Updated Exh 9_Specs.docx

DOCX document 50 KB Posted

Attached to
ITB - Astoria District 1 Office HVAC Replacement
Solicitation number
S-73000-00008085
Issued by
Clatsop County, Oregon

About this file

The provided document is an Exhibit specifying the technical requirements for an Invitation to Bid (ITB)/Bid Solicitation No. S-73000-00008085 issued by the Oregon Department of Transportation (ODOT) for the replacement of HVAC equipment at their District 1 office in Astoria, Oregon, located in Clatsop County. The scope of work includes the removal and recycling of four existing furnaces and four AC units, and the installation of four new 96% efficient 80,000 BTU multistage variable-speed gas furnaces with four 15.2 SEER2-certified 4-ton air conditioning units, including air filtration systems. Additionally, the contractor shall remove and replace four thermostats, make necessary attic access and corridor modifications, reuse existing ductwork, balance and test the system, and coat all outdoor HVAC units with a clear coat for corrosion control. All equipment must have a 10-year parts warranty and a 1-year labor warranty.

The pricing terms, set-asides, incumbents, funding requirements, and other salient information are not provided in the given document. However, it is specified that the work shall include all materials, labor, and applicable permits.

View the file

Other files

File Type Posted
Pre bid sign in sheet.pdf PDF
Reference Drawings.pdf PDF
Bid tabulation~9.xlsx XLSX spreadsheet
Advertisement for RFP Traffic Control Services for PWR Projects.pdf PDF
00008085_ITB~2.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ITB/Bid Solicitation No. S-73000-00008085

EXHIBIT 9 – SPECIFICATIONS

· Contractor shall remove and recycle four existing furnaces and four AC units.

· New equipment to be installed shall be four 96% efficient 80,000 BTU multistage variable-speed gas furnaces with four 15.2 Seer2-certified 4-ton air conditioning units with air filtration systems.

· Contractor shall remove and replace four thermostats. Basis of design is Honeywell Vision Pro.

· Contractor shall make the attic access and attic corridor modifications as necessary to remove and carry and install furnaces from, to and through the attic space. If any modifications are made to the building for this purpose, they shall be brought back to the original conditions.

· Contractor shall reuse existing ductwork.

· Contractor shall balance and test system for correct airflow throughout entire building, adding more dampers if needed for proper airflow.

· All outdoor HVAC units must be coated with a clear coat for corrosion control.

· All units must have a 10 year warranty for parts and a one year warranty for labor.

· Work to include all materials, labor, and applicable permits.

731-042; S004-B101822)

File details come from the government source that posted it. Updated .