Unit Price List for Drilling (1).xlsx

XLSX spreadsheet 17 KB Posted

Attached to
Geotechnical AST Drilling Indefinite Delivery Indefinite Quantity (IDIQ) Multiple Award Task Order Contract (MATOC)
Solicitation number
W9123823R0008
Issued by

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FY23 CLIN (Solicitation

CLINDESCRIPTIONQTYUnit of IssueCost
0001Mobilization and demobilization for all equipment; Provide a price at the task order level (FFP).N/AN/APrice per Task Order
0002ADrill Rig - Solid Flight-Auger and Hollow Stem Auger Drilling Method to include sampling; (Per HOUR)1HR
0002BDrill Rig - Mud Rotary Drilling Method to include sampling; (Per HOUR)1HR
0002CDrill Rig - Air Rotary/ODEX/ARCH Drilling Method to include sampling; (Per HOUR)1HR
0002DDrill Rig Standby Time - Rotary Drilling (Hollow Stem Auger, Mud, Air/ODEX/ARCH) Methods; (Per HOUR)1HR
0002EDrill Rig - Sonic Drilling Method to include sampling; (Per HOUR)1HR
0002FDrill Rig Standby Time - Sonic Drilling Method; (Per HOUR)1HR
0002GDrill Rig - Diamond Rock Core Drilling Method to include sampling; (Per LINEAR FOOT)1LF
0002HDrill Rig Standby Time - Diamond Rock Coring Drilling Method; (Per HOUR)1HR
0002JCone Penetrometer Testing (CPT) Rig; (Per LINEAR FOOT)1LF
0002KCone Penetrometer Test (CPT) Rig Standby Time; (Per HOUR)1HR
0002LSmall Direct Push Rig capable of pushing holes to 50 feet or less; (Per LINEAR FOOT)1LF
0002MLarge Direct Push Rig capable of pushing holes greater than 50 feet; (Per LINEAR FOOT)1LF
0002NDirect Push Standby Time; (Per HOUR)1HR
0002PSpecialty Drilling (Vibracore, barge drilling, Becker Hammer, etc.); Provide a price at the task order level (FFP).N/AN/APrice per Task Order
0002QSpecialty Drilling Standby Time (Vibracore, barge drilling, Becker Hammer, etc.); Provide a price at the task order level (FFP).N/AN/APrice per Task Order
0003ADrill Rig Set-Up - Hollow Stem Auger/Mud Rotary Drilling/Diamond Rock Coring Drilling Methods; (Lump Sum Per Boring = EACH)1EA
0003BDrill Rig Set-Up - Air Rotary/ODEX Drilling Method/Sonic Drilling Methods; (Lump Sum Per Boring = EACH)1EA
0003CDrill Rig Set-Up - Specialty Drilling (Vibracore, barge drilling, Becker Hammer, etc.); will be negotiated per task order; (Per Set-Up = EACH)1EA
0004Automatic Hammer Energy Testing of Automatic Hammer HOURS - to be conducted at the Beginning, Middle, and End of Project; (Per HOUR)1HR
0005Grouting Borings per Cubic Foot (CF) of placed grout; to be calculated in the field; (Per CUBIC FOOT)1CF
0006ACementing and Drilling Out Cement, HQ Diameter Rock Coring; to be determined in the field; (Per LINEAR FOOT)1LF
0006BCementing and Drilling Out Cement, Larger Than HQ Diameter Rock Coring; to be determined in the field; (Per LINEAR FOOT)1LF
0007AStainless steel or brass sleeves; (50 Count Box = EACH)1EA
0007BShelby Tubes; (Per Tube = EACH)1EA
0007CPitcher Tubes; (Per Tube = EACH)1EA
0007DShipping Boxes for Shelby Tubes; (Two Tubes per Box = EACH)1EA
0007EShipping Boxes for Pitcher Tubes; (Two Tubes per Box = EACH)1EA
0007FWood Storage Boxes for Diamond Rock Core Samples; (Per Box = EACH)1EA
0007GMetal Core Boxes for Diamond Rock Core Samples; (Per Box = EACH)1EA
0007HStorage Boxes for Sonic Drill Cuttings; (Per Box = EACH)1EA
0008ADrill borehole and install PVC screen/tube for Monitoring/Observation/Piezometer Well, 2 inches or less in diameter; (Per LINEAR FOOT)1LF
0008BDrill borehole and install PVC screen/tube for Monitoring/Observation/Piezometer Well, 4 inches in diameter; (Per LINEAR FOOT)1LF
0008CDrill borehole and install PVC screen/tube for Monitoring/Observation/Piezometer Well, 6 inches in diameter; (Per LINEAR FOOT)1LF
0008DDrill borehole and install PVC screen/tube per Linear Foot (LF) for Monitoring/Observation/Piezometer/Relief Wells greater than 6 inches in diameter; will be negotiated per task order1LF
0008EDrill Rig Set-up - Monitoring/Observation/Piezometer/Relief Well; (Per Set-Up = EACH)1EA
0008FWell Surface Completion for monitoring/observation/piezometer/relief wells - Flush Mounted Well Completion; (Per Well = EACH)1EA
0008GWell Surface Completion for monitoring/ observation/piezometer/relief wells - Above Ground Well Completion; (Per Well = EACH)1EA
0008HWell Development/Rehabilitation/Cleaning for monitoring/observation/piezometer/relief wells including all equipment; (Per HOUR)1HR
0009AWater (Hydraulic) Pressure (Packer) Tests; to be used for Diamond Rock Coring; (Per HOUR)1HR
0009BPermeability/Pumping Test including all equipment; Provide a price at the task order level (FFP).N/AN/APrice per Task Order
0009CPercolation Tests; (Per Test = EACH)1EA
0010Instrumentation - Piezometers, Inclinometers, and other Instrumentations; Provide a price at the task order level (FFP).N/AN/APrice per Task Order
0011Downhole Geophysical Test; Provide a price at the task order level (FFP).N/AN/APrice per Task Order
0012Color Video Tape Display/Recording for Down Hole Video Camera with audio track to view sidewalls of boreholes, drains, or relief wells; (Per LINEAR FOOT)1LF
0013AOptical and Acoustic Televiewer Data Analysis and Reporting; (Per LINEAR FOOT)1LF
0013BOptical and Acoustic Televiewer Daily Rate; (Per DAY)1DAY
0014Specialized Material and Equipment; Provide a price at the task order level (FFP).N/AN/APrice per Task Order
0015ABackhoe/Trenching Excavation, including experienced operator, required operating expenses and necessary permits; (Per HOUR)1HR
0015BBackhoe/Trenching Excavation Standby Time, including experienced operator, required operating expenses and necessary permits; (Per HOUR)1HR
0016AExcavator (Trackhoe) Excavation, including experienced operator, required operating expenses and necessary permits; (Per HOUR)1HR
0016BExcavator (Trackhoe) Excavation Standby Time, including experienced operator, required operating expenses and necessary permits; (Per HOUR)1HR
0017Special site access requirements or conditions (including disposal of cuttings); Provide a price at the task order level (FFP).N/AN/APrice per Task Order
0018Technical Specialists required for unforeseen conditions; Provide a price at the task order level (FFP).N/AN/APrice per Task Order
0019Additional helper for drilling; well installation; instrumentation activities; color video taping; optical and acoustic televiewing; relief well rehabilitation; drain cleaning; crane; boom truck; CPT; backhoe; excavator; or direct push; (Per DAY)1DAY
0020Subsistence for Crews; per diem for overnight stays (travel) near project site; Provide a price at the task order level (FFP).N/AN/APrice per Task Order
0021Boring, Well, Excavation, and/or Encroachment Permits necessary to conduct work; (Per HOUR)1HR
0022Labor for Preparation of Boring, Well, Excavation, and Encroachment Permits; (Per HOUR)1HR
0023APP-AHA (Accident Prevention Plan; Activity Hazard Analysis); for sites with no HTRW concerns; (Per Task Order = EACH)1EA
0024APP-SSHP (Accident Prevention Plan; Site Safety and Health Plan); for sites with potential or known HTRW concerns; (Per Task Order = EACH)1EA

BID SCHEDULE

&F: &A

File details come from the government source that posted it. Updated .