This is a pre-submittal meeting presentation for a Request for Proposal (RFP) issued by Central San for construction management services related to the Ultraviolet Disinfection Replacement project (District Project 100012). The project encompasses the design and construction of new UV buildings and structures, a new switchgear building and substation, a new junction structure, large piping installation, temporary power facilities, and commissioning equipment to meet NPDES requirements. The RFP was advertised on September 8, 2026, with a pre-proposal meeting held on September 21, 2026. The original submittal deadline of October 2, 2026, was extended to November 13, 2026, with proposals submitted through PlanetBids. The anticipated notification of the short-list for interviews is October 12, 2026, with interviews scheduled for the week of October 19, 2026. The tentative notice to proceed is January 2027, with construction anticipated to commence in late 2027 or early 2028 and conclude in 2032. Construction bid documents are expected in early 2027, with an anticipated award date in spring 2027.
The construction management services contract has an expected level of effort valued at $7,000,000 for all tasks, which include preconstruction services, constructability reviews, bid phase assistance, and construction phase services encompassing management, coordination, documentation, schedule review, inspection, and safety compliance. The current construction cost estimate ranges from $90 million to $100 million. Evaluation of proposals will be based on experience in similar projects (25%), Procore proficiency and technical capability (15%), proposed fee and cost-effectiveness (20%), project team qualifications (25%), and references (15%). Desired qualifications for the prime proposer include a minimum of ten years in wastewater consulting, construction management experience on at least five projects exceeding $25 million, completion of two construction management projects within five years involving civil, mechanical, electrical, and controls work, experience with facility renovations and complex sequencing, Procore proficiency, and a Northern California office location.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| RFP CM Services_UV_Re-Issue.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UV DISINFECTION
REPLACEMENT, DP 100012
Construction Management RFP Pre-Submittal Meeting September 21, 2026
Mark Wenslawski, Senior Engineer
CENTRAL SAN PROCESS FLOW SCHEMATIC
EXISTING ULTRAVIOLET DISINFECTION
SYSTEM
SCOPE OF WORK
• New UV Building and Structures
• New Switchgear Building and
Substation 38
• New Junction Structure M
• Large Piping Installation
• Temporary Power for new UV Facility
• Commissioning Equipment and Meeting
NPDES Requirements
NEW UV BUILDINGS
NEW SWITCHGEAR AND SUBSTATION
NEW JS M AND PIPING
PROJECT CONSTRUCTION ORGANIZATIONAL CHART
CENTRAL SAN PROJECT MANAGEMENT TEAM
AND PROGRAMMATIC SUPPORT CONSULTANT
• Coordinate with Central San staff and all parties
• Manage project budgets
• Approve progress payments, invoices, change orders (COs), etc.
• Major decision maker
CONTRACTOR
CONSTRUCTION MANAGEMENT
• Construction Management, Daily Inspection, Procore
• Document tracking (submittals, RFIs, COs, DCNs)
• Safety oversight
• Point of contact with
Contractor
• Conduct progress meetings
• Review payments
• Manage and review project schedule
• Coordinate shutdowns
• Specialty inspections
• Commissioning
• Manage project closeout documentation and asset handover
DESIGN ENGINEERS
Services During
Construction (Carollo)
• Review submittals
• Answer RFIs
• Start up support
• Design clarifications
• Review Final O&M manuals and asset information
• Produce electronic record drawings
CENTRAL SAN
O&M STAFF
• Review and implement shutdowns
• Review O&M related questions during construction
• Commissioning
PROJECT TASKS
• Task 1 – Preconstruction services (page 7)
• Constructability reviews
• Bid phase assistance
• Task 2 – Construction Phase Services (page 8 – 12)
• Construction management
• Coordination, communication and documentation
• Schedule review
• Inspection and special inspection
• Safety Compliance
PROJECT SCHEDULE AND BUDGET
• Schedule:
• Construction Bid Document Completion – Early
• Three Month Bid Period
• Anticipated Award Date – Spring 2027
• Construction Contract/Submittals NTP – Summer
• Construction Start– Late 2027/Early 2028
• Construction Completion - 2032
• Current construction cost estimate: $90M- $100M
CONSTRUCTION MANAGEMENT BUDGET
• Expected level of effort - $7,000,000 for all tasks.
REVIEW RFP REQUIREMENTS
PROPOSAL SCHEDULE (PAGE 3)
• Request for Proposal...........September 8, 2026 – October 2, 2026
• RFP Advertisement: ..........................................................................Sept. 8, 2026
• Pre-Proposal Meeting (Optional): ................................................... Sept. 21, 2026
• Deadline for Proposers to Submit Questions: ..................................Sept. 21, 2026
• Anticipated Deadline for Central San to Respond to Questions: ......Sept. 25, 2026
• RFP Submittal Deadline (via Planet Bids):................... 5:00 p.m, October 2, 2026
• Anticipated Notification of Interview Short-List: ...... Oct 12, 2026
• Interview ..................................................Week of October 19, 2026
• Tentative Notice to Proceed....................................... January 2027
DESIRED QUALIFICATIONS
FIRMS/SUBCONSULTANTS – DESIRED QUALIFICATIONS
Firm Prime Proposer)
• Be in business for a minimum of ten (10) years performing professional consulting services in the wastewater field in the USA.
• Have acted as the construction manager for at least five (5) wastewater treatment plant projects greater than $25M construction cost.
• Have completed at least two (2) construction management projects in the past five (5) years of wastewater treatment plant construction. This work must have included civil, mechanical, electrical, and controls work.
Alternatively, this qualification can be met by a subconsultant.
• Have project experience with a renovation of an existing facility, multiple completion deadlines, and difficult constraints, sequencing, electrical & instrumentation cutovers, and temporary power.
• Be experienced in the use of Procore.
• Have an office in Northern California, preferably in Contra Costa County.
Subconsultants
• Be in business for a minimum of three (3) years performing similar roles and responsibilities as proposed for this project.
• Subconsultants with an office in Northern California or Contra Costa County are preferred.
DESIRED QUALIFICATIONS (PAGE 14-16)
KEY TEAM MEMBERS – DESIRED QUALIFICATIONS
Construction Manager
• Ten (10) years of experience in wastewater treatment plant construction.
• Served as construction manager for at least three (3) wastewater, water, or industrial plant projects with a similar scope of work.
• Have in the past five (5) years completed one or more project renovation of an existing facility within a publicly owned water or wastewater treatment facility; and performed constructability reviews for one (1) or more capital improvement projects involving the renovation or expansion of an existing publicly owned wastewater or water treatment facility while maintaining continuous plant operations.
• Demonstrated experience evaluating construction sequencing, temporary facilities, bypass pumping, tie-ins, operational constraints, access, maintenance of treatment, contractor means and methods, and project phasing.
• Experience identifying construction risks, schedule impacts, permitting constraints, utility conflicts, and opportunities to improve safety, cost, and constructability.
• Excellent written communication skills with demonstrated experience preparing constructability review reports and providing recommendations to owners and design teams.
• Holds a current civil professional engineer’s license in the state of California.
• Holds a construction management certificate or degree.
• Holds up-to-date OSHA training.
• A construction manager that is located from an office in Contra Costa County. Must be available to attend in-person design review meetings, field investigations, and stakeholder workshops as required throughout the project.
KEY TEAM MEMBERS – DESIRED QUALIFICATIONS
Construction Inspector(s)
• Ten (10) years of experience in wastewater, water, or industrial plant construction inspection.
• Have inspected at least two (2) projects with a similar scope of work (see project description), roles, and responsibilities within the last five (5) years.
• Relevant experience and certifications for the work being performed.
• The ability to maintain an effective working relationship with contractors, consultants, fellow employees, and other departments.
• The ability to read, write, and speak English at a level necessary for satisfactory job performance.
• Special Requirements:
• A valid California Driver's License, Class C or higher.
• Ability to climb ladders, work on scaffolding, crawl in and out of attic spaces and building crawl spaces.
• Trained and certified in: fall protection, CPR, first aid, and OSHA construction safety.
• Additional desired qualifications for mechanical and electrical inspectors, scheduler/schedule analyst, cost estimator, and safety compliance officer are on pages 15 and 16 of the RFP.
SUBMITTAL REQUIREMENTS
Proposal Submittal Requirements
• All proposals shall be submitted electronically through PlanetBids by the posted deadline. The e-procurement system (and Central San) will not accept any proposals after the specified close time.
• Submittal Deadline is 5 pm, October 2, PROPOSAL REQUIREMENTS (PAGES 13-14)
• Proposal Breakdown
• Identification of Proposer
• Firm Profile & Experience
• Proposed Staffing Plan
• Fee Proposal
• Conflicts of Interest
• Exceptions to Contract Terms and Conditions
• Form on RFP page 57
EVALUATION PROCESS (PAGE 17)
Proposals will be reviewed and ranked utilizing the following criteria:
• Experience in similar projects (25%)
• Procore proficiency and technical capability (15%)
• Proposed fee and cost-effectiveness (20%)
• Project team qualifications (25%)
• References (15%)
QUESTIONS?
| UV DISINFECTION REPLACEMENT, DP 100012 |
| Central San Process Flow Schematic |
| Existing Ultraviolet Disinfection System |
| Scope of Work |
| New UV Buildings |
| New Switchgear and Substation |
| New JS M and Piping |
| Project Construction Organizational Chart |
| Project Tasks |
| Project Schedule and Budget |
| Construction Management Budget |
| Review RFP Requirements |
| Proposal Schedule (Page 3) |
| Slide Number 14 |
| Desired Qualifications (page 14-16) |
| Desired Qualifications (page 14-16) |
| Submittal Requirements |
| Proposal REQUIREMENTS (pages 13-14) |
| Evaluation Process (Page 17) |
| Questions?� |
File details come from the government source that posted it. Updated .