WMEC 270A Class SLEP 2.0 DD SLE Draft00.pdf
PDF 7 MB Posted
- Solicitation number
- USCGC_WMEC_270_SLEP_RFI
About this file
This document is a draft specification for the U.S. Coast Guard Cutters WMEC 270' Service Life Extension Project (SLEP) 2.0, detailing comprehensive drydock repairs and system replacements for 270' Medium Endurance Cutters. The specification encompasses 45 work items covering extensive vessel modifications, including hull plating inspection and preservation, propulsion system overhauls, generator replacements, stern tube modifications, and weapon system upgrades like installing a new MK 38 MOD 3 Machine Gun System.
Key technical requirements include removing and replacing ship service and emergency diesel generators, performing ultrasonic hull testing, preserving underwater and freeboard surfaces, renewing propulsion shaft components, overhauling stern tube seal assemblies, and installing new cathodic protection anodes. The project involves critical system upgrades across electrical, mechanical, and structural domains, with specific attention to maintaining vessel integrity, improving operational capabilities, and extending the service life of the WMEC 270' class cutters. The associated Request for Information (RFI) seeks industry feedback on project feasibility, with a ship check scheduled for May 22, 2025, and responses due by June 9, 2025.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC WMEC 270 A Class
SPECIFICATION FOR DRYDOCK REPAIRS
FY2027
Developed By: Stephanie L Eldredge
(Draft-00, 11 April 2025)DRAFT
USCGC WMEC-270A DRYDOCK AVAILABILITY FY2027
ii (Draft-00)
TABLE OF CONTENTS
Revisions Record .......................................................................................................................................... iv Consolidated List of References .................................................................................................................... v Consolidated List of Critical Inspection Items ........................................................................................... xii Principal Characteristics ............................................................................................................................ xiii General Requirements ................................................................................................................................ xiv WORK ITEM 1: Hull Plating, Side Scan, Ultrasonic Testing WORK ITEM 2: Hull Plating, U/W Body, Ultrasonic Testing WORK ITEM 3: U/W Body, Preserve, 100 percent WORK ITEM 4: Hull Plating Freeboard, Preserve, 100 Percent WORK ITEM 5: Hull and Structural Plating, Steel Plate, Renew WORK ITEM 6: Propulsion Shaft Fairwaters and Rope Guards, Renew WORK ITEM 7: Appendages (U/W), Preserve (Internal) and Leak Test WORK ITEM 8: Propulsion Shaft Fairwaters And Rope Guards, Inspect WORK ITEM 9: Voids (Non-Accessible), Preserve (Internal) and Leak Test WORK ITEM 10: Voids, Accessible, Clean and Inspect WORK ITEM 11: Mast, Preserve, 100 Percent WORK ITEM 12: Propulsion Shafting, Strain Gauge Alignment, Drydock, Check WORK ITEM 13: Propulsion Propeller Shaft Coating, Inspect and Test WORK ITEM 14: Propulsion Shafting; Remove, Inspect, and Reinstall WORK ITEM 15: Propulsion Intermediate Shafts; Remove, Inspect, and Reinstall WORK ITEM 16: Propulsion Shaft Coating, Renew WORK ITEM 17: Propulsion Shafting, Straighten WORK ITEM 18: Propulsion Shaft Seal (Mechanical And Inflatable) Assemblies, Inspect and Repair or
Renew WORK ITEM 19: Propeller Shaft Sleeves, Renew WORK ITEM 20: Propulsion Shafting, Optical or Laser Alignment Check WORK ITEM 21: Propulsion Shaft Bearings, External, Renew WORK ITEM 22: Stern Tube Interior Surfaces, Preserve, 100 Percent WORK ITEM 23: Controllable Pitch Propellers, Clean and Inspect WORK ITEM 24: Controllable Pitch Propeller (CPP) System, Inspect and Service WORK ITEM 25: Controllable Pitch Propeller (CPP) Hubs, Renew (Optional) WORK ITEM 26: Controllable Pitch Propeller (CPP) Hubs, Inspect (Optional) WORK ITEM 27: Fathometer Transducer, Renew WORK ITEM 28: Doppler Speed Log Transducer, Clean and Inspect WORK ITEM 29: Sea Valves and Waster Pieces, Overhaul Or Renew WORK ITEM 30: Sea Strainers, Duplex, All Sizes, Overhaul WORK ITEM 31: Sea Strainers, Simplex, All Sizes, Clean and Inspect WORK ITEM 32: Rudder Assemblies; Remove, Inspect And Reinstall WORK ITEM 33: Fin Stabilizers (Bearings, Packing, Stock/Blade), Repair or Renew WORK ITEM 34: Tanks, Ballast, Preserve, 100 Percent WORK ITEM 35: Chain Locker, Preserve, 100 Percent WORK ITEM 36: Superstructure, Preserve, 100 Percent WORK ITEM 37: Cathodic Protection, Zinc Anodes, Renew, WORK ITEM 38: Drydock WORK ITEM 39: Temporary Services, Provide - Cutter WORK ITEM 40: Auxiliary Sea Water Piping, Renew WORK ITEM 41: Ballast, Installation WORK ITEM 42: MK 38 MOD 3, Install
DRAFT
iii (Draft-00)
WORK ITEM 43: Shipboard Equipment and Systems, Lay Up WORK ITEM 44: Ship Service Diesel Generator And Emergency Generator, Replace WORK ITEM 45: Stern Tube, Replace iv (Draft-00)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
v (Draft-00)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Contract Guidance Drawing 901 WMEC 111-008, Rev -, Expanded Shell/Gen Arrg’t
Overlay for Shell Survey, 901-904 Coast Guard Drawing 618 WMEC 161-001, Rev B, Arrg’t & Details Stern Tube & Strut Coast Guard Drawing 618 WMEC 243-008, Rev A, Shafting Arrangement & Details Coast Guard Drawing 618 WMEC 244-002, Rev -, Stern Tube & Strut Bearing Details Coast Guard Drawing 627 WMEC 161-001, Rev B, Arrg’t & Details Stern Tube & Strut Coast Guard Drawing 627 WMEC 243-008, Rev K, Shaft Installation Coast Guard Drawing 627 WMEC 244-005, Rev -, Stern Tube & Strut Bearing Details Coast Guard Drawing 901 WMEC 114-003, Rev C, Shaft Fairwaters and Rope Guards Coast Guard Drawing 901 WMEC 111- 004, Rev D, Transom Pl & Fr Coast Guard Drawing 901 WMEC 111-001, Rev G, Shell Exp Fwd 101 Coast Guard Drawing 901 WMEC 111-001, Rev H, Shell Exp Fwd 101 Coast Guard Drawing 901 WMEC 111-002, Rev F, Shell Exp Aft 182 Coast Guard Drawing 901 WMEC 111-002, Rev G, Shell Exp Aft 182 Coast Guard Drawing 901 WMEC 111-003, Rev H, Shell Exp FR 101-182 Coast Guard Drawing 901 WMEC 111-003, Rev J, Shell Exp FR 101-182 Coast Guard Drawing 901 WMEC 114-001, Rev F, Skeg Coast Guard Drawing 901 WMEC 114-002, Rev D, Bilge Keels Coast Guard Drawing 901 WMEC 114-003, Rev C, Shaft Fairwaters and Rope Guards Coast Guard Drawing 901 WMEC 114-003, Rev C, Shaft Fairwaters And Rope Guards Coast Guard Drawing 901 WMEC 114-005, Rev -, Stern Flap Mods to Structure Coast Guard Drawing 901 WMEC 123-002, Rev D, Chain Lkr Bhds & Details Coast Guard Drawing 901 WMEC 162-001, Rev I, Stacks Coast Guard Drawing 901 WMEC 171-001, Rev J, Main Mast Coast Guard Drawing 901 WMEC 184-010, Rev F, XDCR Fdns and Shell Mods Coast Guard Drawing 901 WMEC 184-024, Rev B, Stuct Mods Incidental to DS60 Doppler Install &
ODOM DWDS Rip-Out Coast Guard Drawing 901 WMEC 243-001, Rev K, Shafting Arrangement Coast Guard Drawing 901 WMEC 243-001, Rev L, Shafting Arr vi (Draft-00)
Coast Guard Drawing 901 WMEC 243-001, Rev L, Shafting Arrangement Coast Guard Drawing 901 WMEC 243-002, Rev G, S- Tubes, Strut Brg & Seal A&D Coast Guard Drawing 901 WMEC 243-002, Rev G, Stern Tubes Strut Brg and Seal Arr and Det Coast Guard Drawing 901 WMEC 243-002, Rev G, Stern Tubes, Strut Bearing & Seal Arrangement and
Details Coast Guard Drawing 901 WMEC 243-002, Rev G, S-Tubes, Strut Brg & Seal A&D Coast Guard Drawing 901 WMEC 243-003, Rev F, Shaft Removal Arr Coast Guard Drawing 901 WMEC 243-003, Rev F, Shaft Removal Arrangement Coast Guard Drawing 901 WMEC 243-004, Rev E, Shafting Details Coast Guard Drawing 901 WMEC 243-004, Rev E, Controllable Pitch Propeller Shafting Details Coast Guard Drawing 901 WMEC 243-004, Rev E, CPP Shafting Details Coast Guard Drawing 901 WMEC 243-004, Rev E, Shafting Details Coast Guard Drawing 901 WMEC 243-004, Rev F, Controllable Pitch Propeller Shafting Details Coast Guard Drawing 901 WMEC 243-004, Rev F, CPP Shafting Details Coast Guard Drawing 901 WMEC 243-004, Rev G, CPP Shafting Details Coast Guard Drawing 901 WMEC 243-004, Rev H, Shafting Details Coast Guard Drawing 901 WMEC 243-005, Rev D, Sftg Align Anal and Procs Coast Guard Drawing 901 WMEC 243-006, Rev C, Shaft Seal A&D Coast Guard Drawing 901 WMEC 243-007, Rev D, Shaft Coupling Assemblies, CPP Coast Guard Drawing 901 WMEC 243-007, Rev E, Controllable Pitch Propeller Shaft Coupling
Assemblies Coast Guard Drawing 901 WMEC 243-007, Rev E, Shaft Coupling Assemblies Coast Guard Drawing 901 WMEC 243-008, Rev A, Hub & Rudder Removal Padeye Arr. & Details Coast Guard Drawing 901 WMEC 245-001, Rev E, CPCH Prop Hyd Sys Diag Coast Guard Drawing 901 WMEC 245-002, Rev F, CPCH Prop Hyd Sys A & D (901) Coast Guard Drawing 901 WMEC 245-003, Rev E, Controllable Pitch Propeller Propeller Hub Assembly Coast Guard Drawing 901 WMEC 245-004, Rev E, Controllable Pitch Propeller Escher Wyss 270 ft
WMEC Blade and Palm Coast Guard Drawing 901 WMEC 245-004, Rev E, Controllable Pitch Propeller Eshcer Wyss 270ft
WMEC Blade and Palm Coast Guard Drawing 901 WMEC 245-005, Rev -, C.P. Propeller Coast Guard Drawing 901 WMEC 245-007, Rev B, Special Tools Coast Guard Drawing 901 WMEC 245-007, Rev B, Special Tools Coast Guard Drawing 901 WMEC 245-008, Rev D, Controllable Pitch Propeller Actuating Unit Type
300.3GN
Coast Guard Drawing 901 WMEC 245-008, Rev D, CPCH Prop Actuator Unit Assy Coast Guard Drawing 901 WMEC 245-009, Rev L, CPCH Prop Hyd Sys Diag Coast Guard Drawing 901 WMEC 245-010, Rev F, CPCH Prop Hyd Sys A & D (902-904) Coast Guard Drawing 901 WMEC 245-013, Rev B, Pitch Actuator System Engagement Mechanisms, Links Shaft Clamps and Brackets Coast Guard Drawing 901 WMEC 245-014, Rev A, CPP System Pitch Setters Coast Guard Drawing 901 WMEC 245-015, Rev B, CPP System Pitch Setters Main Boards, Sub-Boards, Scales and Mechanical Stops vii (Draft-00)
Coast Guard Drawing 901 WMEC 256-002, Rev T, Mn and Aux SW Cooling Sys A&D Coast Guard Drawing 901 WMEC 256-004, Rev A, Aux Salt Water Mods Coast Guard Drawing 901 WMEC 256-004, Rev A, Aux. Salt Water Mods.
Coast Guard Drawing 901 WMEC 256-012, Rev -, Shaft Seal Vent Line Modification Coast Guard Drawing 901 WMEC 256-013, Rev -, Mn and Aux Sw Cooling Sys Diag Coast Guard Drawing 901 WMEC 256-013, Rev -, Mn and Aux SW Cooling Sys Diag Coast Guard Drawing 901 WMEC 256-013, Rev A, Mn and Aux SW Cooling Sys Diag Coast Guard Drawing 901 WMEC 259-002, Rev K, Diesel Exhaust System A & D Coast Guard Drawing 901 WMEC 259-002, Rev K, Diesel Exhaust System A&D Coast Guard Drawing 901 WMEC 424-004, Rev D, Doppler Speed Log System Replacement Ripout, Installation, Arrangement, Wiring and Details Coast Guard Drawing 901 WMEC 451-010, Rev D, 1SG38-SINS2(V)45 Installation BWD & Details Coast Guard Drawing 901 WMEC 524-003, Rev G, Sea Conn, Seachest Conn and Waster Piece A&D Coast Guard Drawing 901 WMEC 529-001, Rev N, Ballasting & Emer Bilge Drainage Sys Diagram Coast Guard Drawing 901 WMEC 562-003, Rev B, Rudderstock Seal Coast Guard Drawing 901 WMEC 562-005, Rev K, A & B Class Rudder Stock And Steering Gear A &
D Coast Guard Drawing 901 WMEC 562-005, Rev K, Rudder Stock and Steering Gear A & D Coast Guard Drawing 901 WMEC 565-005, Rev -, Fin Stabilizer Hydraulic System Diagram Coast Guard Drawing 901 WMEC 565-007, Rev H, Fin Stabilizer Variable Assembly Coast Guard Drawing 901 WMEC 565-020, Rev -, Fin Stabilizer Variable Assembly (Sperry 1890934) Coast Guard Drawing 901 WMEC 565-031, Rev C, Fin Shaft Assembly, w/ Sleeve Fitted NSN 3040-01-
104-5121 Coast Guard Drawing 901 WMEC 565-034, Rev -, Fin Stabilizer Clevis Pin Coast Guard Drawing 901 WMEC 581-002, Rev C, Hawse & Chain Pipes Coast Guard Drawing 901 WMEC 588-003, Rev M, Hlcptr Safety Net-A&D Coast Guard Drawing 901 WMEC 602-002, Rev C, Distinguishing Figures Coast Guard Drawing 901 WMEC 603-001, Rev A, Draft Marks Coast Guard Drawing 901 WMEC 612-004, Rev A, NAVSEA Certified Flight Deck Net Installation.
Coast Guard Drawing 901 WMEC 633-001, Rev B, Cathodic Protection – A & D Coast Guard Drawing 901 WMEC 801-009, Rev L, Outboard Profile Coast Guard Drawing 901 WMEC 801-009, Rev M, Outboard Profile Coast Guard Drawing 901 WMEC 801-012, Rev B, Curves of Form Coast Guard Drawing 901 WMEC 801-022, Rev K, Docking Plan Coast Guard Drawing 905 WMEC 114-003, Rev B, Shaft Fairwaters & Rope Guards Coast Guard Drawing 905 WMEC 243-001, Rev B, Shafting Arrangement Coast Guard Drawing 905 WMEC 243-002, Rev F, Stern Tubes Strut Brg and Seal Arr and Det Coast Guard Drawing 905 WMEC 243-012, Rev B, Controllable Pitch Propeller Shaft Details Coast Guard Drawing 905 WMEC 562-001, Rev G, Rudder Coast Guard Drawing 905 WMEC 565-020, Rev -, Fin Stabilizer Tiller Coast Guard Drawing FL 184-002, Rev A, SS60 Transducer Install Adapter Assy Coast Guard Fleet Drawing FL 2804-12, Rev -, U.S.C.G. Emblem viii (Draft-00)
Coast Guard Fleet Drawing FL 2804-22, Rev A, Consolidated Visual ID for Cutters DEVELOPER NOTE: Delete 901 WMEC 588-003 once Flight Deck Net Replacement TCTO is accomplished. If TCTO is not yet accomplished, delete 901 WMEC 612-004.
NAVSEA Drawing 803-2145807, Rev C, Propulsion Shafting and Components NAVSEA Drawing 803-921865, Rev R, Cathodic Protection Hull Zinc Anodes
COAST GUARD PUBLICATIONS
«REF_A»
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors
Manual Coast Guard Technical Publication (TP) 10500, December 2019, Doppler Sonar, Model DS-60 Coast Guard Technical Publication (TP) 2697, Mar 2024, Main Reduction Gear Coast Guard Technical Publication (TP) 2698, Oct 2019, Manufacturer’s Instruction Book-SWBS
Group(s) 242-245, SWBS 243, Section B – Stuffin g Box Coast Guard Technical Publication (TP) 2699, Feb 2020, Technical manual for the Controllable Pitch
Propeller Coast Guard Technical Publication (TP) 2699, Jan 2023, Manufacturer’s Instruction Book-SWBS
Group(s) 245, Controllable-Pitch Propeller System Coast Guard Technical Publication (TP) 2699, SWBS 245, Section A, Feb 2018, Controllable Pitch
Propeller System Coast Guard Technical Publication (TP) 2718, Jan 2017, Manufacturer’s Instruction Book - SWBS
Group(s) 555-562, 270’ WMEC “A” Class Cutters, Section A, SWBS 561, Steering Gear System, and SWBS 562, Rudder Stock Seal Assembly
Coast Guard Technical Publication (TP) 2719, Aug 2016, Manufacturer’s Instruction Book SWBS Group(s) 565, 270’ WMEC “A” Class Cutters, Fin Stabilizer Machinery
Coast Guard Technical Publication (TP) 5454, Nov 2013, Technical Manual for Type MA Mechanical Stern Tube Seal
Coast Guard Technical Publication (TP) 5490, Apr 2018, Fin Stabilizer System Coast Guard Technical Publication (TP) 9063, SWBS 252, Aug 2016, Coast Guard Machinery Control
System (CGMCS) – Pitch Control System & Throttle Control system – Vol 4 Coast Guard Technical Publication (TP) 9187, SWBS 243, May 2021, Propulsion Shafting and CPP
System Service Manual Fire Prevention and Response Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2020, General
Requirements Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General
Requirements Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Latest Version, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and
Allied Processes Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and
Allied Processes Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Latest Version, Welding and Allied Processes ix (Draft-00)
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard Electrical Cable Removal, Relocation, Splice, Repair, and Installation
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Inspect, Repair, and Test Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), Latest Version, Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2020, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), Latest Version, Requirements for Preservation of Ship Structures Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2022, Drydocking Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2020, Temporary
Services Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2022, Temporary
Hull Accesses
OTHER REFERENCES
American Society for Nondestructive Testing (ASNT) SNT-TC-1A, 2020, Recommended Practice for
Personal Qualification and Certification in Nondestructive Testing American Society of Mechanical Engineers (ASME) B16.34, 2017, Valves-Flanged, Threaded, and
Welding End APM: If work is being done in DD, no cofferdam is needed; delete cofferdam protective measures paragraph 3.1.3 and above NAVSEA ref. Above NAVSEA ref is accessible on-line ASTM D5162, 2021, Standard Practice for Discontinuity (Holiday) Testing of Nonconductive Protective
Coating on Metallic Substrates ASTM International (ASTM) D1330, 2010, Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets ASTM International (ASTM) D5363, 2016, Standard Specification for Anaerobic Single-Component
Adhesives (AN) ASTM International (ASTM) F992, 2017, Standard Specification for Valve Label Plates Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for
Shipyard Employment Commercial Item Description (CID) A-A-59313, Nov 2003, Thread Compound; Anti-seize, Zinc Dust-
Petrolatum Federal Specification (Fed Spec) HH-P-151, Mar 1991, Packing; Rubber-Sheet, Cloth-Insert International Standard Organization (ISO) 4406, 2017, Hydraulic Fluid Power – Fluids – Method for
Coding the Level of Contamination by Solid Particles – Third Edition Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2013 Edition, Pressure Testing Of Steel Valves Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2017 Edition, Butterfly Valves x (Draft-00)
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2018 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2013 Edition, Bronze Gate, Globe, Angle and Check Valves
MIL PRF-16173, Oct 2017, Corrosion Preventive Compound, Solvent Cutback, Cold-Application MIL-A-18001, Dec 2015, Anodes, Sacrificial Zinc Alloy MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning MIL-PRF-16173, Oct 2017, Corrosion Preventive Compound, Solvent Cutback, Cold Application MIL-PRF-16173, Oct 2017, Corrosion Preventive Compound, Solvent Cutback, Cold-Application MIL-PRF-16173, Sep 2006, Corrosion Preventive Compound, Solvent Cutback, Cold-Application MIL-PRF-16173E, Oct 2017, Corrosion Prevention Compound, Solvent Cutback, Cold-Application MIL-PRF-17672E, Oct 2012, Hydraulic Fluid, Petroleum, Inhibited MIL-PRF-24647, Jan 2018, Paint System, Anticorrosive and Antifouling, Ship Hull MIL-S-45180, 1998, Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant MIL-STD-1687, Sep 1994, Thermal Spray Process for Naval Ship Machinery Application MIL-STD-2191, Nov 1992, Repair Welding, Weld Cladding, Straightening, and Cold Rolling of Main
Propulsion Shafting MIL-STD-2199A (SH), Jan 2020, Covering for Waterborne Main Propulsion Shafting on U.S. Naval
Surface Ships and Submarines MIL-STD-2199B (SH), Jan 2020, Coverings for Waterborne Main Propulsion Shafting on U.S. Naval
Surface Ships and Submarines MIL-STD-2199B, Jan 2020 Coverings for Waterborne Main Propulsion Shafting on U.S. Naval Surface
Ships and Submarines Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA-
PRO-160, Nov 2011, Chapter 16, Cofferdams Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA-
PRO-160, Nov 2011, Chapter 16, Cofferdams NAVSEA Technical Manual S9243-AW-TRS-011/SHAFT Rev 1, June 2015, Surface Ships Main
Propulsion Shafting Refurbishment Procedures NAVSEA Technical Manual S9245-AR-TSM-010, December 2012, Marine Propeller Inspection, Repair, and Certification NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for
Fabrication, Welding, and Inspection of Submarine Structure Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 2020 Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric Society of Automotive Engineers (SAE) Aerospace Material Specification AMS-C-6183, 2019, Cork and
Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets Society of Automotive Engineers (SAE) AMS-G-6032, August 2012, Grease, Plug Valve, Gasoline and
Oil Resistant, NATO Code Number G-363, Metric The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2016, Solvent Cleaning The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power-Tool Cleaning to Bare Metal xi (Draft-00)
The Society for Protective Coatings (SSPC) Surface Preparation Specification SSPC-SP 11, 2013, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP 12/NACE No.5, 2002, Surface Preparation and Cleaning of Metals by Waterjetting Prior to Recoating
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation Standard SSPC-SP WJ-2, 2012, Waterjet Cleaning of Metals – Very Thorough Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE), 2007, Joint Surface Preparation Standard SSPC-SP 10/NACE No.2, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE-International (NACE) Joint Surface Preparation Standard SSPC-SP 10/NACE No. 2, 2007, Near-White Metal Blast Cleaning xii (Draft-00)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5 (Inspection report particulars)):
Work Item Title
1 Hull Plating, Side Scan, Ultrasonic Testing
2 Hull Plating, U/W Body, Ultrasonic Testing
3 U/W Body, Preserve, 100 percent
7 Appendages (U/W), Preserve (Internal) and Leak Test
9 Voids (Non-Accessible), Preserve (Internal) and Leak Test
13 Propulsion Propeller Shaft Coating, Inspect and Test
14 Propulsion Shafting; Remove, Inspect, and Reinstall
15 Propulsion Intermediate Shafts; Remove, Inspect, and Reinstall
18 Propulsion Shaft Seal (Mechanical And Inflatable) Assemblies, Inspect and Repair or Renew
21 Propulsion Shaft Bearings, External, Renew
23 Controllable Pitch Propellers, Clean and Inspect
24 Controllable Pitch Propeller (CPP) System, Inspect and Service
30 Sea Strainers, Duplex, All Sizes, Overhaul
31 Sea Strainers, Simplex, All Sizes, Clean and Inspect
32 Rudder Assemblies; Remove, Inspect And Reinstall
33 Fin Stabilizers (Bearings, Packing, Stock/Blade), Repair or Renew
38 Drydock xiii (Draft-00)
PRINCIPAL CHARACTERISTICS
270' WMEC (A-CLASS)
PHYSICAL
Length overall 270' 0" Length between perpendiculars 255' 0" Beam molded 38' 0" Depth molded, main deck amidships 01 level amidships
23' 6" 31' 4"
Full load displacement 1,902.2 long tons Draft, full load to baseline amidships 14' 3" Highest projection above baseline *height approximated
≈ 110' 0"
Shore tie voltage requirements 2 cables, 400A / 450V, 3 phase Frame spacing 1' 0"
MACHINERY
Main propulsion 2 ALCO Model 18-251-F Diesel Engines, 3,600 BHP each Ship’s service generators 2 Caterpillar Model D-398-TA Diesel-driven KATO 6P6-
1350 Generators. 475 KW each @ 0.8 power factor, 450VAC, 3 phase, 60 cycle
Emergency generators Caterpillar Model D-348-TA Diesel-driven KATO 4P4- 1900. 475KW @ 0.8 power factor, 450VAC, 3 phase, 60 cycle
Number of propellers 2 Propeller diameter 9' 0" Number of blades, Each 4 Pitch Controllable Shaft RPM 260 Shaft diameter 10.55" at exit of hull Anchor & chain Two 4,000 lb Navy Stockless Anchors, 8 shots of chain each
TANK CAPACITIES
Diesel fuel total (95%) 79,210 gal.
JP-5 total (95%) 25,890 gal.
Potable water total (100%) 8,553 gal.
Hydraulic & lube oil total (95%) 2,237 gal.
xiv (Draft-00)
00000_0824_FLT
REC_00000_FLT_Commercial Project @ Contractor’ Facility (0121)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and 'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), Latest Version, General Requirements Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), Latest Version, Welding and Allied Processes Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), Latest Version, Requirements for Preservation of Ship Structures
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for
Shipyard Employment
3. REQUIREMENTS
3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements in this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
xv (Draft-00)
NOTE
NAVSEA drawings listed will be available FOR INSPECTION ONLY from the Coast Guard Port Engineer post-award. SFLC will not redistribute NAVSEA documents.
Contractors can apply to NAVSEA headquarters directly for copies.
3.2 Fire watch requirements. The Contractor must refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec 0000, in accomplishing the following task:
• Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.
• Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec 6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. The Contractor must obtain a written KO authorization to deviate from any coatings required in SFLC Std Spec 6310 Appendix C before work.
3.3.3 In-process quality control measures. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).
3.3.3.1 Quality control requirements. The Contractor must abide by the following when performing preservation related inspections. The following measurements must be randomly spaced throughout for the purposes of providing a representation of the entire prepared or coated surface.
3.3.3.1.1 Surface profile measurements. One surface profile measurement must be taken for every 200 square feet for the first 1000 square feet; for each additional 500 square feet or less, one profile measurement must be taken.
Profile measurements must be taken in accordance with SFLC Std Spec 6310, paragraph 3.1.8.3 (Surface profile measurements). A “measurement” for surface profile is defined as follows:
• ASTM D4417, Method B: One profile measurement is the average (mean) of 10 individual readings.
• ASTM D4417, Method C: One profile measurement is the average (mean) of 2 individual readings.
3.3.3.1.2 Soluble salt conductivity measurements. 5 conductivity measurements must be taken every 1000 square feet. For submerged (immersed) applications conductivity measurements must not exceed 30 microsiemens/cm.
For non-submerged (non-immersed) applications conductivity measurements must not exceed 70 microsiemens/cm. If a conductivity check fails, clean the surface in accordance with SFLC Std Spec 6310, paragraph 3.1.8.5 (Soluble salt removal).
3.3.3.1.3 Coating thickness measurements. Three area measurements must be taken for the first 1000 square feet;
for each additional 1000 square feet, perform an additional area measurement. A “measurement” for coating thickness is defined as follows:
• SSPC-PA 2 defines an area measurement as 5 separate spot measurements randomly spaced throughout a 100 square foot area.
• SSPC-PA 2 defines a spot measurement as 3 gage readings and each new gage reading the probe must xvi (Draft-00) be moved to a new location within a 1.5-inch diameter circle defining the spot.
3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non USCG) facilities. The Contractor must provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor must comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.2 Test and procedures. The Contractor is required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.
3.5.3 Regulatory notifications. The Contractor is responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor must submit copies of all regulatory notifications to the Contracting Officer and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, who is responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out;
ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix A, Requirements For Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
3.6 Local Policy. The Contractor must refer to site (e.g., Base) Regulations and Instructions for details regarding local policies (e.g., crane services, parking, or facility usage).
xvii (Draft-00)
3.7 SFLC Standard Specification approved changes. Approved updates to the 2022 SFLC Standard Specifications will appear here.
none
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
xviii (Draft-00)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE / TIME
NAME OF CG REPRESENTATIVE SIGNATURE UNIT DATE/TIME
xix (Draft-00)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL # WORK ITEM
# WORK ITEM TITLE
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE / TIME
xx (Draft-00)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (FRAME REFERENCES) AREA (SQFT)
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/AMPP No. 2
SSPC-SP WJ-2/AMPP WJ-2
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Place Surface Profile Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE /
TIME
xxi (Draft-00)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/AMPP No. 2
SSPC-SP WJ-2/AMPP WJ-2
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area) Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA
RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO
SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Mils Reading (IAW ASTM D4417-Method B for above 10 readings (by column):
Mean Reading (mils)
NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE /
TIME
xxii (Draft-00)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE / TIME
xxiii (Draft-00)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL # WORK ITEM
# WORK ITEM TITLE
COATING MFG PRODUCT NAME BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5 AVERAGE
VALUE
*BASE METAL READING
(BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE /
TIME
xxiv (Draft-00)
4.2 Tank and Void Assessment form.
xxv (Draft-00)
1 (Draft-00)
11000_SideScan_ESD_0723_FLT REC_11000_Side_Scan_FLT_270’ WMEC ‘A’ Class (ALL) (0323)
WORK ITEM 1: Hull Plating, Side Scan, Ultrasonic Testing
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform thickness measurements of underwater (u/w) hull plating by ultrasonic side scan method.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 901 WMEC 111-001, Rev H, Shell Exp Fwd 101 Coast Guard Drawing 901 WMEC 111-002, Rev G, Shell Exp Aft 182 Coast Guard Drawing 901 WMEC 111-003, Rev J, Shell Exp FR 101-182 Coast Guard Drawing 901 WMEC 111- 004, Rev D, Transom Pl & Fr Coast Guard Contract Guidance Drawing 901 WMEC 111-008, Rev -, Expanded Shell/Gen Arrg’t
Overlay for Shell Survey, 901-904
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General
Requirements
OTHER REFERENCES
American Society for Nondestructive Testing (ASNT) SNT-TC-1A, 2020, Recommended Practice for
Personal Qualification and Certification in Nondestructive Testing
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in the following paragraph(s):
• 3.3 Side scan requirements and procedures.
2 (Draft-00)
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
• Hull zinc anode system
• Docking blocks
3.2 Work coordination and preparation. The Contractor must plan all specified vessel work detailed in this specification package to ensure the side scan survey does not necessitate a work stoppage. The Contractor must abide by the following guidance, to facilitate the ultrasonic survey:
• Ensure that all u/w body surface preparation and primer coat application tasks are completed within ten days of lifting the vessel.
• Provide a continuous supply of fresh water at .50 gpm within 50 feet of the vessel with standard hose bib fitting.
• Provide 110 VAC electrical power, and scaffolding or other suitable means of access to bring inspection personnel within one foot of all the body surface inspection areas that are five feet above ground level.
• After completion of the hull survey, and authorized hull repairs, resume/complete u/w body preservation process by applying the second coat of the anti-corrosive coating system, and all anti-fouling paint coats.
• Pay close attention to manufacturer’s recommended practices in regards to paint system overcoat time limitations and required degree of surface cleanliness prior to resuming u/w body coating application.
3.3 Side scan requirements and procedures. The Contractor must ensure the following referring to the Coast Guard drawings listed in Section 2 (References) herein as guidance during the performance of the tasks specified below and submit a CIR.
3.3.1 Testing company and personnel. Provide the services of a qualified ultrasonic testing company, with suitable side scan equipment, to conduct a “Scanning Crawler Automated Test” of the vessel’s u/w hull plating for the presence of metal corrosion and deterioration. Ensure the following:
• All scanning operations are completed by personnel meeting the personnel qualification and certification, as required by contractor process. This contractor-developed personnel qualification and certification process must meet, at a minimum, ASNT Recommended Practice No. SNT-TC-1A.
• An ASNT Level III Analyst is on site, to oversee the project and evaluate the collected data.
• An ASNT Level III or II Analyst is on site, to verify with a hand held gauge all areas on the hull identified as thinner than the specified criteria, in order to expedite all repair procedures.
• Qualified personnel are provided to complete all on-site corrosion inspections.
3.3.2 Coast Guard notification.
3.3.2.1 Provide a daily update to the COR on all areas inspected and potential issues or schedule changes.
3.3.2.2 Notify the COR at least 3 days prior to completion for an onsite review of readings and repair areas.
3 (Draft-00)
3.3.3 Scanning parameters. Use the following parameters during the course of this inspection:
• Automated scanning resolution must be set to 0.5” x 0.5”
• Plates where scan data indicating wastage greater than or equal to 25% nominal plate thickness must be highlighted in “RED” and designated “repair areas”.
• Plates where scan data indicating wastage greater than or equal to 15% to 24% of nominal plate thickness must be highlighted in “YELLOW”.
• Plates where scan data indicating wastage less than 15% of nominal plate thickness must be highlighted in DARK GREEN.
• Hand held UT readings must be taken to verify bad metal areas found with the side scan equipment.
All readings must be provided to the COR and the lowest reading marked on the hull at the bad metal location.
• Areas that are accessible but cannot be reached by the automated scanner must be scanned with a hand-held meter at a resolution of 2” x 2”. Any repair areas found during the hand scan must be marked on the ship’s hull and their approximate positions recorded on the plate drawings and report summary.
3.3.3.1 Any scanning parameter or scope of work changes, including deviations to the color scheme specified above, must be approved by the KO.
3.3.3.2 The “echo-to-echo” technique, or use of multiple backwall echoes to exclude coating thickness, is not authorized due to unreliability in this application.
3.3.4 Ensure that the side scan inspection area includes the Port, Starboard, and Transom exterior shell plate below the water line, but excludes the following list.
• Areas under and within 6-inches of blocks and side blocks (areas that are accessible 6 inches from blocks and side blocks must be hand scanned.)
• Areas up to 6-inches around any obstacle on the hull including sea suctions, discharges, rudderposts, knuckle, bow stem, stabilizer tubes, and stern tubes, as applicable.
• Any areas blocked by immovable scaffolding or shipyard activity.
3.4 Side scan reports. The Contractor must submit to the COR a final report within 3 working days after the side scan inspection is completed. A copy of all repair areas must be clearly marked on the provided shell plate drawing(s), and provide a summary document of same areas.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .