USSS Rowley Training Center ESPC NOO RFIs 2.pdf

PDF 126 KB Posted

Attached to
Notice of Opportunity - 3rd Amendment
Solicitation number
USSS-NOO-001
Issued by

About this file

This document appears to be a set of Post Site Visit Requests for Information (RFIs) related to a potential Energy Savings Performance Contract (ESPC) task order at the James J. Rowley Training Center, which is owned and operated by the U.S. Secret Service (USSS).

The key details include:

  • The USSS is interested in pursuing an ESPC project at the Rowley Training Center and has invited current holders of the Department of Energy (DOE) Fourth Generation ESPC Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract to express interest in being considered for the contractor selection.
  • The scope of the potential task order includes the buildings and facilities at the Rowley Training Center.
  • The RFIs cover various facility-related information such as utility data, lighting, O&M support, and occupancy patterns to help inform the potential ESPC project.
  • The USSS prefers an ESPC term of 10 years or less and is interested in eliminating the use of natural gas at the building level, though retaining natural gas generators.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ESPC Task Order at James J. Rowley Training Center

Post Site Visit Requests for Information (As of 8 October 2024)

Question

USSS Answers

1. Can you provide building level utility data (gas and electric) Information will be provided to the down selected company.

2. Is water metered at each building? If so, can Building level data be provided?

Water is metered at the installation, not at each building.

3. Is there interest in capturing water savings opportunities? No.

4. Is wastewater treated on site? No.

5. Is there a separate fee associated with wastewater? No.

6. What percentage of the existing lighting is LED?

This is difficult to estimate. Perhaps 50% interior and limited building exterior are LED.

7. Have complete buildings converted to LED? If so which ones? Yes. Bowron, Merletti, and Maloney.

8. Are there any current geo-technical studies available for the site?

Yes. Information will be provided to the down selected company, if requested.

9. Does the site have third party O&M support for mechanical and electrical systems? If so who is the subcontractor, and what is the term of their contract?

Yes. The contract is five years.

10. Who currently maintains the generators? We have a third party maintain the generators.

11. What is the current occupancy at each building? Information will be provided to the down selected company.

12. How does occupancy fluctuate throughout the year? It does not fluctuate much.

13. Can an annual training schedule be provided? Not available at this time.

14. Is training consistent throughout the year? Yes, training is consistent throughout the year.

15. ESPC terms can go out to 25 years? Does the site have a preferred term?

Prefer 10 years or less.

16. Is there any interest in eliminating the use of natural gas at the building level?

Yes. However we still prefer to have natural gas generators.