE-OFFS

(E)4" CHS

(E)4" CHR

(BELOW)

RF1

C W

R C

W R

C W

R C

W R

C W

S C

W S

C W

S C

W S

CWS CWSCWR CWR CWR

HWSHWR HWR

(E)4" HWH

(E)4" HWHR

(E)1" STEAM VENT

85-MAU-1

85-MAU-2

ROOF

B85

ROOF

B85A

E FE1

3.8

BC

BC

FN

D

NON-STERILE COMPOUNDING AREA

REF.

BLFH - 1

LOCKER - (STAFF)

SHELVING

R

EF

IV

CHECK

TABLE

LF

H

- 1

CA

RT

CART

LF

H

- 2

WBENCH

TABLE

INCUB.

BI

NS

F

OR

IV

s IV

PRINTER

COUNTERTOP / DRAWERS

SHELVING

CART

SH

EL

VI

NG

BS

C

- 1

SHELVING

TABLE

W

CLASSIC RX

STORAGE

CLASSIC RX

STORAGE

CLASSIC RX

STORAGE

CLASSIC RX

STORAGE

W

REF.

SH

EL

VI

NG

INCUB.

REF.

TCGRx

CSM

OM

NICELL

INPATIENT

PHARMACY

C11

CORRIDOR

STAIRS

C19

CORRIDOR

LOBBY

C17

CORRIDOR

ELEC.

E F GE1 E F GE1

BC

BC

FN

D

NON-STERILE COMPOUNDING AREA

REF.

BLFH - 1

LOCKER - (STAFF)

SHELVING

R

EF

IV

CHECK

TABLE

LF

H

- 1

CA

RT

CART

LF

H

- 2

WBENCH

TABLE

INCUB.

BI

NS

F

OR

IV

s IV

PRINTER

COUNTERTOP / DRAWERS

SHELVING

CART

SH

EL

VI

NG

BS

C

- 1

SHELVING

TABLE

W

CLASSIC RX

STORAGE

CLASSIC RX

STORAGE

CLASSIC RX

STORAGE

CLASSIC RX

STORAGE

W

REF.

SH

EL

VI

NG

INCUB.

REF.

TCGRx

CSM

OM

NICELL

INPATIENT

PHARMACY

C11

CORRIDOR

STAIRS

C19

CORRIDOR

LOBBY

C17

CORRIDOR

ELEC.

3.8

3.8

BC

CTRL. PNL.

BC

FN

D

NON-STERILE COMPOUNDING AREA

CH

EM

O M

ON

IT

OR

A

ND

DO

W

NT

IM

E

VI

EW

ER

A

ND

S

HE

LF

WHITE BOARDS 3 X 4 (2)

LOCKER - (OUTPATIENT)

BUYER'S

TABLE WITH

STORAGE

UNDER

UD

CHECK

TABLE

REF.

BLFH - 1

LOCKER - (STAFF)

SHELVING

R

EF

OM

NI

CE

LL

S

IV

CHECK

TABLE

LF

H

- 1

CA

RT

CART

LF

H

- 2

WBENCH

TABLE

INCUB.

BI

NS

F

OR

IV

s IV

PRINTER

COUNTERTOP / DRAWERS

SHELVING

CART

SH

EL

VI

NG

BS

C

- 1

SHELVING

OPEN SHELVING

OPEN SHELVING

OPEN SHELVING

P

RI

NT

ER

S

COUNTERTOP / DRAWERS

SHELVING

STAINLESS STEEL

WORK TABLE

TC

GR

x

FL

AM

M

AB

LE

CA

BI

NE

T

CO

UN

TE

RT

OP

DR

AW

ER

S

TV

CS

M

OM

NI

CE

LLCOUNTERTOP / DRAWERS

BU

YE

R' S

RE

F.

CO

UN

TE

RT

OP

DR

AW

ER

S

BU

LK

B

OT

TL

E

ST

OR

AG

E

AN

D

UD

B

IN

S

CA

RT

COUNTERTOP / DRAWERS

SHELVING

TABLE

W

CLASSIC RX

STORAGE

CLASSIC RX

STORAGE

CLASSIC RX

STORAGE

CLASSIC RX

STORAGE

W

FR

EE

ZE

R

REF.

SH

EL

VI

NG

BULK BOTTLE STORAGE AND UD BINS

INPATIENT

PHARMACY UD

C11

CORRIDOR

STAIRS

C19

CORRIDOR

LOBBY

C17

CORRIDOR

ELEC. 128

INPATIENT

PHARMACY IV

E F GE1

E F GE1

BC

BC

FN

D

NON-STERILE COMPOUNDING AREA

REF.

BLFH - 1

LOCKER - (STAFF)

SHELVING

R

EF

IV

CHECK

TABLE

LF

H

- 1

CA

RT

CART

LF

H

- 2

WBENCH

TABLE

INCUB.

BI

NS

F

OR

IV

s IV

PRINTER

COUNTERTOP / DRAWERS

SHELVING

CART

SH

EL

VI

NG

BS

C

- 1

SHELVING

TABLE

W

CLASSIC RX

STORAGE

CLASSIC RX

STORAGE

CLASSIC RX

STORAGE

CLASSIC RX

STORAGE

W

REF.

SH

EL

VI

NG

INCUB.

REF.

TCGRx

CSM

OM

NICELL

INPATIENT

PHARMACY

C11

CORRIDOR

STAIRS

C19

CORRIDOR

C17

CORRIDOR

ELEC.

3.8

(E)EF-24

(E)EF-14

(E)EF-33

(E)AHU-8

(E)CH-3 (E)CH-4

(E)DC-1

(E)EF-31

(E)EF-9

(E)AHU-11

(E)EF-26

(E)AHU-12

(E)EF-22

(E)L-3 48x48

(E)36x24 SA

(E )3

6x

R A

(E )2

6x

R A

(E)40x10 SA

(E)AHU-17

(E)EF-34

(E)AHU-17 OA INTAKE

(E)AHU-14

CWR CWR CWR

C W

R C

W R

CWS CWS CWS CWS

C W

S

C W

S C

W S

C W

S

CWS CWS

CWR CWR

C W

R C

W R

C W

R

CWR CWR CWR CWR CWR

C W

R

C W

S C

W S

C W

R C

W R

PH

W

S

PH

W S

PH

W

S

PH

W R

PH

W

R

PH

W R

PH

W

S

CWR CWR CWR CWR

CWR

HWR HWR

HWS

H W

H R

H W

H R

H W

H R

H W

H R

H W

R H

W R

H W

S H

W S

H W

S

HWS

HWR HWR

H W

S H

W R

H W

R

HWR HWR HWR

HWS HWS

BB

B

B

H W

R H

W R

H W

S

HWR

CWR CWR

CWS CWS

C W

S C

W S

C W

R C

W R

CWR

MPS

HWRHWS

(E)1" STEAM VENT

ROOF

B85

ROOF

B85A

3.8

E F GE1

BC

CTRL. PNL.

BC

FN

D

NON-STERILE COMPOUNDING AREA

CH

EM

O M

ON

IT

OR

A

ND

DO

W

NT

IM

E

VI

EW

ER

A

ND

S

HE

LF

WHITE BOARDS 3 X 4 (2)

LOCKER - (OUTPATIENT)

BUYER'S

TABLE WITH

STORAGE

UNDER

UD

CHECK

TABLE

REF.

BLFH - 1

LOCKER - (STAFF)

SHELVING

R

EF

OM

NI

CE

LL

S

IV

CHECK

TABLE

LF

H

- 1

CA

RT

CART

LF

H

- 2

WBENCH

TABLE

INCUB.

BI

NS

F

OR

IV

s IV

PRINTER

COUNTERTOP / DRAWERS

SHELVING

CART

SH

EL

VI

NG

BS

C

- 1

SHELVING

OPEN SHELVING

OPEN SHELVING

OPEN SHELVING

P

RI

NT

ER

S

COUNTERTOP / DRAWERS

SHELVING

STAINLESS STEEL

WORK TABLE

TC

GR

x

FL

AM

M

AB

LE

CA

BI

NE

T

CO

UN

TE

RT

OP

DR

AW

ER

S

TV

CS

M

OM

NI

CE

LLCOUNTERTOP / DRAWERS

BU

YE

R' S

RE

F.

CO

UN

TE

RT

OP

DR

AW

ER

S

BU

LK

B

OT

TL

E

ST

OR

AG

E

AN

D

UD

B

IN

S

CA

RT

COUNTERTOP / DRAWERS

SHELVING

TABLE

W

CLASSIC RX

STORAGE

CLASSIC RX

STORAGE

CLASSIC RX

STORAGE

CLASSIC RX

STORAGE

W

FR

EE

ZE

R

REF.

SH

EL

VI

NG

BULK BOTTLE STORAGE AND UD BINS

INPATIENT

PHARMACY UD

C11

CORRIDOR

STAIRS

C19

CORRIDOR

LOBBY

C17

CORRIDOR

ELEC. 128

INPATIENT

PHARMACY IV

3.8

E F GE1

GI003

JME JME

OPERATIONAL PHASING

DIAGRAMS AND NOTES

0' 32'16'8'

SCALE: 1/16" = 1'-0"

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

Fi le

P at h

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

EXPAND PHARMACY

BOISE, ID

531-22-108

APPROVED:

MARCH 2024REVISIONS: DATE: Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

100% CONSTRUCTION

DOCUMENTS (CD)

DWG. OF

CHIEF ENGINEER

BLDG 85A

N

TRUE NKEYPLAN

SIGNATURE

DIRECTOR

LIMIT OF CONSTRUCTION

FOR FIRST FLOOR PROJECT

AREA AT PHARMACY

SCALE:1

PHASE 1 (a, b)

FLOOR PLAN

1/16" = 1'-0"

CONSTRUCTION NOTES:

1. COORDINATE INFECTION CONTROL RISK ASSESSMENT

(ICRA) REQUIREMENTS WITH COR BEFORE DEMOLITION

AND CONSTRUCTION START WHICH SHALL ALSO BE USED

IN CONJUNCTION WITH PRE-CONSTRUCTION RISK

ASSESSMENT (PCRA) FOR ALL CONSTRUCTION ACTIVITY.

2. BECOME FAMILIAR WITH THE CONSTRUCTION DOCUMENTS

AND NOTIFY THE VETERANS AFFAIRS(VA) CONTRACTING

OFFICER'S REPRESENTATIVE (COR) OF DISCREPANCIES

BEFORE PROCEEDING WITH WORK.

3. ANY EQUIPMENT REMAINING IN THE WORK AREA (AFTER

THE INITIAL VA EQUIPMENT MOVE AND RELOCATION) SHALL

BE DEMOLISHED.

4. PROVIDE A NON-DISRUPTIVE AND ENVIRONMENTALLY

PROTECTED PROCESS FOR THE EXISTING FUNCTIONING

FACILITY OPERATIONS IMMEDIATELY ADJACENT TO AND IN

THE SURROUNDING AREAS WITH RESPECT TO THE AREAS

OF CONSTRUCTION ACTIVITY.

5. COORDINATE HAZARDOUS MATERIAL ABATEMENT AND

DEMOLITION WORK FOR BOTH EXTERIOR AND INTERIOR

AREAS. PREFERENCE SHALL BE GIVEN TO COMPLETING

THIS WORK IN CONJUNCTION WITH DRYING-IN THE

STRUCTURE AND BEFORE INSTALLATION OF ANY TYPE OF

MAJOR SYSTEMS SUCH AS AIR HANDLERS, CHILLERS,

DUCTING, FINISH WORK IN PROGRESS.

6. MAINTAIN TEMPORARY PARTITIONING AND OTHER

MEASURES AS REQUIRED FOR INFECTION CONTROL IN

ORDER TO SEPARATE DAY-TO-DAY HOSPITAL AND

PHARMACY ACTIVITIES FROM CONSTRUCTION ACTIVITIES.

CONTROL OF CONSTRUCTION TRAFFIC, NOISE, DUST, AND

INCLEMENT WEATHER BETWEEN THE EXISTING FACILITY

AND NEW WORK SHALL INCLUDE SAFETY, PROTECTIVE

BARRIERS, AND APPROPRIATE HOURS OF WORK BASED ON

IMPOSITION OF WORK ACTIVITY TO LIMIT THE IMPACT OF

CONSTRUCTION.

7. UTILITY PENETRATIONS FOR TIE-INS BETWEEN NEW AND

EXISTING SHALL BE PERFORMED WITHOUT AFFECTING

DAY-TO-DAY HOSPITAL AND PHARMACY OPERATIONS TO

THE GREATEST EXTENT POSSIBLE. COORDINATE WITH VA

PROVIDING NOTIFICATION AND LEAD TIME AS REQUIRED BY

DIVISION 01 SPECIFICATIONS.

9. COORDINATION IS REQUIRED BETWEEN THE CONTRACTOR

AND THE COR TO ESTABLISH THE MOST EFFICIENT METHOD

FOR BRINGING THE PHARMACY INTO FULL OPERATION.

THE INTERFACE OF SYSTEMS AND INFRASTRUCTURE FOR

MECHANICAL, FIRE PROTECTION, ELECTRICAL, AND

TELECOMMUNICATIONS BETWEEN THE EXISTING AND NEW

AREAS SHALL BE IDENTIFIED AND COORDINATED PRIOR TO

CONSTRUCTION IN ORDER TO DEVELOP A SPECIFIC

APPROACH TO ALLEVIATE DOWN TIME FOR HOSPITAL AND

PHARMACY OPERATIONS AND TEMPORARY RELOCATION

OF HOSPITAL AND PHARMACY PERSONNEL.

10. THE CONSTRUCTION STEPS SHALL BE DIVIDED INTO THREE

COMPONENTS TO INCLUDE THE FOLLOWING AREAS:

SOUTH, NORTH, AND ROOF

SCALE:2

PHASE 2 (b)

ROOF PLAN

1/16" = 1'-0"

CONSTRUCTION PHASING

PHASE 1 (WEST AREA DEMOLITION):

DEMOLITION OF THE ENTIRE WEST AREA (GREEN TEAM AREA)

AND PARTIAL ROOF WORK TO INCLUDE:

a. FLOORING, CABINETRY, PARTITIONS, DOORS, CEILINGS, FIRE

PROTECTION, PLUMBING, HVAC, LIGHTING, ELECTRICAL AND

ASSOCIATED APPURTENANCES.

b. PATIENT LIFT SYSTEMS TO BE CAREFULLY REMOVED AND

TURNED OVER TO COR. COORDINATE WITH COR FOR ANY

OTHER ITEMS THAT WILL NEED TO BE REMOVED AND

STORED FOR LATER REUSE.

c. ADD NEW ROOF PARAPET RAILING, SEE SHEET AE203..

d. REMOVE GRAVEL AND BUILT-UP ROOF COVERING IN AREAS

WITH NEW MECHANICAL DUCT SUPPORT, CURBS, AND MAU

ROOF UNITS.

e. REMOVE EXISTING EXHAUST FAN

PHASE 2 (WEST AREA AND ROOF CONSTRUCTION):

a. CONSTRUCTION BUILD-OUT FOR WEST AREA.

b. INSTALL NEW MECHANICAL ROOF EQUIPMENT.

c. INSTALL NEW VERTICAL DUCTING FROM ROOF TO

PHARMACY.

PHASE 3 (EAST AREA HVAC DEMOLITION AND CONSTRUCTION):

BEFORE DEMOLITION CEILING WORK BEGINS IN THE EAST AREA

(EXISTING IN-PATIENT PHARMACY), ALL EQUIPMENT AND

FURNITURE MUST BE ADEQUATELY PROTECTED DURING EAST

CEILING DEMOLITION AND CONSTRUCTION.

a. RELOCATE EXISTING PHARMACY IV EQUIPMENT AND

FURNITURE FOR REUSE TO THE WEST AREA.

b. REMOVE EXISTING CEILING TILE AND RELOCATE EXISTING

MECHANICAL DUCTING AND ASSOCIATED COMPONENTS

ABOVE CEILING OF EAST AREA TO ALLOW FOR NEW WEST

SIDE DUCTING TO BE INSTALLED.

c. REMOVE PORTIONS OF THE SMOKE BARRIER WALL

(BETWEEN EAST AND WEST AREAS) ABOVE THE CEILING FOR

UTILITY CONNECTIONS BETWEEN THE TWO AREAS.

d. INSTALL NEW DUCTS AND TIE-INS FOR THE RECENTLY

COMPLETED WEST AREA.

PHASE 4 (TRANSITION):

EXISTING STERILE AREA SHALL REMAIN OPERATIONAL DURING

THE TRANSITION:

a. PERFORM OPERATIONAL COMMISSIONING OF NEW WEST

AREA EQUIPMENT

b. PRODUCT FROM STERILE AREAS SHALL BE PLACED IN

CONTAINERS AND RELOCATED TO WEST AREA PHARMACY

VIA EXISTING CORRIDORS.

PHASE 5 (EAST AREA DEMOLITION):

DEMOLITION OF THE ENTIRE EAST AREA (EXISTING INPATIENT

AREA) WITH THE EXCEPTION OF THE EXISTING ROLLING

SHELVING TO INCLUDE:

a. ANY EQUIPMENT REMAINING IN THE AREA (AFTER THE INITIAL

VA EQUIPMENT MOVE AND RELOCATION) SHALL BE

DEMOLISHED.

b. FLOORING, CABINETRY, PARTITIONS, DOORS, CEILINGS, FIRE

PROTECTION, PLUMBING, HVAC, LIGHTING, ELECTRICAL AND

ASSOCIATED APPURTENANCES.

PHASE 6 (EAST AREA CONSTRUCTION):

THE CONSTRUCTION BUILD-OUT OF THE INPATIENT PHARMACY

UD AREA SHALL BE DONE IN TWO PHASES.

a. FIRST PHASE AREA

b. SECOND PHASE AREA.

SCALE:2

PHASE 2 (a)

FLOOR PLAN

1/16" = 1'-0"

SCALE:2

PHASE 2 (c)

ROOF PLAN

1/16" = 1'-0"

SCALE:4

PHASE 4 (a & b)

FLOOR PLAN

1/16" = 1'-0" SCALE:5

PHASE 5 (a, b, & c)

FLOOR PLAN

1/16" = 1'-0" SCALE:6

PHASE 6

FLOOR PLAN

1/16" = 1'-0"

VERTICAL DUCTWORK TRANSITION FROM B85 ROOF TO

1ST FLOOR PHARMACY ROUTED THROUGH EXISTING

DUMBWAITER CHASE - VERIFY SIZE

SCALE:3

PHASE 3 (a - d)

FLOOR PLAN

1/16" = 1'-0"

STERILE PRODUCT ROUTE FROM NORTH AREA

CLEAN ROOMS TO NEW SOUTH AREA.

SCALE:1

PHASE 1 (c - e)

ROOF PLAN

1/16" = 1'-0"

SCALE:6

PHASE 6

FLOOR PLAN

1/16" = 1'-0"

03/27/2024

AutoCAD SHX Text

EF

AutoCAD SHX Text

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text

EF

AutoCAD SHX Text

AutoCAD SHX Text M

AutoCAD SHX Text M

AutoCAD SHX Text

EF

AutoCAD SHX Text

AutoCAD SHX Text

VENT

AutoCAD SHX Text

VENT

AutoCAD SHX Text

VENT

AutoCAD SHX Text

VENT

AutoCAD SHX Text

VENT

AutoCAD SHX Text

VENT

AutoCAD SHX Text

VENT

AutoCAD SHX Text

VENT

AutoCAD SHX Text

VENT

AutoCAD SHX Text

VENT

AutoCAD SHX Text

VENT

AutoCAD SHX Text

VENT

AutoCAD SHX Text

VENT

AutoCAD SHX Text

VENT

AutoCAD SHX Text

VENT

AutoCAD SHX Text

VENT

AutoCAD SHX Text

VENT

AutoCAD SHX Text

VENT

AutoCAD SHX Text

VENT

AutoCAD SHX Text

VENT

AutoCAD SHX Text

VENT

AutoCAD SHX Text

VENT

AutoCAD SHX Text

RF1

AutoCAD SHX Text

RF1

AutoCAD SHX Text

RF4

AutoCAD SHX Text

RF4

AutoCAD SHX Text

CCRF-8567

AutoCAD SHX Text 8.0"

AutoCAD SHX Text 11.8"

AutoCAD SHX Text 12.4"

AutoCAD SHX Text M

AutoCAD SHX Text M

BC

FN

D

INPATIENT

PHARMACY

128E

EXAM 128D

PROCEDURE

128G

EXAM

128A

EXAM

128B

EXAM

128A

CLERK

128D

PRODEDURE

MEN

WOMEN

WAITING

WAITING

C11

CORRIDOR

STAIRS

121B

CHEMO

121A

ANTE ROOM

121C

CLEAN ROOM

C19

CORRIDOR

LOBBY

C17

CORRIDOR

ELEC.

128L

DIC.

BC

BC

FN

D

3.8

2.8

1.9

3.8

2.8

1.9

E F GE1

8' -0

FIRE-RATED PLASTIC

TO PREVENT DUST.

INSTALL PRIOR TO

CONSTRUCTION

EXISTING STRUCTURE

ABOVE

RENOVATED

SPRINKLER SYTEM

CEILING SYSTEM

TEMPORARY WALL

FINISHED FLOOR

GI004

JME RJF

PRECONSTRUCTION INFECTION

CONTROL & RISK ASSEMENT

MATRIX

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

Fi le

P at h

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

EXPAND PHARMACY

BOISE, ID

531-22-108

APPROVED:

MARCH 2024REVISIONS: DATE: Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

100% CONSTRUCTION

DOCUMENTS (CD)

DWG. OF

CHIEF ENGINEER

BLDG 85A

N

TRUE NKEYPLAN

SIGNATURE

DIRECTOR

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8e64352c5.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8c7c20c60.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 878a27048.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 834d869c3.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 88aebb50c.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 881f5f4e9.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 821d49ce5.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 886946df7.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8316519a4.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8484d47de.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8bf1b5ce2.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 88e68c7a8.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8931c5fa6.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 83a601935.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8d14a8c05.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 89045d136.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8fcb6ef53.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 83f08d559.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 850ec067d.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 80c349bbf.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 88d34b884.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 85cccaed6.png C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 88be153db.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8b224f012.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 85753639d.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8d69d1243.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 84988e592.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 800f63025.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 869673d30.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 835bdf47a.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8e2e1be59.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 863dfbb94.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8e4795021.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8386bcb03.png C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8b27f0fdf.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 859a25f5d.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 899f96221.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8508d9b99.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 81e4d860f.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 875047e42.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8b565bc57.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 84f887891.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8438837f4.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8c1665d7a.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8825ddd6c.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 85ee3fd41.png C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8d9bf0796.png C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 83d2b9972.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8cdd33ffe.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8ddb0e343.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 819512c9f.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8bbe73dfd.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 89acf7293.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 85bbdeca8.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8f710598a.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8e873cd76.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 869aab545.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8ab0cb93a.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8de4bf565.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 87d9e083a.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8f2a36ac7.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8d142933c.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8b0c95f80.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8b9939ca9.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 84db1263a.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8e57518ef.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8103cfc87.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 852f3b1e7.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8e283bdb6.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 873dd8688.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 81e9c33db.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 89188c796.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 815df6901.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8a2fd3cf1.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8d09282df.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8e4d3ec9f.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8ffffb117.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 899e7e4c9.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8cd7cc91e.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 88f7dd30b.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 885938811.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 82b7e30c1.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 896ca2953.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 81fa489e6.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 815fd4e93.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 855dd4d31.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8a05d9863.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 89ee552bf.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8ada4844f.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8d030b82f.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8658c901b.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8af5f55b3.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 80004979f.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8b4b5ac40.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 88a44f1fd.png C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 81e629e8b.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 88c8ae67d.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8ddfc4ac7.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8f2662c9d.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 834b51068.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 81617a9e9.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 89a355ab1.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8b9dbed1a.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8d52f0d1c.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 81e12aa16.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8ab23394d.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 82e95f334.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 85ef81a46.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 847ba775f.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 86d85d025.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 8b8a0cc50.png

C:\Users\rforster\Desktop\Desktop\VA Ft Harison - Exterior Stair\PDF Images\PDF Images\VHA ICRA 2023 884f6489b.png

VHA-ICRA-2023-1.0

Infection Prevention and Control Construction/Renovation/Maintenance Permit This page must be posted at the entrance to the project area for Level III and Level IV activities.

Unique permit number:

Location of construction/renovation/maintenance Project manager Project start date Contact phone number Completion date Contractor Permit expiration date

Activity Category (A, B, C, or D)

Overall Patient Risk Category (Low, Medium, High, or Highest)

Level of Infection Prevention and Control Precautions (I, II, III, or IV)

Level of Precautions

Control measures to be in place for the duration of the activity (Check the box for the activity’s Level of Precautions to indicate the Control Measures)

Level I

1. Perform work activity in a manner that does not create dust.

2. Immediately replace any ceiling tile, close access panels, etc., upon completion of work.

3. Any materials and equipment being brought into the facility must be free of contaminants and loose material.

Level II

All control measures in Level I and the following:

1. Provide active means to control airborne dust from dispersing into occupied areas and/or water mist surface to control dust (e.g., Mobile Dust Containment Cart or some other system).

2. Ensure worker clothing is clean and free of visible dust before leaving the work area.

3. Remove or isolate air diffusers (supply and return) to protect the HVAC system from dust and reduce air turbulence. Rebalance system to address diffuser isolation.

4. When the work involves or impacts potable water systems including stagnation due to reduced usage, the piping shall be flushed twice a week or isolated from the main system

5. Seal doors, to prevent dust migration.

6. Contain all trash and debris in the work area. Perform daily cleaning and disposal of trash (covered) from work area using an identified exit route.

7. Any equipment, tools, or materials removed from the work area must be in sealed containers and/or cleaned of dust and debris prior to removal from the area.

8. Nonporous/smooth and cleanable containers (with a hard lid) must be used to transport trash and debris from the construction areas. These containers must be damp-wiped cleaned and free of visible dust/debris before leaving the contained work area.

9. Install a sticky (dust collection) mat at entrance of contained work area based on facility policy. Sticky mats must be changed routinely and when visibly soiled.

10. Maintain clean surroundings when area is not contained by damp mopping or HEPA vacuuming surfaces at least daily.

Level III

All control measures in Levels I and II and the following:

1. Ensure availability of equipment for cleaning hands.

2. Construct and complete critical barriers meeting NFPA 241 requirements. Barriers must extend to the ceiling or if ceiling tile is removed, to the deck above.

3. All (plastic or hard) barrier construction activities must be completed in a manner that prevents dust release. Plastic barriers must be effectively affixed to floor and ceiling (or floor/roof deck above) and secure from movement or damage.

4. Seal all penetrations in containment barriers, including floors and ceiling, using approved materials (UL schedule firestop if applicable for barrier type).

5. Maintain .01 inches /water gauge negative pressurization of the entire workspace by use of HEPA exhaust air systems directed outdoors (unless a work specific waiver is approved by VHA’s Office of Healthcare Engineering); this must be maintained continuously 24/7 for the duration of the project. Exhaust discharged directly to the outdoors that is 25 feet or greater from entrances, air intakes and windows is not required to be HEPA-filtered. Exhausting discharged air into shared or recirculating HVAC systems, or other shared exhaust systems (e.g., bathroom exhaust) is prohibited.

6. Install a differential pressure sensing device (e.g., magnehelic, manometer, or digital monitoring) on exterior of work containment to continually monitor and document negative pressurization. The “ball in the wall” or similar apparatus are not acceptable.

Level IV

All control measures in Levels I, II and III and the following:

1. Barriers must be hard barriers unless temporary to install final barrier.

2. Containment must include an anteroom to ensure pressure control, Anteroom must be large enough for equipment staging, cart cleaning, workers’ PPE and cleaning.

3. Worker clothing and/or PPE must be removed or clean and free of visible dust before leaving the work area anteroom. HEPA vacuuming of clothing or use of cover suits is acceptable.

4. Workers must wear shoe covers or have a method to clean shoes in anteroom Shoe covers must be removed prior to exiting the anteroom to the occupied space (non-work area). Damaged shoe covers must be changed immediately.

Additional requirements:

Project Manager signature Date

Infection Preventionist signature Date

BOISE VAMC SPECIFIC NOTES:

SINCE WORK WILL TAKE PLACE IN A HOSPITAL, THERE IS THE POSSIBILITY

OF THE CONTRACTOR COMING IN CONTRACT WITH BLOOD AND BODY FLUIDS

WHENEVER WORKING ON THE SANITARY SEWER SYSTEM. CONTRACTOR IS

REQUIRED TO PROVIDE AND USE APPROPRIATE PERSONAL PROTECTIVE

EQUIPMENT WHENEVER WORKING ON THE SANITARY SEWER SYSTEM TO

PREVENT EXPOSURE TO THEIR EMPLOYEES.

TEMPORARY BARRIERS MUST BE CONSTRUCTED FOR ALL OCCUPANCIES

WHEREVER CORRIDOR WALLS OR FIRE WALLS ARE IMPACTED BY

CONSTRUCTION. TEMPORARY WALLS THAT SEPARATE RENOVATION

PROJECTS FROM OCCUPIED AREAS MUST BE ONE HOUR CONSTRUCTION

(METAL STUDS 24" ON CENTER WITH 5/8" FIRE TAPED TYPE X SHEETROCK ON

EACH SIDE) WITH 1 HOUR RATED DOORS. TEMPORARY WALLS THAT

SEPARATE NEW CONSTRUCTION FROM OCCUPIED AREAS MUST BE 2-HOUR

RATED (METAL STUDS AT 24" ON CENTER WITH WITH TWO LAYERS OF 5/8"

FIRE TAPED X SHEETROCK ON EACH SIDE) WITH 90 MINUTES RATED DOORS.

TEMPORARY RATED PARTITIONS MUST RUN FROM SLAB TO SLAB AND FROM

EXTERIOR WALL OR FIRE RATED PARTITION TO EXTERIOR WALL OR FIRED

RATED PARTITION. FIREBRICKS OR FIRE PLUGS MUST BE USED TO SEAL

PENETRATIONS IN TEMPORARY OR PERMANENT FIRE SEPARATIONS UNTIL

THEY CAN BE PROPERLY FIRE SEALED. (I.E. CORE DRILLS FOR NEW SEWER

LINES PRIOR TO INSTALLATION AND FIRE CAULKING OF SEWER LINES)

INSTALL BARRIER PRIOR TO COMMENCING DEMOLITION AND CONSTRUCTION

OF EACH AFFECTED PHASE. REMOVE BARRIER WHEN DIRECTED BY

RESIDENT ENGINEER.

WHEN PLASTIC SHEETING IS USED TO SEPARATE AREAS UNDER

CONSTRUCTION FROM THE REMAINDER OF A BUILDING FOR DUST OR

ACCESS CONTROL, THE PLASTIC SHEETING MUST BE FIRE RESISTANT

(LIMITED COMBUSTIBILITY). THIS DOES NOT CHANGE THE REQUIREMENT TO

BUILD TEMPORARY BARRIERS OF METAL STUDS AND GYPSUM BOARD.

LEGEND

EXISTING INTERIOR PARTITION TO REMAIN

WALL DEMOLITION

INFECTION CONTROL / DUST BARRIER PARTITION

TACKY MAT FOR INFECTION / DUST CONTROL AT

CONSTRUCTION ENTRY/ EGRESS DOOR WITH

NON-TRANSFERRING MULTI-SHEET ADHESIVE FLOOR PADS

LIMIT OF CONSTRUCTION

NOT IN SCOPE

1.

2.

3.

SCALE:1

ENLARGED INFECTION CONTROL

AND RISK ASSESMENT FLOOR PLAN

1/4" = 1'-0"

INFECTION CONTROL RISK ASSESSMENT

NOTES:

IMPLEMENT INFECTION CONTROL RISK ASSESSMENT (ICRA)

PROCEDURES PER BOISE VAMC ICRA PLAN AND AS DIRECTED BY THE

COR.

COORDINATE DEMOLITION / CONSTRUCTION DEBRIS PATH OF TRAVEL

AND INTERIM LIFE SAFETY MEASURES WITH COR.

OBTAIN AN INFECTION CONTROL PERMIT PRIOR TO BEGINNING WORK.

CONSTRUCT ANTEROOMS AT ENTRANCES TO CONSTRUCTION AREAS

AND REQUIRE ALL CONSTRUCTION PERSONNEL WHO PASS THROUGH

THIS ROOM TO BE VACUUMED WITH HEPA VACUUM CLEANER PRIOR

TO LEAVING THE SITE.

PROVIDE FIRE EXTINGUISHERS IN CONSTRUCTION AREAS; REVIEW

WITH COR AND VA SAFETY GROUP.

MAINTAIN EXIT LIGHTS IN CONSTRUCTION AREA.

MAINTAIN NEGATIVE AIR PRESSURE IN CONSTRUCTION AREA AT ALL

TIMES (24/7), WHETHER OCCUPIED OR NOT, THROUGHOUT THE

DURATION OF PROJECT USING HEPA-EQUIPPED AIR FILTRATION

UNITS.

CONSTRUCTION AREA SHALL REMAIN ISOLATED FROM THE OTHER

AREAS OF THE MEDICAL CENTER; NO RETURN AIR OR EXHAUST SHALL

PASS INTO AREAS OUTSIDE THE CONSTRUCTION AREA. ISOLATE

HVAC SYSTEM WITHIN CONSTRUCTION AREA TO PREVENT

CONTAMINATION OF EXISTING DUCT SYSTEM.

TACKY MATS SHALL BE PLACED AT ALL DOORS INTO THE

CONSTRUCTION AREA AND SHALL BE MONITORED TO REMAIN

EFFECTIVE THROUGHOUT THE DURATION OF THE PROJECT.

MAINTAIN CLEAN ORDERLY CONSTRUCTION AREA. ALL DEBRIS

REMOVAL SHALL BE IN COVERED CARTS AND/OR CONTAINERS.

AFTER COMPLETION OF WORK: VACUUM THE CONSTRUCTION AREA

WITH HEPA FILTERED VACUUMS, WET MOP WITH DISINFECTANT,

REMOVE CONSTRUCTION BARRIERS (UPON COR APPROVAL). PATCH

AND REPAIR ANY DAMAGE FROM CONSTRUCTION BARRIER REMOVAL

AS WELL AS THE ISOLATION VAC SYSTEM.

CONSTRUCTION BARRIERS SHALL NOT BE REMOVED UNTIL THE

PROJECT IS COMPLETED AND INSPECTED BY VA SAFETY PERSONNEL,

INFECTION CONTROL GROUP, AND COR.

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

SCALE:2

TYPICAL INFECTION CONTROL /

DUST BARRIER PARTITION

1/2" = 1'-0"

O V

BC

OMNI

CELL

MEDICAL

VENDING

DN

UP

J J.1 J.7 K.4 N OFC ED E1 HG L.1

FEC

FEC

CTRL. PNL.

STAIRS

INPATIENT

PHARMACY UD

128B

NON-STERILE

COMPOUNDING

LOBBY

C19

CORRIDOR

C17

CORRIDOR

MEN

WOMEN

WAITING

WAITING

CORRIDOR

C11

ELEC. 128L

DIC.

J.9

ROLLING

STORAGE

(EXISTING)

BC

FN

D

128E

STERILE

HAZARDOUS

DRUG BUFFER

128C

ANTE ROOM

128D

STERILE

NON-HAZARDOUS

DRUG BUFFER

PP

E

GA

RB

A

RE

A

121A

HAZARDOUS

DRUG STORAGE

INPATIENT

PHARMACY IV

NON-STERILE COMPOUNDING AREA

CH

EM

O M

ON

IT

OR

A

ND

DO

W

NT

IM

E

VI

EW

ER

A

ND

S

HE

LF

WHITE BOARDS 3 X 4 (2)

LOCKER - (OUTPATIENT)

BUYER'S

TABLE WITH

STORAGE

UNDER

UD

CHECK

TABLE

REF.

BLFH - 1

LOCKER - (STAFF)

128A

STAFF LOUNGE

SHELVING

R

EF

IV

CHECK

TABLE

LF

H

- 1

CA

RT

CART

LF

H

- 2

WBENCH

TABLE

BI

NS

F

OR

IV

s IV

PRINTER

COUNTERTOP / DRAWERS

SHELVING

CART

SH

EL

VI

NG

BS

C

- 1

SHELVING

OPEN SHELVING

OPEN SHELVING

OPEN SHELVING

P

RI

NT

ER

S

COUNTERTOP / DRAWERS

SHELVING

STAINLESS STEEL

WORK TABLE

FL

AM

M

AB

LE

CA

BI

NE

T

CO

UN

TE

RT

OP

DR

AW

ER

S

TV

COUNTERTOP / DRAWERS

BU

YE

R' S

RE

F.

CO

UN

TE

RT

OP

DR

AW

ER

S

BU

LK

B

OT

TL

E

ST

OR

AG

E

AN

D

UD

B

IN

S

CA

RT

RECEIVING

AREA

COUNTERTOP / DRAWERS

SHELVING

TABLE

W

CLASSIC RX

STORAGE

CLASSIC RX

STORAGE

CLASSIC RX

STORAGE

CLASSIC RX

STORAGE

W

ELEC

SH

EL

VI

NG

BULK BOTTLE STORAGE AND UD BINS

FEC

FE

C

TR

A

VE

L

D

IS

TA

N

C E

=2 1'

-0

COMMON PATH TRAVEL

DISTANCE =35'-0"

TRAVEL DISTANCE =72'-0"

FEC

TYPICAL

TYPICAL

TYPICAL

PRIMARY PATH OF TRAVEL

COMMON PATH OF TRAVEL

EXISTING 2 HOUR FIRE RATED PARTITION

COMBINED EXISTING 2-HOUR FIRE RATED PARTITION

AND SMOKE BARRIER PARTITION

EXISTING SMOKE BARRIER PARTITION.

NOTE: REFER TO KEYNOTE #1 FOR PORTION OF

SMOKE BARRIER WALL TO BE DESIGNATED AS

NON-RATED.

FIRE EXTINGUISHER CABINET,

SEE DETAIL 12/AE501

FEC

LIMIT OF CONSTRUCTION

EXIT SIGNAGE

1B

4.2

2.8

0.9

0.4

1.9

3.8

GI005

JME RJF

LIFE SAFETY

0'

SCALE: 1/8" = 1'-0"SCALE: 1/8" = 1'-0"

16'8'4'

PROJECT NUMBER

BUILDING NUMBER

DRAWING NUMBER

PROJECT TITLE

LOCATION

ISSUE DATE CHECKED DRAWN

DRAWING TITLE

VA FORM 08 - 6231

A

Fi le

P at h

FULLY

SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PHASE:ARCHITECT/ENGINEER OF RECORD SEALCONSULTANT

321 4 5 6 7 8 9 10

EXPAND PHARMACY

BOISE, ID

531-22-108

APPROVED:

MARCH 2024REVISIONS: DATE: Group, Inc.

11031 SOUTH PIKES PEAK DRIVE #202

PARKER, COLORADO 80138

PH: 303.841.3922

WWW.AES-GRP.COM

100% CONSTRUCTION

DOCUMENTS (CD)

DWG. OF

CHIEF ENGINEER

BLDG 85A

N

TRUE NKEYPLAN

SIGNATURE

DIRECTOR

SCALE:1 LIFE SAFETY

1/8" = 1'-0"

LIFE SAFETY LEGEND:

PROJECT DESCRIPTION

THE PROPOSED PROJECT FOR THE VA MEDICAL CENTER, BOISE,

IDAHO IS THE EXPANSION OF THE INPATIENT PHARMACY FROM

1825 SF TO 3600 SF BY INCORPORATING ADJACENT EXAM ROOM

SPACE INTO THE ENLARGED PHARMACY.

THE BUILDING HAS AN EXISTING FIRE SPRINKLER AND ALARM

SYSTEM WHICH WILL REQUIRE LIMITED MODIFICATION AND

RELOCATION IN ORDER TO ACCOMMODATE THE REVISED SPACE.

OCCUPANCY CLASSIFICATION

EXISTING AMBULATORY HEALTH CARE (NFPA 101 CHAPTER 21)

OCCUPANT LOAD (NFPA 101 SECTION 7.3.1.2)

AMBULATORY HEALTH CARE = 150 SF/ OCCUPANT

TOTAL SQUARE FOOTAGE = (3600 / 150) = 24

INTERIOR FINISH (NFPA 101, SECTION 21.3.3)

INTERIOR FINISH SHALL BE IN ACCORDANCE WITH NFPA 101

SECTION 10.2, AND CONTENTS WITH NFPA 101, SECTION 10.3

FIRE SPRINKLER SYSTEM (NFPA 101 SECTION 9.7)

EXISTING AUTOMATIC SPRINKLER SYSTEM

FIRE ALARM SYSTEM (NFPA 101 SECTION 9.7.2.1)

EXISTING ALARM SYSTEM

REQUIRED SEPARATION

INTERIOR WALLS (NFPA 101 SECTION 8.2.2.3)

BECAUSE THE PROJECT AREA IS PROTECTED BY AN AUTOMATIC

SPRINKLER SYSTEM (NFPA SECTION 8.7.1.1), A PORTION OF AN

EXISTING SMOKE BARRIER WALL THAT DIVIDES THE SPACE IS NO

LONGER REQUIRED TO BE RATED AND IS TO REDESIGNATED AS A

NON-RATED WALL. THE CONTINUITY OF THE REMAINING SMOKE

BARRIER WALL IS TO BE MAINTAINED BEYOND THE LIMITS OF THE

PROJECT.

SEPARATION FROM HAZARDS

NEW STERILE AND NON-STERILE CLEAN ROOM AREA WALLS ARE

NOT REQUIRED TO BE FIRE RATED BECAUSE THEY HAVE THE

SAME OCCUPANCY CLASSIFICATION AS THE PHARMACY AREA.

MEANS OF EGRESS (NFPA 101 SECTIONS 7.1 AND 21.2)

1. THE CURRENT PLAN HAS A TOTAL OF 4 EXITS WITH 3 EXITS

IN THE INPATIENT PHARMACY UD AND 1 EXIT IN THE

PHARMACY IV AREA SEPARATED BY A DEMISING WALL.

2. TWO EXISTING EXITS WILL BE ELIMINATED AND ANOTHER IS

TO BE RELOCATED.

NUMBER OF EXITS (NFPA 101 SECTION 7.4.1)

TOTAL EXITS REQUIRED = 2 (NFPA 101 SECTION 7.4.1)

TOTAL EXITS PROVIDED = 4

TRAVEL EXIT DISTANCE (NFPA 101 SECTION 21.2.6)

MAXIMUM ALLOWABLE TRAVEL DISTANCE = 200'

ACTUAL TRAVEL DISTANCE = 99'

MAXIMUM ALLOWABLE COMMON PATH OF TRAVEL = 100'

ACTUAL TRAVEL PATH = 77'

EXIT WIDTH (NFPA 101 SECTION 7.2.1.2.3.2)

MINIMUM DOOR LEAF WIDTH REQUIREMENT OF 32"

PORTABLE FIRE EXTINGUISHERS (NFPA 10)

75'-0" MAXIMUM TRAVEL DISTANCE

BUILDING CODE SUMMARY:

2018 NFPA 10 STANDARD FOR PORTABLE FIRE

EXTINGUISHERS

2019 NFPA 13 STANDARD FOR THE INSTALLATION OF

SPRINKLER SYSTEMS

2020 NFPA 70 NATIONAL ELECTRICAL CODE

2019 NFPA 72 NATIONAL FIRE ALARM CODE

2021 NFPA 101 LIFE SAFETY CODE

2019 NFPA 110 STANDARD FOR EMERGENCY AND STANDBY

POWER SYSTEMS

2015 ABAAS ARCHITECTURAL BARRIERS ACT

ACCESSIBILITY STANDARDS

2021 PG 18-10 VA DESIGN CRITERIA, FIRE PROTECTION,

(8TH ED. JUNE 1)

2022 PG 18-13 VA BARRIER FREE DESIGN STANDARD,

(REV. NOV.1). A SUPPLEMENT TO ABAAS

KEY NOTES

1. SMOKE BARRIER WALL TO BE DESIGNATED

AS NON-RATED AND TO REMAIN AS CONSTRUCTED.

2. PROVIDE ADEQUATE DUST, SIGHT AND SAFETY

BARRIERS BETWEEN THE AREAS OF WORKS AND

AREAS NOT IN CONTRACT.

03/27/2024 ftp://image.autodesk.com/drawing/STENO_CHAIR_1.dwg ftp://image.autodesk.com/drawing/STENO_CHAIR_1.dwg ftp://image.autodesk.com/drawing/STENO_CHAIR_1.dwg ftp://image.autodesk.com/drawing/STENO_CHAIR_1.dwg ftp://image.autodesk.com/drawing/STENO_CHAIR_1.dwg ftp://image.autodesk.com/drawing/STENO_CHAIR_1.dwg ftp://image.autodesk.com/drawing/STENO_CHAIR_1.dwg ftp://image.autodesk.com/drawing/STENO_CHAIR_1.dwg ftp://image.autodesk.com/drawing/STENO_CHAIR_1.dwg ftp://image.autodesk.com/drawing/STENO_CHAIR_1.dwg ftp://image.autodesk.com/drawing/STENO_CHAIR_1.dwg ftp://image.autodesk.com/drawing/STENO_CHAIR_1.dwg ftp://image.autodesk.com/drawing/STENO_CHAIR_1.dwg ftp://image.autodesk.com/drawing/STENO_CHAIR_1.dwg ftp://image.autodesk.com/drawing/STENO_CHAIR_1.dwg ftp://image.autodesk.com/drawing/STENO_CHAIR_1.dwg ftp://image.autodesk.com/drawing/STENO_CHAIR_1.dwg ftp://image.autodesk.com/drawing/STENO_CHAIR_1.dwg ftp://image.autodesk.com/drawing/STENO_CHAIR_1.dwg ftp://image.autodesk.com/drawing/STENO_CHAIR_1.dwg ftp://image.autodesk.com/drawing/STENO_CHAIR_1.dwg ftp://image.autodesk.com/drawing/STENO_CHAIR_1.dwg ftp://image.autodesk.com/drawing/STENO_CHAIR_1.dwg ftp://image.autodesk.com/drawing/STENO_CHAIR_1.dwg ftp://image.autodesk.com/drawing/STENO_CHAIR_1.dwg…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .