FBO Kodiak Temporary Mooring Solicitation_pkg_4-10-2024.pdf
PDF 5 MB Posted
- Solicitation number
- Not on record
About this file
This document is a solicitation for the USCG Kodiak Cutter Temporary Mooring. The U.S. Coast Guard is seeking a commercial lessor to provide temporary mooring for five cumulative Coast Guard vessels, including two vessels (CGC ALEX HALEY or CGC CYPRESS, and an SPC-TB Boat) that will be displaced starting January 2025 due to a construction project, and three additional vessels that will arrive incrementally beginning January/February 2025. The solicitation details the specific mooring requirements for the medium-sized cutter (225-282 ft), three Fast Response Cutters (175 ft each), and one SPC-TB boat, including specifications for fendering, electrical, water, and sewage services. The lessor must also provide laydown space, parking, and other support services. The temporary mooring lease is required from January 2025 through September 2027, with options to renew for an additional 2 years. The Coast Guard will fund all utilities and considers all offers, including those that can only berth some of the vessels. Offered space must meet government requirements for fire, safety, accessibility, and sustainability.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCG Kodiak Cutter Temporary Mooring Solicitation
Leased space must meet Government requirements for fire safety, accessibility, seismic, and sustainability standards per the terms of the Lease.
City, State: Kodiak, AK Temp Mooring Item Minimum Requirement Preferred/Optional
Items
One (1) medium sized CG Cutter between 225 FT and 282 FT in length
Moorings shall have sufficient vertical and horizontal load capacity to safely house cutter during typical Kodiak wind events. Cutter Specs are in Appendix A.
Timeframe Jan 2025 – Sep 2027 Moorage One (1) berth: 382 LF, 22 FT depth of water
Fendering
Mooring fendering shall meet or be substantially and functionally consistent with a minimum of ten (10) 5 FT x 10 FT diameter closed cell foam filled fenders at a 20 FT spacing and centered amidships along the berth.
Electrical Shoretie
Two (2) 450 VAC ‘Viking’ MIL-C24368 receptacles (female); 400A each, 60hz, 3 phase. These 2 receptacles shall be provided and installed by the lessor in accordance with Appendices B and C.
Water Shoretie ~1,100 gal/day; 1.5 in hose capable of 100 gal/min @ 30 PSI (min)
Sewage Shoretie ~9,000 gal/day service via one 4 in camlock connection or daily trucked vacuum service.
Three (3) Fast Response Cutters
Moorings shall have sufficient vertical and horizontal load capacity to safely house cutter during typical Kodiak wind events. Cutter Specs are in Appendix A.
Timeframe FRC #1: Jan 2025 – Sep 2027 FRC #2: Apr 2025 – Sep 2027 FRC #3: Oct 2025 – Sep 2027
Moorage Three (3) total berths:
175 LF each, 18 FT depth of water
Fendering
Mooring fendering shall meet or be substantially and functionally consistent with a minimum five (five) 3 FT x 8 FT closed cell foam filled fenders at a 20 FT spacing along each of the three FRC berths, centered amidships along each berth.
Electrical Shoretie
For each FRC: One (1) 450VAC, 200A, 60hz, 3 phase source provided via pigtails. These will be wired to CG provided isolation transformers as Government Furnished equipment in accordance with Appendices B and C.
City, State: Kodiak, AK Temp Mooring Item Minimum Requirement Preferred/Optional
Items
Water Shoretie For each FRC: ~1,100 gal/day; 1.5 in hose capable of 100 gal/min @ 30 PSI (min)
Sewage Shoretie For each FRC: ~1,500 gal/day; either (3) connected shoreties or trucked vacuum service every other day (each).
One (1) SPC-TB Boat
Timeframe Jan 2025 – Sep 2027 Moorage 48 LF
Electrical Shoretie One (1) 30A/120V shore tie
Cumulative Fleet Services Required beginning Jan 2025
Parking 75 Standard passenger vehicle parking spaces, including those needs of CG military, civilian and contractor personnel.
130 parking spaces
Storage & Lay-down
5,000 SF of laydown space on site for deliveries & equipment pre-staging CG controlled equipment and property including buoys as required.
10,000 SF of laydown space
Visitor allowance
Lessor shall allow authorized civilians to visit these CG ships to perform services that may be required by the ships. A list of authorized visitors will be provided by the CG on a monthly basis to facilitate any necessary security screenings. The intent of this requirement is to allow contractors to access the CG ships to perform maintenance work.
Electrical Isolation Transformer Installation
Four (4) portable 480V delta primary to 450V delta secondary electrical isolation transformers will be provided by the Coast Guard as Government Furnished Equipment.
The lessor is required to retain the services of a registered professional electrical engineer to design, and a qualified, licensed electrical contractor to install all four units in accordance with Appendix B and C.
Trash Four (4) 4-YD dumpsters for solid waste.
Dumpsters shall be serviced twice-weekly.
Full Term Homeport services beginning Jan 2025 through Sept 2027
Options to Renew 2 additional years from Oct 2027 thru Sep
Occupancy Estimated 01 Jan 2025 City, State: Kodiak, AK
Issue: The US Coast Guard is seeking a temporary mooring lease for five (5) cumulative CG vessels being affected by a construction project to their permanent mooring. Two of the vessels (either the CGC ALEX HALEY or CGC CYPRESS, and the SPC-TB Boat will be displaced when the construction period starts, in January 2025.
The other three vessels are due to arrive to Kodiak incrementally beginning January or February 2025. When construction concludes on or around September 2027, all vessels will return to their permanent mooring at the Kodiak Coast Guard Base. The selected commercial lessor will allow these temporarily homeported CG vessels to conduct all normal activities conducted by military vessels with CG personnel in-port including, but not limited to: stores onloads, ammunitions on/off-loads, fuel onloads, maintenance activities, diving services, and hazardous materials on/offloads. These activities and services are not required to be conducted by the lessor but will be conducted by CG personnel and with separately provided services including third party provided contracted services.
The requirement needs for each cutter are listed above and found throughout this solicitation’s appendices. This is a formal request for an offer to meet the CG’s needs.
The Coast Guard will fund all utilities (water/sewer/electrical) via separate and distinct line items in this contract.
The CG will consider all offers to include those that can only berth some of the vessels or listed capabilities.
Offered space must meet Government requirements for Fire, Safety and Handicapped Accessibility, and Sustainability set forth in the Solicitation for Offers.
Location: Entire site, including all required leased facilities (berths, laydown space, etc.) shall be enclosed by a MARSEC-1 compliant security perimeter.
The Coast Guard Reserves the right to adjust or terminate the solicitation as is necessary.
All Leases will be entered under the US Coast Guards Authority 14 USC 501 (e).
Interested parties should send expressions of interest to:
David Brumley Realty Specialist United States Coast Guard 1301 Clay St #700N Oakland CA 96512-99801
(571) 607-1065 David.E.Brumley@USCG.mil mailto:David.E.Brumley@USCG.mil
APPENDIX A
KODIAK TEMPORARY MOORINGS
LOADING CAPACITY REQUIREMENTS
Metric Medium Sized Cutter Fast Response Cutter
Displacement 3963 tons 353 long tons
Horizontal Load Sail Area 13,118 SF, Wind Speed 50 Kts, Load on Pier 129,254 pounds
Design to UFC 4-152-01 (3-4) and 4-159-03. Worst-case docking impact of 1.5 feet per second (0.888 knots) normal to the waterfront structure should be used. The FRCs cross sectional sail area is 2,232 SF.
Vertical Load 600 pounds per sq. foot, 20,000 pounds per wheel, 112,000 pounds outrigger
For Floating Dock Vertical Load: The determination used is that no trucks, forklifts, manlifts (etc.) will be authorized on the floating docks.
Mooring Devices and Deck Fittings
6 Bollards, 5 Double Bitts, 20 Cleats
Minimum of four (4) bollards and cleats are required for each cutter capable of holding two breasted FRCs to the pier.
REFERENCES
1. USCG Cutter Moorings Configuration Standard Technical Order SILC (SILC-CSTO-36-11 31 21-02)
2. UFC 4-159-03 Moorings
3. UFC 4-152-01 Design: Piers and Wharves
APPENDIX B
ELECTRICAL SCOPE
The Lessor shall hire a registered professional electrical engineer to design, and a qualified, licensed electrical contractor to install 480/277-VAC, 3-Phase Electrical Services for supporting one (1) Medium Sized Cutter and three (3) Fast Response Cutters 480-VAC to 450-VAC Portable Isolation Shoretie Transformer (PIST) power supplies.
Medium Sized Cutter requires Electrical Shore Power with the following general specifications:
• Voltage: 480-VAC,
• Frequency: 60-HZ,
• Phase: 3,
• Neutral: N/A,
• Amperage: 800,
• Grounding: 'Grounded'
Each Fast Response Cutter requires Electrical Shore Power with the following general specifications:
• Voltage: 480-VAC,
• Frequency: 60-HZ,
• Phase: 3,
• Neutral: N/A,
• Amperage: 400,
• Grounding: 'Grounded'
The one-line diagrams for the Medium Sized Cutter (225’ WLB or 282’ WMEC) and Fast Response Cutter (154’ WPC) are found in the USCG Electrical Shore Tie Configuration Standard Technical Order (CSTO) SILCCSTO-36-11 21 27 11-04 (Rev-A). This CSTO is attached to this solicitation as Appendix C.
• For the Medium Sized Cutter reference Figure C-8: High-Power Cutters, 2 MIL-C Receptacles
• For the Fast Response Cutters reference Figure C-2: Low-Power Cutters, 450V, three-phase
(specifically the SINGLE FRC PIER BERTH 154’ WPC Diagram)
Shore-side Electrical Services for the Medium Sized Cutter is required to be operational no later than 01 January 2025.
Shore-side Electrical Services for each of the three (3) Fast Response Cutters are also required to be operational no later than 01 January 2025.
GOVERNMENT FURNISHED EQUIPMENT
The Government will be providing four (4) Portable Isolation Shoretie Transformer Power Supplies as Government Furnished Equipment. Each Portable Isolation Shoretie Transformer is designed for a 'Grounded' 480-VAC, 3-Phase, 3-Wire w/ Frame-Grounded input, and 'Ungrounded' 450-VAC, 3-Phase, 3-Wire output.
Portable Isolation Shoretie Transformer for the Medium Sized Cutter will have:
APPENDIX B
ELECTRICAL SCOPE
• One (1) 800-AT Circuit-Breaker/ Disconnect Enclosure with two (2) 50' lengths of 500-MCM, CU, Type-W, 3-conductor Cable.
• At the Shore-side Electrical Service Equipment ends of the two (2) Type-W Shoretie cables will be a 400-AMP NATO MIL-C-24368/1 Plug/Connector per cable (Requiring a MIL-C-24368/2C Receptacle per cable on Shore-side Electrical Service Equipment).
• An additional exterior-mounted Grounding Terminal-Lug, continuous with the Grounding System of the Shore-side Electrical Service Equipment, will need to be provided at the Shore-side Electrical Service Equipment for connecting a minimum of one (1) 4/0-AWG DLO CU Frame Grounding conductor to the Medium Endurance Cutter’s, Portable Isolation Shoretie Transformer.
Each of the three (3) Portable Isolation Shoretie Transformers for the Fast Response Cutters will have:
• One (1) 400-AT Circuit-Breaker/ Disconnect Enclosure with one (1) 50' length of 500-MCM, Type-W, 3-conductor cable.
• Then at the Shore-side Electrical Service Equipment end of the Type-W Shoretie cable will be a
400-AMP NATO MIL-C-24368/1 Plug/Connector (Requiring a MIL-C-24368/2C Receptacle on Shore-side Electrical Service Equipment).
• An additional exterior-mounted Grounding Terminal-Lug, continuous with the Grounding System of the Shore-side Electrical Service Equipment, will need to be provided at the Shore-side Electrical Service Equipment for connecting a minimum of one (1) 4/0-AWG DLO CU Frame Grounding conductor to each of the three (3) Fast Response Cutters, Portable Isolation Shoretie Transformers.
The Lessor is required to retain the services of a qualified, licensed Electrical Contractor for connecting and testing both the 480-VAC Grounded as well as the 450-VAC Ungrounded portions of the Government provided four (4) each Portable Isolation Shoretie Transformers. A submittal with the connection design shall be submitted to the Coast Guard for review prior to commencing work. A CG representative shall be invited to be onsite for the testing of the equipment.
Prior to completing this Contract (Lease), the Lessor is required to retain a qualified, licensed Electrical Contractor for disconnecting all four (4) Portable Isolation Shoretie Transformers and returning the units back to the Coast Guard.
REFERENCE STANDARDS
1. USCG Electrical Shore Tie Configuration Standard Technical Order (CSTO) SILCCSTO- 36-11 21 27 11-04 (Rev-A)
2. IEEE C57.12.01-2020: IEEE Standard for General Requirements for Dry-Type Distribution and Power Transformers.
3. NFPA-70 Edition as has been adopted by State of Alaska at time of construction.
4. NFPA- 303 Fire Protection Standard for Marinas and Boatyards. [Currently 2021 Ed.]
5. NFPA-307 Standard for the Construction and Fire Protection of Marine Terminals, Piers, and Wharves. [Currently 2021 Ed.]
Mission Support Business Model
Configuration
Standard
Technical Order
Electrical Shore Ties (Rev A)
SILC-CSTO-36-11 21 27 11-04
This page intentionally left blank.
Commander U.S. Coast Guard
Shore Infrastructure Logistics Center
300 East Main Street, Suite 800 Norfolk, VA 23510-9104
Staff Symbol: (C) Phone: (757) 628-4277 Fax: (757) 628-4322 John.D.Berry@uscg.mil
11000
31 July 2023
Subj: ELECTRICAL SHORE TIES (REV A)
Ref: a) Civil Engineering Manual, COMDTINST M11000.11 (series)
b) Shore Infrastructure – Mission Support Business Model Requirements Directive
Technical Order, SILC-RDTO-36-11 29 11 00-01 (latest)
1. PURPOSE. This Configuration Standard Technical Order (CSTO) establishes standards for
Electrical Shore Tie systems for Coast Guard shore facility applications.
2. ACTION. Resource managers overseeing the delivery of shore infrastructure products and services shall ensure compliance with the provisions of this technical order in accordance with references (a) and (b).
3. AUTHORIZATION. This technical order has been reviewed and is authorized by the Shore
Infrastructure Logistics Center (SILC) Commander.
4. DIRECTIVES / TECHNICAL ORDERS AFFECTED. This technical order supersedes SILC-
CSTO-36-11 21 27 11-04/2011 0506.
5. ENVIRONMENTAL ASPECT AND IMPACT CONSIDERATIONS.
a. The development of this technical order and the guidance contained within it have been thoroughly reviewed by the originating office in conjunction with SILC Environmental
Management Division (EMD). This guidance is categorically excluded under current
Department of Homeland Security (DHS) categorical exclusion L5 from further environmental analysis in accordance with the Coast Guard Environmental Planning Policy, COMDTINST
5090.1 (series).
b. This guidance will not result in any substantial change to existing environmental conditions or violations of applicable Federal, state, or local laws relating to the protection of the environment. All future specific actions resulting from the general guidance in this technical order must be individually evaluated for compliance with the National Environmental Policy Act
(NEPA) and other applicable mandates, consistent with Coast Guard Environmental Planning
Policy.
6. DISTRIBUTION. SILC Configuration Manager posts an electronic version of this technical order in Coast Guard Technical Information Management System (CG-TIMS) and adds the document in the Approved Technical Order Library on SILC's Configuration Management Page on the CG Portal. No paper distribution will be made of this document.
mailto:John.D.Berry@uscg.mil
Subj: ELECTRICAL SHORE TIES (REV A) 11000
7. SCOPE. The standards described in this technical order shall be implemented in accordance with the following constraints.
a. TECHNICAL AUTHORITY. The technical authority for this technical order is the SILC
Commander. Additional roles and responsibilities associated with executing this configuration standard are identified in Section 1.3 of this technical order.
b. ASSETS / EQUIPMENT. This technical order applies to waterfront electrical shore ties, which are components of electrical distribution systems (CATCODE 812-32).
8. TOOLS AND EQUIPMENT. No tools required.
9. TRAINING. Implementation of this technical order does not require training beyond standard
Coast Guard requirements for personnel.
10. DEVELOPMENT TEAM. The following authorities and subject matter experts were significantly involved in producing this technical order.
ORIGINAL DOCUMENT (2011) DEVELOPMENT TEAM
Name Position Organization
Al Boudreau Subject Matter Expert BASE KODIAK
John Mathews Subject Matter Expert FDCC
Carl Lundquist Subject Matter Expert SFLC
Wade Williams Subject Matter Expert SFLC
David Robinson Subject Matter Expert CEU Miami
Eric Tipping Subject Matter Expert FDCC
2023 REVISION DEVELOPMENT TEAM
Name Position Organization
Al Boudreau Subject Matter Expert BASE KODIAK-FE
CDR Eric Para Product Line Manager SILC-PL-MSPL
CDR Maile Tesler Deputy Product Line Manager SILC-PL-MSPL
LCDR Liam McCue Product Line Branch Chief SILC-PL-MSPL
Tim Shea Asset Line Manager SILC-PL-MSPL
LT Matt Fann Subject Matter Expert CEU PROVIDENCE
Scott Arsenault Subject Matter Expert CEU PROVIDENCE
Dolores Pynemercier Subject Matter Expert SFLC-ESD-NAME-ESS
Shawn Orlena Subject Matter Expert SFLC-ESD-NAME-ESS
Subj: ELECTRICAL SHORE TIES (REV A) 11000
11. FORMS / REPORTS. None
12. REQUEST FOR CHANGES. Submit recommendations for technical order improvements, waivers, or corrections in accordance with the Engineering Change Proposal and Configuration Control Board Process Guide Technical Order (PGTO).
J. D. BERRY, P.E.
Captain, U.S. Coast Guard Commander, Shore Infrastructure Logistics Center
This page intentionally left blank.
Electrical Shore Ties i
TABLE OF CONTENTS
1 Overview
1.1 Conf iguration Standard Summary
1.2 Applicability
1.3 Roles and Responsibilities
2 Technical Requirements
2.1 Organization
2.2 Scope
2.2.1 Who Performs
2.2.2 Applicability
2.2.3 When to Perform
2.2.4 To Whom (Customers)
2.2.5 Suppliers
2.3 Process Links
2.4 General Design Requirements
2.4.1 General Requirements
2.4.2 Russellstoll® Receptacles
2.4.3 Equipment Location
2.4.4 Raceways and Conductors
2.4.5 Installation and Acceptance Testing
2.5 Shore Tie Standards – Small Boats
2.5.1 Main Disconnect Requirements
2.5.2 Feeder Requirements
2.5.3 Electrical Receptacle and Plug Requirements
2.6 Shore Tie Standards – Cutters
2.6.1 Main Disconnect Requirements
2.6.2 Feeder Requirements
2.6.3 Isolation Transformer Requirements
2.6.4 Power Mound Requirements
2.6.5 Electrical Receptacle and Plug Requirements
3 References
4 Def initions
Appendix A – Shore Tie Receptacle and Connector ...........................................................................A-1
Appendix B – Recommended Shore Power Practices ........................................................................B-1
Appendix C – One-Line Diagrams .....................................................................................................C-1
Appendix D – Shore Tie Grounding Diagrams................................................................................... D-1
Appendix E – Shore Power Standard Operating Instructions...............................................................E-1
Appendix F – Photos........................................................................................................................ F-1
1 OVERVIEW
1.1 Configuration Standard Summary
This Configuration Standards Technical Order (CSTO) establishes standards for electrical shore tie systems supporting USCG small boats and cutters. The Shore Infrastructure Logistics Center
(SILC) is responsible for the shore tie systems from the shoreside main circuit breaker to the shore tie receptacle and is also responsible for identifying the receptacle’s mating shore tie cable plug. The Surface Forces Logistics Center (SFLC) is responsible for the shore tie systems from the plug on the shoreside end of the shore tie cable to the electrical system on the cutter or boat. This CSTO is based on the use of Russellstoll® shore tie receptacles and shore tie plugs for small boats and low-power cutters and Military Specifications (MIL-SPEC)/NATO plugs and receptacles for high-power cutters.
Standardization of electrical shore ties for cutters has significantly improved interoperability of surface forces. A standard nationwide shore power receptacle/plug configuration for cutters is desirable to support homeport changes, new cutter construction, and extended out-of-area deployments. The standard receptacle/plug configuration for each cutter provides for shore power connectivity even at deployable and re-deployable locations.
1.2 Applicability
This technical order applies to all new or replacement electrical shore tie systems installed to support USCG vessels. Specifically, this guidance applies to shore ties supporting small boats, high-power cutters, and low-power cutters at Coast Guard shore facilities. All other shore ties provided to support other boats shall comply with National Electrical Code (NEC) Article 555, Marinas, Boatyards, and Commercial and Noncommercial Docking Facilities.
This CSTO does not identify the cables connecting the vessel to the shore tie.
Figure 1-1 is intended to aid in identifying the correct section and diagram for each vessel type.
Figure 1-1: Shore Tie Selection
Go to section 2.5 Shore Tie Standards – Small Boats
See table A.1 Small Boats
Start
High Power Cutter (Length >= 175' Shore power >=
300A)
Low Power Cutter (65'<= Length <175'
Shore power < 300A)
Small Boat (Length < 65')
Shore Tie Selection
Go to section 2.6 Shore Tie Standards – Cutters
See table A.2 Low Power Cutters
Go to section 2.6 Shore Tie Standards – Cutters
See table A.3 High Power Cutters
End
1.3 Roles and Responsibilities
The technical authority for this configuration standard is the SILC Commander. Table 1-1 enumerates the roles and responsibilities for executing the standards defined in this technical order. The following “RASCI” codes are used:
R = Responsible: Those who do the work (typically only one Responsible per task).
A = Approver: The one ultimately accountable for the deliverable or task (must have only one Approver per task).
S = Supports: Those who provide resources, information, expertise, or other assistance in completing of the task. A Supports role indicates more intensive and consistent involvement than just being identified in a Consulted role.
C = Consulted: Those whose opinions are sought (two-way communications).
I = Informed: Those who are kept up to date on progress (one-way communication).
Table 1-1: Roles and Responsibilities RASCI Matrix
Task, Deliverable, or Responsibility SF
LC
- S
DT
CG
-4
CG
-4
Pl an ni ng
SI
LC
CE
U
M
AS
I M
SP
L
El ec tri ca l S ho re Ti e W
G
Fa cil ity E ng in ee r
FD
CC
CG
-9
A cq ui sit io n
Te ch ni ca l W ar ra nt
H ol de r
Identi fy and priori tize new shore tie requirements C A R S C I I C
Develop new shore tie project C C C R
Construction management and
Commiss ioning of shore ties I C I S R
Develop Specs for Approved
AFC43 Project R C C
Construction Management and
Commiss ioning of AFC43 shore ties
R C I S
Waiver request process I C R S S
Update CSTO C S R S C C
Manage Russel lStol l receptacle s tock C R
2 TECHNICAL REQUIREMENTS
This Configuration Standard Technical Order (CSTO) establishes standards for the electrical infrastructure of the shore ties based upon SFLC facility requirements for each vessel. In conformance with logistics practices and to enhance homeporting interoperability, shore ties shall be standard for each cutter class and for each class of small boats. Standardization of shore ties will normally occur during the acquisition phase, with funding provided from the appropriation used to procure the new cutters/small boats. This CSTO applies to new installations and/or modernization and recapitalization of existing shore ties.
This CSTO addresses only the shoreside facilities and equipment to provide electrical service to cutters and small boats.
2.1 Organization
This CSTO covers the SILC’s responsibility for configuring and installing electrical shore ties, and each surface asset section of this CSTO (Section 2.5 and 2.6) is organized into the following subsections from upstream to downstream of the electrical circuit when applicable:
• Main Disconnect Requirements
• Feeder Requirements
• Isolation Transformer Requirements
• Power Mound Requirements
• Enclosure, Electrical Receptacle and Plug Requirements
• Installation and Acceptance Testing
This technical order defines the requirements for providing acceptable facility/vessel (cutters and small boats) electrical shore ties throughout the Coast Guard for both new and existing assets as identified in Table A-1, Table A-2, and Table A-3.
2.2 Scope
The boundaries of engineering responsibility between this SILC CSTO; the Naval Engineering
Manual, COMDTINST M9000.6 (series); and the Command, Control, Communication, Computer, Cyber and Intelligence Service Center (C5ISC) are the receptacle in the shore tie enclosure and plug on the shoreside end of the shore tie cable. This standard is based on
Russellstoll® receptacles for small boats and low-power cutters as well as MIL-SPEC receptacles for high-power cutters. For clarification purposes, the responsibilities for the SILC, SFLC, and C5ISC are divided as follows:
SILC: This CSTO covers the electrical distribution system and all associated equipment from the shoreside main circuit breaker to the shore tie receptacle on the pier. It also identifies the connector based upon SFLC-defined requirements.
SFLC: The SFLC is responsible for defining the electrical system and all associated equipment from the plug on the shoreside end of the shore tie cable to the electrical system on the cutter/boat. Shore tie cables are under the purview of the SFLC and thus outside the scope of this CSTO. The SFLC is responsible for providing shore tie cables with the proper plug to connect to the shore tie. Therefore, best practices for the proper care, storage, and maintenance of shore tie cables are not addressed in this SILC CSTO.
C5ISC: Command, Control, Communications, Computers, and Information Technology (C4IT) shore tie cables provide shipboard connectivity to the provided voice circuits and data circuits from the servicing shore facility, as identified in U.S. Coast Guard C4&IT Shore Tie Cable
Standards. No other services (i.e., CCTV, CATV, etc.) are considered part of the standard
C4&IT shore tie. Shore tie receptacles for cutter C4IT communications are only covered by this
CSTO when they are included in a power mound configuration. Standalone communication shore-ties are not included in this technical order.
2.2.1 Who Performs
The Shore Infrastructure Logistics Center (SILC) is responsible for executing this technical order for the shoreside electrical system installation, based upon the pier-side power system requirements provided by the SFLC. The Facilities Design and Construction Center (FDCC), Civil Engineering Units (CEUs), and Facility Engineers (FEs) for HQ units of the SILC are responsible for executing the requirements of this technical order. The FDCC and the CEU organizations will execute this technical order through their contracting officers with appropriate
PC&I or Coastal and Shore Operations-Depot Level Maintenance (CSO-DLM) funding.
Any request for deviation from the guidance provided within this CSTO requires an approved waiver in accordance with the Engineering Change Proposal and Configuration Control Board
Process Guide, SILC-PGTO-36-11 29 13 15 11-00.
2.2.2 Applicability
All surface forces (cutters and boats) and their homeport and logistics facilities are covered under this technical order.
2.2.3 When to Perform
All new construction, recapitalization, and shore tie upgrades at piers and wharfs shall comply with this technical order.
2.2.4 To Whom (Customers)
The technical order shall be used by all facility managers (CEU, Base FE, Engineering Officers
(EO), sector logistics officers, or FDCC for new facilities) to plan, design, repair, and construct shore ties for all cutters and small boats.
2.2.5 Suppliers
CEUs, FEs, EOs, shall design and procure replacement enclosures and receptacles when required. Cutter crews and small boat station personnel shall not construct or procure their own replacement enclosures and receptacles.
2.3 Process Links
To ensure compliance with the principles of configuration management, electrical shore ties are established as a Configuration Item (CI). The as-built drawings for the shore ties will document the physical baseline of the CI. Changes to this Configuration Standard for electrical shore ties must be submitted for approval first through the SILC Engineering Change Proposal (ECP) process and then through the SFLC Engineering Board. Guidance for the SILC ECP process can be found in the Engineering Change Proposal and Configuration Control Board Process
Guide, SILC-PGTO-36-11 29 13 15 11-00. Inspections will be conducted and documented through Functional Configuration Audits (FCAs) and Physical Configuration Audits (PCAs) to validate configuration compliance.
2.4 General Design Requirements
2.4.1 General Requirements
Shore power infrastructure (up to the dockside receptacles) shall be designed and installed in accordance with the latest edition of the NEC; circuits intended to supply ungrounded power to vessels shall fully comply with the minimum requirements of NEC Article 250.21(A) and (B).
Installations shall comply with latest article of NEC Article 555, Marinas, Boatyards, and
Commercial and Noncommercial Docking Facilities.
Utilities provide grounded power for customer use with ±5% voltage variations. Shore power voltage variations during operation of up to ±5% of 450V nominal, typical of most utilities, are permissible. To meet the 450V ungrounded delta power requirements for Coast Guard cutters, this service will require transformation to ungrounded power. Refer to section 2.6.3 for these requirements and section B.4.2 for further clarification.
2.4.1.1 Arc Flash
An arc flash study, including arc flash labeling of the electrical system, shall be provided in accordance with safety guidelines in the Electrical Equipment Arc Flash Safety TCTO, SILC-
TCTO-36-11 55 13 23. Arc flash labels shall be posted in a conspicuous location on the exterior of its enclosure in compliance with the latest editions of NEC 110.16 and OSHA 29. All new electrical equipment and all renovations shall be provided with arc hazard requirements. Arc flash labels are required for any service equipment and feeder supplied equipment rated 1000A or more. Any personnel working within the flash protection boundary will be required to wear
PPE that meets the flash hazard risk category.
2.4.1.2 Enclosures
Equipment enclosures shall be designed and fabricated such that the internal components will perform their intended function satisfactorily in the environment to which the enclosure is exposed. Enclosures for electrical equipment shall be in accordance with National Electrical
Manufacturers Association (NEMA) or International Electrotechnical Commission (IEC) standards. Paint coating systems must meet the minimum requirements of Institute of Electrical and Electronic Engineers (IEEE) C57.12.29 unless noted otherwise herein.
2.4.1.2.1 Enclosure Environmental Conditions
Outdoor enclosures shall be designed to accommodate the heaviest rain, ultraviolet/solar heating, freezing, and wind-blown spray expected at the site. Enclosures located at or near the waterfront piers shall be of NEMA 4X construction with type 316 stainless steel exterior hardware. Enclosures that require ventilation are required to be NEMA 3RX rated and constructed of type 316 stainless steel when located at or near the waterfront. Where practicable, elevate enclosures of switching gear and transformers in accordance with the flooding considerations outlined in section 2.3 of the New Building Design & Construction CSTO
(SILC-CSTO-36-71 91 11 13-10). All other enclosures shall be located at a minimum of two feet above the highest tide level for the area under normal circumstances as required by the latest edition of NEC 555.
2.4.1.3 Shore Tie Plugs
The plugs and receptacles utilized for shore ties supporting standard small boats have been standardized on Russellstoll®. For receptacle and plug requirements, see Table A-1 for Small
Boats, Table A-2 for Low-Power Cutters, and Table A-3 for High-Power Cutters.
Splicing cables is prohibited.
2.4.2 Russellstoll® Receptacles
A limited supply of new Russellstoll® receptacles is maintained at the SFLC warehouse and is only available through direct coordination with the Mission Support Product Line (MSPL). The primary purpose for this inventory is to support Casualty Reporting (CASREP) response and hurricane recovery. Receptacles may also be provided as government-furnished equipment for construction contracts impacted by long delivery times or other contractual issues. For configurations requiring Russellstoll® shore tie receptacles, MSPL has created an inventory program to assist with long lead time and Buy American Act complications that may exist.
Subject to inventory levels, MSPL can provide government-furnished receptacle equipment to assist with new construction, depot level maintenance, and casualty repairs to CEUs or shore facilities upon request. To get more details on the program visit MSPL’s shore tie program
SharePoint page located here. MIL-SPEC receptacles are not inventoried at this time.
For a design where only a single receptacle is required, the preferred design is to provide a single receptacle in a Russellstoll®-provided receptacle enclosure.
All shore power receptacles shall be equipped with a mechanical interlock, like the Russellstoll®
MaxGard or ESL Power Systems Interlock, that blocks insertion and removal of the plug when the receptacle is energized. A mechanical interlock on the receptacle prevents installation or removal of a plug while the integral disconnect switch or circuit breaker is closed, protecting ship's force from a possible arc that could damage the plug or cause burns. The components are designed for heavy duty marine use and exposure to salt-laden moisture.
2.4.3 Equipment Location
Electrical equipment shall be constructed with a coating system and located to maximize protection from vehicle impacts, storm surges, flooding, and windblown or floating debris.
Electrical equipment susceptible to vehicle impacts shall be protected by appropriately sized, placed, and anchored bollards. Bollards shall be painted bright yellow with optional black striping or provided with a commercially manufactured identification cover assembly.
https://uscg.sharepoint-mil.us/sites/silc_spo/CE%20Product%20Lines/MS/SitePages/Russellstoll-Receptacles.aspx?source=https%3a//uscg.sharepoint-mil.us/sites/silc_spo/CE%20Product%20Lines/MS
2.4.4 Raceways and Conductors
2.4.4.1 Conduit and Cable Trays
Any conduit run underneath piers and wharves shall be adequately supported and braced to prevent rupture due to seismic motion, impacts from floating debris, storm surges, or flooding.
Conduit support structures shall be capable of resisting gravity loads as well as buoyant forces.
Conduit and trays shall be supported with stainless steel hardware.
2.4.4.2 Non-Metallic Raceway
Epoxy fiberglass conduit (RTRC) (minimum ¼ inch wall thickness) or epoxy fiberglass cable trays shall be used underneath piers and wharves. Cable trays may be used where protection or elevation avoids impact from debris.
Above pier shall be either RTRC or PVC schedule 80.
PVC schedule 40 shall not be used.
For installations with large numbers of heavy cables, non-metallic epoxy fiberglass cable trays are recommended under piers when protected from floating debris.
2.4.4.3 Metallic Raceway (Optional)
PVC-coated rigid galvanized steel (RGS) (urethane interior coating) conduit, marine-grade aluminum, or Type 316 stainless steel cable trays shall be used underneath piers or wharves.
Certain design considerations should be considered before using either system, as follows:
• PVC-coated RGS conduit shall be properly tied into the earth electrode ground system for the pier. RGS conduit will corrode in marine environments, can experience significant induced current as a result, and shall thus be carefully considered. Consider oversizing conduit to accommodate conductor bundling and thus minimize induction per NEC.
• Marine-grade aluminum or Type 316 stainless steel cable trays may be used, but all shore tie feeder conductors shall be bundled per NEC to reduce induction.
• PVC-coated RGS shall be installed by contractors with a minimum of 5 years of experience. Continued maintenance and inspection of system is necessary to ensure couplings and connections retain integrity and avoid corrosion.
• RGS, rigid metal conduit (RMC), and electric metallic tube (EMT) shall not be used on waterfront areas.
• Type 316 stainless steel may be used and shall be supported with stainless steel hardware.
2.4.4.4 Conductors
Multiple conductor control cables to power mounds from switchgear shall be shielded. Cables that run through vaults or under piers or wharves shall be designed for submergence. Shore power cable ampacity shall normally be calculated at 40°C (104°F) ambient air temperature. A
50°C (122°F) ambient air temperature should be substituted in exceptionally hot climates.
For services exceeding 400 amperes, 535 MCM single conductor diesel locomotive (DLO/UL44
RHH-RHW-2) cable is the required minimum AWG wire size because of its flexibility and resistance to moisture. Actual wire size shall be increased as required to not exceed the specified maximum permitted cable voltage % (cable distance from dedicated voltage isolation transformer to power mound receptacle). Each conduit should contain exactly one conductor of each phase. For cable trays, single conductor cables should be tightly banded into triplexed phase bundles. To prevent inductive heating, unbundled single conductor cables shall not encircle ferromagnetic material. Refer to drawing Figure C-14 for cable information and termination hardware to be used with this conductor. Larger sizes of DLO cable may be required for long runs based on an allowable voltage drop at full rated load.
Double banking or parallel stacking of power cables is not allowed.
The feeder conductor distance from the disconnect switch ashore to the shore tie should be minimized to prevent excessive voltage drop.
2.4.4.5 Terminations
Cables shall terminate on bus bars and circuit breakers with silver-plated compression type ring terminals, which are to be applied using the manufacturer-recommended crimper and die. Anti-rotation clips shall be used with single hole type lugs to prevent possible short circuiting with nearby conductors. Provide stud adapters on circuit breakers for landing lugs.
Compression lugs for DLO cable (and other finely stranded cable) shall be specifically designed for such conductors. Utilize oxide inhibiter on cable prior to compression of lug and sleeve heat shrink over barrel of lug and at least 3 inches over conductor jacket.
Terminations utilizing Allen screws or mechanical clamps shall not be used.
2.4.5 Installation and Acceptance Testing
All acceptance tests shall be performed in the presence of a Coast Guard inspector or
Contracting Officers Representative (COR). Contractor shall provide a written report to the
Coast Guard inspector of all test results within one week of test completion.
See section B.2.11 for details regarding electrical equipment installation, and section B.2.12 for details on acceptance testing.
2.5 Shore Tie Standards – Small Boats
All vessels less than 65 feet in length are classified as small boats and are identified solely by hull number.
Electrical shore ties for small boats have been standardized on Russellstoll®. Replacement of the existing shore ties to meet this standard shall be accomplished as part of normal maintenance/recapitalization actions unless safety concerns necessitate more immediate replacement. Electrical shore ties to support new assets shall be constructed as part of the homeport preparation process using funds appropriated for the acquisition of the new vessel.
Refer to Table A-1 for electrical characteristics.
2.5.1 Main Disconnect Requirements
2.5.1.4 Disconnect Switches
The receptacle(s) serving a single vessel shall be on their own disconnect switch(es) or circuit breaker(s) to allow an afloat unit to disconnect and connect to shore power without affecting other vessels. For vessels with non-continuous loads only, a 100% rated breaker is required.
The long-time delay setting of each dockside circuit breaker shall be no greater than the smaller of the following:
• The total ampacity of the shore-to-ship cable(s) connected to it.
• The ampacity of the feeder between the associated shore power receptacle(s) and the in-hull circuit breaker, including the rating of any step-down transformer.
2.5.1.5 Metering
Shore power for small boats shall be metered in accordance with the Advanced Metering
Infrastructure CSTO, SILC-CSTO-36-11 31 17 11-01. A single master meter is required to meter all small boat shore ties located at each pier/wharf supporting small boats. Individual metering of small boat shore power is not required.
2.5.2 Feeder Requirements
2.5.2.1 Raceway and Conductors
See section 2.4.4 for requirements on raceway and conductors.
2.5.3 Electrical Receptacle and Plug Requirements
Shoreside power receptacles shall be equipped with a mechanical interlock that blocks insertion and removal of the plug when the receptacle is energized. Russellstoll® mechanically interlocked receptacles are the standard for small boats. Refer to Figure F-6 for an example of a small boat receptacle.
A mechanical interlock shore tie receptacle, like the Russellstoll® MaxGard, is a circuit breaker interlock that prevents installation or removal of a plug while the integral disconnect circuit breaker is closed. A rugged cast aluminum housing with electrostatic epoxy coating and stainless-steel hardware enables heavy duty marine use and exposure to salt-laden moisture.
Waterproof construction with O-ringed interior components provides environmental separation, watertight mated or unmated. A heavy on/off handle adds mechanical-to-electrical (CB) interlock functionality. All receptacles and connectors shall have a gated rotating disk (gated deadfront) on the face of the interior, which engages upon insertion. Standard delayed-action pull, and withdrawal offers all plugs an explosion-proof rating. Pin and sleeves shall be marine-grade
CDA brass, and 200- and 400-amp pins and sleeves are silver plated. Twenty-four single-rated device polarizations ensure exact voltage, frequency, and phase differentiations. There are two optional pilot/control pins for contactors, load monitoring circuits, shunt trip, and any other communication function if needed. Grounding of the mechanical interlock shore tie receptacle shall be accomplished through a separate center ground (earth) make-first and break-last pole on all devices for complete system ground to protect from possible arcing.
When convenient, multiple small boat receptacles can be mounted on a single stanchion mount to save space along the shore dock.
2.5.3.1 Standard Small Boats
Grounded service shall be provided to each standard small boat (e.g., 45-foot response boat – medium (RBM), 47-foot motor lifeboat (MLB), and 49-foot buoy utility stern loading (BUSL) boat). The shore tie enclosure shall house a Russellstoll® mechanically interlocked shore tie receptacle, as shown in Table A-1.
Where several vessels of the same class operate within a geographical area, it may be advantageous to outfit all homeports with the same receptacle.
2.5.3.2 Non-Standard Small Boats
Shore receptacles for non-standard small boats are not standardized.
All shore ties supporting non-standard small boats shall comply with NEC Article 555, Marinas, Boatyards, and Commercial and Noncommercial Docking Facilities.
2.6 Shore Tie Standards – Cutters
Vessels 65 feet in length and longer are generally classified as cutters, which are further broken down into the categories of low-power cutters (LPCs) and high-power cutters (HPCs). Each cutter has a name as well as a responsible SFLC product line. Cutters are assigned a permanent crew with an officer in charge (OIC) or commanding officer (CO). The specific shore tie technical requirements for each cutter class are available from the SFLC and are summarized in Appendix A.
Electrical shore ties for high-power cutters are standardized on MIL-SPEC 400-amp receptacles and are normally provided using the PC&I funds set aside to modify/upgrade waterfront facilities to support the new cutters. Refer to Table A-3.
Electrical shore ties for low-power cutters are non-standard and variable, all utilizing
Russellstoll® receptacles. Replacement of the existing receptacles to meet this standard shall be accomplished as part of normal maintenance/recapitalization actions. Receptacles and enclosures to support new assets shall be constructed as part of the homeport preparation process using funds appropriated for the acquisition of the new vessel. Refer to Table A-2.
In order to obtain favorable utility rates, shore power systems may be equipped with static or automatic power factor correcting capacitors. Capacitor banks shall be equipped with discharge resistors that automatically reduce plate voltage to less than 50 volts within one minute of de-energization. For services intended for use by cutters with paralleling capabilities, the system shall be designed to prevent operation with a leading (capacitive) power factor.
Ungrounded delta 450V, three-phase, three-wire, 60 Hz power shall be the Coast Guard shore tie standard for cutters operating in salt water or the Great Lakes. This category is further subdivided into low-power cutters and high-power cutters. The desired hotel voltage as measured at the cutter switchboard with normal port loads should be 450V; therefore, the source voltage may be higher than 450V. Field adjustments may be made to the primary transformer taps per section 2.6.3.4.1. See Table A-2.
Ungrounded delta 230V, three-phase, three-wire, 60 Hz power shall be the Coast Guard shore tie standard for river (WLR), inland waterway (WLI), and construction (WLIC) tenders operating predominantly in fresh water. See Table A-2.
2.6.1 Main Disconnect Requirements
2.6.1.1 Disconnect Switches
The receptacle(s) serving a single vessel shall be on their own disconnect switch(es) or circuit breaker(s) to allow an afloat unit to disconnect and connect to shore power without affecting other vessels. For non-continuous loads, a 100% rated breaker is required.
The long-time delay setting of each dockside circuit breaker shall be no greater than the smaller of the following:
• The total ampacity of the shore-to-ship cable(s) connected to it.
• The ampacity of the feeder between the associated shore power receptacle(s) and the in-hull circuit breaker, including the rating of any step-down transformer.
2.6.1.2 Metering
Shore power to each cutter shall be separately metered in accordance with the Advanced
Metering Infrastructure CSTO, SILC-CSTO-36-11 31 17 11-01.
2.6.1.3 Phase rotation
Phase rotation for shore power AC systems shall follow the NEC arrangement. For bus and cable connections, the arrangement is A-B-C, from front to back, top to bottom, left to right as viewed from the front of enclosure; for shore-tie receptacle phase rotation, the arrangement is
“clockwise” as viewed from the front of the receptacle. On multiple parallel receptacle installations, each pin location on each receptacle must be connected to the same phase.
2.6.2 Feeder Requirements
2.6.2.1 Raceway and Conductors
See section 2.4.4 for requirements on raceway and conductors.
2.6.2.2 Grounding
See Appendix D for a typical shore and cutter power distribution system grounding diagram.
2.6.2.3 Circuit Protection
2.6.2.3.1 Remotely Operated Circuit Breakers
Remotely operated circuit breakers shall be of a molded case design with an internal electrical operator and spring charging motor, and a high-current electro-mechanical contactor may also be used as a remotely operated solenoid. Motor-driven accessories shall not be installed over the operating handles of molded case devices.
2.6.2.3.2 Over-Current Relays
Programmable electronic trip units or over-current relays shall be installed as over-current protective devices in all shore power distribution circuits operating above 250 volts. Thermal-magnetic trip elements may be used in lower voltage shore power distribution systems and shall be rated for 40°C ambient.
2.6.2.3.3 Phase Loss Protection
One or more relays shall be installed to protect main service panels with a three-phase power supply from phase loss. Such protective relays shall automatically secure shore power until satisfactory conditions are reestablished, requiring manual reset. Phase loss shall be provided with adjustable time delay (0.1–20 seconds) on the shunt trip of the molded case circuit breaker.
2.6.2.3.4 Surge Protective Devices
Shore power systems shall be equipped with Type 2 surge protective devices (SPDs) to prevent damage to sensitive cutter electronic systems. Such devices shall be designed to clamp line-to-line voltages to the lowest values recognized by UL Standard 1449 and safely dissipate the maximum expected surge energy without damage. SPDs shall be self-testing to alert maintenance personnel of surge protection failure.
2.6.3 Isolation T ransformer Requirements
2.6.3.1 Shore Power Isolation Transformers
Shore power isolation transformers are normally of the dry type, typically available in sizes up to
2500 kVA. Oil-filled transformers are also acceptable, especially for large services, when installed in marine environments; however, local environmental regulations may prohibit locating such units, even those filled with biodegradable vegetable oil, at sites where tank leakage could drain into navigable waters. Designers shall refer to local guidance and code requirements including accounting for marine conditions when selecting an appropriate transformer type.
When significant corrosion or heavy weather is expected, oil-filled transformers are preferred.
2.6.3.2 Transformer Insulation
Shore power transformers for all vessels shall be equipped with copper windings with 220°C rated insulation and 150°C average temperature rise at full load in a 40°C ambient environment.
If a dry type transformer is to be located outdoors, a 115°C epoxy encapsulated transformer shall be used in accordance with NEMA 6P.
2.6.3.3 Transformer Cooling Class
Dry type transformers shall have an “AA/FA” cooling class. Transformer shall be Ambient Air
(AA) cooled under low loading conditions with Forced Air (FA) using natural convection for cooling under heavier loading conditions.
2.6.3.4 Transformers Serving Cutters
Each cutter shore tie service shall be fed from a dedicated delta-delta isolation transformer with the characteristics detailed in the following subsections. Two or more cutters shall not be connected to the same isolation transformer.
2.6.3.4.1 Voltage Adjusting Taps
Voltage adjusting taps on the primary…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .