This is a Performance Work Statement (PWS) for Eaton UPS Battery Replacement and Capacity Expansion services to be performed at Tinker Air Force Base, Oklahoma for the B-2 Weapon System Support Center (WSSC) under AFLCMC/WBZ.

The primary objectives include: (1) replacement of eighty existing E54/540W batteries (Eaton: PWHR12540W4FR) housed in two existing battery cabinets, with forty batteries per cabinet; (2) procurement and installation of two new Eaton 93PM Battery Cabinets (Eaton: IBC-LW), each factory-equipped with forty new batteries for a total of eighty new batteries; and (3) connection of all wiring from the newly installed battery cabinets to existing 93PM UPS units per manufacturer specifications, with one cabinet placed directly beside the existing UPS unit and one cabinet approximately thirty feet away requiring conduit installation through the suspended ceiling. Additional requirements include: providing an Eaton Customer Service Engineer (CSE) on-site for shutdown prior to installation and startup/reconfiguration after installation; responsibility for offloading, delivery, installation, removal, and disposal of old batteries; contractor provision of all necessary offloading equipment; removal of batteries from cabinets at the concrete staging area due to raised flooring load restrictions before moving empty cabinets to final installation points; and strict adherence to Eaton OEM specifications, National Electric Code standards, and manufacturer guidelines. Work is performed during normal business hours (0730-1630) Monday through Friday as specified by the Contracting Officer. All new cabinets, batteries, and materials must be genuine Eaton OEM components, with written approval required from the B-2 WSSC Facilities Management Point of Contact before any deviations. The contractor must maintain a technically trained workforce, employ U.S. citizens only, comply with security clearance requirements including National Agency Check verification, and submit a Safety and Health Plan within ten business days of contract award. Contractor employees require professional identification and must comply with all Air Force and Department of Defense regulations, OSHA Voluntary Protection Program requirements, and applicable security protocols for the B-2 facility.

View the file

Other files

File Type Posted
B2 WSSC UPS Single Source Redacted.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CUI

PERFORMANCE WORK STATEMENT

AFLCMC/WBZ

EATON UPS BATTERY REPLACEMENT AND

CAPACITY EXPANSION

Revised 15 MAY 2026

SECTION ONE: DESCRIPTION OF SERVICES

1.0. Organization.

AFLCMC/WBZ

1.1. Agency Mission.

The B-2 Weapon System Support Center (WSSC) is a center for on-aircraft software development and support, as well the logistics and engineering support center for the B-2 System Program Office. In order to support the activities within the WSSC, commercial uninterruptible power supply (UPS) devices are utilized to provide clean, continuous power to the computer equipment in the facility.

1.2. Description of Services.

The contractor shall provide all labor, equipment, local travel, transportation, and incidentals to provide technical support defined by this PWS to be performed at Tinker AFB, OK. Support shall be required during, but not limited to, normal business hours (0730-1630) Monday through Friday or as specified by Contracting Officer (CO).

1.3. Project Background and Objectives.

The B-2 System Program Office is responsible for maintaining a number of information technology (IT) data systems and networks in support of the B-2 Weapon System. It has been the experience of the B-2 System Program Office that UPS runtime is critical to continued and stable laboratory system operations, and that two (2) 93PM UPS units currently require additional backup runtime.

Therefore, this effort shall include the following objectives:

1. Replace eighty (80) existing E54 / 540W (Eaton: PWHR12540W4FR) batteries housed within the two

(2) existing battery cabinets (40 batteries per cabinet).

2. Procure and install two (2) new Eaton 93PM Battery Cabinets (Eaton: IBC-LW). Each new cabinet shall come equipped from the factory with forty (40) E54 / 540W (Eaton: PWHR12540W4FR) batteries (80 batteries total for the new cabinets).

3. Connect all wiring from newly installed Battery Cabinets (Eaton: IBC-LW) to existing 93PM UPS units in accordance with manufacturer.

• 1 Cabinet – Placed directly beside existing cabinet/UPS unit

• 1 Cabinet – Approximately 30 feet away. Will require the use of conduit running up and into suspended ceiling, and then back down to existing UPS unit.

4. Provide Eaton Customer Service Engineer (CSE) on-site for shutdown prior to installation.

5. Provide Eaton Customer Service Engineer (CSE) on-site start-up and 93PM reconfiguration after installation.

6. Battery Replacement to include delivery, installation, removal and disposal of old batteries.

7. Contractor shall be responsible for offloading battery cabinets and equipment from the delivery truck to ground level. The Contractor shall provide all necessary equipment for offloading (e.g., liftgate, forklift). Equipment may be delivered directly from the manufacturer to the B-2 building.

8. Fully loaded battery cabinets exceed the load rating of raised flooring that must be traversed from delivery/staging area to final installation point. The Contractor shall remove the batteries from the cabinets at the concrete staging area prior to moving the empty cabinets across the raised laboratory flooring to the final installation point.

1.4. Task Description.

The contractor shall provide services in order to achieve the objectives for the B-2 program listed above. All new cabinets, replacement batteries, and materials shall be genuine Eaton OEM components. Any deviation from original vendor items (OEM) shall be first accepted by the B-2 WSSC Facilities Management POC in writing before being purchased and installed. All installations shall be performed in a skillful and professional manner. All external wiring and conduit installations shall comply with the latest National Electric Code (NEC or NFPA70).

1.4.1. Manufacturer Guidelines.

The contractor shall perform all battery replacements, new cabinet installations, and system configurations strictly in accordance with the original manufacturer’s (Eaton) instructions and specifications. To safely and effectively perform the required UPS shutdown, startup, and system reconfiguration, the Contractor (or their designated subcontractor) shall utilize a certified Eaton Customer Service Engineer (CSE). Furthermore, the contractor must have verifiable, authorized access to the OEM's proprietary service software, authorized diagnostic hardware (e.g., Eaton service laptops), and restricted OEM firmware repositories required to integrate the new battery cabinets with the existing 93PM UPS systems without voiding the manufacturer warranty.

1.4.2. Travel.

The contractor will not be required to travel other than to Tinker AFB for this effort.

1.4.3. Applicable Publications.

The Contractor will have access to all Air Force and Department of Defense publications applicable to the work tasks assigned. The Contractor shall obtain the forms and publications expressly required to perform the work in this contract via the internet at the Tinker AFB Public Web Site: http:/www-ext.tinker.af.mil/default.asp.

In the event that a Federal form or publication is not available on line, the Government will provide the forms, instructions, or publications to the Contractor upon request by the Contractor. In the event that laws, regulations, Technical Orders, Air Force Instructions, or Air Force Material Command Instructions change during the term of this contract, the Contractor is required to comply as such changes come into effect. The Contractor shall notify the contracting officer within 10 working days of any potential cost impact associated with any regulation changes. The contractor shall not proceed with implementing these changes until approved by the PCO.

1.5. Contractor Personnel.

1.5.1. Contractor POC.

The contractor shall provide a point of contact for all matters related to this task within 10 working days of contact award.

1.5.2. Contractor Employees.

The contractor shall not employ persons on this contract if such employee is identified to the contractor by the CO as a potential threat to the health, safety, security, and/or general well-being or operational mission of the installation and its population. Employees must be US citizens. The contractor shall provide the Government with initial and updated lists of contractor employees’ names and position titles. The contractor shall not employ any person who is an employee of the United States Government if the employment of that person would create a conflict of interest, nor shall the contractor employ any person who is an employee of the Department of the Air Force, either military or civilian.

All contract employees depending on particular condition, occasion or place, or job assignment shall require professional, suitable attire. All contractor employees shall conduct themselves in a professional, courteous manner.

The selection, assignment, reassignment, transfer, supervision, management, and control of contractor employees in performance of this PWS shall be the responsibility and prerogative of the contractor; however, the contractor shall comply with the requirements set forth in this PWS and Tinker AFB regulations concerning conduct of employees as referenced herein.

The contractor employees need to identify themselves as contractor personnel by introducing themselves or being introduced as contractor personnel and displaying distinguishing badges or other visible identification for meetings with Government personnel. In addition, contracts shall require contractor personnel to appropriately identify themselves as contractor employees in telephone conversations and in formal and informal written correspondence.

The contractor shall employ and maintain a technically trained and experienced work force.

1.5.3Mandatory Provisions.

On occasion, services may be required to support an activation or exercise of contingency plans outside normal duty hours prescribed in the document. Upon Force Protection Conditions (FPCONs) being implemented, all contractors will be tasked along with government personnel to implement FPCON measures to ensure facility security, to include checks of the facility and personnel entering and exiting building 1083 in conditions CHARLIE (imminent terrorist attack) or DELTA (actual attack) and to continue until FPCON is lessened or terminated.

1.5.4Contractor Identification Badges.

Common Access Cards will not be issued to contractors. It is the responsibility of the contractor to ensure employees have access to Tinker AFB. Visitor passes can be issued.

1.5.5Mission Essential Services.

Contractor employees are not considered essential personnel for this effort.

1.5.6Key Control.

The contractor shall establish and implement methods of ensuring that no keys/key cards issued to the contractor by the Government are lost or misplaced and are not used by unauthorized persons. NOTE: All references to keys include key cards. No keys issued to the contractor by the Government will be duplicated. Such procedures shall include turn-in of any issued keys by personnel who no longer require access to locked areas. The contractor shall immediately report the occurrences of lost or duplicate keys to the CO. In the event keys, other than master keys, are lost or duplicated, the contractor shall, upon direction of the CO, re-key or replace the affected lock or locks;

however, the Government, at its option, may replace the affected lock or locks or perform re-keying. When the Government performs the replacement of locks or re-keying, the total cost of re-keying or the replacement of the lock or locks shall be deducted from the monthly payment due the contractor. In the event a master key is lost or duplicated, the Government shall replace all locks and keys for that system and the total cost deducted from the monthly payment due the contractor. The contractor shall prohibit the use of Government issued keys by any persons other than the contractor's employees. The contractor shall prohibit the opening of locked areas by contractor employees to permit entrance of persons other than contractor's employees engaged in the performance of assigned work in those areas, or personnel authorized entrance by the CO.

1.5.7Miscellaneous Requirements.

The contractor shall comply with Section 508 of the Rehabilitation Act of 1973 as required. Contractor employees shall comply with the appropriate Federal, State, and Local environmental, safety, and Occupational Health laws and regulations. Any training for contractor employees required by these directives is the responsibility of the contractor.

1.5.8Security Clearances.

Per AFSSI 5027 para 5.3.1, all persons accessing the base network shall, at a minimum, have a completed National Agency Check (NAC), verified through Sentinel Key System. IAW AFI 31-601, para 2.4., when contractors require unescorted entry to restricted areas, access to sensitive unclassified information, access to government automated information systems (AIS) and/or sensitive equipment, not involving access to classified information, the contractor's personnel security questionnaire is processed by the sponsoring Air Force activity per DOD 5200.2-R and AFI 31-501.

Special Access Program (SAP) facility/Automated Information Systems (AIS) or modifications to existing SAP facility/AIS must comply with all applicable B-2 security regulations including the JSIG. The contractor must participate in the installation Operations Security (OPSEC) program and protect Air Force unclassified Critical Information to the same degree as it safeguards proprietary information.

1.5.9Contractor Manpower Reporting.

When necessary, the contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract via a secure data collection site. The contractor is required to completely fill in all required data fields at https://sam.gov/content/home.

Reporting inputs will be for the labor executed during the period of performance for each Government fiscal year (FY), which runs 1 October through 30 September. While inputs may be reported any time during the FY, all data shall be reported no later than 31 October* of each calendar year.

*Reporting Period: Contractors are required to input data by 31 October of each year.

Uses and Safeguarding of Information: Information from the secure website is considered to be proprietary in nature when the contract number and contractor identity are associated with the direct labor hours and direct labor dollars. At no time will any data be released to the public with the contractor name and contract number associated with the data.

SECTION THREE: GOVERNMENT-FURNISHED PROPERTY & SERVICES

2.0 Shared Property of the Government.

Not applicable

3.0. Government Furnished Services.

The Government will furnish the following services:

3.0.1. Security Police.

The Government will provide general on-base security police service. Security police telephone numbers are 911 for emergencies.

3.0.2. Fire & Emergency Services.

The Government will provide general on-base fire protection services. The contractor shall comply with fire prevention rules and regulations enforced by the Tinker AFB Fire Prevention Branch. The Government will provide, inspect, and maintain the fire extinguishers in contractor occupied space.

3.0.3. Utilities.

The Government will furnish utility services. These utilities include natural gas, electricity, water, and sewer for the sole purpose of accomplishing this contract. If the contractor requires additional utility services, it shall be the contractor’s responsibility to provide them. The contractor shall use due care and diligence in efforts to conserve utilities to reduce utility costs.

3.0.4. Telephone.

The Government will provide telephone service consisting of Class 3 (formerly referred to as Class C) and Class 1 (formerly referred to as class A) service (to include DSN service). The contractor shall ensure that the Government provided telephone usage is limited to only official Government business related to the performance of this contract.

The contractor shall furnish their own telephone service provided by local commercial carrier for their use in matters other than official Government business pertaining to this contract.

A class “A” line, or correctly called a Class 1 line, places no restrictions on the calls you make. In other words, you can make long distance calls and call off base. A Class “B” line, or correctly called a Class 2 line, allows you to call off base but not make long distance calls. A Class “C” line, or correctly called a Class 3 line, allows you to only make calls within Tinker Air Force Base.

3.0.5. Emergency Procedures

Contractor employees shall follow the direction of Government employees in regards to emergency procedures, i.e.

fire, tornado, active shooter, bomb threats. It is the responsibility of the contractor to provide guidance and establish procedures for responding to an emergency for their employees. It is the contractors' responsibility to account for their employees following an emergency evacuation. Contractor Personnel shall participate with government personnel in all fire and tornado drills at no additional cost to the Government.

SECTION FOUR: ADDITIONAL INFORMATION

4.0 Safety Intent Statement

“The safety of everyone on Tinker AFB is our top priority. All Individuals must accept personal responsibility for safety and seek opportunities for improving the safety of our work environment. Everyone working on Tinker AFB is challenged to find, fix (if able) and report all hazards and near-misses. It is our shared duty to take every reasonable step and precaution to prevent accidents and preserve the health/safety of each contractor and government employee.”

4.1 Air Force Voluntary Protection Program

The Air Force has adopted the OSHA Voluntary Protection Program (VPP). Consequently, VPP impacts all applicable Contractors operating on Air Force Installations. It is the Contractor’s responsibility to ensure its employees and managers have a comprehensive understanding of VPP as well as full compliance with OSHA requirements. Contractors (to include applicable Contractors), involved in any service contract, must follow the safety and health rules of the installation or VPP site.

Detailed information on VPP is available on the OSHA website (http://www.osha.gov/dcsp/vpp/index.html).

http://www.osha.gov/dcsp/vpp/index.html

Applicable Contractors. These requirements apply only to contractors whose employees work more than 1000 hours per quarter on a government installation.

Days Away, Restricted, and or Transfer Case Incident Rate (DART). Number of recordable injuries and illness cases per 100 full-time employees resulting in days away from work, restricted work activity, and/or transfer that a site has experienced in a given time frame.

Total Case Incident Rate (TCIR). Total number of recordable injuries and illness cases per 100 full-time employees that a site has experienced in a given time frame.

It is the contractor's sole responsibility for compliance with the Occupational Safety and Health Act (OSHA) (Public Law 91-596). The contractor must submit a Safety and Health Plan to the contracting officer 10 business days after contract award. The contractor's plan shall include appropriate measures to ensure the contractor reacts promptly to investigate, correct and track alleged safety & health violations and/or uncontrolled hazards in contractor work areas. Additional, installation specific references and policies may be included/attached to this section. The plan shall:

a. Demonstrate a management commitment to employee safety and health.

Identify the application of the safety and health plan to subcontractors.

Identify the roles and responsibilities of the following individuals.

i. Management

ii. Supervisors

iii. Employees

iv. Safety Coordinator

b. Identify applicable safety rules and regulations

c. Include a worksite hazard analysis to include base-line hazard identification and required control measures;

d. Include a job site analysis to include hazards of tasks required to control measures;

e. Identify employee safety and health training requirements and the documentation process;

f. Include a workplace inspection frequency, to include identifying the individual conducting the inspections;

g. Include employee hazard reporting procedures;

h. Identify individual(s) responsible for corrective action hazards;

i. Identify first aid/injury procedures;

j. Identify procedures for accident investigation and reporting;

k. Identify emergency response procedures

l. Identify the process for tracking controlled hazards in contractor work areas

An applicable contractor is responsible for establishing these requirements for all subcontractors who qualify as applicable contractors.

Appendix A: Existing Equipment Baseline

Serial Number Manufacturer Model Description

EP435UJJ06 EATON 93PM-L-120 Uninterruptible Power System (UPS 1) EP434UJJ05 EATON 93PM-L-120 Uninterruptible Power System (UPS 2)

FP451VXX02 EATON 93PM IBC-LW Existing Battery Cabinet (for UPS 1) FP451VXX01 EATON 93PM IBC-LW Existing Battery Cabinet (for UPS 2)

N/A EATON PWHR12540W4FR Existing E54 / 540W Batteries (Qty: 80 total across both cabinets)

SECTION ONE: DESCRIPTION OF SERVICES
1.1. Agency Mission.
1.2. Description of Services.
1.3. Project Background and Objectives.
1.4. Task Description.
1.4.1. Manufacturer Guidelines.
1.4.2. Travel.
1.4.3. Applicable Publications.
1.5. Contractor Personnel.
1.5.2. Contractor Employees.
1.5.3Mandatory Provisions.
1.5.4Contractor Identification Badges.
1.5.5Mission Essential Services.
1.5.6Key Control.
1.5.7Miscellaneous Requirements.
1.5.8Security Clearances.
1.5.9Contractor Manpower Reporting.
SECTION THREE: GOVERNMENT-FURNISHED PROPERTY & SERVICES
3.0. Government Furnished Services.
3.0.1. Security Police.
3.0.2. Fire & Emergency Services.
3.0.3. Utilities.
3.0.4. Telephone.
3.0.5. Emergency Procedures
SECTION FOUR: ADDITIONAL INFORMATION
4.1 Air Force Voluntary Protection Program