updated SOW - SAP-F Furniture - 16 Dec 2024.docx
DOCX document 28 KB Posted
- Attached to
- Intent to Sole Source: SAP-F Furniture Buy
- Solicitation number
- Not on record
About this file
This Statement of Work (SOW) outlines requirements for providing and installing new systems furniture at the Naval Air Warfare Center Training Systems Division (NAWCTSD) in Orlando, Florida. The work involves installing furniture in the DeFlorez Complex that must match existing systems, with completion required by May 26, 2025. The SOW is accompanied by a Special Notice indicating NAWCTSD's intent to sole source to Kimball International (CAGE: 4V077) as the OEM of the existing furniture system.
Key requirements include following federal/state/local codes and Unified Facility Criteria, covering unused whip locations, ensuring NEC-compliant electrical work, and maintaining minimal dust/noise levels with daily cleanup. Contractors must submit safety data sheets, accident prevention plans, work schedules, and employee information within 7 days of award. Work hours will be coordinated between 6 a.m. and 6 p.m. Monday through Friday, with power disruptions prohibited during normal working hours. Interested parties must respond to Alexis Diaz by 4:30 PM EST on January 3, 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1_List of Items_SAP-F Expansion Furniture - 5 Dec 2024.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Title: Provide Systems Furniture Activity Location: Naval Support Activity (NSA) Orlando FL Scope of Work Prepared by: NAWCTSD, Orlando
PART 1 GENERAL
1. GENERAL INFORMATION:
It is the declared and acknowledged intention and meaning to provide new systems furniture in the DeFlorez Complex, and incidental related work, complete and ready for use, at the Naval Air Warfare Center Training Systems Division, 12221 Science Drive, Orlando, Florida 32826-3224.
0. Detailed Project Description
Provide and install new systems furniture complete and ready to use including all associated appurtenances. Furniture must match existing. All work to be coordinated with the government (NAWCTSD).
Several requirements for this project are as follows:
All applicable federal, state, and local codes shall be followed including but not limited to Unified Facility Criteria found at https://www.wbdg.org/ffc/dod/unified-facilities-criteria-ufc
1. Covering unused former whip locations with approved cover plates
1. Ensuring all electrical work meets NEC requirements
1. Ensuring that all work is tested to be complete and useable
1. Ensuring dust and noise levels are kept to a minimum with daily cleanup.
1.2 SUBMITTALS
Submit three copies of the following for approval by the Contracting Officer within 7 calendar days after award.
1.2.1 Statements
a. Safety Data Sheet (SDS),
b. Statement of Nonuse of Ozone Depleting Substances (ODS),
c. Accident Prevention Plan including Activity Hazard Analysis,
d. Work Schedule,
e. Bonds and insurance.
In subcontracts under this contract that require work on a Government installation and shall require subcontractors to provide and maintain the insurance required in the Schedule or elsewhere in the contract. The Contractor shall maintain a copy of all subcontractors’ proofs of required insurance, and shall make copies available to the Contracting Officer upon request.
f. Name, SSN, and Citizenship of each on site worker.
1.3 PERIOD OF PERFORMANCE
The Contractor shall be required to complete the entire work, ready for use, not later than 26th of May 2025.
1.4 DEFINITIONS
Where "as shown", "as indicated", "as detailed", or words of similar import are used, it shall be understood that reference to the drawings/sketches accompanying this specification is made unless stated otherwise. Where "as directed", "as permitted", "approved", "acceptance", or words of similar import are used, it shall be understood that the direction, requirements, permission, approval, or acceptance of the Contracting Officer is intended unless stated otherwise. As used herein, "provided" shall be understood to mean "provided complete in place in a completely usable condition", that is "furnished and installed". As used herein "secure" shall be understood to mean "marked by solidity, firmness, and stability, especially in design or construction".
1.5 SAFETY REQUIREMENTS
In performing the contract, the Contractor shall provide for protecting the lives and health of employees and other persons and for preventing damage to property, materials, supplies and equipment in accordance with the latest revision of the U.S. Army Corps of Engineers "Safety and Health Requirements Manuals" (EM 38511) and "Occupational Safety and Health Standards" (29 CFR 1910). Prior to commencement of the work, the Contractor shall meet in conference with representatives of the Contracting Officer to discuss and develop mutual understandings relative to the administration of safety. All OSHA work standards shall be followed including but not limited to Lockout/Tagout procedures. Electrical Safety Code and OSHA 1910 subchapter S shall be specifically followed. Prior to commencement of the work, the contractor shall meet in conference with representatives of the Contracting officer to discuss and develop a mutual understand relative to the administration of safety. Power shall not be deenergized without at least 2 weeks’ prior approval of the Contracting Officer. No live electrical work shall be permitted.
PART 2 PRODUCTS
Use only Contracting Officer approved parts or materials.
PART 3 EXECUTION
3.1 STATION REGULATIONS
The Contractor and his employees and subcontractors shall become familiar with and obey all applicable Federal, State, local and station regulations, including fire, safety, traffic, and security regulations. No employee of the Contractor shall be admitted to the work site without satisfactory proof of United States citizenship. Some work areas may require an escort and/or a security clearance for access.
3.1.1 Working Hours
Work hours will be coordinated with the Contracting Officer. No power disruptions are allowable during normal working hours. The Contractor will work together with the Contract Surveillance Representative for access into restricted spaces. Contracting Officer shall approve working hours prior to commencement of work. Regular working hours shall consist of an 8-hour period established by the Contracting Officer between 6 a.m. and 6 p.m., Monday through Friday, excluding Government holidays.
End of Scope of Work