About this file
This is a U.S. Army Corps of Engineers (USACE) Department of the Army Permit issued by the Jacksonville District Regulatory Division for maintenance dredging work at the Archie Glover Boat Ramp in Santa Rosa County, Florida. The permit (SAJ-2024-00097) authorizes Santa Rosa County to hydraulically dredge 5,100 cubic yards of sediments from a 30-foot-wide access channel (1.15 acres) in Mullatto Bayou to a depth of -5.83 mean low water, with dredged material to be discharged in an adjacent upland disposal site with return waters directed to surface waters. The project also includes replacement of eight aids to navigation pilings that delineate the channel. The work is located at the terminus of North 14th Avenue on Escambia Bay in Milton, Florida (Section 05, Township 01 South, Range 29 West). The permit was issued September 5, 2024, and is valid through March 14, 2026. The permittee must submit a Commencement Notification within 10 days of initiating work and a Self-Certification Statement of Compliance within 60 days of completion. The work is authorized under Nationwide Permits (NWP) Number 35 (Maintenance Dredging), NWP Number 16 (Return Water From Upland Contained Disposal Areas), and NWP Number 1 (Aids to Navigation).
The permit includes extensive environmental and operational conditions that must be satisfied prior to and during construction. The permittee is required to install floating turbidity barriers with weighted skirts around all work areas, implement erosion control measures along work area perimeters, post a copy of the permit at the construction site, and maintain the upland disposal site to prevent discharge of dredged material into waters of the United States except through the existing stormwater collection system. Compliance with General Conditions from 33 CFR Part 320-330 is mandatory, including manatee protection measures requiring all vessels to operate at idle speed/no wake in manatee habitat, shutdown of in-water operations if manatees approach within 50 feet, and immediate reporting of any collisions or injuries to the Florida Fish and Wildlife Conservation Commission. The permit also incorporates protection measures for threatened Eastern Indigo Snakes, requiring notification to the U.S. Fish and Wildlife Service at least 30 days prior to clearing activities, educational posters and briefings for construction personnel, and immediate cessation of work if snakes are encountered. Additionally, the permittee must comply with Jacksonville District Programmatic Biological Opinion requirements and comply with all applicable cultural resources conditions, including immediate notification to the Corps if archaeological or cultural materials are discovered.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
September 5, 2024
Regulatory Division North Permits Branch Pensacola Permits Section
SAJ-2024-00097 (NW-HMM)
Santa Rosa County c/o Michael Schmidt 6051 Old Bagdad Highway, Suite 301 Milton, FL 32583
Dear Mr. Schmidt:
The U.S. Army Corps of Engineers (Corps) has completed the review of your application for a Department of the Army permit. Your application was assigned file number SAJ- 2024-00097 (NW-HMM). A review of the information and drawings provided shows the proposed work is to maintenance dredge a total of 5100 cubic yards of sediments from a 30-foot wide (1.15-acre) access channel of Mullatto Bayou to -5.83 mean low water (-5.5 feet NAVD88). The material will be hydraulically dredged and discharged in adjacent uplands with return waters to waters of the United States. The work also includes the replacement of 8 aids to navigation (pilings) that delineate the access channel. The project is located at the Archie Glover Boat Ramp at the terminus of North 14th Avenue, on Escambia Bay, Latitude 30.5324° North, Longitude 87.12742° West, in Milton, in Section 05, Township 01 South, Range 29 West, in Santa Rosa County, Florida.
Your project, as depicted on the enclosed drawings, is authorized by Nationwide Permit (NWP) Number 35, Maintenance Dredging, Nationwide Permit (NWP) Number 16, Return Water From Upland Contained Disposal Areas, and Nationwide Permit (NWP) Number 1, Aids to Navigation. This verification is valid until March 14, 2026. In order for this NWP authorization to be valid, you must ensure that the work is performed in accordance with the Nationwide Permit General Conditions, the Jacksonville District Regional Conditions, and the General and Project-Specific Special Conditions listed below.
Furthermore, if you commence or are under contract to commence this activity before the date that the relevant NWP is modified or revoked, you will have 12 months from the date of the modification or revocation of the NWP to complete the activity under the present terms and conditions of this NWP. Alternatively, you can access the U.S. Army Corps of Engineers' (Corps) Jacksonville District's Regulatory Source Book web page for links to view NWP information at: https://www.saj.usace.army.mil/Missions/Regulatory/Source- Book/. Please be aware this Internet address is case sensitive and should be entered as it appears above. Once there you will need to select “Source Book” and then select “Nationwide Permits.” These files contain the description of the NWP authorization, the NWP general conditions, and the regional conditions, which apply specifically to this NWP verification.
DEPARTMENT OF THE ARMY
JACKSONVILLE DISTRICT CORPS OF ENGINEERS
PENSACOLA REGULATORY OFFICE
41 NORTH JEFFERSON STREET, SUITE 301
PENSACOLA, FLORIDA 32502
REPLY TO
ATTENTION OF
https://www.saj.usace.army.mil/Missions/Regulatory/Source-Book/ https://www.saj.usace.army.mil/Missions/Regulatory/Source-Book/
You must comply with all of the special and general conditions for the NWP, including any project-specific conditions included in this letter and all conditions incorporated by reference as described above.
General Conditions (33 CFR PART 320-330):
1. The time limit for completing the work authorized ends on March 14, 2026.
2. You must maintain the activity authorized by this permit in good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modification of this permit from this office, which may require restoration of the area.
3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and state coordination required to determine if the remains warrant a recovery effort of if the site is eligible for listing in the National Register of Historic Places.
4. If you sell the property associated with this permit you must obtain the signature of the new owner on the transfer form attached to this letter and forward a copy to this office to validate the transfer of this authorization.
5. If a conditioned water quality certification has been issued for your project, you must comply with the conditions specified in the certification as special conditions to this permit.
For your convenience, a copy of the certification is attached if it contains such conditions.
6. You must allow a representative from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being or has been accomplished in accordance with the terms and conditions of your permit.
Project Specific Special Conditions:
The following project specific special conditions are included with this verification:
1. Reporting Address: The Permittee shall submit all reports, notifications, documentation and correspondence required by the general and special conditions of this permit to either (not both) of the following addresses:
a. For electronic mail (preferred): SAJ-RD-Enforcement@usace.army.mil (not to exceed 15 MB).
b. For standard mail: U.S. Army Corps of Engineers, Regulatory Division, Enforcement Section, P.O. Box 4970, Jacksonville, FL 32232-0019.
mailto:SAJ-RD-Enforcement@usace.army.mil
The Permittee shall reference this permit number, SAJ-2024-00097 (NW - HMM), on all submittals.
2. Commencement Notification: Within 10 days from the date of initiating the work authorized by this permit the Permittee shall submit a completed “Commencement Notification” Form (Attached).
3. Self-Certification: Within 60 days of completion of the work authorized by this permit, the Permittee shall complete the attached “Self-Certification Statement of Compliance” form and submit it to the Corps. In the event that the completed work deviates in any manner from the authorized work, the Permittee shall describe the deviations between the work authorized by this permit and the work as constructed on the “Self- Certification Statement of Compliance” form. The description of any deviations on the “Self-Certification Statement of Compliance” form does not constitute approval of any deviations by the Corps.
4. Assurance of Navigation and Maintenance: The Permittee understands and agrees that, if future operations by the United States require the removal, relocation, or other alteration, of the structures or work herein authorized, or if in the opinion of the Secretary of the Army or his authorized representative, said structure or work shall cause unreasonable obstruction to the free navigation of the navigable waters, the Permittee will be required, upon due notice from the Corps of Engineers, to remove, relocate, or alter the structural work or obstructions caused thereby, without expense to the United States.
No claim shall be made against the United States on account of any such removal or alteration.
5. Turbidity Barriers: Prior to the initiation of any of the work authorized by this permit, the Permittee shall install floating turbidity barriers with weighted skirts that extend within define distance desired or use 1 foot of the bottom around all work areas that are in, or adjacent to, surface waters. The turbidity barriers shall remain in place and be maintained daily until the authorized work has been completed and turbidity within the construction area has returned to ambient levels. Turbidity barriers shall be removed upon stabilization of the work area.
6. Erosion Control: Prior to the initiation of any work authorized by this permit, the Permittee shall install erosion control measures along the perimeter of all work areas to prevent the displacement of fill material outside the work area into waters of the United States. The erosion control measures shall remain in place and be maintained until all authorized work is completed and the work areas are stabilized.
7. Dredge Area: The area to be dredged shall not exceed the dimensions and depths indicated on the permit drawings.
8. Dredged Material Disposal: The Permittee shall place all dredged material in a self-contained, upland disposal site as detailed in the attached drawings. The Permittee shall maintain the upland disposal site to prevent the discharge of dredged material and associated effluent into waters of the United States, except the discharge of effluent directed through the existing stormwater collection system as shown on the attached drawings.
9. Agency Changes/Approvals: Should any other agency require and/or approve changes to the work authorized or obligated by this permit, the Permittee is advised a modification to this permit instrument is required prior to initiation of those changes. It is the Permittee’s responsibility to request a modification of this permit from the Pensacola Permits Section. The Corps reserves the right to fully evaluate, amend, and approve or deny the request for modification of this permit.
10. Posting of Permit: The Permittee shall have available and maintain for review a copy of this permit and approved plans at the construction site.
11. Manatee Conditions: The Permittee shall comply with the attached “Standard Manatee Conditions for In-Water Work – 2011”.). The most recent version of the Manatee Conditions must be utilized.
12. Eastern Indigo Snake Protection Measures and Inspection: Permittee shall comply with U.S. Fish and Wildlife Service's “Standard Protection Measures for the Eastern Indigo Snake” dated March 23, 2021, as provided in Attachment X. of this permit. All gopher tortoise burrows, active or inactive, shall be evacuated prior to site manipulation in the vicinity of the burrow. If excavating potentially occupied burrows, active or inactive, individuals must first obtain state authorization via a Florida Fish and Wildlife Conservation Commission (FWC) Authorized Gopher Tortoise Agent permit. The excavation method selected shall minimize the potential for injury of an indigo snake.
The Permittee shall follow the excavation guidance provided in the most current FWC Gopher Tortoise Permitting Guidelines found at http://myfwc.com/gophertortoise. If an indigo snake is encountered, the snake must be allowed to vacate the area prior to additional site manipulation in the vicinity. Holes, cavities, and snake refugia other than gopher tortoise burrows shall be inspected each morning before planned site manipulation of a particular area, and if occupied by an indigo snake, no work shall commence until the snake has vacated the vicinity of the proposed work.
13. Jacksonville District Programmatic Biological Opinion (JAXBO): Structures and activities authorized under this permit will be constructed and operated in accordance with all applicable PDCs contained in the JAXBO, based on the permitted activity.
Failure to comply with applicable PDCs will constitute noncompliance with this permit.
In addition, failure to comply with the applicable PDCs, where a take of listed species occurs, would constitute an unauthorized take. The NMFS is the appropriate authority to determine compliance with the Endangered Species Act. The most current version of JAXBO can be accessed at the Jacksonville District Regulatory Division website in the Endangered Species section of the Sourcebook located at:
http://www.saj.usace.army.mil/Missions/Regulatory/SourceBook.aspx
JAXBO may be subject to revision at any time. The most recent version of these JAXBO must be utilized during the design and construction of the permitted work.
14. Cultural Resources/Historic Properties:
a. No structure or work shall adversely affect impact or disturb properties listed in the National Register of Historic Places (NRHP) or those eligible for inclusion in the
NRHP.
http://www.saj.usace.army.mil/Missions/Regulatory/SourceBook.aspx
b. If during the ground disturbing activities and construction work within the permit area, there are archaeological/cultural materials encountered which were not the subject of a previous cultural resources assessment survey (and which shall include, but not be limited to: pottery, modified shell, flora, fauna, human remains, ceramics, stone tools or metal implements, dugout canoes, evidence of structures or any other physical remains that could be associated with Native American cultures or early colonial or American settlement), the Permittee shall immediately stop all work and ground-disturbing activities within a 100-meter diameter of the discovery and notify the Corps within the same business day (8 hours). The Corps shall then notify the Florida State Historic Preservation Officer (SHPO) and the appropriate Tribal Historic Preservation Officer(s) (THPO(s)) to assess the significance of the discovery and devise appropriate actions.
c. Additional cultural resources assessments may be required of the permit area in the case of unanticipated discoveries as referenced in accordance with the above Special Condition and if deemed necessary by the SHPO, THPO(s), or Corps, in accordance with 36 CFR 800 or 33 CFR 325, Appendix C (5). Based, on the circumstances of the discovery, equity to all parties, and considerations of the public interest, the Corps may modify, suspend or revoke the permit in accordance with 33 CFR Part 325.7. Such activity shall not resume on non-federal lands without written authorization from the SHPO for finds under his or her jurisdiction, and from the Corps.
d. In the unlikely event that unmarked human remains are identified on non-federal lands, they will be treated in accordance with Section 872.05 Florida Statutes. All work and ground disturbing activities within a 100-meter diameter of the unmarked human remains shall immediately cease and the Permittee shall immediately notify the medical examiner, Corps, and State Archeologist within the same business day (8-hours). The Corps shall then notify the appropriate SHPO and THPO(s). Based, on the circumstances of the discovery, equity to all parties, and considerations of the public interest, the Corps may modify, suspend or revoke the permit in accordance with 33 CFR Part 325.7. Such activity shall not resume without written authorization from the State Archeologist and from the Corps.
This letter of authorization does not include conditions that would prevent the ‘take’ of a state-listed fish or wildlife species. These species are protected under sec. 379.411, Florida Statutes, and listed under Rule 68A-27, Florida Administrative Code. With regard to fish and wildlife species designated as species of special concern or threatened by the State of Florida, you are responsible for coordinating directly with the Florida Fish and Wildlife Conservation Commission (FWC). You can visit the FWC license and permitting webpage (http://www.myfwc.com/license/wildlife/) for more information, including a list of those fish and wildlife species designated as species of special concern or threatened. The Florida Natural Areas Inventory (http://www.fnai.org/) also maintains updated lists, by county, of documented occurrences of those species.
This letter of authorization does not give absolute Federal authority to perform the work as specified on your application. The proposed work may be subject to local building restrictions mandated by the National Flood Insurance Program. You should contact your local office that issues building permits to determine if your site is located in a flood-prone http://www.myfwc.com/license/wildlife/ http://www.fnai.org/ area, and if you must comply with the local building requirements mandated by the National Flood Insurance Program.
This letter of authorization does not preclude the necessity to obtain any other Federal, State, or local permits, which may be required.
Thank you for your cooperation with our permit program. The Corps’ Jacksonville District Regulatory Division is committed to improving service to our customers. We strive to perform our duty in a friendly and timely manner while working to preserve our environment. We invite you to complete our automated Customer Service Survey at https://regulatory.ops.usace.army.mil/customer-service-survey/. Please be aware this Internet address is case sensitive and you will need to enter it exactly as it appears above.
Your input is appreciated – favorable or otherwise.
Should you have any questions related to this verification letter or have issues accessing the documents reference in this letter, please contact Holly Millsap at the letterhead address above, via telephone at 850-470-9823, or via e-mail at Holly.M.Millsap@usace.army.mil.
Sincerely, Holly Millsap Project Manager Enclosures:
CC: Jeff Huggins, Baskerville-Donovan, Inc., Agent https://regulatory.ops.usace.army.mil/customer-service-survey/ mailto:Holly.M.Millsap@usace.army.mil
A
A
A
SANTA ROSA COUNTY
CHANNEL MAINTENANCE
VICINITY MAP NNTS
PROJECT
LOCATION
INDEX
FOR
CONSTRUCTION PLANS
PREPARED BY
OCTOBER 2023
ENGINEERING BUSINESS: EB-0000340
449 W. MAIN ST., PENSACOLA, FL 32502 (850)438-9661
Pensacola - Panama City Beach - Tallahassee - Mobile
BASKERVILLE-DONOVAN, INC.
ENGINEERING THE SOUTH SINCE 1927
SAN
TA ROSA COUNTY
FLOR I DA
PREPARED FOR:
N
EN
GI
NE
ER
IN
G
BU
SI
NE
SS
: E B-
Pe ns ac ol a
- P an am a C ity B ea ch
Ta lla ha ss ee
M ob ile
9 W
. M
AI
N
ST
., P
EN
SA
CO
LA
, F
L 3
(8
)4
-9
B A
S K
E R
V
IL
LE
-D
O N
O V
A N
, I N
C
EN
GI
NE
ER
IN
G
TH
E
SO
UT
H
SI
NC
E
GI
NE
ER
IN
G
BU
SI
NE
SS
: E B-
Pe ns ac ol a
- P an am a C ity B ea ch
Ta lla ha ss ee
M ob ile
9 W
. M
AI
N
ST
., P
EN
SA
CO
LA
, F
L 3
(8
)4
-9
B A
S K
E R
V
IL
LE
-D
O N
O V
A N
, I N
C
EN
GI
NE
ER
IN
G
TH
E
SO
UT
H
SI
NC
E
NE
ER
IN
G
BU
SI
NE
SS
: E B-
Pe ns ac ol a
- P an am a C ity B ea ch
Ta lla ha ss ee
M ob ile
9 W
. M
AI
N
ST
., P
EN
SA
CO
LA
, F
L 3
(8
)4
-9
B A
S K
E R
V
IL
LE
-D
O N
O V
A N
, I N
C
EN
GI
NE
ER
IN
G
TH
E
SO
UT
H
SI
NC
E
NE
ER
IN
G
BU
SI
NE
SS
: E B-
Pe ns ac ol a
- P an am a C ity B ea ch
Ta lla ha ss ee
M ob ile
9 W
. M
AI
N
ST
., P
EN
SA
CO
LA
, F
L 3
(8
)4
-9
B A
S K
E R
V
IL
LE
-D
O N
O V
A N
, I N
C
EN
GI
NE
ER
IN
G
TH
E
SO
UT
H
SI
NC
E
NE
ER
IN
G
BU
SI
NE
SS
: E B-
Pe ns ac ol a
- P an am a C ity B ea ch
Ta lla ha ss ee
M ob ile
9 W
. M
AI
N
ST
., P
EN
SA
CO
LA
, F
L 3
(8
)4
-9
B A
S K
E R
V
IL
LE
-D
O N
O V
A N
, I N
C
EN
GI
NE
ER
IN
G
TH
E
SO
UT
H
SI
NC
E
B B
A A
N
EN
GI
NE
ER
IN
G
BU
SI
NE
SS
: E B-
Pe ns ac ol a
- P an am a C ity B ea ch
Ta lla ha ss ee
M ob ile
9 W
. M
AI
N
ST
., P
EN
SA
CO
LA
, F
L 3
(8
)4
-9
B A
S K
E R
V
IL
LE
-D
O N
O V
A N
, I N
C
EN
GI
NE
ER
IN
G
TH
E
SO
UT
H
SI
NC
E
INFLOW ZONE
SETTLING
ZONE
OUTFLOW
ZONE
EQUIMENT STAGING AREA
NE
ER
IN
G
BU
SI
NE
SS
: E B-
Pe ns ac ol a
- P an am a C ity B ea ch
Ta lla ha ss ee
M ob ile
9 W
. M
AI
N
ST
., P
EN
SA
CO
LA
, F
L 3
(8
)4
-9
B A
S K
E R
V
IL
LE
-D
O N
O V
A N
, I N
C
EN
GI
NE
ER
IN
G
TH
E
SO
UT
H
SI
NC
E
NE
ER
IN
G
BU
SI
NE
SS
: E B-
Pe ns ac ol a
- P an am a C ity B ea ch
Ta lla ha ss ee
M ob ile
9 W
. M
AI
N
ST
., P
EN
SA
CO
LA
, F
L 3
(8
)4
-9
B A
S K
E R
V
IL
LE
-D
O N
O V
A N
, I N
C
EN
GI
NE
ER
IN
G
TH
E
SO
UT
H
SI
NC
E
NE
ER
IN
G
BU
SI
NE
SS
: E B-
Pe ns ac ol a
- P an am a C ity B ea ch
Ta lla ha ss ee
M ob ile
9 W
. M
AI
N
ST
., P
EN
SA
CO
LA
, F
L 3
(8
)4
-9
B A
S K
E R
V
IL
LE
-D
O N
O V
A N
, I N
C
EN
GI
NE
ER
IN
G
TH
E
SO
UT
H
SI
NC
E
COMMENCEMENT NOTIFICATION
Within ten (10) days of initiating the authorized work, submit this form via electronic mail to saj-rd-enforcement@usace.army.mil (preferred, not to exceed 15 MB) or by standard mail to U.S. Army Corps of Engineers, Enforcement Section, P.O. Box 4970, Jacksonville, FL 32232-0019.
1. Department of the Army Permit Number: SAJ-2024-00097 (NW-HMM)
2. Permittee Information:
Name: __________________________________________
Email: __________________________________________
Address: __________________________________________
Phone: __________________________________________
3. Construction Start Date: ______________________
4. Contact to Schedule Inspection:
Name: __________________________________________
Email: __________________________________________
Phone: __________________________________________
Signature of Permittee
Printed Name of Permittee
Date mailto:saj-rd-enforcement@usace.army.mil
SELF-CERTIFICATION STATEMENT OF COMPLIANCE
Permit Number: SAJ-2024-00097 (NW-HMM)
Permittee’s Name & Address (please print or type): ___________________________________
Telephone Number: ____________________________________________________________
Location of the Work: ___________________________________________________________
Date Work Started: ___________________ Date Work Completed: ______________________
PROPERTY IS INACCESSIBLE WITHOUT PRIOR NOTIFICATION: YES ______ NO_______
TO SCHEDULE AN INSPECTION PLEASE CONTACT _______________________________
AT __________________________
Description of the Work (e.g. bank stabilization, residential or commercial filling, docks, dredging, etc.):
Acreage or Square Feet of Impacts to Waters of the United States: ______________________
Describe Mitigation completed (if applicable): ________________________________________
Describe any Deviations from Permit (attach drawing(s) depicting the deviations):
I certify that all work, and mitigation (if applicable) was done in accordance with the limitations and conditions as described in the permit. Any deviations as described above are depicted on the attached drawing(s).
Signature of Permittee
Date
DEPARTMENT OF THE ARMY PERMIT TRANSFER REQUEST
Permit Number: SAJ-2024-00097 (NW-HMM)
When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit will continue to be binding on the new owner(s) of the property. Although the construction period for works authorized by Department of the Army permits is finite, the permit itself, with its limitations, does not expire.
To validate the transfer of this permit and the associated responsibilities associated with compliance with its terms and conditions, have the transferee sign and date below and mail to the U.S. Army Corps of Engineers, Enforcement Section, Post Office Box 4970, Jacksonville, FL 32232-0019 or submit via electronic mail to:
SAJ-RD-Enforcement@usace.army.mil (not to exceed 15 MB).
(TRANSFEREE-SIGNATURE) (SUBDIVISION)
(DATE) (LOT) (BLOCK)
(NAME-PRINTED) (STREET ADDRESS)
(MAILING ADDRESS)
(CITY, STATE, ZIP CODE)
mailto:SAJ-RD-Enforcement@usace.army.mil
STANDARD MANATEE CONDITIONS FOR IN-WATER WORK
The permittee shall comply with the following conditions intended to protect manatees from direct project effects:
a. All personnel associated with the project shall be instructed about the presence of manatees and manatee speed zones, and the need to avoid collisions with and injury to manatees. The permittee shall advise all construction personnel that there are civil and criminal penalties for harming, harassing, or killing manatees which are protected under the Marine Mammal Protection Act, the Endangered Species Act, and the Florida Manatee Sanctuary Act.
b. All vessels associated with the construction project shall operate at "Idle Speed/No Wake” at all times while in the immediate area and while in water where the draft of the vessel provides less than a four-foot clearance from the bottom. All vessels will follow routes of deep water whenever possible.
c. Siltation or turbidity barriers shall be made of material in which manatees cannot become entangled, shall be properly secured, and shall be regularly monitored to avoid manatee entanglement or entrapment. Barriers must not impede manatee movement.
d. All on-site project personnel are responsible for observing water-related activities for the presence of manatee(s). All in-water operations, including vessels, must be shutdown if a manatee(s) comes within 50 feet of the operation. Activities will not resume until the manatee(s) has moved beyond the 50-foot radius of the project operation, or until 30 minutes elapses if the manatee(s) has not reappeared within 50 feet of the operation. Animals must not be herded away or harassed into leaving.
e. Any collision with or injury to a manatee shall be reported immediately to the Florida Fish and Wildlife Conservation Commission (FWC) Hotline at 1-888-404-3922. Collision and/or injury should also be reported to the U.S. Fish and Wildlife Service in Jacksonville (1-904-731-3336) for north Florida or Vero Beach (1-772-562-3909) for south Florida, and to FWC at ImperiledSpecies@myFWC.com
f. Temporary signs concerning manatees shall be posted prior to and during all in-water project activities. All signs are to be removed by the permittee upon completion of the project. Temporary signs that have already been approved for this use by the FWC must be used. One sign which reads Caution: Boaters must be posted. A second sign measuring at least 8 ½” by 11" explaining the requirements for “Idle Speed/No Wake” and the shut down of in-water operations must be posted in a location prominently visible to all personnel engaged in water-related activities. These signs can be viewed at MyFWC.com/manatee. Questions concerning these signs can be sent to the email address listed above.
mailto:ImperiledSpecies@myFWC.com�
CAUTION: MANATEE HABITAT
All project vessels
IDLE SPEED / NO WAKE
When a manatee is within 50 feet of work all in-water activities must
SHUT DOWN
Report any collision with or injury to a manatee:
Wildlife Alert:
1-888-404-FWCC (3922)
cell * FWC or #FWC
STANDARD PROTECTION MEASURES FOR THE EASTERN INDIGO SNAKE
U.S. Fish and Wildlife Service
August 12, 2013
The eastern indigo snake protection/education plan (Plan) below has been developed by the U.S.
Fish and Wildlife Service (USFWS) in Florida for use by applicants and their construction personnel. At least 30 days prior to any clearing/land alteration activities, the applicant shall notify the appropriate USFWS Field Office via e-mail that the Plan will be implemented as described below (North Florida Field Office: jaxregs@fws.gov; South Florida Field Office:
verobeach@fws.gov; Panama City Field Office: panamacity@fws.gov). As long as the signatory of the e-mail certifies compliance with the below Plan (including use of the attached poster and brochure), no further written confirmation or “approval” from the USFWS is needed and the applicant may move forward with the project.
If the applicant decides to use an eastern indigo snake protection/education plan other than the approved Plan below, written confirmation or “approval” from the USFWS that the plan is adequate must be obtained. At least 30 days prior to any clearing/land alteration activities, the applicant shall submit their unique plan for review and approval. The USFWS will respond via e-mail, typically within 30 days of receiving the plan, either concurring that the plan is adequate or requesting additional information. A concurrence e-mail from the appropriate USFWS Field Office will fulfill approval requirements.
The Plan materials should consist of: 1) a combination of posters and pamphlets (see Poster Information section below); and 2) verbal educational instructions to construction personnel by supervisory or management personnel before any clearing/land alteration activities are initiated (see Pre-Construction Activities and During Construction Activities sections below).
POSTER INFORMATION
Posters with the following information shall be placed at strategic locations on the construction site and along any proposed access roads (a final poster for Plan compliance, to be printed on 11” x 17” or larger paper and laminated, is attached):
DESCRIPTION: The eastern indigo snake is one of the largest non-venomous snakes in North America, with individuals often reaching up to 8 feet in length. They derive their name from the glossy, blue-black color of their scales above and uniformly slate blue below. Frequently, they have orange to coral reddish coloration in the throat area, yet some specimens have been reported to only have cream coloration on the throat. These snakes are not typically aggressive and will attempt to crawl away when disturbed. Though indigo snakes rarely bite, they should NOT be handled.
SIMILAR SNAKES: The black racer is the only other solid black snake resembling the eastern indigo snake. However, black racers have a white or cream chin, thinner bodies, and WILL BITE if handled.
LIFE HISTORY: The eastern indigo snake occurs in a wide variety of terrestrial habitat types throughout Florida. Although they have a preference for uplands, they also utilize some wetlands mailto:jaxregs@fws.gov mailto:verobeach@fws.gov mailto:panamacity@fws.gov and agricultural areas. Eastern indigo snakes will often seek shelter inside gopher tortoise burrows and other below- and above-ground refugia, such as other animal burrows, stumps, roots, and debris piles. Females may lay from 4 - 12 white eggs as early as April through June, with young hatching in late July through October.
PROTECTION UNDER FEDERAL AND STATE LAW: The eastern indigo snake is classified as a Threatened species by both the USFWS and the Florida Fish and Wildlife Conservation Commission. “Taking” of eastern indigo snakes is prohibited by the Endangered Species Act without a permit. “Take” is defined by the USFWS as an attempt to kill, harm, harass, pursue, hunt, shoot, wound, trap, capture, collect, or engage in any such conduct.
Penalties include a maximum fine of $25,000 for civil violations and up to $50,000 and/or imprisonment for criminal offenses, if convicted.
Only individuals currently authorized through an issued Incidental Take Statement in association with a USFWS Biological Opinion, or by a Section 10(a)(1)(A) permit issued by the USFWS, to handle an eastern indigo snake are allowed to do so.
IF YOU SEE A LIVE EASTERN INDIGO SNAKE ON THE SITE:
• Cease clearing activities and allow the live eastern indigo snake sufficient time to move away from the site without interference;
• Personnel must NOT attempt to touch or handle snake due to protected status.
• Take photographs of the snake, if possible, for identification and documentation purposes.
• Immediately notify supervisor or the applicant’s designated agent, and the appropriate
USFWS office, with the location information and condition of the snake.
• If the snake is located in a vicinity where continuation of the clearing or construction activities will cause harm to the snake, the activities must halt until such time that a representative of the USFWS returns the call (within one day) with further guidance as to when activities may resume.
IF YOU SEE A DEAD EASTERN INDIGO SNAKE ON THE SITE:
• Cease clearing activities and immediately notify supervisor or the applicant’s designated agent, and the appropriate USFWS office, with the location information and condition of the snake.
• Take photographs of the snake, if possible, for identification and documentation purposes.
• Thoroughly soak the dead snake in water and then freeze the specimen. The appropriate wildlife agency will retrieve the dead snake.
Telephone numbers of USFWS Florida Field Offices to be contacted if a live or dead eastern indigo snake is encountered:
North Florida Field Office – (904) 731-3336 Panama City Field Office – (850) 769-0552 South Florida Field Office – (772) 562-3909
PRE-CONSTRUCTION ACTIVITIES
1. The applicant or designated agent will post educational posters in the construction office and throughout the construction site, including any access roads. The posters must be clearly visible to all construction staff. A sample poster is attached.
2. Prior to the onset of construction activities, the applicant/designated agent will conduct a meeting with all construction staff (annually for multi-year projects) to discuss identification of the snake, its protected status, what to do if a snake is observed within the project area, and applicable penalties that may be imposed if state and/or federal regulations are violated. An educational brochure including color photographs of the snake will be given to each staff member in attendance and additional copies will be provided to the construction superintendent to make available in the onsite construction office (a final brochure for Plan compliance, to be printed double-sided on 8.5” x 11” paper and then properly folded, is attached). Photos of eastern indigo snakes may be accessed on USFWS and/or FWC websites.
3. Construction staff will be informed that in the event that an eastern indigo snake (live or dead) is observed on the project site during construction activities, all such activities are to cease until the established procedures are implemented according to the Plan, which includes notification of the appropriate USFWS Field Office. The contact information for the USFWS is provided on the referenced posters and brochures.
DURING CONSTRUCTION ACTIVITIES
1. During initial site clearing activities, an onsite observer may be utilized to determine whether habitat conditions suggest a reasonable probability of an eastern indigo snake sighting (example:
discovery of snake sheds, tracks, lots of refugia and cavities present in the area of clearing activities, and presence of gopher tortoises and burrows).
2. If an eastern indigo snake is discovered during gopher tortoise relocation activities (i.e. burrow excavation), the USFWS shall be contacted within one business day to obtain further guidance which may result in further project consultation.
3. Periodically during construction activities, the applicant’s designated agent should visit the project area to observe the condition of the posters and Plan materials, and replace them as needed. Construction personnel should be reminded of the instructions (above) as to what is expected if any eastern indigo snakes are seen.
POST CONSTRUCTION ACTIVITIES
Whether or not eastern indigo snakes are observed during construction activities, a monitoring report should be submitted to the appropriate USFWS Field Office within 60 days of project completion. The report can be sent electronically to the appropriate USFWS e-mail address listed on page one of this Plan.
ATTENTION:
THREATENED EASTERN INDIGO
SNAKES MAY BE PRESENT ON
THIS SITE!!!
IF YOU SEE A LIVE EASTERN INDIGO SNAKE ON THE SITE:
• Cease clearing activities and allow the eastern indigo snake sufficient time to move away from the site without interference.
• Personnel must NOT attempt to touch or handle snake due to protected status.
• Take photographs of the snake, if possible, for identification and documentation purposes.
• Immediately notify supervisor or the applicant’s designated agent, and the appropriate U.S. Fish and
Wildlife Service (USFWS) office, with the location information and condition of the snake.
• If the snake is located in a vicinity where continuation of the clearing or construction activities will cause harm to the snake, the activities must halt until such time that a representative of the USFWS returns the call (within one day) with further guidance as to when activities may resume.
IF YOU SEE A DEAD EASTERN INDIGO SNAKE ON THE SITE:
• Cease clearing activities and immediately notify supervisor or the applicant’s designated agent, and the appropriate USFWS office, with the location information and condition of the snake.
• Take photographs of the snake, if possible, for identification and documentation purposes.
• Thoroughly soak the dead snake in water and then freeze the specimen. The appropriate wildlife agency will retrieve the dead snake.
USFWS Florida Field Offices to be contacted if a live or dead eastern indigo snake is encountered:
North Florida Field Office – (904) 731-3336 Panama City Field Office – (850) 769-0552 South Florida Field Office – (772) 562-3909
Killing, harming, or harassing indigo snakes is strictly prohibited and punishable under State and Federal Law.
DESCRIPTION: The eastern indigo snake is one of the largest non-venomous snakes in North America, with individuals often reaching up to 8 feet in length. They derive their name from the glossy, blue-black color of their scales above and uniformly slate blue below. Frequently, they have orange to coral reddish coloration in the throat area, yet some specimens have been reported to only have cream coloration on the throat. These snakes are not typically aggressive and will attempt to crawl away when disturbed.
Though indigo snakes rarely bite, they should NOT be handled.
SIMILAR SNAKES: The black racer is the only other solid black snake resembling the eastern indigo snake. However, black racers have a white or cream chin, thinner bodies, and WILL BITE if handled.
LIFE HISTORY: The eastern indigo snake occurs in a wide variety of terrestrial habitat types throughout Florida.
Although they have a preference for uplands, they also utilize some wetlands and agricultural areas.
Eastern indigo snakes will often seek shelter inside gopher tortoise burrows and other below- and above-ground refugia, such as other animal burrows, stumps, roots, and debris piles. Females may lay from 4 - 12 white eggs as early as April through June, with young hatching in late July through October.
PROTECTION: The eastern indigo snake is classified as a Threatened species by both the USFWS and the Florida Fish and Wildlife Conservation Commission. “Taking” of eastern indigo snakes is prohibited by the Endangered Species Act without a permit. “Take” is defined by the USFWS as an attempt to kill, harm, harass, pursue, hunt, shoot, wound, trap, capture, collect, or engage in any such conduct. Penalties include a maximum fine of $25,000 for civil violations and up to $50,000 and/or imprisonment for criminal offenses, if convicted.
Only individuals currently authorized through an issued Incidental Take Statement in association with a USFWS Biological Opinion, or by a Section 10(a)(1)(A) permit issued by the USFWS, to handle an eastern indigo snake are allowed to do so.
Photo: Dirk Stevenson
August 12, 2013
IF YOU SEE A LIVE EASTERN
INDIGO SNAKE ON THE SITE:
• Cease clearing activities and allow the eastern indigo snake sufficient time to move away from the site without interference.
• Personnel must NOT attempt to touch or handle snake due to protected status.
• Take photographs of the snake, if possible, for identification and documentation purposes.
• Immediately notify supervisor or the applicant’s designated agent, and the appropriate U.S. Fish and Wildlife Service (USFWS) office, with the location information and condition of the snake.
• If the snake is located in a vicinity where continuation of the clearing or construction activities will cause harm to the snake, the activities must halt until such time that a representative of the USFWS returns the call (within one day) with further guidance as to when activities may resume.
IF YOU SEE A DEAD EASTERN
INDIGO SNAKE ON THE SITE:
• Cease clearing activities and immediately notify supervisor or the applicant’s designated agent, and the appropriate USFWS office, with the location information and condition of the snake.
• Take photographs of the snake, if possible, for identification and documentation purposes.
• Thoroughly soak the dead snake in water and then freeze the specimen.
The appropriate wildlife agency will retrieve the dead snake.
USFWS Florida Field Offices to be contacted if a live or dead eastern indigo snake is encountered:
North Florida ES Office – (904) 731-3336 Panama City ES Office – (850) 769-0552 South Florida ES Office – (772) 562-3909
DESCRIPTION: The eastern indigo snake is one of the largest non-venomous snakes in North America, with individuals often reaching up to 8 feet in length. They derive their name from the glossy, blue-black color of their scales above and uniformly slate blue below. Frequently, they have orange to coral reddish coloration in the throat area, yet some specimens have been reported to only have cream coloration on the throat. These snakes are not typically aggressive and will attempt to crawl away when disturbed.
Though indigo snakes rarely bite, they should NOT be handled.
SIMILAR SNAKES: The black racer is the only other solid black snake resembling the eastern indigo snake. However, black racers have a white or cream chin, thinner bodies, and WILL BITE if handled.
LIFE HISTORY: The eastern indigo snake occurs in a wide variety of terrestrial habitat types throughout Florida. Although they have a preference for uplands, they also utilize some wetlands and agricultural areas. Eastern indigo snakes will often seek shelter inside gopher tortoise burrows and other below- and above-ground refugia, such as other animal burrows, stumps, roots, and debris piles. Females may lay from 4 - 12 white eggs as early as April through June, with young hatching in late July through October.
Killing, harming, or harassing indigo snakes is strictly prohibited and punishable under State and Federal Law.
Only individuals currently authorized through an issued Incidental Take Statement in association with a USFWS Biological Opinion, or by a Section 10(a)(1)(A) permit issued by the USFWS, to handle an eastern indigo snake are allowed to do so.
LEGAL STATUS: The eastern indigo snake is classified as a Threatened species by both the USFWS and the Florida Fish and Wildlife Conservation Commission.
“Taking” of eastern indigo snakes is prohibited by the Endangered Species Act without a permit. “Take” is defined by the USFWS as an attempt to kill, harm, harass, pursue, hunt, shoot, wound, trap, capture, collect, or engage in any such conduct.
Penalties include a maximum fine of $25,000 for civil violations and up to $50,000 and/or imprisonment for criminal offenses, if convicted.
ATTENTION:
THREATENED EASTERN INDIGO
SNAKES MAY BE PRESENT ON
THIS SITE!!!
Please read the following information provided by the U.S. Fish and Wildlife Service to become familiar with standard protection measures for the eastern indigo snake.
Photo: Dirk Stevenson
August 12, 2013
| 2024-00097_Santa Rosa Co-Archie Glover_NW1-16-35-PERMIT.pdf |
| 2024-00097_Santa Rosa Co-Archie Glover_NW1-16-35.pdf |
| 20240115 Santa Rosa County Channel_Permit Plan Set_Signed and Sealed.pdf |
| ATTACHMENT -- Standard Manatee Conditions for In-Water Work_2011.pdf |
| ATTACHMENT - EIS_Standard Protection Measures.pdf |
| 20130812 Eastern Indigo Snake Poster.pdf |
| Slide Number 1 |
File details come from the government source that posted it. Updated .