USAG Ansbach Grounds_Maintenance_Performance Work Statement (PWS).pdf
PDF 2 MB Posted
- Attached to
- Grounds Maintenance USAG Ansbach
- Solicitation number
- W912PB-26-R-A003
About this file
This Performance Work Statement (PWS) details ground maintenance services for U.S. Army Garrison Ansbach in Germany, covering eight kasernes across approximately 8,967,831 square meters. The contract is for a base year with four 12-month option years, running from April 2026 to March 2030, with a 30-day phase-in period. The contractor will provide comprehensive grounds maintenance including mowing, edging, trimming, tree and shrub maintenance, irrigation, fertilization, leaf and debris removal, and specialized services for high visibility, common, and unimproved areas.
Key requirements include maintaining grass at specific heights (2 inches for athletic fields and housing, 3 inches for other areas), performing tasks according to Work Capability Level 3 standards, and managing maintenance across different ground categories. The contractor must provide all personnel, equipment, and materials, follow environmental and safety regulations, and submit various deliverables including a Quality Control Plan, training certificates, and performance reports. The contract is a firm-fixed-price type with some "As Required" contract line items, and will cover grounds maintenance for approximately 5,778 military, civilian, and contractor personnel, along with 3,145 resident family members.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
i
GROUND MAINTENANCE SERVICES
PERFORMANCE WORK STATEMENT (PWS)
1 October 2025
USAG Ansbach Grounds Maintenance Services Enterprise-wide Performance Work Statement (PWS) (ISR 404 – Grounds Maintenance Services)
Table of Contents
1.0 General
1.1 Description of Services/Introduction
1.2 Background
1.3 Objectives
1.4 Scope
1.5 Period of Performance (PoP)
1.6 Traffic Flow
1.7 Restoration of Real Property Damage
1.8 General Information
1.8.1 Quality Control Plan (QCP)
1.8.2 Place of Performance
1.8.3 Recognized Holidays
1.8.4 Hours of Operation
1.8.5 Installation Closures
1.8.6 Emergency Delays
1.8.7 Unforeseen Closures of Service Areas
1.8.8 Place of Performance
1.8.9 Type of Contract
1.8.10 Security Requirements
1.8.11 Access and General Protection/Security Policy and Procedures
1.8.12 Physical Security
1.8.13 Security Training
1.8.14 Anti-Terrorism (AT) Level I Training
1.8.15 iWATCH Training
1.8.16 Operational Security (OPSEC) Awareness Training
1.8.17 Threat Awareness and Reporting Program Training
1.8.18 Local Health Protection Conditions
1.8.19 Key Control
1.8.20 Lost Keys
1.8.21 Prohibited use of Government provided keys or key cards
1.8.22 Lock Combinations
1.8.23 Post Award Conference/Periodic Progress Meetings
1.8.24 Service Contract Reporting
1.9 Government Roles and Responsibilities
(ISR 404 – Grounds Maintenance Services)
1.9.1 Contracting Officer (KO)
1.9.2 Contracting Officer’s Representative (COR)
1.9.3 COR Authority
1.9.4 COR Functions
1.10 Specific Contractor Requirements, Roles and Responsibilities
1.10.1 Authorization to Perform Services in Germany
1.10.2 Contractor Hiring Restrictions
1.10.3 Contractor Identification
1.10.4 Standards of Conduct
1.10.5 Contractor Key Personnel
1.10.6 Project Manager (PM)
1.10.7 Quality Control Manager (QCM)
1.10.8 Quality Control Inspectors (QCI)
RESERVED
1.10.9 Phase In /Phase Out Period
1.11 Emergency Services
1.11.1 Emergency Medical Treatment
1.11.2 Accident Reporting
1.12 Environmental Compliance Plan and Program
1.12.1 Safety
1.12.2 Safety Plan
1.12.3 Spill Plan
1.12.4 Asbestos Awareness
1.13 Environmental Compliance
2.0 Definitions and Acronyms
2.1 Definitions
2.2 ACRONYMS
3.0 Government Furnished Property, Equipment and Services
3.1 Property
3.2 Equipment
3.3 Services
3.4 Utilities
3.5 Materials
4.0 Contractor Furnished Items and Services
4.1 General
(ISR 404 – Grounds Maintenance Services)
4.2 Materials
4.3 Equipment
4.4 Unserviceable Contractor Equipment
4.5 Vehicles
5.0 Specific Tasks for Grounds Maintenance
5.1 General
5.2 Description of Services
5.2.1 Scope
5.2.2 Service High Visibility Areas
5.2.3 Mowing
5.2.4 Edging
5.2.5 Trimming
5.2.6 Fertilizing and Liming
5.2.7 Seeding and Topsoil
5.2.8 Hydroseeding
5.2.9 Sodding
5.2.10 Aerating and Overseeding
5.2.11 Maintain Flower Beds
5.2.12 Weed Control
5.2.13 Remove Debris, Leaves, and Litter
5.2.14 Service/Maintain Trees
5.2.15 Perform Mechanical Tree Spading and Transplanting
5.2.16 Tree Mulching
5.2.17 Tree Fertilization
5.2.18 Tree Pruning
5.2.19 Tree Removal and Replacement
5.2.20 Emergency Tree Removal
5.2.21 Reforestation
5.2.22 Hedge and Shrub Maintenance
5.2.23 Hedge and Shrub Mulching
5.2.24 Hedge and Shrub Fertilization
5.2.25 Hedge and Shrub Pruning
5.2.26 Irrigation
5.2.27 Operation of Irrigation Systems
5.2.28 Maintenance of Irrigation Systems
(ISR 404 – Grounds Maintenance Services)
5.2.29 Service/Maintain Xeriscape Areas
5.2.30 Athletic Fields Grounds Maintenance
5.2.30.1 Aerification of Athletic Fields
5.2.30.2 Fertilization of Athletic Fields
5.2.30.3 Edging of Athletic Fields
5.2.31 Special Services
5.2.32 Special Event Services
5.2.33 Service Common Areas
5.2.34 Service Fire Breaks and Ranges
5.2.35 Service Unimproved Areas
5.2.36 Service Specialized Locations
5.3 Other Special Services
5.3.1 Refuge and Nature Trail Maintenance
5.3.2 Special Equipment Requirements
6.0 Applicable Publications (Current Editions)
6.1 Regulations, Publications, Manuals, Local Policies and Procedures
7.0 Mandatory Records and Report Forms
8.0 Attachment/Technical Exhibits (TEs)
8.1 Attachment 1/TE-1 – Performance Requirements Summary
8.2 Attachment 2/TE-2 – Deliverables Schedule
8.3 Installation Map(s)
1277601113.CIV
Cross-Out
1.0 General.
This is a non-personal services contract to provide Grounds maintenance Services for the U.S. Army Garrison Ansbach, Germany.
• The Government will not exercise any supervision or control over the contract service providers.
• The Contractor shall perform to the standards specified in this Performance Work Statement (PWS).
• Contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.
• The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to complete the requirements as outlined and defined in this
PWS.
1.1 Description of Services/Introduction.
The Contractor shall provide all personnel, equipment, supplies, facilities, transportation, tools, materials, supervision, and other items and non-personal services necessary to perform all grounds maintenance service tasks and frequencies as described and defined in this Performance Work Statement (PWS), Part 5 Specific Tasks and Part 8 Attachment/Technical Exhibits, TE-4 Enterprise Municipal Grounds maintenance Services Performance Standards and Frequencies, except for those items specified as Government furnished property and services (If applicable, see Part 4 Contractor Furnished Items and Services). The Contractor shall perform to the standards in this contract.
1.2 Background.
USAG Ansbach is located in Germany in the state of Bavaria. USAG Ansbach consists of approximately 8,967,831 square meters (2,216 acres) and 615 buildings. The population base consists of approximately 5,778 military and Government civilian and Contractor personnel, as well as 3,145 resident family members.
1.3 Objectives.
The Contractor shall ensure all work accomplished as fulfillment of this PWS meets all applicable Federal, State, and local laws, regulations, directives and other requirements (LOR) (See Definitions & Acronyms, 2.2 Acronyms --- Legal and Other Requirements) to include, but not limited to the documents in Part 6 Applicable Publications.
TE-11 Work Capability Levels for Grounds Maintenance includes enterprise municipal grounds maintenance services performance standards, frequencies, and tasks identifies tasks and frequencies for minimum standards. Currently, this requirement is under TE 11 Work Capability 3 (see page 51 and/or TE 11 attachment). Based on need, the Government reserves the right to adjust the Capability level through bilateral modification.
1.4 Scope.
The Contractor shall inspect, service, maintain, and landscape grounds of USAG Ansbach. The work shall include scheduling and performance of mowing and trimming;
turf replacement; leaf and debris removal; tree, hedge, and shrub planting, maintenance, (ISR 404 – Grounds Maintenance Services) irrigation, and fertilization; policing of areas; tree and stump removal, and other associated work in coordination with the Contracting Officer’s Representative (COR).
The Contractor shall provide all work necessary to maintain the grounds to the standards specified herein. The Contractor shall provide for tree preservation and protection during all maintenance and construction activities as specified by USAG Ansbach. During performance of the contract, the Government reserves the right to add or delete facilities and/or the level of services required. A modification to the contract will be executed to incorporate these changes.
1.5 Period of Performance (PoP).
The period of performance shall be for one (1) Base Year of 12 months and FOUR (4) 12-month option years. The Period of Performance reads as follows:
Phase-in Period 1 – 30 April 2026 Base Year 1 April 2026 – 31 March 2027 Option Year I 1 April 2027 – 31 March 2028 Option Year II 1 April 2028 – 31 March 2029 Option Year III 1 April 2029 – 31 March 2030
1.6 Traffic Flow.
The Contractor shall maintain the free flow of vehicle and pedestrian traffic while conducting grounds maintenance service tasks.
1.7 Restoration of Real Property Damage.
Any damage to Government Real Property by the Contractor’s operations shall be restored to the original state at no additional cost to the Government (e.g., structural damage, damage to landscape or fencing, et al).
1.8 General Information.
1.8.1 Quality Control Plan (QCP).
The Contractor shall develop and maintain a QCP to ensure services are performed in accordance with (IAW) this PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is the means by which it assures that the work provided complies with the requirements of the contract.
The Contractor’s Proposed QCP shall be submitted to the Contracting Officer (KO) through the Contracting Officer’s Representative (COR) for review within ten (10) days after date of contract award (Deliverable A001).
The Government will review and either notify the Contractor in writing of acceptance of the plan or return their comments to the Contractor within ten (10) days. If the Government has provided comments, the Contractor shall then have three (3) days to submit a Final QCP. After receipt of the Final QCP, the Contractor may receive the Contracting Officer’s acceptance in writing. Any proposed changes to the accepted QCP are required to be resubmitted for acceptance by the Contracting Officer no later than thirty (30) days prior to the anticipated change and before implementation by the Contractor. The timeline noted above will apply for review and acceptance for proposed changes. At a minimum, the QCP must include and answer the following to be acceptable:
a. A chart showing the organizational structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality Control Team.
b. How will the Contractor monitor work to ensure that performance complies with all deliverables (etc. timelines, deadlines, and goals)?
c. How will the Contractor monitor work to ensure that performance complies with all specifications and requirements of the contract, including clauses?
d. How will the Contractor monitor and ensure staff qualifications remain current and valid including DOCPER processes/approvals throughout contract performance?
e. How will the Contractor ensure all keys issued will remain controlled items (Paragraph 1.8.18 Key Control)?
f. How will the Contractor identify, investigate, and correct any non-conforming performance and prevent similar deficiencies in the future?
g. How will the Contractor file and save all Quality Control related documents for the life of the contract plus 5 years?
1.8.1.1 The Contractor shall inform the COR of issues or potential issues that might affect the performance within one (1) hour of identifying those issues. Verbal reports shall be followed up by written reports within two (2) days (Deliverable A002).
1.8.2 Place of Performance
The work to be performed under this contract will be performed at USAG Ansbach.
USAG Ansbach consists of multiple military installations/kasernes and services will need to be performed at eight (8) kasernes within the USAG Ansbach footprint: Katterbach Kaserne, Bismarck Kaserne, Shipton Kaserne including the Urlas area, Barton Kaserne, Bleidorn Kaserne, Storck Barracks at Illesheim, and Franken Kaserne. The Contractor shall provide the KO a schedule no later than (10) workdays prior to commencing work.
Schedule shall outline tasks to be performed by specific building and identify the timeline for the task to be accomplished. The KO will provide the Contractor with requirements to make changes to the schedule as they occur.
1.8.3 Recognized Holidays.
U.S. Federal Holidays
New Year’s Day January 1st Martin Luther King Jr.’s Birthday 3rd Monday in January President’s Day 3rd Monday in February Memorial Day Last Monday in May
Juneteenth June 19th Independence Day July 4th Labor Day 1st Monday in September Columbus Day 2nd Monday in October Veteran’s Day November 11th Thanksgiving Day 4th Thursday in November Christmas Day December 25th
German Holidays
New Year’s Day (Neujahr) January 1st Three King’s Day (Heilige Drei Könige) January 6th Good Friday (Karfeitag) Varies Easter Monday (Ostermontag) Varies Labor Day (Tag der Arbeit) May 1st Ascension Day (Christi Himmelfahrt) Varies Whit Monday (Pfingstmontag) Varies Corpus Christi (Fronleichnam) Varies Day of German Unity (Tag der Deutschen Einheit) October 3rd All Saint’s Day (Allerheiligen) November 1st 1st Christmas Day (1. Weihnachtsfeiertag) December 25th 2nd Christmas Day (2. Weihnachtsfeiertag) December 26th
1.8.4 Hours of Operation.
Normal hours of operation are between the hours of 0730 to 1600, Monday through Friday, excluding Federal holidays, German holidays, or when the Government facilities are closed due to local or national emergencies, administrative closings, or similar Government directed facility closings.
• The Contractor shall coordinate with COR to establish a schedule to conduct business if services are required outside of normal hours of operation.
• The Contractor shall maintain an adequate workforce for the uninterrupted performance of all tasks defined within this PWS when Government facilities are not closed for the above reasons.
1.8.5 Installation Closures.
When an unforeseen installation closure occurs on a regularly scheduled day of work, the Contractor shall reschedule the work to be performed the following day unless the following day is a Saturday, Sunday, a recognized Federal holiday, and when routine work is not scheduled for that day; or reschedule the work for the next business day following the closure.
1.8.6 Emergency Delays.
• If the Contractor determines unsafe weather conditions or work environment is cause for an interruption of services, the Contractor shall notify the COR two (2) hours prior to curtailing operations (Deliverable A003).
o The Contractor shall obtain COR approval to resume operations.
• The Contractor shall coordinate with the DPW designated representative(s) in preparation for and during emergency operations situations such as inclement weather, flood, active shooter, fire or other emergency situations.
1.8.7 Unforeseen Closures of Service Areas.
When an unforeseen closure occurs on a regularly scheduled day of work (i.e., severe weather, training holiday, day of mourning, etc.).
• The Contractor shall reschedule the service on any day satisfactory to the customer and minimizes impact on the Contractor’s normal work schedule.
1.8.8 Place of Performance.
The work to be performed under this requirement will be performed throughout the entire area occupied by USAG Ansbach and at any pertinent locations in and around USAG Ansbach. Maps of USAG Ansbach service areas are located in Part 8, Attachment/Technical Exhibit Listings, TE-3 through TE-10.
1.8.9 Type of Contract.
The government will award a FIRM FIXED PRICE (FFP) type of contract with some “As Required” CLIN’s.
1.8.10 Security Requirements.
The Government may require the contractor to provide service to a secured area. In such instances, the grounds maintenance contractor personnel shall be trained in security requirements and will be escorted during the entire time needed to complete the tasks outlined in this PWS at such facilities.
1.8.11 Access and General Protection/Security Policy and Procedures.
Contractor and all associated subcontractors’ employees shall provide all information required for background checks to meet installation access requirements to be accomplished by installation Provost Marshal Office, Director of Emergency Services or Security Office. Contractor workforce must comply with all personal identity verification requirements (i.e., FAR clause 52.204-9, Personal Identity Verification of Contractor Personnel) as directed by DOD, HQDA and/or local policy. In addition to the changes otherwise authorized by the changes clause of this contract, should the Force Protection Condition (FPCON) at any individual facility or installation change, the Government may require changes in contractor security matters or processes.
Access to U.S. installations and controlled areas is limited to personnel who meet security criteria and are authorized by Host Nation law to work in that country. Failure to submit required information/data and obtain required documentation or clearances in accordance with Army in Europe (AE) Regulation 190-16 (AE Reg 190-16) Installation Access Control or (AE) Regulation 604-1 for Germany specific contracts, will be grounds for denying access to U.S. installations and controlled areas. The Contractor shall ensure that any subcontractors used in performance of this contract complies with these requirements and that all employees, of both the Contractor and any subcontractor utilized by the Contractor, are made aware of and comply with these requirements. Should anything in this paragraph conflict with AE Reg 190-16 or (AE) Regulation 604-1, the regulation takes precedent.
The Contractor shall be aware of and comply with the requirements associated with Installation Access Control. The Government is not liable for any costs associated with performance delays due solely to a firm’s failure to comply with Installation Access Control System (IACS) processing requirements.
Contractor personnel performing work onsite under this contract shall provide an acceptable Good Conduct Certificate (GCC) “Fuehrungszeugnis" prior to contract start date and maintain the certificate for the life of the contract (Deliverable A004).
The Contractor shall return installation passes to the issuing IACS office when the contract is completed or when a Contractor employee no longer requires access.
AE Reg 190-16 (and AE 190-16-G German translation) can be found on the following website: https://www.aepubs.eur.army.mil/AE-Regulations/smdsearch8659/190-16/.
1.8.12 Physical Security.
At the close of each work period, the contractor shall ensure government facilities, equipment, and materials are secured IAW the Army Physical Security Program (AR 190-13).
1.8.13 Security Training.
In the event of a National Defense Emergency affecting USAG Ansbach, the USAG Ansbach COR will immediately notify the contract POC. At that time, the contractor shall take immediate steps to cease all activities on the installation(s) and will cause all personnel to leave the installation(s) property until notice is given by the installation and USAG Ansbach POC that National Defense Emergency conditions are no longer in effect.
1.8.14 Anti-Terrorism (AT) Level I Training.
IAW Department of Defense Instruction (DoDI) 2000.16, Vol. 1 DoD Antiterrorism Standards and Army Regulation (AR) 525-13 Antiterrorism, all Contractor employees, including subcontractor employees, requiring access to Army installations, facilities, or controlled access areas shall complete Antiterrorism (AT) Level I awareness training within 30 calendar days after contract start date. The Contractor shall submit certificates of completion for each affected contract employee and subcontractor employee to the KO or COR within 30 calendar days after completion of training by all employees and subcontractor personnel on a recurring annual basis. AT Level I awareness training is available at the following site: http://jko.jten.mil (Deliverable A005).
https://www.aepubs.eur.army.mil/AE-Regulations/smdsearch8659/190-16/ http://jko.jten.mil/
• If access to a computer is not available, the Government will provide AT Level I training to Contractor employees within 30 business days after contract start and maintain a copy of the attendance roster for one (1) year. Any Contractor hired after contract start will be required to receive AT Level I training within 30 calendar days either online or as provided by the Government. The Contractor must present the training certificate to the KO or designated Government representative/COR within 30 calendar days (See Deliverables Schedule, paragraph 8.2, Deliverables (Deliverable A005).
1.8.15 iWATCH Training.
The Contractor shall brief the local iWATCH program (training standards provided by the Installation Anti-Terrorism Officer (ATO)) to all its’ employees and associated subcontractors. This training is used to inform employees of the types of behavior to watch for and instruct employees to report suspicious activity to USAG Ansbach, Military Police and the COR. The Contractor shall complete the training within 30 calendar days after contract award and within 30 calendar days of new employees commencing performance and send to the KO or designated Government representative/COR via both electronic and paper copy within 30 calendar days of completion (Deliverable A006).
1.8.16 Operational Security (OPSEC) Awareness Training.
For contracts that require OPSEC Training. All contractor employees, to include subcontractor’s employees, requiring access to Army installation, facilities, controlled, access areas, and/or installation computers shall complete OPSEC Level I training within 30 days after contract start date or effective date of incorporation of this requirement into the contract. The Contractor shall provide either certificates of completion or dates of attendance for each affected contractor employee and subcontractor employee to the COR, or to the Contracting Officer if a COR is not assigned, with 15 calendar days after completion of training by all employees and subcontractor personnel (Deliverable A007).
1.8.17 Threat Awareness and Reporting Program Training.
For all DA contractors. Training will be completed within 30 days of assignment or employment to an organization and will undergo live environment TARP training will be completed annually IAW AR 381-12 Threat Awareness and Reporting Program. The Contractor shall provide either certificates of completion or dates of attendance for each affected contractor employee and subcontractor employee to the COR, or to the Contracting Officer if a COR is not assigned, with 15 calendar days after completion of training by all employees and subcontractor personnel (Deliverable A008).
1.8.18 Local Health Protection Conditions
Contractor will comply with all national and DoD policies with regard to health protection issues including pandemic outbreaks. Local Health Protection Conditions (HPCON) change based on risk levels in the surrounding area USAG Ansbach and in cooperation with local, state and national guidance. The Contractor shall comply with installation and higher headquarters policies aimed at mitigating the spread of dangerous communicable diseases.
1.8.19 Key Control.
The Contractor shall establish and implement methods of making sure all keys/key cards issued to the Contractor by the Government are not lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards.
• No keys issued to the Contractor by the Government shall be duplicated.
• The Contractor shall develop procedures covering key control that shall be included in the QCP.
• Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas.
1.8.20 Lost Keys.
• No keys issued to the Contractor by the Government shall be duplicated.
• The Contractor shall immediately report any occurrences of lost keys/key cards to the COR in the event keys, other than master keys are lost or duplicated.
• In the event a key is lost, the Contractor shall, upon direction of the KO, have the
Government re-key or replace the affected lock or locks.
• When the replacement of locks or re-keying is performed by the Government, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the Contractor.
• In the event a master key is lost, all locks and keys for that system shall be replaced by the Government and the total cost deducted from the monthly payment due the Contractor.
1.8.21 Prohibited use of Government provided keys or key cards.
The Contractor shall prohibit the use of Government issued keys/key cards by any persons other than the Contractor’s employees.
• No keys issued to the Contractor by the Government shall be duplicated.
• The Contractor shall prohibit the opening of locked areas by Contractor employees to permit entrance of persons other than Contractor employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the COR.
1.8.22 Lock Combinations.
RESERVED
1.8.23 Post Award Conference/Periodic Progress Meetings.
The Contractor shall attend the post award conference convened by the Contracting Activity or Contract Administration Office as agreed upon and stated in the contract award document.
• When the KO, COR and DPW management meets with the Contractor to review the Contractor's performance, written minutes of meetings shall be recorded by the Government and signed by the Requirements Authority (RA) and the KO.
• The written minutes will be distributed within five (5) business after the meeting.
• If any party does not concur with any portion of the minutes, the non-concurrence shall be provided in writing to the KO/COR within two (2) workdays following receipt of the minutes.
• Notwithstanding the Contractor’s responsibility for total management during the performance of this contract, the administration of the contract requires maximum coordination and cooperation between the Government and the Contractor.
1.8.24 Service Contract Reporting.
System for Award Management (SAM) Service Contract Report (SCR). The Contractor shall report ALL Contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for Grounds Maintenance Services at USAG Ansbach. The Contractor is required to completely fill in all required data fields through the following web address: www.SAM.gov. Reporting inputs will be for the labor executed during the period of performance during each Government FY, which runs from October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year.
Contractors may direct questions to the help desk by clicking “View Assistance for SAM.gov” which is located at the top of the SAM.gov website. From there, you can the select “Contact Our Service Desk” which will allow you to contact SAM.gov directly. If contract period of performance ends prior to September 30, the Contractor has 30 calendar days from end date of the contract to complete the SAM SCR requirement (Deliverable A009).
Steps for Submitting a Service Contract Report (SCR).
1. Go to www.sam.gov and log in.
2. Select Entity Registrations and then select Service Contract Reporting.
3. SAM displays your entities which have service contracts and meet the reporting criteria. Select View by entity to see the service contracts for each entity
4. Next, select Add for the service contract against which you want to create a Service Contract Report. Each service contract which meets the FAR Subpart 4.1703 reporting thresholds is displayed.
5. You will be taken to the Complete Service Contract Report page. SAM displays the contract details and allows you to report. You are required to enter the following information: - Total Amount Invoiced: Total dollar amount invoiced for services performed during the previous Government fiscal year under the contract (this amount should include the prime and any subcontract amount). - Prime Contractor Hours Expended: Prime contractor direct labor hours expended on the services performed during the previous Government fiscal year. The amount you enter is automatically divided by 2,080 hours to calculate a Full Time Employee (FTE) equivalent, displayed under the Prime Contractor Hours Expended as Prime Contractor FTEs.
6. Report any required Tier 1 subcontractor information by selecting the Add Tier 1 Subcontract Information button.
http://www.sam.gov/ http://www.sam.gov/
7. When you are ready to submit the report, select Submit. This saves your report and returns you to the Select Service Contract page where you can create other SCRs or edit an existing SCR.
Steps for Editing a Submitted Report
1. Follow steps 1-4 above. Any previously submitted SCR will have a View/Edit button instead of an Add button.
2. Select View/Edit. You will be able to view the current SCR, edit available fields, and resubmit the record. You can also delete previously entered information altogether.
1.9 Government Roles and Responsibilities.
1.9.1 Contracting Officer (KO).
The KO is the only person authorized to make any changes in any of the requirements listed on this PWS; notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the KO.
• In the event the Contractor makes any change at the direction of any person other than the KO, the change will be considered to have been made without authority and solely at the risk and expense of the Contractor.
• All contract administration will be affected by the KO.
• Communications pertaining to contractual administrative matters shall be addressed to the KO.
• No changes in or deviations from the terms and conditions shall be affected without a written modification to the contract, executed by the KO authorizing such changes.
• The KO will approve all Deliverables and plans required in this PWS.
1.9.2 Contracting Officer’s Representative (COR).
The KO will appoint a COR during the performance of this requirement.
• Additional Government personnel may be designated to assist in contract oversight IAW AR 70-13 Management and Oversight of Service Acquisitions.
• Other surveillance personnel may be designated as COR and shall be trained and appointed IAW DoDI 5000.72, Department of Defense (DoD) Standard for Contracting Officer’s Representative (COR) Certification.
• The COR will provide assistance in identification and resolution of problems, conflicts in priority, subtask requirement definitions, and other operations type problems.
• The COR will perform IAW the responsibilities and duties identified in the appointment letter.
1.9.3 COR Authority.
A letter of designation will be issued to the COR by the KO.
• A copy of the letter will be sent to the Contractor.
• The letter of designation states the responsibilities and limitations of the COR, especially with regard to changes in cost, price estimates, or changes in delivery dates.
• The COR is not authorized to change any of the terms and conditions with regard to cost, quantity, or schedule of the resulting order.
1.9.4 COR Functions.
The COR or designated Government representative shall monitor all technical aspects of the contract and assists in contract administration.
• The COR or designated Government representative is authorized to perform the following functions:
o assure the Contractor performs the technical requirements of the contract.
o perform inspections necessary in connection with contract performance.
o maintain written and oral communications with the Contractor concerning technical aspects of the contract.
o issue written interpretations of technical requirements.
o monitor, document, and report Contractor's performance and notify both the
KO and Contractor of any deficiencies.
o coordinate availability of Government-Furnished Property and provides direction or assistance for site entry requests of Contractor personnel.
1.10 Specific Contractor Requirements, Roles and Responsibilities.
1.10.1 Authorization to Perform Services in Germany.
1.10.2 Contractors performing services in the Federal Republic of Germany (FRG) shall comply with German law. The Contractor shall determine whether performance requires registration with German authorities or authorization to do business in Germany and, if so, shall comply with all requirements. Whether or not registration or authorization to do business is required, the Contractor shall determine what documents or authorization its employees and any subcontractor employees must possess to work in Germany. The Contractor shall ensure affirmatively that its employees and subcontractor employees possess such documents or authorizations.
1.10.3 Contractor employees who: (a) are not nationals of Germany or other European Union countries; (b) are not members of the force, the civilian component, or their dependents; or c) do not have assimilated status under Articles 71, 72, or 73 of the Supplementary Agreement to the NATO SOFA shall possess work and residence permits.
1.10.4 By acceptance of and performance under this contract, the Contractor affirms that it has complied with the requirements above. Compliance with this requirement and German law is a material contract requirement. Noncompliance by the Contractor or subcontractor at any tier shall be grounds for issuing a negative past performance evaluation and terminating this contract for default.
1.10.2 Contractor Hiring Restrictions.
The Contractor shall not hire or subcontract with off-duty or former Government employees whose employment would result in a conflict of interest as defined in DOD 5500.7-R Joint Ethics Regulation.
1.10.3 Contractor Identification.
The Contractor shall ensure that personnel be identified as a Contractor to distinguish themselves (e.g., badge, company logo, or uniform) from Government employees.
• The Contractor shall ensure all correspondence and reports produced are marked as Contractor products or that Contractor participation is disclosed.
• Contractor owned/leased vehicles and trailers shall be clearly identified.
1.10.4 Standards of Conduct.
Contractor personnel’s conduct shall not reflect discredit upon the Government.
The Contractor shall ensure all personnel present a professional appearance while working on the Government installation.
• The Contractor’s employees shall observe and comply with all local policies and procedures concerning fire, safety, environmental protection, sanitation, security, and possession of firearms or other lethal or illegal weapons or substance.
• The Contractor shall ensure all Contractor employees, providing services under this contract, conduct themselves and perform services in a professional, safe, and responsible manner.
• The Contractor shall remove, from the job site, any employee for reasons of misconduct or security.
• The Contractor shall ensure employee conduct complies with 41 USC §423, Procurement Integrity.
• The Contractor shall also ensure that no Contractor employees conduct political related activities or events on the installation.
• The removal of such a person shall not relieve the Contractor of the requirement to provide personnel to perform adequate and timely service.
1.10.5 Contractor Key Personnel.
Contractor shall provide a resume of key personnel, who will be designated in writing, to the KO within one week of the contract award (Deliverable A010). These key personnel shall be available during normal duty hours. These individuals designated as key personnel shall be able to understand, speak, read, and write the English language.
Additionally, the Contractor shall provide with the proposal proof of one (1) year of relevant experience within five (5) years preceding the issuance of the solicitation (Deliverable A010a). At a minimum, provide relevant proof of contract experience by providing:
(a) Tour location and customer name;
(b) Contract number (if such a designation exists);
(c) A narrative explaining the requirement and how it is relevant to the requirements of this solicitation;
(d) Contract performance dates; and
(e) Total contract value.
1.10.6 Project Manager (PM).
The Contractor shall provide a PM who is responsible for the performance of the work.
• The PM must demonstrate a minimum of 5 years of experience within the past 10 years providing Grounds Maintenance services, which must be provided with the proposal (Deliverable A010b).
• The PM shall have full authority to act for the Contractor on all contract matters relating to daily operation of the contract.
• The name and contact information of the PM shall be provided to the KO and COR and shall be present and on-site, and available during normal duty hours.
• In the circumstances when the PM is not available, the Contractor shall designate an alternate who can perform the same duties during the absence.
• The Project Manager shall be available by cellular phone so that the Contracting Officer / COR may send verbal messages to the Project Manager by telephone on an immediate basis.
1.10.7 Quality Control Manager (QCM).
1.10.8 Quality Control Inspectors (QCI).
RESERVED
1.10.9 Phase In /Phase Out Period.
The Contractor shall prepare and submit (within ten (10) business days after contract award), a Phase In/Phase Out Plan to be implemented by the Contractor (Deliverable A011).
• The Contractor shall provide sufficient experienced personnel during the phase-in and phase-out period to ensure that the services are maintained at the required level of proficiency.
• During the phase-in, the Contractor shall observe all operations pertinent to the requirements of the PWS.
• The Contractor shall commence all operations required by this PWS by the end of phase in period.
• On the initial day of performance, the Contractor shall provide a work force which is fully qualified and capable of performing all work required under this contract.
• During the ten (10) business day transition period immediately prior to the end of the previous contract, the Contractor shall permit the successor Contractor (and the successor Contractor's employees) to observe and become familiar with any and all operations under the contract.
• The Contractor shall fully cooperate with the successor Contractor during Phase Out and the Government so as not to interfere with future work or duties.
1.11 Emergency Services.
1.11.1 Emergency Medical Treatment.
The Contractor or their employees shall immediately notify their supervisor of any incident occurring on the job requiring immediate emergency medical treatment. The Contractor shall notify the COR immediately, not later than (NLT) two (2) hours of the incident. The Contractor shall be responsible for the emergency medical treatment services for Contractor personnel. Verbal reports shall be followed up by written reports within two (2) days (Deliverable A012).
1.11.2 Accident Reporting.
• Contractor shall comply with all respective Safety, Accident, and Safety- and Fire Prevention Regulations specific to USAG Ansbach.
• The Contractor shall comply with Germany Working Conditions Act (Arbeitsschutzgesetz) and Statutory Accident Insurance (Gesetzliche Unfallversicherung / GUV) Regel 189-October 1995 etc.
• The Contractor shall provide a verbal report to the COR within two (2) hours of each such occurrence followed up by an email documenting each such occurrence (Deliverable A013).
• The Contractor shall adhere to reporting of mishaps IAW AR 385-10, The Army Safety Program (Chapter 3 Accident Investigation and Reporting, Chapter 4 Contracting Safety) and DA Pam 385-40, Army Accident Investigations and Reporting.
1.12 Environmental Compliance Plan and Program.
The Contractor shall submit for Government review and approval an Environmental Plan (EP) within thirty (30) business days (Deliverable A014) of contract award that complies with USAG Ansbach directive.
The Contractor shall ensure that all its operations and activities conform to the USAG Ansbach’s environmental policy requirements. The Contractor’s Environmental Plan shall ensure that all contract personnel have received appropriate levels of training in the handling, use, storage, and disposal of hazardous material. In addition, the Contractor shall ensure that all Contractor controlled activities on USAG Ansbach installations are conducted in accordance with the USAG Ansbach Spill Prevention and Response Plan, Solid Waste Policy, Final Governing Standards-Germany, and applicable German environmental laws/standards.
If contract requires the use of hazardous materials/substances, the Contractor shall, prior to mobilization, inform the Contracting Officer Representative (COR) of the types and number of hazardous materials needed to be brought onto the Garrison to fulfill their contractual requirements. Contractor shall also provide the Safety Data Sheets, storage requirements and proposed storage locations for the hazardous material. The COR shall provide a copy of this information to the Garrison Fire Department and the Environmental Division.
Prior to contract completion, the Contractor shall remove all hazardous materials and dispose of all hazardous waste (HW) generated in accordance with Final Governing Standards Germany and applicable German environmental laws/standards. A copy of the HW disposal documents must be forwarded to the HW program manager at the DPW Environmental Division.
The Contractor shall clean up at its own expense any contamination, including soil and ground water contamination caused by hazardous materials/substances brought onto the garrison, or by his activities. The Contractor must immediately report any hazardous substance spills to the Garrison Fire Department.
The Contractor shall contact the COR or the USAG Ansbach Directorate of Public Works-Environmental Division (DPW-ED), for a copy of the Garrison Environmental Policy, Spill Prevention and Response Red Plan, Garrison Solid Waste Policy, and German Final Governing Standards.
1.12.1 Safety.
The Contractor shall safeguard and maintain all Government and Contractor property, as well as provide for the safety and well-being of personnel employed under this contract.
• The Contractor shall comply with AR 385-10, The Army Safety Program.
• All unsafe acts or conditions fostered by the Contractor or Contractor personnel may be grounds for the KO to halt any and all Contractor performance until such unsafe conditions are corrected.
• The Contractor shall take due caution not to endanger personnel during performance of this contract.
• Upon discovery of a serious hazard such as, but not limited to, fire, or fuel spill, the Contractor shall immediately notify the KO and designated authorized representatives verbally followed up with an email notification (Deliverable A015).
1.12.2 Safety Plan.
The Contractor shall develop and implement a safety plan for its’ employees.
• The Contractor shall submit the safety plan to the KO/COR for review and acceptance within 30 business days after contract award (Deliverable A016).
• Revisions shall be submitted to the KO/COR five (5) business days prior to the effective date of change (Deliverable A017).
1.12.3 Spill Plan.
The Contractor shall comply with the USAG Ansbach’s Spill Prevention Control and Countermeasure Plan.
• The Contractor shall submit a Spill Plan to the COR for approval within 30 calendar days of contract award (Deliverable A018).
• The Contractor shall verbally notify the COR, followed by written notification as required in the USAG Ansbach Spill Plan, if the Contractor spills or releases any hazardous substances, (i.e., substances listed in 40 CFR 302, Designation, Reportable Quantities, and Notification.)
1.12.4 Asbestos Awareness.
1.13 Environmental Compliance.
The contractor shall implement the following environmental objectives in accordance with FAR 23.4; FAR 23.7; FAR 52.223-1 through 52.223-5; and based on EPA-issued guidance):
• Maximize the utilization of environmentally preferable products.
• Maximize the utilization of bio-based products. See USDA-designated items at http://www.biopreferred.gov or 7 CFR part 3201.
• Maximize the reutilization of nonhazardous and recovered materials.
• Promote recycling and other cost-effective waste reduction.
• Eliminate or reduce the generation of hazardous waste and the need for special material processing (including special handling, storage, treatment, and disposal).
• Promote energy-efficiency and water conservation.
1.13.1 Safety Data Sheets.
For materials that have Safety Data Sheets (SDS) associated with them, the Contractor shall submit the SDS to the KO or designated Government representative (i.e., COR) for approval five (5) business days after contract award (Deliverable A019).
• The Contractor shall adhere to all applicable requirements of the Installation Hazardous Waste Management Plan.
• The Contractor shall provide all materials, labor, training, transportation, and equipment for the handling and storage of hazardous materials or toxic materials.
http://www.biopreferred.gov/
PART 2
DEFINITIONS & ACRONYMS
2.0 Definitions and Acronyms.
2.1 Definitions.
Acceptable Quality Level (AQL).
The AQL is the maximum percent defective (or the number of defects per hundred units) that, for purposes of sampling inspection can be considered satisfactory.
Call Outs.
Call outs may be requested for tasks identified as a standard or enhanced service.
These can include nonrecurring requests for special events, spills, and events that may be reoccurring however on an unscheduled basis such as cleaning before and after flights which do not have a set, predetermined schedule.
Child, Youth and School Services (CYS).
Overarching naming convention for Child Development Center (CDC); Youth Activity Center; and School Age Services (SAS) is Child, Youth and School, Services (CYS);
shall be used when referencing all programs.
Contractor.
A supplier or vendor awarded a contract to provide specific supplies or service to the Government. The term used in this contract refers to the prime.
Contractor Acquired Property (CAP).
Property acquired, fabricated, or otherwise provided by the Contractor for performing a contract and to which the Government has title.
Contracting Officer (KO).
A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the Government. Note: The only individual who can legally bind the Government.
Contracting Officer’s Representative (COR).
An employee of the U.S. Government appointed by the contracting officer to administer the contract. Such appointment shall be in writing and shall state the scope of authority and limitations. This individual has authority to provide technical direction to the Contractor as long as that direction is within the scope of the contract, does not constitute a change, and has no funding implications. This individual does NOT have authority to change the terms and conditions of the contract.
Deficient Service.
A service output that does not meet the standard of performance associated with the Performance Work Statement.
Deliverable.
Objective evidence that can be physically delivered but may include non-manufactured things such as meeting minutes or reports.
Equipment.
A tangible item that is functionally complete for its intended purpose, durable, nonexpendable, and needed for the performance of a contract. Equipment is not intended for sale and does not ordinarily lose its identity or become a component part of another article when put into use. Equipment does not include material, real property, special test equipment or special tooling.
Government Furnished Property (GFP).
Property in the possession of, or directly acquired by, the Government and subsequently furnished to the Contractor for performance of a contract. Government-furnished property includes, but is not limited to, spares and property furnished for repair, maintenance, overhaul, or modification. Government-furnished property also includes Contractor-acquired property if the Contractor-acquired property is a deliverable under a cost contract when accepted by the Government for continued use under the contract.
Government Property.
All property owned or leased by the Government. Government property includes both Government- furnished property and Contractor-acquired property. Government property includes material, equipment, special tooling, special test equipment, and real property. Government property does not include intellectual property and software.
Government Project Manager.
The DPW Project Engineer/Technician assigned to manage this PWS.
Legal and Other Requirements.
Applicable Federal, State, local, DoD and Army laws, codes, regulations and other requirements.
Loss of Government Property.
Unintended, unforeseen or accidental loss, damage, or destruction of Government property that reduces the Government’s expected economic benefits of the property.
Loss of Government property does not include occurrences such as purposeful destructive testing, obsolescence, normal wear and tear, or manufacturing defects. Loss of Government property includes, but is not limited to:
Items that cannot be found after a reasonable search.
Theft Damage resulting in unexpected harm to property requiring repair to restore the item to usable condition; or Destruction resulting from incidents that render the item useless for its intended purpose or beyond economical repair. Contractor shall prepare damage reports monthly and submit to COR.
Material.
Property that may be consumed or expended during the performance of a contract, component parts of a higher assembly, or items that lose their individual identity through incorporation into an end-item. Material does not include equipment, special tooling, and special test equipment or real property.
Non-Personal Services.
The personnel rendering the services are not subject; either by the contract’s terms or by the manner of its administration, to the supervision and control usually prevailing in relationships between the Government and its employees. Non personal service contracts are authorized by the Government in accordance with FAR 37.012, under general contracting authority, and do not require specific statutory authorization.
Performance Requirements Summary (PRS).
Identifies the key service outputs of the Contractor.
Physical/Community Fitness Centers.
Physical/Community Fitness Center facilities may include a gymnasium, athletic courts, work out areas, weight rooms, showers, restrooms, locker rooms, indoor hand ball courts, whirlpool, sauna, administrative space,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .