100% FINAL SPECIFICATIONS

US DISTRICT COURT 15‐15

1376 CHAMBERS REMODEL

DALLAS, TEXAS

Contract Number: GS‐07P‐12‐HH‐D‐0050

GSA Order Number: GS‐P‐07‐16‐UA‐7005

GSA Building: Earle Cabell Federal Building and US Courthouse, Dallas, Texas

06/06/2017

USDC 15-15 100% FINAL SUBMITTAL

1376 CHAMBERS REMODEL GS-P-07-16-UA-7005

13TH FLOOR

DC 15-15 USDC (1376) 06/06/2017 00 01 02 - 1

Dallas, TX

SECTION 00 01 02

PROJECT INFORMATION

PART 1 GENERAL

1.01 PROJECT IDENTIFICATION

A. Project Name: US District Court 15-15; USDC 1376 Chambers Remodel, Dallas, TX 75242

B. GSA PROJECT MANAGER / REPRESENTATIVE NAME: Peter Longerich

Project Number: GS-P-07-16-UA-7005

Project Location: Earle Cabell Federal Office Building – TX0284

Project Location City: Dallas, Texas

C. The Owner, hereinafter referred to as GSA

1.02 PROJECT DESCRIPTION

A. Summary Project Description: Renovation of an existing judge’s chamber space: Chamber 1376.

1.03 PROCUREMENT TIMETABLE

A. GSA reserves the right to change the schedule or terminate the entire procurement process at any time.

1.04 PROCUREMENT DOCUMENTS

A. Availability of Documents: Complete sets of procurement documents may be obtained:

1. From: GSA PROJECT MANAGER: Peter Longerich: Peter.Longerich@gsa.gov

PART 2 PRODUCTS / PROPERT INFORMATION

(THE FOLLOWING IS PROVIDED FOR INFORMATIONAL PURPOSES)

Building Business Hours: 6:00 am until 6:00 pm Mon-Fri.

O&M Hours of Operation: 8:00 am until 5:00 pm Mon-Fri.

Weekend/AfterHour Access Procedures: Provide Government picture ID and access request for afterhours work to be admitted, worker must have proper badge and be included on work list

Hot Work Permits: 72 hours prior notice; Procedures: Submit permit request through PM to Property Manager

ZoneOuts/Utility Interruptions: 72 hours prior notice; Procedure: Submit permit request through PM to Property Manager

Keys to Building’s Mechanical and Electrical rooms for Contractors (escort requirements, if any) Issued by O & M Contractor.

No MC Cable used except light whips. ¾” EMT minimum required.

Construction Core/Locks Keys___Yale “G” sectional core must be under the NM (New

Master) and match any existing space an agency has unless approved by the Property Manager.

Emergency Calls: After hours Mega Center and PM Loading Dock Usage o Trash to be removed by Contractor after recycle materials turned over to the Custodial department.

o Dock clearance required if loiter time exceeds 30 minutes during building business hours o Parking: None available on property

SEALS PAGE

Architect of Record Barton Drake – R.A. TX 12845

VAI Architects Incorporated 16000 North Dallas Parkway, Suite 200 Dallas, Texas 75248 P - 972.934.8888 F – 972.458.2323

Electrical Engineer Harold Hobbs – P.E. 52549

JJA Mechanical & Electrical Engineering Consultants 8150 North Central Expressway m-2100 Campbell Centre Dallas, Texas 75206 P – 214.739.8880 F – 972.458.1777

Mechanical Engineer John Douglas Bronson – P.E. 87643

JJA Mechanical & Electrical Engineering Consultants 8150 North Central Expressway m-2100 Campbell Centre

DC 14-24 USDC (1516) 06/06/2017 00 01 07 - 1

Plumbing Engineer Scott Herrbold – P.E. 83285

JJA Mechanical & Electrical Engineering Consultants 8150 North Central Expressway m-2100 Campbell Centre

DC 14-24 USDC (1516) 06/06/2017 00 01 07 - 2

DC 15-15 USDC (1376) 06/06/2017 00 01 02 - 2

o Daytime work is only approved by the Property Manager (no noise, dust, smells, or vibrations)

Freight Elevator usage: Daytime vs After Hours no dedicated elevator usage Security Requirements: All contract workers on GSA projects shall be badged. A list of workers and location in the building they will be working shall be sent to the Project Manager and shall be current for the entirety of the project. The Project Manager will send the list to the Property Manager who will give a copy to Building Security. Building Security will not allow access unless workers are listed.

Returning contractor’s badges: All contractors badges must be returned at the badge expiration date or extended with the project contract dates.

After Hours Emergency Procedures (List of Emergency Contacts) o Building Manager: Richard Kuhlman Phone Number 6822065187 o Assistant Building Manager: Lea McWhirter Phone Number 8172392789

(THE FOLLOWING SPREADSHEET (ATTACHED) IS PROVIDED FOR INFORMATIONAL PURPOSES

ONLY AND IS IN REFERENCE TO BUILDING STANDARD FINISHES AND REQUIREMENTS.)

U pdated 10-5-16

B U

ILD

IN

G S

TA

N

D A

R D

S 1100 C om m erce Street

B uilding-w ide application D oors in C om m on H allw ays

3070 - 3 ft. X 7 ft. B londe B irch w ood or m ost prom inent clolor in hallw ay

D oor Finish

S tain grade doors - C orridors to m atch existing hallw ay doors, if m ultiple colors, consult w ith the property m ananger H ardw are

A ll floor except court floors

26D (C hrom e or S atin finish) C ourt floors 3B

A ntique B rass D oor C losures

Y ale or N orton D oor S tops

26D or A ntique B rass Floor M ounted H inges 26D or A ntique B rass Locks

Y ale/C ourt is M edeco core w ith Y ale locks - M ust be coded under building m aster

D oor O penings Lever H andle

Fire A larm

S ystem

N otifier system

- C ontractor m ust be N otifier - qualified to m odify the system devices, adding new , m oving existing, etc.

C orridors/Elevator Lobbies

D oors

S ee door standards above

Light Fixtures 2 X

2 and 2 X 4 P recision/P aragon - R

D S type (2 lam

p) or sim ialer. (Lam p Type for 2X

2 is F17T8641)

A fter hours lighting control system

C onnected to the B

A S

, during renovations, all lights m ust be tied into the A

P C

D D

C building controlled system . E nsure em ergency/courtesy lights left in space

P aint

To be approved by property m anager

W all coverings

V inyl, Type II, V ersa P attern D

40-002, w idth 52/54", 20 oz. per square yard

C arpet

20 oz., Tufted, textured loop, 36 X 36 inches - M illiken A ttitudes style or equal - C olor to be approved by property m anager

C arpet trim

/border 28 oz., tufted, textured loop, 50 cm

X 50 cm

, M illiken In C olor style or equal C olor to be approved by property m anager

E levator Lobby B orders M illiken solid colors, either black, gray or to m atch carpet on floor C olor to be approved by property m anager B ase B urke 523 B lack/B row n rubber or equal

C orner G uards Im pact resistent from K enm ark - color to m atch adjoining surface and m ust be approved by building m anager

S ignage

To m atch building standard signage, A

S I S ign S ystem s S prinker H eads

C eiling Tiles

2 X 2 #347 non directionsl 5/8" thick

R estroom s Fixtures

A m erican m ade fixtures/A

D A accessible Toilet P aper H olders

C ustodial C ontractor to provide P aper Tow el H olders C ustodial C ontractor to provide

C eilings

P laster

C olors

M R

R

- grey/blue W

R R

- m auve/grey

Floors 12 X

12 ceram ic tile

W alls

12 X 12 ceram ic tile w ainscotting/vinyl to ceiling

Light Fixtures 1 X

4 fluorescent - cool w hite

O ffice Space

P aint

A gency to determ ine colors and type C eiling Tiles 2X

2 #347 non directional 5/8" thick C row n M olding S tain grade 5" w ood

P lastic C eiling Trim 1" w idth - color varies D oors S ee above standards

Light Fixtures 2X

2 and 2X 4 P recision/P aragon - R

D S type (2 lam

p) or sim ilar (Lam p Type for 2X

2 is F17T8641)

Light Tubes cool w hite, phillips/alto fluorescents Light S ensors M otion or sound - ultrasound

E xit Lights

LE

D red slim linew hite face, red lettering connected to em ergency rise, absolutely no batteries installed

A fter H ours lighting control system C onnected to B A

S , furind renovations all lights m ust be tied into the A P

C D

D C building controlled system

. E nsure em ergency/courtesy lights are left in space C arpet Tile 28 ounce, carpet squares only unless in C ourtroom s.

W all B ase 4" B lack/B row n B urke continuous roll or equal

A bove S tandard Item s, include but not lim ited to - M aintained at A gency expense

D im m er sw itches, fans, light sensors, alternate light fixtures and light bulbs, private restroom s, jury room s, break room s - all fixtures for sinks and com m odes are considered agency ow ned item

s. In order to be consistent w ith the building supplies, install building standard paper tow el and toilet paper holders, otherw ise, agency could be responsible for supplying the type that fits w hat w as installed.

E lectrical service

A ll hom e runs from the panel to J-boxes on the floor m ust be don in 3/4" E M

T or better. A

LL

P A

N E

L S C

H E

D U

LE

S

S H

A

LL B

E U

P D

A

TE

D

K ey W ays A ll blanks are Y ale, 6 pin, R

N

1st floor through 6th floor G

A 7th floor through 12th floor

G B

13th floor through 14th floor G

D

15th floor through 16th floor G

V S tairw ell keys - 100

G C

Janitors' closets 1100 &

G C

G rand M aster K ey

Y ale, 6 pin, R

N 11 G

B reakroom s - K itchens

D oors

S ee standards above

E lectrical

O utlets around sinks m ust be G

FI

Fixtures A m erican m ade D isposals P

R O

H

IB

ITE

D

Flooring C

T or V C

T is approved for agency choice C ove B ase

4" rubber rolled style - B urke rubber or equal

H V

A C

C onnected to the 24 hour chilled w ater loop

S upplem ental U nits

C onsidered agency ow ned and all utilities and m aintenance m ust be paid for by the agency on an annual basis. G

S A w ill com plete estim ates for this inform ation. P roject M anager m ust inform the P roperty M anager w hen an agency has a supplem ental unti in their alterations.

S upplem ental unit installation inform ation

B uilding standard control points: start/stop, S tatus (C T not D

P ), S pace Tem p, S upply air tem o, and C ontrol V alve. 5 control points estim ated at $1,000 per point. Trane B

C X

V series fan coils, requires hot taps, type "L" copper in on C H

W supply and returns, type "M dedicated electrical

C ard R eaders

H

IR

S C

H approved installer. If an agency installs card readers to its doors, it is in colntrol if tis ow n system

. A gency w ill need a stand alone com puterand printer for printing the cards.

The building perim eter card readers are all H

IR

S

C H

DC 15-15 USDC (1376) 06/06/2017 00 01 02 - 3

PART 3 EXECUTION (NOT USED)

END OF SECTION

USDC 15‐15 100% FINAL SUBMITTAL

1376 CHAMBERS REMODEL GS‐P‐07‐16‐UA‐7005

13TH FLOOR

DC 15-15 USDC (1376) 06/06/2017 00 01 10 - 1

Dallas, TX

TABLE OF CONTENTS

SPECIFICATIONS

DIVISION 00 – INTRODUCTORY INFORMATION

00 01 02 Project Information

00 01 07 Seal's Page 00 01 10 Table of Contents

DIVISION 01 -- GENERAL REQUIREMENTS

01 14 00 GSA Work Restrictions

01 21 00 Allowances

01 25 00 GSA Substitution Procedures

01 29 00 GSA Payment Procedures

01 31 20 GSA Critical Path Method Scheduling for Small Projects

01 32 00 Construction Progress Documentation

01 33 00 GSA Submittal Procedures

01 40 00 GSA Quality Assurance and Control

01 59 30 GSA Security Regulations

01 59 50 GSA Safety & Health

01 60 00 GSA Product Requirements

01 61 16 Volatile Organic Compound VOC Content Restrictions

01 70 00 GSA Execution Requirements

01 73 20 GSA Selective Demolition

01 74 10 GSA Construction Indoor Air Quality Requirements

01 74 19 GSA Construction Nonhazardous Waste Management and Disposal

01 77 00 GSA Closeout Procedures

01 91 13 GSA Commissioning

DIVISION 02 -- EXISTING CONDITIONS

02 41 00 Demolition

DIVISION 03 -- CONCRETE (NOT USED)

DIVISION 04 -- MASONRY (NOT USED)

DIVISION 05 -- METALS (NOT USED)

DIVISION 06 -- WOOD, PLASTICS, AND COMPOSITES

06 10 00 Rough Carpentry

06 20 00 Finish Carpentry

DC 15-15 USDC (1376) 06/06/2017 00 01 10 - 2

06 41 00 Architectural Wood Casework

DIVISION 07 -- THERMAL AND MOISTURE PROTECTION

07 92 00 Joint Sealants

DIVISION 08 – OPENINGS

08 14 16 Flush Wood Doors and Frames

08 71 00 Door Hardware

08 71 00.08 Door Hardware Schedule

DIVISION 09 -- FINISHES

09 05 61 Common Work Results for Flooring Preparation

09 21 16 Gypsum Board Assemblies

09 30 00 Tiling

09 51 00 Suspended Acoustical Ceilings

09 65 00 Resilient Flooring

09 68 13 Tile Carpeting

09 91 23 Interior Painting

DIVISION 10 – SPECIALTIES

10 28 00 Toilet Bath and Laundry Accessories

DIVISION 11 -- EQUIPMENT (NOT USED)

DIVISION 12 – FURNISHINGS

12 21 13 Horizontal Louver Blinds

12 36 00 Countertops

DIVISION 13 -- SPECIAL CONSTRUCTION (NOT USED)

DIVISION 14 -- CONVEYING EQUIPMENT (NOT USED)

DIVISION 21 -- FIRE SUPPRESSION

21 05 00 Fire Suppression General Requirements

21 05 10 Fire Suppression System

DIVISION 22 – PLUMBING

22 01 30 Plumbing System Cleaning and Testing

22 05 00 Plumbing General Requirements

22 05 23 Plumbing Valves

DC 15-15 USDC (1376) 06/06/2017 00 01 10 - 3

22 05 29 Plumbing System Hangers and Supports

22 07 00 Pipe Insulation (Plumbing)

22 11 16 Domestic Water Piping

22 11 19 Plumbing Specialties

22 13 16 Sanitary Waste and Vent Piping

22 33 00 Electric Domestic Water Heaters

22 40 00 Plumbing Fixtures

DIVISION 23 -- HEATING, VENTILATING, AND AIR-CONDITIONING

23 05 00 Basic Mechanical Materials and Methods

23 05 29 Hangers and Supports for HVAC Piping and Equipment

23 05 93 Testing, Adjusting, and Balancing for HVAC

23 07 00 Duct Insulation

23 31 13 Metal Ducts

23 33 00 Air Duct Accessories

23 37 13 Diffusers, Registers and Grilles

DIVISION 26 -- ELECTRICAL

26 05 00 Basic Electrical Materials and Methods

26 05 20 Conductors and Cables

26 05 30 Raceway and Boxes for Electrical Systems

26 05 40 Wiring Devices

26 05 60 Grounding and Bonding for Electrical Systems

26 05 75 Identification for Electrical Systems

26 47 00 Panelboards

26 47 50 Safety Switches, Fuses and Enclosed Circuit Breakers

26 51 00 Interior Lighting

26 53 00 Lighting Control Devices

26 72 00 Fire Alarm System

26 95 10 Electrical Cleaning and Testing

DIVISION 27 – COMMUNICATIONS (NOT USED)

DIVISION 28 – SAFETY/SECURITY (NOT USED)

DC 15-15 USDC (1376) 06/06/2017 00 01 10 - 4

END OF TABLE OF CONTENTS

DC 15-15 USDC (1376) 06/06/2017 01 14 00 - 1

SECTION 011400

WORK RESTRICTIONS

PART 1 - GENERAL

1.1 CONTRACTOR USE OF PREMISES

A. The Contractor will review and document the existing conditions surrounding the project premises. Provide documentation to the Government prior to the commencement of any construction activity.

B. During the construction period, the Contractor shall have full use of the designated premises for construction operations, including full use of the indicated work site, limited only by the Government's right to perform work or retain other contractors to perform work on portions of the project.

C. The Contractor shall limit use of the premises to the work in areas indicated, and to allow for Government occupancy and public use.

1. Confine operations at the site to areas indicated. Do not disturb portions of the site beyond the areas in which Work is indicated.

2. Keep driveways and entrances serving the premises clear and available at all times to the Government, Government employees and to visitors. Do not use these areas for parking or storage of materials.

3. Schedule deliveries to minimize space and time requirements for storage of material and equipment on site.

4. Maintain existing building in a safe and weather-tight condition throughout the construction period. Repair damage caused by construction operations to the satisfaction of the government. Take precautions to protect the building, its occupants and the public during the construction period. A representative of the Contractor shall be available to arrive on site within one (1) hour of notice should an emergency occur.

5. Keep public areas, such as hallways, stairs, lobbies and toilet rooms, free from accumulation of waste material, rubbish, construction debris and construction materials.

6. Space on the premises will be made available for the Contractor's storage and related activities, provided that its use will not interfere with operations of the Government.

Arrange and gain approval for use of this space through the Contracting Officer.

7. Use of the existing loading dock facilities will be shared with Government activities on a first-come-first-served, wait-your-turn basis. The loading dock is available for the delivery of materials, tools, and supplies between the hours of 6am and 6pm. Contractor shall coordinate delivery of materials and goods with GSA prior to arrival.

8. Existing materials and equipment that are removed as part of the construction operations, and that are not reused or designated to be salvaged as Government property, shall become the property of the Contractor and shall be removed from the site. Storage or sale of excess salvageable materials and equipment is not permitted on site.

9. Pollution producing equipment shall not be located near air intakes where airborne smoke or fumes could be drawn into the building. When not required for powering unloading operations, turn off engines when docked.

10. Smoking is not permitted in or around the building, see Facilities Management Regulation (FMR) Case 2008-102—3. Also see Code of Federal Regulations (CFR) 41 CFR Part 102-74.

13TH FLOOR

DC 15-15 USDC (1376) 06/06/2017 01 14 00 - 2

Dallas, TX

11. No parking will be available on site during working hours for building occupants. The Contractor and Contractor's employees shall make their own arrangements for vehicle parking off site.

12. Cell Phones: Contractor is to provide company cell phone during this contract. All cell phones to be “on vibrate” at all times. If a telephone begins audibly ringing, the building guards will take the cell phone and hold until the end of the working day prior to the con-tractor leaving the property. Cell phones are only permitted in construction area and contractor’s office space.

13. No apparatus with an open flame is allowed to be used within the facility without the prior receipt of a burn permit. Contact the Field Office to obtain burn permits. Burn permits are required for each separate occurrence.

14. Permits: Refer to FAR 52.236-7

15. The work shall be sequenced to minimize disruption to building occupants, visitors, and maintenance activities. To the greatest extent feasible, demolition work should not take place until supplies are on hand to perform new work.

16. Coordinate with the GSA Building Manager and the COR for site access.

17. Coordinate with the GSA Building Manager and the COR on correct response procedures for any building system alarms occurring during or resulting from the construction process.

18. All building systems outside the immediate construction area shall be kept fully operational during normal working hours.

19. Protect building site from flying debris.

20. Cameras are not permitted on the premises.

1.2 GOVERNMENT OCCUPANCY

A. The Government will occupy the site and the existing building during the entire period of construction. Cooperate with the Government's representatives during construction operations to minimize conflicts, mitigate noise, and facilitate Government usage. Perform the Work in a manner that does not interfere with the Government's operations.

B. The Government reserves the right to occupy, place, and install equipment in completed areas of the building prior to Substantial Completion, provided such occupancy does not interfere with completion of the Work. The Government's installation of equipment and partial occupancy shall not constitute acceptance of the total Work.

1. Prior to partial Government occupancy, mechanical and electrical systems for the space shall be fully operational, and required inspections and tests shall be successfully completed. Upon occupancy, the Government will operate and maintain mechanical and electrical systems serving the occupied portions of the building.

2. Upon occupancy, the Government will assume responsibility for maintenance and custodial service for the occupied portions of the building.

1.3 WORKING HOURS

A. Refer to Section 2 of the SOW.

13TH FLOOR

DC 15-15 USDC (1376) 06/06/2017 01 14 00 - 3

Dallas, TX

A. Work accomplished during Government Unoccupied Hours shall be performed at no additional cost to the Government. Contractor shall submit a proposed schedule and gain GSA approval at least 72 hours before proceeding with any work during Government Unoccupied Hours.

B. Weekend/After Hour’s Access Procedures: Provide Government picture ID and access request for after-hours work to be admitted, worker must have proper badge and be included on work list.

PART 2 - PRODUCTS (Not Applicable)

PART 3 - EXECUTION (Not Applicable)

END OF SECTION 01 14 00

remove remaining ...

13TH FLOOR

DC 15-15 USDC (1376) 06/06/2017 01 21 00 - 1

Dallas, TX

SECTION 01 21 00

ALLOWANCES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. The Government is providing the references included in this sub-section for information purposes only and is not intended to provide a comprehensive, all-inclusive list of any and all potentially relevant portions of the Contract Documents. Drawings and general provisions of the Contract, including Federal Acquisition Regulations (FAR) and General Services Administration Acquisition Regulations (GSAR) contract clauses, and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements governing allowances.

1. Certain items are described in the Contract Documents as allowance items. The purpose of allowance items is to defer selection of actual products and systems to a later date when direction will be provided to the Contractor. The GSA Contracting Officer will issue Modifications to incorporate allowance items in the Work after actual products and systems have been determined.

B. Types of allowance items may include the following :

1. Lump-sum allowance items.

2. Unit-price allowance items.

3. Quantity allowance items.

1.3 SELECTION AND PURCHASE

A. At the earliest practical date after award of the Contract, the contractor shall advise the GSA of the date when final selection and purchase of each product or system described by an allowance item must be completed to avoid delaying the Work. Allowances must be included in all schedule submissions

1.4 ACTION SUBMITTALS

A. Submit proposals for products or systems described by allowance items in the form specified for Change Orders.

1.5 INFORMATIONAL SUBMITTALS

A. Submit copies of invoices or delivery slips to show actual quantities of materials delivered to the site for use in fulfillment of each unit-price and quantity allowance item.

B. Coordinate and process submittals for allowance items in same manner as for other portions of the Work.

13TH FLOOR

DC 15-15 USDC (1376) 06/06/2017 01 21 00 - 2

Dallas, TX

1.6 COORDINATION

A. Coordinate allowance items with other portions of the Work. Furnish templates as required to coordinate installation.

B. Modifications based on an allowance item shall include cost to Contractor of specific products and systems selected by the contracting officer under allowance and shall include taxes, freight, delivery to Project site, Contractor's costs for receiving and handling at Project site, labor, installation, overhead, and profit.

1. If requested by GSA, purchase additional quantities under unit-price or quantity allowances and prepare unused material for storage as directed by GSA. Deliver unused material to GSA defined storage space and/or as directed.

1.7 ADJUSTMENT OF ALLOWANCE ITEMS

A. Modifications to an allowance item shall comply with the changes clauses and any other contract modifications procedures found in the Contract Documents.

B. GSA reserves the right to establish the quantity of work-in-place by independent quantity survey, measure, or count.

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION

3.1 EXAMINATION

A. Examine products covered by an allowance item promptly on delivery for damage or defects.

Return damaged or defective products to manufacturer for replacement.

3.2 PREPARATION

A. Coordinate materials and their installation for each allowance item with related materials and installations to ensure that each allowance item is completely integrated and interfaced with related work.

3.3 SCHEDULE OF ALLOWANCE ITEMS

END OF SECTION 01 21 00

NA

13TH FLOOR

DC 15-15 USDC (1376) 06/06/2017 01 25 00 - 1

Dallas, TX

SECTION 01 25 00

SUBSTITUTION PROCEDURES

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. The Government is providing the references included in this sub-section for information purposes only and is not intended to provide a comprehensive, all-inclusive list of any and all potentially relevant portions of the Contract Documents. Drawings and general provisions of the Contract and other Division 01 Specification Sections, apply to this Section.

1.2 SUMMARY

A. Section includes administrative and procedural requirements for substitutions.

B. Related Sections:

1. Division 01 60 00 Section "Product Requirements" for requirements for submitting comparable product submittals for products by listed manufacturers.

2. Divisions 02 through 26 Sections for specific requirements and limitations for substitutions.

1.3 DEFINITIONS

A. Substitutions: Proposed changes to the Contract Documents by the Contractor for products, materials, equipment, and methods of construction.

1. Substitutions for Cause: Changes proposed by Contractor that are required due to changed Project conditions, such as unavailability of product, regulatory changes, or unavailability of required warranty terms

2. Substitutions for Convenience: Changes proposed by Contractor or Owner that are not required in order to meet other Project requirements but may offer advantage to Contractor or Owner

1.4 SUBMITTALS for Cause or Convenience:

A. Substitution Requests: Per Submittal Procedures Section 013300 submit electronic copies of each request for consideration. Identify product or fabrication or installation method to be replaced. Include Specification Section number and title and Drawing numbers and titles.

1. Substitution Request Form: Coordinate with GSA for approved form.

2. Documentation: Show compliance with requirements for substitutions and the following, as applicable:

a. Coordination information, including a list of changes or modifications needed to other parts of the Work and to construction performed by the Government and separate contractors that will be necessary to accommodate proposed substitution.

b. Detailed comparison of significant qualities of proposed substitution with those of the Work specified. Include annotated copy of applicable specification section.

Significant qualities may include attributes such as performance, weight, size, durability, visual effect, sustainable design characteristics, energy and resource performance goals, warranties, and specific features and requirements indicated.

Indicate deviations, if any, from the Work specified.

13TH FLOOR

DC 15-15 USDC (1376) 06/06/2017 01 25 00 - 2

Dallas, TX

c. Product Data, including drawings and descriptions of products and fabrication and installation procedures.

d. Samples, where applicable or requested.

e. Certificates and qualification data, where applicable or requested.

f. List of similar installations for completed projects with project name, location and contact information of owner and architect/engineer of record.

g. Material test reports from a qualified testing agency indicating and interpreting test results for compliance with requirements indicated.

h. Research reports evidencing compliance with building code in effect for project, when applicable for the proposed substitution.

i. Detailed comparison of Contractor's construction schedule using proposed substitution with products specified for the Work. If specified product or method of construction cannot be provided within the Contract Time, include letter from manufacturer, on manufacturer's letterhead, stating date of receipt of purchase order, lack of availability, or delays in delivery. Provide a schedule fragment with a time impact analysis to allow the Government to consider the proposed substitution.

j. Cost information, including a proposal of change, if any, in the Contract Sum.

k. Proposed substitution complies with requirements in the Contract Documents except as indicated in substitution request, is compatible with related materials, and is appropriate for applications indicated.

l. The Contracting Officer may require the Contractor to provide a contractor's waiver of rights to additional payment or time that may subsequently become necessary because of failure of proposed substitution to produce indicated results.

3. The Contracting Officer or Contracting Officer’s Representative (CO) or (COR) Action: If necessary, the Contracting Officer or COR will request additional information or documentation for evaluation. The Contractor shall be entitled to receive notice of action on submittals within a reasonable time, given the volume or complexity of the submittals and the criticality of the affected activities to Substantial Completion as may be indicated in the Project Schedule. The Contractor shall not be entitled to receive notice of action on submittals containing variations from Contract requirements in less than twenty working days.

1.5 Failure by the government to respond does not constitute acceptance of the proposed substitution.

1.6 QUALITY ASSURANCE

A. Compatibility of Substitutions: Investigate and document compatibility of proposed substitution with related products and materials. Engage qualified testing agency to perform compatibility tests recommended by manufacturers.

1.7 PROCEDURES

A. Coordination: Modify or adjust affected work as necessary to integrate work of the approved substitutions.

13TH FLOOR

DC 15-15 USDC (1376) 06/06/2017 01 25 00 - 3

Dallas, TX

PART 2 - PRODUCTS

2.1 SUBSTITUTIONS

A. Substitutions for Cause: Submit requests for substitution immediately upon discovery of need for change, but not later than 10 days prior to time required for preparation and review of related submittals.

1. Conditions: The Contracting Officer (CO) will consider Contractor's request for substitution when the following conditions are satisfied. If the following conditions are not satisfied, the Contracting Officer (CO) will return requests without action, except to record noncompliance with these requirements:

a. Requested substitution is consistent with the Contract Documents and will produce indicated results.

b. Substitution request is fully documented and properly submitted.

c. If requested substitution involves schedule impact Contractor has identified time impact and a mitigation plan. .

d. Requested substitution has received necessary approvals of authorities having jurisdiction.

e. Requested substitution is compatible with other portions of the Work.

f. Requested substitution has been coordinated with other portions of the Work.

g. Requested substitution provides specified warranty.

h. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.

B. Substitutions for Convenience: The Contracting Officer (CO) will consider requests for substitution if received within 10 days after Notice to Proceed. Requests received after that time may be considered or rejected at discretion of the Contracting Officer (CO) or the Contracting Officer Representative (COR).

1. Conditions: The Contracting Officer will consider Contractor's request for substitution when the following conditions are satisfied

a. Requested substitution offers the Government a substantial advantage in cost, time, energy conservation, or other considerations, after deducting additional obligations the Government incurs.

b. Requested substitution does not require extensive revisions to the Contract Documents.

c. Requested substitution is consistent with the Contract Documents and will produce indicated results.

d. Substitution request is fully documented and properly submitted.

If requested substitution involves schedule impact Contractor has identified time impact and a mitigation plan.

e. Requested substitution has received necessary approvals of authorities having jurisdiction.

f. Requested substitution is compatible with other portions of the Work.

g. Requested substitution has been coordinated with other portions of the Work.

h. Requested substitution provides specified warranty.

i. If requested substitution involves more than one contractor, requested substitution has been coordinated with other portions of the Work, is uniform and consistent, is compatible with other products, and is acceptable to all contractors involved.

PART 3 EXECUTION (Not Used)

13TH FLOOR

DC 15-15 USDC (1376) 06/06/2017 01 25 00 - 4

13TH FLOOR

DC 15-15 USDC (1376) 06/06/2017 01 29 00 - 1

Dallas, TX

SECTION 012900

PAYMENT PROCEDURES

PART 1 - GENERAL

1.1 SUMMARY

A. This Section specifies administrative and procedural requirements necessary to prepare and to process Requests for Payment.

1.2 DEFINITIONS

A. Schedule of Values: A detailed written statement (masterformat) furnished by the Contractor outlining the portions of the contract sum, which allocates values (price & percentage) for the various parts of the work and used as the basis for payment application and reviewing progress payments.

The Agreement provides further details.

B. Request for Payment: A contractor’s invoice and request for progress payment with substantiating information consistent with approved schedule of values.

1.3 SCHEDULE OF VALUES

1. Coordination: Submit completed Schedule of Values no later than (14) fourteen calendar days prior to scheduled date of initial Requests for Payment.

2. Identification: Complete the following Project Identification fields in the Schedule of Values:

a. Project Name

b. Project Number

c. Project Location, City, State

d. Base Contract Number

e. Task Order Number

f. Modification Number

g. GSA Project Manager

h. Contractor's Name and contact information

i. Date of submittal

3. Provide a breakdown of the Contract Sum in enough detail to facilitate continued evaluation of Requests for Payment and progress reports.

a. Work activity – (by division or specific work activity)

b. Dollar value of each specific work activity – both with an amount in dollars and whole cents, and as a percentage of the Contract Sum to nearest one-hundredth percent.

Adjust the amounts to total to the Contract Sum and the percentages to total 100 percent.

c. Each item in the schedule of values and Requests for Payment shall be complete.

Include total cost and proportionate share of general overhead and profit for each item.

(i.e. no stand alone item for Overhead, and Profit)

d. Modifications that affect value.

e. Update affected work branches and subordinate line items and

f. resubmit the schedule of values before the next Request for Payment when

Modifications result in a change in the Contract Sum

g. Line item for mobilization and de-mobilization

h. Line item for close out (% to be negotiated with GSA)

4. Options: Provide a separate Schedule of Values for each exercised Option.

13TH FLOOR

DC 15-15 USDC (1376) 06/06/2017 01 29 00 - 2

Dallas, TX

5. Each item in the Schedule of Values and Requests for Payment shall be complete. Temporary facilities and other major cost items that are not direct cost of actual work-in-place may be shown either as separate line items in the schedule of values or distributed as general overhead expense, at the government's option.

6. Revise and update workbook with all items affecting scope, schedule or cost and resubmit within (14) fourteen calendar days as coordinated with project manager or contracting officer.

Contractor shall provide a final as-built schedule at project completion. Update affected work branches and subordinate line items and resubmit the schedule of values before the next Request for Payment when Modifications result in a change in the Contract Sum

1.4 REQUESTS FOR PAYMENT

A. Requirements for Requests for Payment are in Section III, Terms and Conditions of the Agreement.

13TH FLOOR

DC 15-15 USDC (1376) 06/06/2017 01 29 00 - 3

Dallas, TX

PART 2 - PRODUCTS (Not Used)

PART 3 - EXECUTION (Not Used)

DC 15-15 USDC (1376) 06/06/2017 01 31 20 – 1

SECTION 01 31 20

CRITICAL PATH METHOD SCHEDULING

PART 1 - GENERAL

1.01 SUMMARY

C. The purpose of the Project Schedule shall be to:

1. Plan the project and communicate that plan.

2. Provide the status and forecast the timely completion of the work.

3. Record the actual start dates, actual finish dates and actual sequence of the work.

4. Ensure adequate planning, staffing, scheduling and reporting during execution of the Work by the Contractor;

5. Ensure coordination of the Work among all affected parties;

6. Assist the Contractor and GSA in the preparation and evaluation of the Contractor’s monthly progress payments; and

7. Assist the Contractor and GSA in monitoring the progress of the work, and evaluating proposed changes to the Contract and/or requests for additional time to Project Completion.

1.02 RELATED SECTIONS

A. The Government is providing the references included in this sub-section for information purposes only and is not intended to provide a comprehensive, all-inclusive list of any and all potentially relevant portions of the Contract Documents. Drawings and provisions of the Contract including General and Supplementary Conditions apply to this Section as if repeated herein.

B. Section 012900 – Payment Procedures C. Section 013200 – Construction Progress Documentation

1.03 DEFINITIONS

A. Definitions applicable to this Section include the following:

1. Activity - An element of the Work or task performed during the course of the project. Each schedule activity shall be a clearly defined, manageable and monitorable task depicting an estimated duration and an estimated cost. Each activity shall be limited to one trade unless the GSA specifically approves otherwise on an exception basis.

2. Baseline Schedule - The original work plan approved by GSA as the Project Schedule depicting the contractor’s plan to prosecute the work.

3. Constraint - A scheduling restriction imposed on the start, finish or float of an activity. No constraints will be allowed. Exception: for projects with limited or no storage areas requiring “just in time” deliveries, a zero free float may be acceptable.

4. Critical Path - The Project critical path is defined as the longest, continuous path of interrelated activities depicting project work from Notice To Proceed (NTP) to project completion. All reports and graphics indicating the Critical Path shall depict the longest path of interrelated activities. Unless otherwise approved by GSA, the Baseline Schedule Critical Path shall use all allotted Contract time. The contractor has the right to develop a schedule that forecasts an early finish. However, all time between the forecasted early finish of substantial completion and the contractual substantial completion date shall be shown as float and shall be available to the Project team.

DC 15-15 USDC (1376) 06/06/2017 01 31 20 – 2

5. Critical Path Method (CPM) - A scheduling technique using activities, durations, and interrelationships/dependencies (logic), such that all activities are interrelated with logic ties from the beginning of the project to the completion of the project. There shall be no open ended relationships in the schedule. All activities shall have at least one successor with a finish relationship (“finish to start” or “finish to finish”) except the last activity in the network.

6. Data Date - The date to which progress is updated. In most scheduling software, the data date represents the next day of work and all progress is updated through the day prior to the data date.

7. Float – is the difference between the forecasted early dates and the forecasted late dates; the amount of time an activity can be delayed without delaying the Substantial Completion Date.

Float is considered a project commodity jointly shared between GSA and the Contractor and shall be used in the best interest of completing the Project on time. The critical path is not dependent on float. Float is calculated after the critical (longest) path has been determined.

8. Float Suppression – the masking of available float through the use of constraints, unreasonable logical relationships or unreasonable durations. Float suppression techniques are not allowed. On an exception basis, the use of a zero free float constraint to depict “just in time” deliveries on projects with little or no storage might be acceptable.

9. Network Plan - The Network Plan is the entire database of activities, logic, durations, and all items relating to any activity input into the scheduling software and is the complete representation of the Project Schedule prepared using the Critical Path Method and graphically shown in a time-scaled form. The network shows the sequence and interdependence of the activities, and planned and actual progress by activity, required for complete performance of the Work.

10. Project Schedule - The Project Schedule includes the Preliminary Schedule (submitted at bid or as determined by the CO), the approved Baseline Schedule (developed based on the Preliminary Schedule), and all subsequent Schedule Updates, Schedule Revisions, Recovery Schedules, and As-Built Schedule.

11. Recovery Schedule – A schedule depicting the Contractor's plan for recovery of time lost on the project.

12. Schedule Revision - A schedule in which the plan for the work is revised. A Schedule Revision is required when the current schedule no longer represents the actual or planned prosecution of the Work.

13. Schedule Update - A schedule in which only actual start dates, actual finish dates and duration percent complete is updated from the prior data date to the current data date. No revisions will be permitted in a Schedule Update (i.e. added activities, deleted activities, logical relationships, etc.).

14. Time Impact Analysis - A technique to demonstrate the effect of a schedule revision or proposed revision against the current approved Project Schedule.

15. Total Float - The amount of time an activity (or chain of activities) can be delayed without affecting the Project Substantial Completion Date.

16. Working Day - A Working Day is a calendar day scheduled for active prosecution of the work.

1.04 CRITICAL PATH METHOD SCHEDULE

A. Provide a detailed, time-scaled computer generated Project Schedule with activities representing each portion of the Work for the entire Contract Performance Period. The Project Schedule shall use the Critical Path Method (CPM) for the planning, scheduling and reporting of the work to be performed under the contract.

B. No unspecified constraints, float suppression techniques, or use of activity durations, logic ties and/or sequences deemed unreasonable by GSA shall be used in the Project Schedule.

C. As defined by the Contract, the entire project performance period shall establish the Project

Substantial Completion Date which shall be used in the planning and presentation of the

DC 15-15 USDC (1376) 06/06/2017 01 31 20 – 3

Contractor’s Project Schedule. GSA reserves the right not to approve any schedule deemed to have an unrealistic forecasted Substantial Completion Date. Government approval of an early completion Project Schedule shall not modify the Contractual Substantial Completion Date or Project Completion Date. The time difference between the Contractor’s planned Substantial Completion Date and the Contract directed Substantial Completion Date shall be considered Project Float, jointly owned and for the mutual use of both the Contractor and GSA.

1.05 SUBMITTALS and MEETINGS

A. Project Schedule Requirements Meeting:

1. The Contractor shall meet with GSA within 7 calendar days after Notice to Proceed to conduct a joint review of the Project Schedule requirements in this Section.

B. Preliminary Schedule:

Within 14 calendar days of Notice to Proceed, Contractor shall submit a Preliminary Schedule detailing the complete scope of work and proposed logical relationships. All owner furnished equipment and materials shall be identified with dates needed to be received by the contractor.

1. Within 14 calendar days of receipt by the GSA of the Preliminary Schedule, the Contractor and GSA shall meet to discuss the results of GSA's schedule review. To the extent that revisions are required, the Contractor shall resubmit the Preliminary Schedule to the GSA for approval within seven (7) calendar days of receipt of the GSA's comments.

C. Baseline Project Schedule

Schedule activities shall be cost loaded in whole dollars and the assigned dollar value (cost-loading) of each activity of the Network shall cumulatively equal the specified Bid Item Breakdown and Total Contract Amount.

For any items that the Contractor intends to bill for stored materials (when allowed by contract), these items need to be shown as separate “material procurement” activities in the schedule and the material dollars only placed on these activities. Billing for stored materials on any other schedule activities not broken out in this manner will not be allowed.

Include an activity code field “SOV” for the coding of each schedule activity with the schedule of value (SOV) line items; this is for the tabulation and summarization of contractor assigned cost-loading Schedule of Values for application of Progress Payment Request reporting.

1. The Contractor shall submit the Baseline Project Schedule within 7 calendar days after approval of the Preliminary Schedule. The Baseline Schedule shall be the Contractor's detailed plan for ALL work from NTP through contract completion. All punchlist work shall be completed to, or prior to, the Contract Completion Date.

2. Unless otherwise approved by the GSA, the Project Schedule shall include, but is not limited to, the following items [Edit each one for your specific project requirements]:

a. Activities necessary to depict time to prepare submittals, time for the GSA to review

DC 15-15 USDC (1376) 06/06/2017 01 31 20 – 4

submittals, procurement, design, construction, third party inspections, close-out, start-up, testing and balancing, commissioning and turnover, and work by separate contractors.

b. The schedule shall include separate activities for the submittal, review, procurement or fabrication, and delivery of key and long-lead items. The Project Schedule shall indicate submittal dates, and depict the review period as defined in the Contract or Supplementary Provisions for A/E/GSA review. Procurement/submittal activities shall be assigned codes that will allow these activities to be sorted and printed separately from the construction/close-out/commissioning work activities.

c. The Baseline Schedule shall have a Data Date no later than NTP, and no activities shall be progressed to show work completed to date without prior acceptance of the GSA.

d. Activity descriptions of the work shall include area designators sufficient to identify where the Work will occur. The work related to each Activity shall be limited to one work trade and one area.

e. Interrelationships (logic) and sequencing for ALL activities. Each activity shall have at least one successor (except for the last activity) relationship to form a logically connected Network Plan from NTP to the Contract Completion Date. Each activity shall have at least one successor with a finish relationship (finish-to-start or finish-to-finish relationship).

f. Activity durations shall be in units of whole work days. Except submittal and procurement activities, durations shall not exceed one reporting period [Team define i.e. month)]____ (User Defined #6) unless approved by the GSA. Durations for Government submittal reviews shall meet the requirements set forth in the Contract Documents. Activity durations shall not be overly short. One day durations shall not be assigned unless specifically requested by the contractor and specifically accepted by the GSA. Activity durations are expected to be between one week and one month, however shorter or longer durations can be assigned as needed to properly plan and coordinate the work.

g. Contractual milestone events as defined in the Contract Documents including, but not limited to, phased work, work restrictions/access/shift work, and work being performed by separate contractors shall be included in the schedule. The substantial completion and project completion tasks shall be assigned to a seven (7) day work week calendar.

h. ALL activities shall at a minimum be coded by Area, Responsibility (trade/ subcontractor), and Phase . Additional codes are allowed to sufficiently identify where work will occur.

Codes shall be a maximum of six (6) characters and abbreviations shall be fully described in the Project Schedule narrative. The Contractor’s self-performed work shall be clearly identifiable.

D. Baseline Schedule Review Process and Submittal Requirements

1. The GSA will review the Baseline Schedule and provide comments to the Contractor within 7 calendar days of receipt of submittal and, if needed, will arrange for a Baseline Schedule Review Meeting with the Contractor for discussion of the schedule. The Baseline Schedule, when approved, shall become the basis for the next monthly Schedule Update submitted by the Contractor.

a. Baseline Schedule Review Meeting. The Contractor shall present the Baseline Schedule to GSA at the review meeting, and describe the Contractor's means and methods for accomplishing the Work [include if required earlier: and the cost loading of the schedule.]

b. In the event that GSA provides comments or the Baseline Schedule does NOT meet the requirements of this specification, the contractor shall, within seven 7 calendar days, revise the Project Schedule to bring it into compliance with these requirements, and Contractor shall make a full Baseline Schedule submission for GSA’s review and approval.

c. Upon approval of the Baseline Schedule by the GSA, the cost-loaded values shown in the

DC 15-15 USDC (1376) 06/06/2017 01 31 20 – 5

Project Schedule and progress of activities will be used as a basis for determining progress payments. Monthly progress payments shall be based upon information developed using the current monthly Schedule Update. The computer generated cost report will be used by the GSA for verification of the Application for Payment submitted by the Contractor.

d. GSA's approval of the Baseline Project Schedule does not relieve the Contractor of responsibility whatsoever for the accuracy or feasibility of the Project Schedule, or of the Contractor’s ability to meet the Substantial Completion Date.