(u)S02_DRAWINGS.pdf
PDF 15 MB Posted
- Attached to
- Y1DZ--Replace 15Kv Main Switchgear
- Solicitation number
- 36C24220B0055
About this file
This document provides details on a federal contract opportunity for replacing switchgear. The solicitation number is 36C24220B0055 and is seeking to replace 15kV main switchgear at the FDR VA Medical Center in Montrose, New York under project number 620-17-118. The contracting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2. The bid opening was held on May 7, 2020 via Webex. The abstract for bid number 36C24220B0013 is attached. No further information is provided on response dates, award dates, pricing terms, or set asides.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| (u)S07_OF 1419A Bid Abstract 2.pdf | ||
| (u)S07_OF 1419 Bid Abstract 1.pdf | ||
| 36C24220B0055 0004.docx | DOCX document | |
| 36C24220B0055 0003.docx | DOCX document | |
| 19-453 VA Montrose Switchgear - Pre-Bid RFI Responses.docx | DOCX document | |
| S04_Walk Thru Sign In Sheet 20201201.pdf | ||
| 36C24220B0055 0002.docx | DOCX document | |
| 36C24220B0055 0001.docx | DOCX document | |
| Pre-bid Sign-in sheet 20201124.pdf | ||
| (u)S02_CD SPECIFICATIONS.pdf | ||
| 36C24220B0055_2.docx | DOCX document | |
| (u)S02_Wage Determination.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
V
A
P
R
O
P
E
R
T
Y
L
I
N
E
C
E
N
T
E
N
O
F
S
E
M
E
B
U
R
I
D
C
A
X
I
B
L
E
4 13
18 28
THREE 30,000 GAL.
FUEL OIL TANKS
250,000 GAL.
WATER OIL TANK
300,000 GAL.
WATER TANK
TRANSFORMER
ELECT.
GENERATOR
R
A
I
L
R
O
A
D
N
O
R
T
H
D
U
T
H
S
PAVED
P
R
O
P
E
R
Y
H
U
I
T
A
T
M
E
R
I
C
A
NEW YORK STATE
VETERANS NURSING HOME
OUTPATIENT BUILDING 3
BUILDING NAME
NUMBERS
BUILDING
BUILDING SCHEDULE
BUILDING NAME
NUMBERS
BUILDING
23 STORAGE
ADMINISTRATIVE OFFICES
ADMINISTRATIVE
NURSING HOME CARE UNIT
ACUTE BUILDING
QUARTERS 30
CHILD CARE 29
RESIDENTIAL TREATMENT 28
CHAPEL 27
GYM 26
RECREATION/CANTEEN 25
MAIN ELECTRICAL 24
TRANSFORMER PLATFORM 22
CHIMNEY 21
BOILER PLANT 20
FIRE HOUSE 19
VACANT-OUTLEASED 18
WAREHOUSE 17
ENGINEERING 16
NHCU 15
PSYCHIATRY 14
WOMEN PATIENT'S 11
KITCHEN & DINING HALL 5
THEATER 2
ADMINISTRATION 1
RESIDENTIAL TREATMENT
GREEN HOUSE (WOMEN PATIENT'S) 56
55 BS2 BUS STOP (NEAR BLDG. 15)
WOMEN'S REST BUILDING
DOMICILIARY
BS1 BUS STOP (NEAR BLDG. 16)
OXYGEN STORAGE TANK
WATER TOWER
CHLORINATION CHAMBER
CONCESSION & SHELTER
PATIENT'S TOOL & BOAT HOUSE STORAGE
BATH HOUSE
GREEN HOUSE
CELL PHONE COMMUNICATION
SLUDGE BED
FLAG POLE
WASTEWATER TREATMENT
DIRECTOR'S GARAGE 32
CHIEF OF STAFF QRTR.
PAINT STORAGE
MEN'S REST BUILDING
GARAGE & STORAGE
CHLORINATION CHAMBER 59
58 SECONDARY SETTLING TANKS
TRICKLING FILTER 57
REPLACE 15KV MAIN SWITCHGEAR
VAMC MONTROSE, NY
GI-001
COVER SHEET
WITH INDEX TO DRAWINGS
JCL
F i l e
N a m e
C
U s e r s j c l A p p
D a t a L o c a l T e m p A c P u b l i s h
G
I d w g a y o u t
G
I
D a t e
T h u
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
INDEX OF DRAWINGSBUILDING LOCATION MAP
AREA OF WORK
AREA OF WORKAREA OF WORK
OVERALL CAMPUS SITE PLAN
PHASING PLAN
GENERAL INFORMATION:
SYMBOLS, ABBREVIATIONS, NOTES,
GI-002
F i l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
G
I d a y o u t
G
I
D a t e
T h u
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
JCL
PROPOSED PHASING SEQUENCE:
PROPOSED FEEDER SWITCHOVER SEQUENCE
GENERAL SYMBOLS
GENERAL NOTES: GENERAL DEMOLITION NOTES:
GENERAL CONSTRUCTION ACTIVITY NOTES:
& PHASING PLAN
ASBESTOS ABATEMENT LEGEND:
1 WINDOW CAULK & GLAZING TO BE REMOVED.
2 DOOR CAULK & GLAZING TO BE REMOVED.
3 PIPE INSULATION TO BE REMOVED.
AIRLOCK
HEPA-FILTER NEGATIVE AIR MACHINE.
GENERAL NOTES:
1. Asbestos abatement shall be performed in accordance with the specification and applicable regulations.
Personnel holding current New York State Department of
Labor (N.Y.S.D.O.L.) asbestos handler's certificates shall perform the work. Additionally, the Contractor must employ N.Y.S.D.O.L. certified supervisors to be on the work site for all abatement activities. The contractor must be currently licensed by the N.Y.S.D.O.L. All certificates and licenses are to be readily available for verification by the Veterans Affairs Medical Center (V.A.M.C).
2. Contractor is responsible for removal and disposal of all asbestos-containing materials and asbestos-contaminated materials within the specified areas.
3. Contractor is responsible for verification of all quantities of asbestos-containing materials.
4. Contractor is responsible for precleaning any existing asbestos contamination, dust and debris within the removal areas.
5. Contractor is responsible for maintaining the integrity of building finishes. The contractor shall repair any and all damages caused by abatement activities or his personnel.
6. Contractor is solely responsible for all means, methods, techniques, sequences and procedures and for coordinating all portions of the scope of work under this contract.
7. Some of the work may be phased to accommodate the
V.A.M.C. facility requirements. Work may have to be performed off-hours, weekends and at night at no additional cost to the V.A.M.C.
8. The project shall be filed as a large project with the
N.Y.S.D.O.L. and U.S.E.P.A.
ASBESTOS ABATEMENT NOTES:
1. The Contractor is to remove the asbestos-containing materials (ACM's) and asbestos contaminated materials in accordance with New York State Industrial Code Rule 56
(12 NYCRR Part 56), the VAMC specification and applicable Federal OSHA and EPA regulations. Where there is an overlap the most stringent regulation shall apply.
2. The 15KV Main Switch Gear Lineup in Building 24 is being replaced. The replacement involves the demolition of existing rooms, construction of new rooms and the addition of new switch gear. ACM's must be removed to allow for the renovation of the building. ACM's include but are not limited to pipe insulation, pipe fitting insulation, window caulk, window glazing, door caulk, and door glazing.
3. The contractor must comply with OSHA Code of Federal
Regulation 29 CFR 1926.62 for any work involving the lead paint. The contractor shall perform work impacted by the Building 24 project wet to reduce dust levels so that the exposure to his workers is below the OSHA action limit of 30 micrograms per cubic meter. This shall be accomplished by means of a negative exposure assessment (NEA).
4. The asbestos abatement contractor shall perform tent/glovebag removal for the indoor work areas. The asbestos abatement contractor shall perform glovebag removal within HEPA-filtered negative air pressure tent enclosures for indoor abatement of pipe insulation. All tent abatement areas shall have an airlock entrance. The tent enclosure shall be vented to the outdoor air via
HEPA-filtered negative air machines. Tents shall be constructed in accordance with 12 NYCRR Part 56. In areas of public access the tent enclosures shall be sheathed for safety. The contractor shall also abate any debris as ACM that is present.
5. Window caulk, window glazing, door caulk and door glazing removal shall be performed from outside the building in accordance with 12 NYCRR Part 56 Section
56-11.6 (Exterior Project Removal of Non-friable ACM
Caulking). Critical barriers shall be installed on the outside of the building over the window openings. The work area shall be an area demarcated with
“Danger-Asbestos” signs and red warning tape placed at a minimum distance of 25' in every direction. Only certified workers and authorized visitors shall be permitted in the work area during asbestos abatement activities. Asbestos abatement activities and general contracting work shall not be permitted to occur at the same time in an asbestos abatement work area. Simultaneous general contracting work shall occur at least 25' away from the asbestos abatement work on the outside of the building. Outdoor work areas shall not require clearance air samples. The outdoor work areas will be considered abated when there is no visible debris or dust remaining and the VPIH has performed a successful visual inspection.
6. The contractor shall coordinate the location of his personnel and waste decontamination unit(s), and waste dumpster with the V.A. Engineer at the preconstruction meeting.
7. The contractor shall be responsible for any and all damages resulting from asbestos abatement activities.
8. All utilities, mechanical systems and piping shall be locked out and tagged before the contractor is to begin abatement activities. Mechanical and electrical systems, which cannot be locked out and tagged, shall be protected and supported throughout asbestos abatement activities.
9. Scheduling of work shall be coordinated with the V.A.
Numerous mechanical and electrical systems must remain operational throughout the project. These systems are critical to the VAMC's operation and must be preserved and protected throughout the asbestos abatement project.
Some of the work will be phased to accommodate VAMC facility requirements. Work will have to be performed during regular (0800-1600) off-hours (1600-0000), weekends and at night (0000-0800). Some work may have to be performed 24-hours around the clock for specific mechanical and operational shutdowns.
Coordinate 24-hour operations with VAMC shutdowns.
Scheduling of this work is critical to the operation of the facility.
10. In areas of public access, the contractor shall erect isolation barriers that separate the work areas from the remainder of the building. The barriers shall be constructed of a fire retardant sheathing material of at least 1/2" thickness. The isolation barrier shall be plasticized with two (2) layers of 6-mil plastic sheeting.
The isolation barriers shall be caulked at the sheathing seams and where the sheathing meets the floor, walls and ceiling. The isolation barrier shall be constructed using
2"x4" framing, 16 inches center-to-center, and caulked at all seams. All utilities and piping shall be locked out and tagged before the contractor is to begin abatement activities.
LEAD PAINT ABATEMENT NOTES:
1. Lead paint (LP) has been identified on the window lintels, doors, window frames, wall plaster, ceiling plaster, cinderblock, radiators, and floors that will be disturbed by the Building 24 Switch Gear Lineup replacement project.
The lead painted and/or lead-containing materials listed above will be demolished and/or scraped for priming to allow for the project. The Occupational Safety and Health
Administration (OSHA) consider any concentration of lead in paint to be LP. For construction purposes on this project, all painted surfaces shall be considered LP. All demolition, scraping, priming and disposal of LP and LP covered materials shall be by the contractor.
Asbestos-Containing Materials Quantity Table
Location Material
Quantity
STORAGE 2 PIPE INSULATION
100 L.F. < 4"
15 FITTINGS < 4"
15 L.F. 4 - 8"
7 FITTINGS 4 - 8"
STORAGE 2 DOOR CAULK & GLAZING 6 S.F.
STORAGE 2 WINDOW CAULK & GLAZING 3 S.F.
STORAGE 2A
PLENUM SPACE
ABOVE
PIPE INSULATION
10 L.F. < 4 - 8"
2 FITTINGS 4 - 8"
LOCKER 2B PIPE INSULATION
70 L.F. < 4"
15 FITTINGS < 4"
45 L.F. 4 - 8"
10 FITTINGS 4 - 8"
LOCKER 2B WINDOW CAULK & GLAZING 3 S.F.
TOILET 3 PIPE INSULATION
90 L.F. < 4"
20 FITTINGS < 4"
10 L.F. 4 - 8"
4 FITTINGS 4 - 8"
TOILET 3 WINDOW CAULK & GLAZING 3 S.F.
VACANT 4 PIPE INSULATION
20 L.F. < 4"
5 FITTINGS < 4"
6 L.F. 4 - 8"
2 FITTINGS 4 - 8"
CORRIDOR 7Z PIPE INSULATION
20 L.F. < 4"
5 FITTINGS < 4"
6 L.F. 4 - 8"
2 FITTINGS 4 - 8"
CORRIDOR 7Z DOOR CAULK & GLAZING 4 S.F.
N
FIRST FLOOR ASBESTOS/LEAD PAINT ABATEMENT PLAN
HA-101
F i l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
R
E C
E I V
E D a s b e s t o s d w g s H
A d a y o u t
H
A
D a t e
T h u
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
TGE EDS
Egan Environmental Consulting, Inc.
Thomas G. Egan, C.I.H.
CERT. INDUSTRIAL HYGIENIST
NO. 6369 CP
ASBESTOS/LEAD PAINT
ABATEMENT PLAN
FIRST FLOOR
GENERAL NOTES:
CONCRETE POST BARRICADES
PERMANENT 6' HIGH CHAIN LINK FENCE AND GATE
F i l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
D
W G
S A
S d a y o u t
A
S
D a t e
T h u
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
AS-001
ARCHITECTURAL:
SYMBOLS, NOTES, ABBREVIATIONS
& DETAILS
JCL
GENERAL SYMBOLS
10' TEMPORARY CONSTRUCTION FENCING DETAIL
WITH DOUBLE MAN GATE DETAIL
TEMPORARY CONSTRUCTION PARTITION
GENERAL NOTES:
ABBREVIATIONS
ARCHITECTURAL LINE TYPES
WALL TYPE LEGEND
SLAB ON GRADE DETAIL
CONCRETE PAD DETAIL
T
R
A
V
S
T
A
N
C
E
A
V
S
T
A
N
C
E
T
R A
V E
L
D
I S
T A
N C
E
EXISTING PAVED SURFACE
T
R
A
V
S
T
A
N
C
E
N
LEGEND
SHADE INDICATES
AREA OF RENOVATION
DISTANCE TO EXIT
LOCATION OF NEW FIRE EXTINGUISHER CABINET
WITH 10LB EXTINGUISHER
GALLON PER MINUTE
SURFACE MOUNTED (U.N.O.)
MINIMUM INTERIOR DIMENSIONS: 9"x9"x27".
FIRE EXTINGUISHER TO BE PROVIDED BY VA.
MOUNT BOTTOM OF CABINET 36" AFF.
NEW EXIT SIGN LOCATION
NEW DOOR
EXISTING DOOR
FIRST FLOOR PROPOSED LIFE SAFETY PLAN
ARCHITECTURAL: LIFE SAFETY
FIRST FLOOR PLAN
AS-100
F i l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
D
W G
S A
S
L
I F
E
S
A F
E T
Y d a y o u t
A
S
D a t e
T h u
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
JCL
MOUNTING HEIGHTS OF FIRE EXTINGUISHERS
FIRST FLOOR PROPOSED PLAN
FIRST FLOOR DEMO PLAN
ARCHITECTURAL:
FIRST FLOOR PLANS
AS-101
F i l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
D
W G
S A
S
D
E M
N
S T
R
P
L A
N d a y o u t
A
S
D a t e
T h u
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
JCL
KEYED NOTES: KEYED NOTES:
NOTES:
PLATFORM ASSEMBLY DETAIL
SECTION AT DOOR
COLUMN/PLATFORM CONNECTION DETAIL
COLUMN TOP DETAIL
STRINGER BASE DETAIL
COLUMN BASE DETAILS
TREAD ASSEMBLY DETAIL
ROOM FINISH SCHEDULE
ROOM NO.
ROOM
NAME
AREA
EXISTING FLOOR
MATERIAL
FLOOR FINISH
NORTH WALL
FINISH
EAST WALL
FINISH
SOUTH WALL
FINISH
WEST WALL
FINISH
CEILING
MATERIAL
CEILING
FINISH
CEILING
HEIGHT
COMMENTS
FINISH MATERIAL SCHEDULE
SYMBOL ITEM
MANUFACTURER
NO. NAME REMARKS
EXISTING & NEW
WALL MATERIAL
ENLARGED PARTIAL FIRST FLOOR PROPOSED PLAN
ARCHITECTURAL:
PARTIAL 1ST FLOOR PLAN & DETAILS
AS-102
F i l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
D
W G
S A
S A
S
E
N L
A R
G E
D
P
L A
N S
D
E T
A I L
E
V d a y o u t
A
S
D a t e
T h u
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
SL
STAIR/PLATFORM SECTION
TREAD & RISER ASSEMBLY DETAILS
STAIR & PLATFORM ASSEMBLY DETAILS
STAIR & PLATFORM ASSEMBLY DETAILS
GENERAL NOTES:
STAIR/PLATFORM FRONT ELEVATION
2A
FLOOR ACCESS PANEL DETAIL
ARCHITECTURAL:
AS-103
F i l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
D
W G
S A
S A
S
E
N L
A R
G E
D
P
L A
N S
D
E T
A I L
E
V d a y o u t
A
S
D a t e
T h u
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
SL
EQUIPMENT SECTION &
DETAILS
EQUIPMENT SECTION
WALL TYPE 1 - 2 HR RATING U905
FIRE EXIT HARDWARE FOR DOUBLE EGRESS DOORS
DOOR FRAMES
DOOR SCHEDULE
CONCRETE NOTES:
FIRE EXIT HARDWARE FOR SINGLE EGRESS DOORS
SILL
JAMB
TRANSOM BAR
HEAD
NOTES:
EXISTING WINDOW TYPE
AS-104
F i l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
D
W G
S A
S A
S
E
N L
A R
G E
D
P
L A
N S
D
E T
A I L
E
V d a y o u t
A
S
D a t e
T h u
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
SL
WALL SECTION & DETAILS
WALL OPENING DETAIL
DEMO - WALL OPENING DETAIL FOR NEW DOOR
DOOR SECTION DETAIL
DEMO - DOOR DETAIL
DEMO - WINDOW DETAIL
DEMO - WALL OPENING DETAIL
HEADER DETAIL
EXISTING WINDOW DETAIL
ARCHITECTURAL:
ELEVATIONS
AS-201
F i l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
D
W G
S A
S A
S
E
N L
A R
G E
D
P
L A
N S
D
E T
A I L
E
V d a y o u t
A
S
D a t e
T h u
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
SL
EXISTING SOUTH ELEVATION
NEW SOUTH ELEVATION
NEW NORTH ELEVATION
EXISTING NORTH ELEVATION
i l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
D
W G
S M
H d a y o u t
M
H
D a t e
T h u
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
MH-001
MECHANICAL:
SYMBOLS, NOTES, ABBREVIATIONS
& DETAILS
JCL
GENERAL SYMBOLS
GENERAL HVAC NOTES:HVAC DEMOLITION NOTES:
DUCTWORK SYMBOLS
HVAC LINE TYPES
OPTIONS
LOCATION
MARK
DUCTLESS SPLIT-SYSTEM UNIT
NOTES:
EVAPORATOR
MOUNTING
TYPE
NET COOLING/HEATING
CAPACITY
FAN
ELECTRICAL CHARACTERSTICS
VOLTAGE
BTU/HR
S.E.E.R.
CFM
MCA
MOCP
CONVECTOR SCHEDULE
NOTE:
EXHAUST FAN SCHEDULE
NOTES:
LOUVER SCHEDULE
NOTES:
ELECTRIC DUCT-MOUNTED COIL SCHEDULE
NOTES:
CONVECTOR-STEAM PIPING CONNECTION
EXHAUST HOOD DETAIL
EXTERIOR WALL LOUVER DETAIL
ABBREVIATIONS
FIRST FLOOR DEMO PLAN
MECHANICAL:
FIRST FLOOR PLANS
MH-101
F i l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
D
W G
S M
H d a y o u t
M
H
D a t e
T h u
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
JCL
FIRST FLOOR DEMO PLAN
PLUMBING:
FIRST FLOOR PLANS
PL-101
F i l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
D
W G
S P
L d a y o u t
P
L
D a t e
T h u
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
JCL
PLUMBING DEMOLITION NOTES:
GENERAL PLUMBING NOTES:
PLUMBING LINE TYPES
PIPING SYMBOLS
VALVE SYMBOLS
FIRST FLOOR DEMO PLAN
FIRE PROTECTION:
FIRST FLOOR PLANS
FX-101
F i l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
D
W G
S F
X d a y o u t
F
X
D a t e
T h u
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
JCL
UPRIGHT SPRINKLER DETAIL
NOTE:
FIRE PROTECTION SYSTEM DEMOLITION NOTES: FIRE PROTECTION SYSTEM NOTES:
FIRE PROTECTION LINE TYPES
SPRINKLER LEGEND
LEGEND AND SCHEDULE OF SPRINKLER EQUIPMENT
SEED MIXTURE
SPECIES LBS / ACRE
LAWN RESTORATION REQUIREMENTS
F i l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
D
W G
S E
S d a y o u t
E
S
D a t e
T h u
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
ES-001
ELECTRICAL:
SYMBOLS, NOTES, ABBREVIATIONS
& DETAILS
JCL
GENERAL ELECTRICAL NOTES: ELECTRICAL DEMOLITION NOTES:
COMMUNICATION SYMBOLS
FIRE ALARM SYMBOLS
SITE SYMBOLS
GROUNDING LEGEND
POWER SYMBOLS
ELECTRICAL LINE TYPES
LIGHTING SYMBOLS
l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
D
W G
S E
S d a y o u t
E
S
D a t e
T h u
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
ELECTRICAL: CAMPUS ELECTRIC SITE PLAN
ES-002
ELECTRICAL:
SL
CAMPUS ELECTRIC SITE PLAN
KEYED NOTES:
OUTPATIENT BUILDING 3
BUILDING NAME
NUMBERS
BUILDING
BUILDING SCHEDULE
BUILDING NAME
NUMBERS
BUILDING
23 STORAGE
ADMINISTRATIVE OFFICES
ADMINISTRATIVE
NURSING HOME CARE UNIT
ACUTE BUILDING
QUARTERS 30
CHILD CARE 29
RESIDENTIAL TREATMENT 28
CHAPEL 27
GYM 26
RECREATION/CANTEEN 25
MAIN ELECTRICAL 24
TRANSFORMER PLATFORM 22
CHIMNEY 21
BOILER PLANT 20
FIRE HOUSE 19
VACANT-OUTLEASED 18
WAREHOUSE 17
ENGINEERING 16
NHCU 15
PSYCHIATRY 14
WOMEN PATIENT'S 11
KITCHEN & DINING HALL 5
THEATER 2
ADMINISTRATION 1
RESIDENTIAL TREATMENT
GREEN HOUSE (WOMEN PATIENT'S) 56
55 BS2 BUS STOP (NEAR BLDG. 15)
WOMEN'S REST BUILDING
DOMICILIARY
BS1 BUS STOP (NEAR BLDG. 16)
OXYGEN STORAGE TANK
WATER TOWER
CHLORINATION CHAMBER
CONCESSION & SHELTER
PATIENT'S TOOL & BOAT HOUSE STORAGE
BATH HOUSE
GREEN HOUSE
CELL PHONE COMMUNICATION
SLUDGE BED
FLAG POLE
WASTEWATER TREATMENT
DIRECTOR'S GARAGE 32
CHIEF OF STAFF QRTR.
PAINT STORAGE
MEN'S REST BUILDING
GARAGE & STORAGE
CHLORINATION CHAMBER 59
58 SECONDARY SETTLING TANKS
TRICKLING FILTER 57
NOTE:
l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
D
W G
S E
S d a y o u t
E
S
D a t e
T h u
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
ELECTRICAL: SITE PLAN - AREA OF DETAIL
ES-003
ELECTRICAL:
SL
SITE PLAN - AREA OF DETAIL
NOTES:
GROUND ROD DETAIL
GROUND ROD INSPECTION WELL DETAIL
CONFIGURATION
GROUND
ELECTRODE
6-WAY DUCTBANK DETAIL
FIRST FLOOR DEMO PLAN
ELECTRICAL:
FIRST FLOOR POWER PLANS
ES-101
F i l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
D
W G
S E
S d a y o u t
E
S
D a t e
T h u
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
JCL
DEMO KEY NOTES
NOTES:
POWER PANEL - (24-L1)
POWER PANEL - (24-PP-2)
FIRST FLOOR DEMO PLAN
ELECTRICAL:
FIRST FLOOR LIGHTING PLANS
EL-101
F i l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
D
W G
S E
L d a y o u t
E
L
D a t e
T h u
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
JCL
DEMO KEY NOTES
LIGHTING SCHEDULE
LIGHT WALL MOUNTED UNIT
EMERGENCY BATTERY
SURFACE MOUNTED FIXTURE DETAIL
ELECTRICAL:
ONE-LINE DIAGRAMS
ES-601
F i l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
D
W G
S E
S d a y o u t
E
S
D a t e
F r i
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
EXISTING 13.8 KV PRIMARY SWITCHGEAR AND BUILDING 24 DISTRIBUTION ONE-LINE DIAGRAM
NEW PRIMARY 15KV SWITCHGEAR
PROPOSED MAIN-TIE-MAIN CLOSE TRANSITION SEQUENCE OF OPERATION:
JCL
NEW 13.8 KV PRIMARY SWITCHGEAR AND BUILDING 24 DISTRIBUTION ONE-LINE DIAGRAM
ES-602
F i l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
D
W G
S E
S d a y o u t
E
S
D a t e
T h u
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
JCL
MAIN BREAKER #1 SCHEMATICS
ES-603
F i l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
D
W G
S E
S d a y o u t
E
S
D a t e
T h u
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
JCL
MAIN BREAKER #2 SCHEMATICS
ES-604
F i l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
D
W G
S E
S d a y o u t
E
S
D a t e
T h u
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
JCL
TIE BREAKER SCHEMATICS
ES-605
F i l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
D
W G
S E
S d a y o u t
E
S
D a t e
T h u
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
JCL
TYPICAL FEEDER BREAKER SCHEMATICS
THREE-LINE DIAGRAMS
ES-606
F i l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
D
W G
S E
S d a y o u t
E
S
D a t e
T h u
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
JCL
MAIN SWITCHGEAR THREE-LINE DIAGRAM SHEET 1
ES-607
F i l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
D
W G
S E
S d a y o u t
E
S
D a t e
F r i
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
JCL
MAIN SWITCHGEAR THREE-LINE DIAGRAM SHEET 2
ES-608
F i l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
D
W G
S E
S d a y o u t
E
S
D a t e
T h u
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
JCL
MAIN SWITCHGEAR THREE-LINE DIAGRAM SHEET 3
ONE-LINE DIAGRAM
ES-610
CAMPUS ELECTRICAL ONE-LINE DIAGRAM - FEEDERS A & B
NEW MAIN PRIMARY SERVICE
EQUIPMENT - BLDG #24
F i l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
D
W G
S E
S d a y o u t
E
S
D a t e
T h u
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
13.8KV METALCLAD VACUUM BREAKER
SWITCHGEAR, SEE DRAWING ES-601
JCL
15 KV DISTRIBUTION EQUIP. ONE-LINE PLATE - LOOP A-B
KIRK KEY SEQUENCE OF OPERATION:
ONE-LINE DIAGRAM
ES-611
CAMPUS ELECTRICAL ONE-LINE DIAGRAM - FEEDERS C & D
F i l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
D
W G
S E
S d a y o u t
E
S
D a t e
T h u
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
JCL
15 KV DISTRIBUTION EQUIP. ONE-LINE PLATE - LOOP C-D
KIRK KEY SEQUENCE OF OPERATION:
SCHEDULE
ES-801
F i l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
D
W G
S E
S d a y o u t
E
S
D a t e
T h u
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
JCL
DEVICE INFORMATIONID TERMINATIONS
EXCAVATIONS MADE IN LAYERED SOILS
¾
EXCAVATIONS MADE IN TYPE B SOIL
SINGLE BENCH
VERTICAL SIDED LOWER PORTION
SIMPLE SLOPE
MULTIPLE BENCH
SIMPLE SLOPE
EXCAVATIONS MADE IN TYPE C SOIL
VERTICAL SIDED LOWER PORTION
EXCAVATIONS MADE IN TYPE A SOIL
¾
SIMPLE SLOPE-GENERAL SIMPLE SLOPE-SHORT TERM
SIMPLE BENCH MULTIPLE BENCH
UNSUPPORTED VERTICALLY
SIDED LOWER PORTION --
MAXIMUM 8 FEET IN DEPTH)
UNSUPPORTED VERTICALLY
SIDED LOWER PORTION --
MAXIMUM 12 FEET IN DEPTH)
SUPPORTED OR SHIELDED
VERTICALLY SIDED LOWER
PORTION
¾
OSHA REQUIREMENTS
TABLE B-1- MAXIMUM ALLOWABLE SLOPES
SOIL OR ROCK TYPE
MAXIMUM ALLOWABLE SLOPES (H:V)¹ FOR
EXCAVATION LESS THAN 20 FEET DEEP³
²
ELECTRICAL:
SCHEDULES & DETAILS
ES-802
F i l e
N a m e
F
V
A
M
O N
T R
O S
E
E
L E
C T
R I C
A L
D
W G
S E
S d a y o u t
E
S
D a t e
T h u
M a y a m e j c l
ENGINEERING LLPFE PROJECT NO: 14-071/19-453
22 Mulberry St., Suite 2A, Middletown, NY 10940 t 845-343-1481; fx 855-320-8735
181 Church St., Suite 100, Poughkeepsie, NY 12601 t 845-454-9704; fx 855-320-8735 www.fellp.com
620-12-108
5-22-2020
REPLACE 15KV
MAIN SWITCHGEAR
VAMC FDR MONTROSE, NY 24
2094 ALBANY POST RD. MONTROSE, NY 10548
100% CD SUBMISSION 5-22-2020
BJP
EXCAVATION DETAILS
DC PANEL SCHEDULE DCP-1
DC ONE-LINE DIAGRAM
SYMBOL
DESCRIPTION
LEGEND AND SCHEDULE OF BATTERY
SYSTEM EQUIPMENT
IN FIRE RATED MASONRY PARTITION
CONDUIT PENETRATION
SYSTEM SCHEMATIC
FIRE ALARM / DETECTION
FIRE ALARM EQUIPMENT SCHEDULE
CONDUIT PENETRATION
IN FIRE RATED CONCRETE FLOOR
MEDIUM VOLTAGE TERMINATION DETAIL
| Sheets and Views |
| HA-101.pdf |
| Sheets and Views |
| GI-001-GI-001 |
| GI-002-GI-002 |
| HA-101 |
| AS-001-AS-001 |
| AS-100 LIFE SAFETY-AS-100 |
| AS-101 DEMO & CONSTR PLAN-AS-101 |
| AS-102-AS-104 ENLARGED PLANS, DETAILS & ELEV-AS-102 |
| AS-102-AS-104 ENLARGED PLANS, DETAILS & ELEV-AS-103 |
| AS-102-AS-104 ENLARGED PLANS, DETAILS & ELEV-AS-104 |
| AS-102-AS-104 ENLARGED PLANS, DETAILS & ELEV-AS-201 |
| MH-001-MH-001 |
| MH-101-MH-101 |
| PL-101-PL-101 |
| FX-101-FX-101 |
| ES-001-ES-001 |
| ES-002 & ES-003-ES-002 |
| ES-002 & ES-003-ES-003 |
| ES-101-ES-101 |
| EL-101-EL-101 |
| ES-601-ES-601 |
| ES-602-ES-602 |
| ES-603-ES-603 |
| ES-604-ES-604 |
| ES-605-ES-605 |
| ES-606-ES-606 |
| ES-607-ES-607 |
| ES-608-ES-608 |
| ES-610-ES-610 |
| ES-611-ES-611 |
| ES-801-ES-801 |
| ES-802-ES-802 |
File details come from the government source that posted it. Updated .