About this file

This is a Prime/Subcontractor Form for the County of Volusia, Department of Public Works, Road & Bridge Division, for ITB No. 27-B-30KW, Contract No. C-2107, related to Main Street Bridge No. 794004 Repairs—Cleaning and Painting project in Daytona Beach, Florida. The project requires cleaning and painting all structural steel on the bascule and flanking spans, installing web repair plates, replacing bolts and rivets, removing abandoned air buffers and strike plates, and disassembling bearings for cleaning, re-packing, and replacement of grease fittings. The form mandates that bidders list all proposed subcontractors and their respective work disciplines, with anticipated subcontractor categories including Maintenance of Traffic, Bridge Balance Testing—Counterweight Adjustment, Steel Cleaning, Prep & Painting, and Soil Testing. The contractor must provide all labor, materials, equipment, traffic control, environmental testing, functional checks including span balancing, operation and maintenance manuals, and restoration and as-built surveys and drawings. Failure to complete and return this form may result in a non-responsive bid.

The form requires bidders to allocate the total bid price across the prime contractor and all subcontractors, with green-shaded cells designating where dollar values and work percentages must be entered; all other cells are automatically calculated. The prime contractor is responsible for ensuring all subcontractors hold appropriate licenses, and any subcontractor changes during project completion require prior written approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not permit changes to the total submitted base bid pricing. This form is also used to determine local preference in accordance with Section 2.8, D (Local Bid Preference) as outlined in the solicitation documents.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Contract No. C-2107ITB No. 27-B-30KW
PRIME/SUBCONTRACTOR FORM
FAILURE TO COMPLETE AND RETURN THIS FORM MAY RESULT IN A NON-RESPONSIVE BID
Bidders are to list ALL Subcontractors that he/she proposed to perform scope of work for this project. The bidder hereby states that he/she proposes, if awarded the contract to hire the following Subcontractor(s) for this project. Prime Contractor is responsible for ensuring that all Subcontractors hold the appropriate license(s). Any change to the Subcontractors during the completion of this project shall receive prior approval from the County Project Manager. The County reserves the right to seek clarification regarding subcontractors but will not allow change to the total submitted base bid pricing.
TOTAL BID$ - 0This number should match the Total Bid Price

(inclusive of performance/payment bond, if applicable) as listed in Section 10, Pricing Table

PRIME CONTRACTORCompany name and complete addressDollar Value performed by Prime Contractor% of Work performed by Contractor
$ - 00.00%
List appropriate sub contractors to be used for each displine listed below, if prime is self performing note self performing in the box under company name and address and submit $0.00 to equal 0 % as this should be included in the green box above. If additional subcontractors are required and their discipline is not listed below they may be added in the blank rows. This form will also be used to determine local preference in accordance with Section 2.8, D. Local Bid Preference in the solicitation.
Anticipated Subcontractor Disciplines required for this project.Company name and complete addressDollar Value performed by Subcontractor(s)% of Work performed by Subcontractor
(Examples: Electrical, HVAC, Plumbing,
Landscaping, etc. for your project)0.00%
Maintenance of Traffic$ - 00.00%
Bridge Balance Testing -
Counterweight Adjustment$ - 00.00%
Steel Cleaning, Prep & Painting$ - 00.00%
Soil Testing$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
$ - 00.00%
Bidders shall complete the areas shaded in GREEN, which shall be the dollar values assigned to each Contractor (Prime and Subs). All other cells shall be automatically calculated. The total listed in the GREY cell must equal 100%$ - 00%