Updated Copy February 13, 2018.pdf

PDF 1 MB Posted

Attached to
751/16464. SMD; Sturgeon Pt SP- Lighthouse Elec Improvements
Solicitation number
RFQ-171-190000000673-3
Issued by
Alcona County, Michigan

About this file

This is a Phase 100 Tower Stair and Electrical Systems Assessment Study report prepared by WTA Architects for the State of Michigan Department of Technology, Management and Budget/Department of Natural Resources Parks and Recreation Division regarding the Sturgeon Point Lighthouse in Harrisville, Michigan, dated February 13, 2018. The study provides a detailed assessment of the lighthouse's electrical systems, including power distribution, wiring conditions, and lighting systems. Key findings include separate metering for the lighthouse (60 amp, 120/240-volt service) and keeper's quarters, aging electrical panels including a Push-O-Matic panel and fuse box in the keeper's quarters, and various types of wiring throughout the facility including original cloth jacketed type "NM" wiring in walls and newer PVC jacketed Romex wiring in accessible spaces.

The report's recommendations include critical replacements of the Push-O-Matic panel and original fuse box in the keeper's quarters, though this would require opening walls to address the cloth jacketed wiring. Additional recommendations include re-supporting existing Romex/"MC" wiring to meet code, installing proper fitting in the upper tower panel, placing the outbuilding 40-amp feed in conduit, installing a new exterior receptacle, and upgrading to LED lighting while maintaining historically appropriate fixtures. The study includes 31 photographs documenting the current electrical system conditions throughout the facility. The document serves as a comprehensive assessment to guide future electrical system upgrades while preserving the historic nature of the lighthouse.

View the file

Other files

File Type Posted
AD-1 Final PDF.pdf PDF
Scan Sep0419sturgeon.pdf PDF
Specifications 16464.pdf PDF
Plans 16464.pdf PDF
Advertisment 16464.pdf PDF
16464-Addendum1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Phase 100 – Tower Stair and Electrical Systems Assessment Study

For

State of Michigan

Department of Technology, Management and Budget/ Department of Natural Resources

Parks and Recreation Division

To

Sturgeon Point Lighthouse

Harrisville, Michigan

File No. 751/16464.SMD

Index No. 51023 WTA Project No. 2016078

February 13, 2018

Prepared By:

WTA Architects 100 S. Jefferson Avenue; Suite 601

Saginaw, Michigan 48607

TOWER STAIR AND ELECTRICAL SYSTEMS ASSESSMENT STUDY

STURGEON POINT LIGHTHOUSE

Table of Contents

Tower Brick Spalling ...............................................................................Page 2 to 11

Structural ..................................................................................................Page 12 to 16

Electrical ..................................................................................................Page 17 to 25

Opinion of Probable Cost.........................................................................Page 26 to 28

Electrical

Observations:

Power:

The existing lighthouse and keeper’s quarters are metered separately. See photos 19 and 20. The lighthouse has a 60 amp., 120/240-volt service. The service is routed outside along the exterior wall and into the back of the main panel. This main panel is in the entry of the lighthouse between the keeper’s quarters and the lighthouse tower. See photo 21. Located at the base of the lighthouse tower is another (6) circuit panel that feeds the tower lights and a second upper (2) circuit panel. Located here at the tower base is also a 1kw, 95-

130-volt input to 120-volt output transformer that is believed to power the Fresnel lens lamp. See photo 22.

The (2) circuit panel in the upper tower is operational and currently powers the 120-volt receptacle and the existing NOAA power supply, which powers their weather equipment. See photo 30.

The keeper’s quarters are equipped with an old-style Push-O-Matic panel. See photo 23. This panel feeder is routed from the meter within the crawl space and then up through the floor to the panel. See photo 24. This panel feeds the entire keeper’s quarters. It backfeeds an existing fuse box with (4) fuses. See photo 31. These

(4) fuses then power most of the circuits in the keeper’s quarters. The Push-O-Matic also powers the museum outbuilding located to the west of the keeper’s quarters with a 40 amp, 120/240-volt breaker. There is an exterior pole mounted light that is also powered from the keeper’s quarters. See photo 25.

The existing wiring appears to be a variation of original cloth jacketed type “NM” which is believed to still be located in all walls. There is also some newer PVC jacketed Romex wiring, which was probably installed around the same time the Push-O-Matic panel was installed. See photos 26 and 27. This wiring is present in the crawl space and attic space where there is accessibility. There is also “MC” flexible metal clad wiring located in the attic, which is then spliced to the existing wiring to the second-floor lights and to wiring that is in the walls of the second floor. In general, any space that was accessible appears to have had newer wiring installed at some point in time, but the existing wiring that is still located within the lathe and plaster walls is probably cloth jacketed Romex-type wiring.

Lighting:

The existing lighting is very minimal throughout both the lighthouse and the keeper’s quarters. Most of the lights are time appropriate, but some new track lighting has been installed where historical artifacts are on display.

Recommendations:

Power:

Although all the panels in both the lighthouse and keeper’s quarters show signs of aging, the most critical ones to replace would be the Push-O-Matic and the original fuse box, which are in the keeper’s quarters. The Push-

O-Matic panel should be a simple replacement, but that is not the case for the fuse box. The fuse box is recessed in the existing lathe and plaster wall, and all four circuits coming from this box are located within the walls. To eliminate the cloth jacketed wiring, the walls would need to be opened up. The fuse box could then be eliminated or saved and abandoned in place, if deemed a historical value. All circuits would then have to be extended over to the new panel that will replace the Push-O-Matic. The wiring from the receptacles, switches, and lights located in the keeper’s quarters would also need to be replaced, meaning walls and ceilings would have to be channeled and patched once new wiring is installed.

It is important to note that once new wiring is installed, new grounded receptacles could be installed to replace the existing non-grounded receptacles.

Other less obtrusive recommendations are as follows:

• Re-support/secure all existing Romex or “MC” wiring to meet code. See photo 27.

• Install proper fitting in upper tower panel for the branch wiring. See photo 28.

• The outbuilding 40-amp feed should be installed within conduit. See photo 29.

• Install a completely new exterior receptacle to avoid using extension cords during events.

Lighting:

The existing time appropriate light fixtures should remain, but newer screw-in LED lamps could be installed.

The existing track lighting could be replaced with newer LED type track lighting. LED is a great source of light to display items and the smaller fixture sizes are visually less noticeable.

Photo 19

Photo 20

Photo 21

Photo 22

Photo 23

Photo 24

Photo 25

Photo 26

Photo 27

Photo 28

Photo 29

Photo 30

Photo 31

Cover Page 2.13.18.pdf
Revisions 2-18-18.pdf

File details come from the government source that posted it. Updated .