(u)S02_DRAWINGS.pdf

PDF 15 MB Posted

Attached to
Y1DZ--Replace 15Kv Main Switchgear
Solicitation number
36C24220B0055
Issued by

About this file

This document provides details on a federal contract opportunity for replacing switchgear. The solicitation number is 36C24220B0055 and is seeking to replace 15kV main switchgear at the FDR VA Medical Center in Montrose, New York under project number 620-17-118. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2. The bid opening was held on May 7, 2020 via Webex. The abstract for bid number 36C24220B0013 is attached. No further information is provided on response dates, award dates, pricing terms, or set asides.

View the file

Other files

File Type Posted
(u)S07_OF 1419A Bid Abstract 2.pdf PDF
(u)S07_OF 1419 Bid Abstract 1.pdf PDF
36C24220B0055 0004.docx DOCX document
36C24220B0055 0003.docx DOCX document
19-453 VA Montrose Switchgear - Pre-Bid RFI Responses.docx DOCX document
S04_Walk Thru Sign In Sheet 20201201.pdf PDF
36C24220B0055 0002.docx DOCX document
36C24220B0055 0001.docx DOCX document
Pre-bid Sign-in sheet 20201124.pdf PDF
(u)S02_CD SPECIFICATIONS.pdf PDF
36C24220B0055_2.docx DOCX document
(u)S02_Wage Determination.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

V

A

P

R

O

P

E

R

T

Y

L

I

N

E

C

E

N

T

E

N

O

F

S

E

M

E

B

U

R

I

D

C

A

X

I

B

L

E

4 13

18 28

THREE 30,000 GAL.

FUEL OIL TANKS

250,000 GAL.

WATER OIL TANK

300,000 GAL.

WATER TANK

TRANSFORMER

ELECT.

GENERATOR

R

A

I

L

R

O

A

D

N

O

R

T

H

D

U

T

H

S

PAVED

P

R

O

P

E

R

Y

H

U

I

T

A

T

M

E

R

I

C

A

NEW YORK STATE

VETERANS NURSING HOME

OUTPATIENT BUILDING 3

BUILDING NAME

NUMBERS

BUILDING

BUILDING SCHEDULE

BUILDING NAME

NUMBERS

BUILDING

23 STORAGE

ADMINISTRATIVE OFFICES

ADMINISTRATIVE

NURSING HOME CARE UNIT

ACUTE BUILDING

QUARTERS 30

CHILD CARE 29

RESIDENTIAL TREATMENT 28

CHAPEL 27

GYM 26

RECREATION/CANTEEN 25

MAIN ELECTRICAL 24

TRANSFORMER PLATFORM 22

CHIMNEY 21

BOILER PLANT 20

FIRE HOUSE 19

VACANT-OUTLEASED 18

WAREHOUSE 17

ENGINEERING 16

NHCU 15

PSYCHIATRY 14

WOMEN PATIENT'S 11

KITCHEN & DINING HALL 5

THEATER 2

ADMINISTRATION 1

RESIDENTIAL TREATMENT

GREEN HOUSE (WOMEN PATIENT'S) 56

55 BS2 BUS STOP (NEAR BLDG. 15)

WOMEN'S REST BUILDING

DOMICILIARY

BS1 BUS STOP (NEAR BLDG. 16)

OXYGEN STORAGE TANK

WATER TOWER

CHLORINATION CHAMBER

CONCESSION & SHELTER

PATIENT'S TOOL & BOAT HOUSE STORAGE

BATH HOUSE

GREEN HOUSE

CELL PHONE COMMUNICATION

SLUDGE BED

FLAG POLE

WASTEWATER TREATMENT

DIRECTOR'S GARAGE 32

CHIEF OF STAFF QRTR.

PAINT STORAGE

MEN'S REST BUILDING

GARAGE & STORAGE

CHLORINATION CHAMBER 59

58 SECONDARY SETTLING TANKS

TRICKLING FILTER 57

REPLACE 15KV MAIN SWITCHGEAR

VAMC MONTROSE, NY

GI-001

COVER SHEET

WITH INDEX TO DRAWINGS

JCL

F i l e

N a m e

C

U s e r s j c l A p p

D a t a L o c a l T e m p A c P u b l i s h

G

I d w g a y o u t

G

I

D a t e

T h u

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

INDEX OF DRAWINGSBUILDING LOCATION MAP

AREA OF WORK

AREA OF WORKAREA OF WORK

OVERALL CAMPUS SITE PLAN

PHASING PLAN

GENERAL INFORMATION:

SYMBOLS, ABBREVIATIONS, NOTES,

GI-002

F i l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

G

I d a y o u t

G

I

D a t e

T h u

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

JCL

PROPOSED PHASING SEQUENCE:

PROPOSED FEEDER SWITCHOVER SEQUENCE

GENERAL SYMBOLS

GENERAL NOTES: GENERAL DEMOLITION NOTES:

GENERAL CONSTRUCTION ACTIVITY NOTES:

& PHASING PLAN

ASBESTOS ABATEMENT LEGEND:

1 WINDOW CAULK & GLAZING TO BE REMOVED.

2 DOOR CAULK & GLAZING TO BE REMOVED.

3 PIPE INSULATION TO BE REMOVED.

AIRLOCK

HEPA-FILTER NEGATIVE AIR MACHINE.

GENERAL NOTES:

1. Asbestos abatement shall be performed in accordance with the specification and applicable regulations.

Personnel holding current New York State Department of

Labor (N.Y.S.D.O.L.) asbestos handler's certificates shall perform the work. Additionally, the Contractor must employ N.Y.S.D.O.L. certified supervisors to be on the work site for all abatement activities. The contractor must be currently licensed by the N.Y.S.D.O.L. All certificates and licenses are to be readily available for verification by the Veterans Affairs Medical Center (V.A.M.C).

2. Contractor is responsible for removal and disposal of all asbestos-containing materials and asbestos-contaminated materials within the specified areas.

3. Contractor is responsible for verification of all quantities of asbestos-containing materials.

4. Contractor is responsible for precleaning any existing asbestos contamination, dust and debris within the removal areas.

5. Contractor is responsible for maintaining the integrity of building finishes. The contractor shall repair any and all damages caused by abatement activities or his personnel.

6. Contractor is solely responsible for all means, methods, techniques, sequences and procedures and for coordinating all portions of the scope of work under this contract.

7. Some of the work may be phased to accommodate the

V.A.M.C. facility requirements. Work may have to be performed off-hours, weekends and at night at no additional cost to the V.A.M.C.

8. The project shall be filed as a large project with the

N.Y.S.D.O.L. and U.S.E.P.A.

ASBESTOS ABATEMENT NOTES:

1. The Contractor is to remove the asbestos-containing materials (ACM's) and asbestos contaminated materials in accordance with New York State Industrial Code Rule 56

(12 NYCRR Part 56), the VAMC specification and applicable Federal OSHA and EPA regulations. Where there is an overlap the most stringent regulation shall apply.

2. The 15KV Main Switch Gear Lineup in Building 24 is being replaced. The replacement involves the demolition of existing rooms, construction of new rooms and the addition of new switch gear. ACM's must be removed to allow for the renovation of the building. ACM's include but are not limited to pipe insulation, pipe fitting insulation, window caulk, window glazing, door caulk, and door glazing.

3. The contractor must comply with OSHA Code of Federal

Regulation 29 CFR 1926.62 for any work involving the lead paint. The contractor shall perform work impacted by the Building 24 project wet to reduce dust levels so that the exposure to his workers is below the OSHA action limit of 30 micrograms per cubic meter. This shall be accomplished by means of a negative exposure assessment (NEA).

4. The asbestos abatement contractor shall perform tent/glovebag removal for the indoor work areas. The asbestos abatement contractor shall perform glovebag removal within HEPA-filtered negative air pressure tent enclosures for indoor abatement of pipe insulation. All tent abatement areas shall have an airlock entrance. The tent enclosure shall be vented to the outdoor air via

HEPA-filtered negative air machines. Tents shall be constructed in accordance with 12 NYCRR Part 56. In areas of public access the tent enclosures shall be sheathed for safety. The contractor shall also abate any debris as ACM that is present.

5. Window caulk, window glazing, door caulk and door glazing removal shall be performed from outside the building in accordance with 12 NYCRR Part 56 Section

56-11.6 (Exterior Project Removal of Non-friable ACM

Caulking). Critical barriers shall be installed on the outside of the building over the window openings. The work area shall be an area demarcated with

“Danger-Asbestos” signs and red warning tape placed at a minimum distance of 25' in every direction. Only certified workers and authorized visitors shall be permitted in the work area during asbestos abatement activities. Asbestos abatement activities and general contracting work shall not be permitted to occur at the same time in an asbestos abatement work area. Simultaneous general contracting work shall occur at least 25' away from the asbestos abatement work on the outside of the building. Outdoor work areas shall not require clearance air samples. The outdoor work areas will be considered abated when there is no visible debris or dust remaining and the VPIH has performed a successful visual inspection.

6. The contractor shall coordinate the location of his personnel and waste decontamination unit(s), and waste dumpster with the V.A. Engineer at the preconstruction meeting.

7. The contractor shall be responsible for any and all damages resulting from asbestos abatement activities.

8. All utilities, mechanical systems and piping shall be locked out and tagged before the contractor is to begin abatement activities. Mechanical and electrical systems, which cannot be locked out and tagged, shall be protected and supported throughout asbestos abatement activities.

9. Scheduling of work shall be coordinated with the V.A.

Numerous mechanical and electrical systems must remain operational throughout the project. These systems are critical to the VAMC's operation and must be preserved and protected throughout the asbestos abatement project.

Some of the work will be phased to accommodate VAMC facility requirements. Work will have to be performed during regular (0800-1600) off-hours (1600-0000), weekends and at night (0000-0800). Some work may have to be performed 24-hours around the clock for specific mechanical and operational shutdowns.

Coordinate 24-hour operations with VAMC shutdowns.

Scheduling of this work is critical to the operation of the facility.

10. In areas of public access, the contractor shall erect isolation barriers that separate the work areas from the remainder of the building. The barriers shall be constructed of a fire retardant sheathing material of at least 1/2" thickness. The isolation barrier shall be plasticized with two (2) layers of 6-mil plastic sheeting.

The isolation barriers shall be caulked at the sheathing seams and where the sheathing meets the floor, walls and ceiling. The isolation barrier shall be constructed using

2"x4" framing, 16 inches center-to-center, and caulked at all seams. All utilities and piping shall be locked out and tagged before the contractor is to begin abatement activities.

LEAD PAINT ABATEMENT NOTES:

1. Lead paint (LP) has been identified on the window lintels, doors, window frames, wall plaster, ceiling plaster, cinderblock, radiators, and floors that will be disturbed by the Building 24 Switch Gear Lineup replacement project.

The lead painted and/or lead-containing materials listed above will be demolished and/or scraped for priming to allow for the project. The Occupational Safety and Health

Administration (OSHA) consider any concentration of lead in paint to be LP. For construction purposes on this project, all painted surfaces shall be considered LP. All demolition, scraping, priming and disposal of LP and LP covered materials shall be by the contractor.

Asbestos-Containing Materials Quantity Table

Location Material

Quantity

STORAGE 2 PIPE INSULATION

100 L.F. < 4"

15 FITTINGS < 4"

15 L.F. 4 - 8"

7 FITTINGS 4 - 8"

STORAGE 2 DOOR CAULK & GLAZING 6 S.F.

STORAGE 2 WINDOW CAULK & GLAZING 3 S.F.

STORAGE 2A

PLENUM SPACE

ABOVE

PIPE INSULATION

10 L.F. < 4 - 8"

2 FITTINGS 4 - 8"

LOCKER 2B PIPE INSULATION

70 L.F. < 4"

15 FITTINGS < 4"

45 L.F. 4 - 8"

10 FITTINGS 4 - 8"

LOCKER 2B WINDOW CAULK & GLAZING 3 S.F.

TOILET 3 PIPE INSULATION

90 L.F. < 4"

20 FITTINGS < 4"

10 L.F. 4 - 8"

4 FITTINGS 4 - 8"

TOILET 3 WINDOW CAULK & GLAZING 3 S.F.

VACANT 4 PIPE INSULATION

20 L.F. < 4"

5 FITTINGS < 4"

6 L.F. 4 - 8"

2 FITTINGS 4 - 8"

CORRIDOR 7Z PIPE INSULATION

20 L.F. < 4"

5 FITTINGS < 4"

6 L.F. 4 - 8"

2 FITTINGS 4 - 8"

CORRIDOR 7Z DOOR CAULK & GLAZING 4 S.F.

N

FIRST FLOOR ASBESTOS/LEAD PAINT ABATEMENT PLAN

HA-101

F i l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

R

E C

E I V

E D a s b e s t o s d w g s H

A d a y o u t

H

A

D a t e

T h u

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

TGE EDS

Egan Environmental Consulting, Inc.

Thomas G. Egan, C.I.H.

CERT. INDUSTRIAL HYGIENIST

NO. 6369 CP

ASBESTOS/LEAD PAINT

ABATEMENT PLAN

FIRST FLOOR

GENERAL NOTES:

CONCRETE POST BARRICADES

PERMANENT 6' HIGH CHAIN LINK FENCE AND GATE

F i l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

D

W G

S A

S d a y o u t

A

S

D a t e

T h u

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

AS-001

ARCHITECTURAL:

SYMBOLS, NOTES, ABBREVIATIONS

& DETAILS

JCL

GENERAL SYMBOLS

10' TEMPORARY CONSTRUCTION FENCING DETAIL

WITH DOUBLE MAN GATE DETAIL

TEMPORARY CONSTRUCTION PARTITION

GENERAL NOTES:

ABBREVIATIONS

ARCHITECTURAL LINE TYPES

WALL TYPE LEGEND

SLAB ON GRADE DETAIL

CONCRETE PAD DETAIL

T

R

A

V

S

T

A

N

C

E

A

V

S

T

A

N

C

E

T

R A

V E

L

D

I S

T A

N C

E

EXISTING PAVED SURFACE

T

R

A

V

S

T

A

N

C

E

N

LEGEND

SHADE INDICATES

AREA OF RENOVATION

DISTANCE TO EXIT

LOCATION OF NEW FIRE EXTINGUISHER CABINET

WITH 10LB EXTINGUISHER

GALLON PER MINUTE

SURFACE MOUNTED (U.N.O.)

MINIMUM INTERIOR DIMENSIONS: 9"x9"x27".

FIRE EXTINGUISHER TO BE PROVIDED BY VA.

MOUNT BOTTOM OF CABINET 36" AFF.

NEW EXIT SIGN LOCATION

NEW DOOR

EXISTING DOOR

FIRST FLOOR PROPOSED LIFE SAFETY PLAN

ARCHITECTURAL: LIFE SAFETY

FIRST FLOOR PLAN

AS-100

F i l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

D

W G

S A

S

L

I F

E

S

A F

E T

Y d a y o u t

A

S

D a t e

T h u

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

JCL

MOUNTING HEIGHTS OF FIRE EXTINGUISHERS

FIRST FLOOR PROPOSED PLAN

FIRST FLOOR DEMO PLAN

ARCHITECTURAL:

FIRST FLOOR PLANS

AS-101

F i l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

D

W G

S A

S

D

E M

N

S T

R

P

L A

N d a y o u t

A

S

D a t e

T h u

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

JCL

KEYED NOTES: KEYED NOTES:

NOTES:

PLATFORM ASSEMBLY DETAIL

SECTION AT DOOR

COLUMN/PLATFORM CONNECTION DETAIL

COLUMN TOP DETAIL

STRINGER BASE DETAIL

COLUMN BASE DETAILS

TREAD ASSEMBLY DETAIL

ROOM FINISH SCHEDULE

ROOM NO.

ROOM

NAME

AREA

EXISTING FLOOR

MATERIAL

FLOOR FINISH

NORTH WALL

FINISH

EAST WALL

FINISH

SOUTH WALL

FINISH

WEST WALL

FINISH

CEILING

MATERIAL

CEILING

FINISH

CEILING

HEIGHT

COMMENTS

FINISH MATERIAL SCHEDULE

SYMBOL ITEM

MANUFACTURER

NO. NAME REMARKS

EXISTING & NEW

WALL MATERIAL

ENLARGED PARTIAL FIRST FLOOR PROPOSED PLAN

ARCHITECTURAL:

PARTIAL 1ST FLOOR PLAN & DETAILS

AS-102

F i l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

D

W G

S A

S A

S

E

N L

A R

G E

D

P

L A

N S

D

E T

A I L

E

V d a y o u t

A

S

D a t e

T h u

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

SL

STAIR/PLATFORM SECTION

TREAD & RISER ASSEMBLY DETAILS

STAIR & PLATFORM ASSEMBLY DETAILS

STAIR & PLATFORM ASSEMBLY DETAILS

GENERAL NOTES:

STAIR/PLATFORM FRONT ELEVATION

2A

FLOOR ACCESS PANEL DETAIL

ARCHITECTURAL:

AS-103

F i l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

D

W G

S A

S A

S

E

N L

A R

G E

D

P

L A

N S

D

E T

A I L

E

V d a y o u t

A

S

D a t e

T h u

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

SL

EQUIPMENT SECTION &

DETAILS

EQUIPMENT SECTION

WALL TYPE 1 - 2 HR RATING U905

FIRE EXIT HARDWARE FOR DOUBLE EGRESS DOORS

DOOR FRAMES

DOOR SCHEDULE

CONCRETE NOTES:

FIRE EXIT HARDWARE FOR SINGLE EGRESS DOORS

SILL

JAMB

TRANSOM BAR

HEAD

NOTES:

EXISTING WINDOW TYPE

AS-104

F i l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

D

W G

S A

S A

S

E

N L

A R

G E

D

P

L A

N S

D

E T

A I L

E

V d a y o u t

A

S

D a t e

T h u

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

SL

WALL SECTION & DETAILS

WALL OPENING DETAIL

DEMO - WALL OPENING DETAIL FOR NEW DOOR

DOOR SECTION DETAIL

DEMO - DOOR DETAIL

DEMO - WINDOW DETAIL

DEMO - WALL OPENING DETAIL

HEADER DETAIL

EXISTING WINDOW DETAIL

ARCHITECTURAL:

ELEVATIONS

AS-201

F i l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

D

W G

S A

S A

S

E

N L

A R

G E

D

P

L A

N S

D

E T

A I L

E

V d a y o u t

A

S

D a t e

T h u

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

SL

EXISTING SOUTH ELEVATION

NEW SOUTH ELEVATION

NEW NORTH ELEVATION

EXISTING NORTH ELEVATION

i l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

D

W G

S M

H d a y o u t

M

H

D a t e

T h u

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

MH-001

MECHANICAL:

SYMBOLS, NOTES, ABBREVIATIONS

& DETAILS

JCL

GENERAL SYMBOLS

GENERAL HVAC NOTES:HVAC DEMOLITION NOTES:

DUCTWORK SYMBOLS

HVAC LINE TYPES

OPTIONS

LOCATION

MARK

DUCTLESS SPLIT-SYSTEM UNIT

NOTES:

EVAPORATOR

MOUNTING

TYPE

NET COOLING/HEATING

CAPACITY

FAN

ELECTRICAL CHARACTERSTICS

VOLTAGE

BTU/HR

S.E.E.R.

CFM

MCA

MOCP

CONVECTOR SCHEDULE

NOTE:

EXHAUST FAN SCHEDULE

NOTES:

LOUVER SCHEDULE

NOTES:

ELECTRIC DUCT-MOUNTED COIL SCHEDULE

NOTES:

CONVECTOR-STEAM PIPING CONNECTION

EXHAUST HOOD DETAIL

EXTERIOR WALL LOUVER DETAIL

ABBREVIATIONS

FIRST FLOOR DEMO PLAN

MECHANICAL:

FIRST FLOOR PLANS

MH-101

F i l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

D

W G

S M

H d a y o u t

M

H

D a t e

T h u

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

JCL

FIRST FLOOR DEMO PLAN

PLUMBING:

FIRST FLOOR PLANS

PL-101

F i l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

D

W G

S P

L d a y o u t

P

L

D a t e

T h u

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

JCL

PLUMBING DEMOLITION NOTES:

GENERAL PLUMBING NOTES:

PLUMBING LINE TYPES

PIPING SYMBOLS

VALVE SYMBOLS

FIRST FLOOR DEMO PLAN

FIRE PROTECTION:

FIRST FLOOR PLANS

FX-101

F i l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

D

W G

S F

X d a y o u t

F

X

D a t e

T h u

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

JCL

UPRIGHT SPRINKLER DETAIL

NOTE:

FIRE PROTECTION SYSTEM DEMOLITION NOTES: FIRE PROTECTION SYSTEM NOTES:

FIRE PROTECTION LINE TYPES

SPRINKLER LEGEND

LEGEND AND SCHEDULE OF SPRINKLER EQUIPMENT

SEED MIXTURE

SPECIES LBS / ACRE

LAWN RESTORATION REQUIREMENTS

F i l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

D

W G

S E

S d a y o u t

E

S

D a t e

T h u

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

ES-001

ELECTRICAL:

SYMBOLS, NOTES, ABBREVIATIONS

& DETAILS

JCL

GENERAL ELECTRICAL NOTES: ELECTRICAL DEMOLITION NOTES:

COMMUNICATION SYMBOLS

FIRE ALARM SYMBOLS

SITE SYMBOLS

GROUNDING LEGEND

POWER SYMBOLS

ELECTRICAL LINE TYPES

LIGHTING SYMBOLS

l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

D

W G

S E

S d a y o u t

E

S

D a t e

T h u

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

ELECTRICAL: CAMPUS ELECTRIC SITE PLAN

ES-002

ELECTRICAL:

SL

CAMPUS ELECTRIC SITE PLAN

KEYED NOTES:

OUTPATIENT BUILDING 3

BUILDING NAME

NUMBERS

BUILDING

BUILDING SCHEDULE

BUILDING NAME

NUMBERS

BUILDING

23 STORAGE

ADMINISTRATIVE OFFICES

ADMINISTRATIVE

NURSING HOME CARE UNIT

ACUTE BUILDING

QUARTERS 30

CHILD CARE 29

RESIDENTIAL TREATMENT 28

CHAPEL 27

GYM 26

RECREATION/CANTEEN 25

MAIN ELECTRICAL 24

TRANSFORMER PLATFORM 22

CHIMNEY 21

BOILER PLANT 20

FIRE HOUSE 19

VACANT-OUTLEASED 18

WAREHOUSE 17

ENGINEERING 16

NHCU 15

PSYCHIATRY 14

WOMEN PATIENT'S 11

KITCHEN & DINING HALL 5

THEATER 2

ADMINISTRATION 1

RESIDENTIAL TREATMENT

GREEN HOUSE (WOMEN PATIENT'S) 56

55 BS2 BUS STOP (NEAR BLDG. 15)

WOMEN'S REST BUILDING

DOMICILIARY

BS1 BUS STOP (NEAR BLDG. 16)

OXYGEN STORAGE TANK

WATER TOWER

CHLORINATION CHAMBER

CONCESSION & SHELTER

PATIENT'S TOOL & BOAT HOUSE STORAGE

BATH HOUSE

GREEN HOUSE

CELL PHONE COMMUNICATION

SLUDGE BED

FLAG POLE

WASTEWATER TREATMENT

DIRECTOR'S GARAGE 32

CHIEF OF STAFF QRTR.

PAINT STORAGE

MEN'S REST BUILDING

GARAGE & STORAGE

CHLORINATION CHAMBER 59

58 SECONDARY SETTLING TANKS

TRICKLING FILTER 57

NOTE:

l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

D

W G

S E

S d a y o u t

E

S

D a t e

T h u

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

ELECTRICAL: SITE PLAN - AREA OF DETAIL

ES-003

ELECTRICAL:

SL

SITE PLAN - AREA OF DETAIL

NOTES:

GROUND ROD DETAIL

GROUND ROD INSPECTION WELL DETAIL

CONFIGURATION

GROUND

ELECTRODE

6-WAY DUCTBANK DETAIL

FIRST FLOOR DEMO PLAN

ELECTRICAL:

FIRST FLOOR POWER PLANS

ES-101

F i l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

D

W G

S E

S d a y o u t

E

S

D a t e

T h u

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

JCL

DEMO KEY NOTES

NOTES:

POWER PANEL - (24-L1)

POWER PANEL - (24-PP-2)

FIRST FLOOR DEMO PLAN

ELECTRICAL:

FIRST FLOOR LIGHTING PLANS

EL-101

F i l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

D

W G

S E

L d a y o u t

E

L

D a t e

T h u

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

JCL

DEMO KEY NOTES

LIGHTING SCHEDULE

LIGHT WALL MOUNTED UNIT

EMERGENCY BATTERY

SURFACE MOUNTED FIXTURE DETAIL

ELECTRICAL:

ONE-LINE DIAGRAMS

ES-601

F i l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

D

W G

S E

S d a y o u t

E

S

D a t e

F r i

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

EXISTING 13.8 KV PRIMARY SWITCHGEAR AND BUILDING 24 DISTRIBUTION ONE-LINE DIAGRAM

NEW PRIMARY 15KV SWITCHGEAR

PROPOSED MAIN-TIE-MAIN CLOSE TRANSITION SEQUENCE OF OPERATION:

JCL

NEW 13.8 KV PRIMARY SWITCHGEAR AND BUILDING 24 DISTRIBUTION ONE-LINE DIAGRAM

ES-602

F i l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

D

W G

S E

S d a y o u t

E

S

D a t e

T h u

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

JCL

MAIN BREAKER #1 SCHEMATICS

ES-603

F i l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

D

W G

S E

S d a y o u t

E

S

D a t e

T h u

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

JCL

MAIN BREAKER #2 SCHEMATICS

ES-604

F i l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

D

W G

S E

S d a y o u t

E

S

D a t e

T h u

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

JCL

TIE BREAKER SCHEMATICS

ES-605

F i l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

D

W G

S E

S d a y o u t

E

S

D a t e

T h u

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

JCL

TYPICAL FEEDER BREAKER SCHEMATICS

THREE-LINE DIAGRAMS

ES-606

F i l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

D

W G

S E

S d a y o u t

E

S

D a t e

T h u

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

JCL

MAIN SWITCHGEAR THREE-LINE DIAGRAM SHEET 1

ES-607

F i l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

D

W G

S E

S d a y o u t

E

S

D a t e

F r i

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

JCL

MAIN SWITCHGEAR THREE-LINE DIAGRAM SHEET 2

ES-608

F i l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

D

W G

S E

S d a y o u t

E

S

D a t e

T h u

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

JCL

MAIN SWITCHGEAR THREE-LINE DIAGRAM SHEET 3

ONE-LINE DIAGRAM

ES-610

CAMPUS ELECTRICAL ONE-LINE DIAGRAM - FEEDERS A & B

NEW MAIN PRIMARY SERVICE

EQUIPMENT - BLDG #24

F i l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

D

W G

S E

S d a y o u t

E

S

D a t e

T h u

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

13.8KV METALCLAD VACUUM BREAKER

SWITCHGEAR, SEE DRAWING ES-601

JCL

15 KV DISTRIBUTION EQUIP. ONE-LINE PLATE - LOOP A-B

KIRK KEY SEQUENCE OF OPERATION:

ONE-LINE DIAGRAM

ES-611

CAMPUS ELECTRICAL ONE-LINE DIAGRAM - FEEDERS C & D

F i l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

D

W G

S E

S d a y o u t

E

S

D a t e

T h u

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

JCL

15 KV DISTRIBUTION EQUIP. ONE-LINE PLATE - LOOP C-D

KIRK KEY SEQUENCE OF OPERATION:

SCHEDULE

ES-801

F i l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

D

W G

S E

S d a y o u t

E

S

D a t e

T h u

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

JCL

DEVICE INFORMATIONID TERMINATIONS

EXCAVATIONS MADE IN LAYERED SOILS

¾

EXCAVATIONS MADE IN TYPE B SOIL

SINGLE BENCH

VERTICAL SIDED LOWER PORTION

SIMPLE SLOPE

MULTIPLE BENCH

SIMPLE SLOPE

EXCAVATIONS MADE IN TYPE C SOIL

VERTICAL SIDED LOWER PORTION

EXCAVATIONS MADE IN TYPE A SOIL

¾

SIMPLE SLOPE-GENERAL SIMPLE SLOPE-SHORT TERM

SIMPLE BENCH MULTIPLE BENCH

UNSUPPORTED VERTICALLY

SIDED LOWER PORTION --

MAXIMUM 8 FEET IN DEPTH)

UNSUPPORTED VERTICALLY

SIDED LOWER PORTION --

MAXIMUM 12 FEET IN DEPTH)

SUPPORTED OR SHIELDED

VERTICALLY SIDED LOWER

PORTION

¾

OSHA REQUIREMENTS

TABLE B-1- MAXIMUM ALLOWABLE SLOPES

SOIL OR ROCK TYPE

MAXIMUM ALLOWABLE SLOPES (H:V)¹ FOR

EXCAVATION LESS THAN 20 FEET DEEP³

²

ELECTRICAL:

SCHEDULES & DETAILS

ES-802

F i l e

N a m e

F

V

A

M

O N

T R

O S

E

E

L E

C T

R I C

A L

D

W G

S E

S d a y o u t

E

S

D a t e

T h u

M a y a m e j c l

ENGINEERING LLPFE PROJECT NO: 14-071/19-453

22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735

181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com

620-12-108

5-22-2020

REPLACE 15KV

MAIN SWITCHGEAR

VAMC FDR MONTROSE, NY 24

2094 ALBANY POST RD. MONTROSE, NY 10548

100% CD SUBMISSION 5-22-2020

BJP

EXCAVATION DETAILS

DC PANEL SCHEDULE DCP-1

DC ONE-LINE DIAGRAM

SYMBOL

DESCRIPTION

LEGEND AND SCHEDULE OF BATTERY

SYSTEM EQUIPMENT

IN FIRE RATED MASONRY PARTITION

CONDUIT PENETRATION

SYSTEM SCHEMATIC

FIRE ALARM / DETECTION

FIRE ALARM EQUIPMENT SCHEDULE

CONDUIT PENETRATION

IN FIRE RATED CONCRETE FLOOR

MEDIUM VOLTAGE TERMINATION DETAIL

Sheets and Views
HA-101.pdf
Sheets and Views
GI-001-GI-001
GI-002-GI-002
HA-101
AS-001-AS-001
AS-100 LIFE SAFETY-AS-100
AS-101 DEMO & CONSTR PLAN-AS-101
AS-102-AS-104 ENLARGED PLANS, DETAILS & ELEV-AS-102
AS-102-AS-104 ENLARGED PLANS, DETAILS & ELEV-AS-103
AS-102-AS-104 ENLARGED PLANS, DETAILS & ELEV-AS-104
AS-102-AS-104 ENLARGED PLANS, DETAILS & ELEV-AS-201
MH-001-MH-001
MH-101-MH-101
PL-101-PL-101
FX-101-FX-101
ES-001-ES-001
ES-002 & ES-003-ES-002
ES-002 & ES-003-ES-003
ES-101-ES-101
EL-101-EL-101
ES-601-ES-601
ES-602-ES-602
ES-603-ES-603
ES-604-ES-604
ES-605-ES-605
ES-606-ES-606
ES-607-ES-607
ES-608-ES-608
ES-610-ES-610
ES-611-ES-611
ES-801-ES-801
ES-802-ES-802

File details come from the government source that posted it. Updated .