This document is a U.S. Coast Guard Bridge Pre-Construction Notice and Request form applicable to waterway projects in the Jacksonville sector. The form serves as a notification checklist for contractors undertaking bridge-related work and requires submission to both Sector Jacksonville Waterways and the Southeast District Bridge Administration. Key procedural requirements include submission of a 60-day advance notice prior to project start and a 30-day advance notice before any channel obstructions, closures, or opening restrictions occur. The form requires contractors to identify specific project details including the roadway/bridge name, waterway, bridge owner, project timeline, in-water equipment to be used, petroleum products or hazardous materials storage and transfer activities, and any proposed channel or vertical clearance restrictions. For movable spans, contractors must specify whether they are requesting complete closure, single leaf opening, limited openings, or advance notice procedures, along with the hours of advance notice needed for full opening and equipment repositioning.
The form mandates that all in-water equipment be properly lighted per Coast Guard requirements and establishes protocols for equipment placement and removal at the end of each workday. Contractors must designate a primary 24-hour point of contact and identify a separate point of contact responsible for full opening procedures and equipment movement. For projects occurring between June and November, submission of a hurricane plan is required. All notifications must be directed to Sector Jacksonville Waterways at D07-DG-SECJAX-WATERWAYS@uscg.mil and Jennifer N. Zercher at the Southeast District Bridge Administration. The form applies to the Main Street Bridge No. 794004 repairs project in Daytona Beach, Florida, administered by Volusia County's Department of Public Works.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
BRIDGE PRE-CONSTRUCTION NOTICE/REQUEST
Roadway/Bridge:
Waterway:
Bridge Owner:
Contractor Primary/24-Hour POC:
Project: Start Date/Time: Finish Date/Time:
Brief Project Description:
The Coast Guard requires all in-water equipment to be properly lighted. List any in-water equipment to be used:
Describe type/quantity of petroleum products or hazardous materials stored/transferred on site (if any):
Describe any proposed channel restrictions or closures and/or vertical clearance restrictions. Include dates/times of restriction(s):
On a movable span, are you requesting: Complete Closure, Single Leaf Opening, Limited Openings, Advance Notice.
Please Explain:
If Applicable:
Hurricane plan submitted for projects between June & November: Y/N How many hours advance notice needed for a full opening:
How many hours advance notice needed to move equipment to provide access to full channel:
Will in-water equipment remain in place or moved at end of workday:
POC for full opening/moving equipment:
60 days advance notice required prior to starting a project. 30 days advance notice required prior to any channel obstructions, closures, or opening restrictions. Make all notifications to Sector Jacksonville Waterways (D07-DG- SECJAX-WATERWAYS@uscg.mil) and to Southeast District Bridge Administration (Jennifer.N.Zercher@uscg.mil)
US Coast Guard Southeast District ꞏ Bridge Administration Branch (dpb) ꞏ 909 SE 1st Ave. ꞏ Miami, FL 33131