DRAFT W9123823R0008 20221116.pdf
PDF 869 KB Posted
- Solicitation number
- W9123823R0008
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PIEE Proposal_Manager Instructions.pdf | ||
| PIEE Proposal_Manager_Functions Instructions.pdf | ||
| Unit Price List for Drilling (1).xlsx | XLSX spreadsheet | |
| PIEE Vendor_Registration.pdf | ||
| PIEE Posting_Offer Instructions.pdf | ||
| B01 - Pre-Solicitation Notice - Final 20221116.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CODE
(Hour)
PAGE(S)
until local time
A
X B
X C
D
EX
X
G
F 47 - 58
59 - 67
X H 68 - 74
RATING PAGE OF PAGES
7. ISSUED BY
(Date)
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)
Prescribed by GSA
FAR (48 CFR) 53.214(c)
1 74
(If other than Item 7)
15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO
AND
ADDRESS
SIGN OFFER (Type or print)
OF
OFFEROR
AMENDMENT NO. DATE
15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE - ENTER
SUCH ADDRESS IN SCHEDULE.
18. OFFER DATE
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)
2. CONTRACT NO.
W91238 8. ADDRESS OFFER TO
See Item 7
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in
CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.
10. FOR INFORMATION
CALL:
A. NAME (NO COLLECT CALLS)
11. TABLE OF CONTENTS
SOLICITATION/ CONTRACT FORM
SUPPLIES OR SERVICES AND PRICES/ COSTS
2 - 6
X I CONTRACT CLAUSES
DESCRIPTION/ SPECS./ WORK STATEMENT
PACKAGING AND MARKING
7 - 31 J LIST OF ATTACHMENTS
INSPECTION AND ACCEPTANCE
DELIVERIES OR PERFORMANCE
X K
REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
CONTRACT ADMINISTRATION DATA X
SPECIAL CONTRACT REQUIREMENTS
OFFER (Must be fully completed by offeror) 34 - 37 X M
L INSTRS., CONDS., AND NOTICES TO OFFERORS
EVALUATION FACTORS FOR AWARD
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT
(See Section I, Clause No. 52.232-8)
14. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments
AMENDMENT NO. DATE
to the SOLICITATION for offerors and related documents numbered and dated):
FACILITY
12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period
SOLICITATION, OFFER AND AWARD
X
(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE
EMAIL:TEL: (Signature of Contracting Officer)
CODE CODE
B. TELEPHONE (Include area code) C. E-MAIL ADDRESS
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:
10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM
24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE
PART IV - REPRESENTATIO NS AND INSTRUCTIO NS
PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS
38 - 46
PART II - CO NTRACT CLAUSES
USACE SACRAMENTO DISTRICT
ATTN: CONTRACTING DIVISION
1325 J STREET
SACRAMENTO CA 95814-2922
FAX:
TEL:
FAX:
TEL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SOLICITATION
6. REQUISITION/PURCHASE NO.5. DATE ISSUED
15 Mar 2023
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
[ X ]
3. SOLICITATION NO.
W9123823R0008
Section B - Supplies or Services and Prices
ITEM NO SUPPLIES/SERVICES MAX
QUANTITY
UNIT UNIT PRICE MAX AMOUNT
0001 1 Job Testing and Drilling
FFP
Firm Fixed Price (FFP) Multiple Award Task Order Contract (MATOC)
Indefinite Delivery Indefinite Quantity (IDIQ) Contract for Drilling Services for use primarily within the U.S. Army Corps of Engineers (USACE) Sacramento
District's (CESPK) Civil and Military Works Boundaries. Work may also be performed within the USACE South Pacific Division (CESPD) boundaries including the following districts: Sacramento District (CESPK), Albuquerque
District (CESPA), Los Angeles District (CESPL), and San Francisco (CESPN).
The geographical area includes California, Arizona, Nevada, Utah, New Mexico and parts of Oregon, Idaho, Wyoming, Colorado and Texas.
Contractor to provide all labor, material, equipment and supervision to perform geotechnical work and explorations in hazardous, toxic, or radioactive waste
(HTRW) site conditions for drilling services and sampling in accordance with
(IAW) Section C, Statement of Work. Services will be further defined, and work accomplished by issuance of individual Task Orders.
The minimum guarantee is $2,500.00.
FOB: Destination
PSC CD: R404
MAX
NET AMT
CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE
The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.
MINIMUM
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
AMOUNT
2,500.00 9,900,000.00
DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND ORDER VALUE
The minimum quantity and order value for each Delivery/Task Order issued shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for each
Delivery/Task Order issued shall not exceed the maximum quantity and order value stated in the following table.
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
2,500.00 500,000.00
CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE
The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.
CLIN
QUANTITY
MINIMUM
AMOUNT
MAXIMUM
QUANTITY
MAXIMUM
0001 2500.00
500,000.00
BID SCHEDULE
CLIN DESCRIPTION QTY Unit of
Issue
Cost
0001 Mobilization and demobilization for all equipment; Provide a price at the task order level (FFP).
N/A N/A Price per
Task
Order
0002A Drill Rig - Solid Flight-Auger and Hollow Stem Auger Drilling Method to include sampling; (Per HOUR)
1 HR
0002B Drill Rig - Mud Rotary Drilling Method to include sampling; (Per HOUR) 1 HR
0002C Drill Rig - Air Rotary/ODEX/ARCH Drilling Method to include sampling; (Per
HOUR)
1 HR
0002D Drill Rig Standby Time - Rotary Drilling (Hollow Stem Auger, Mud, Air/ODEX/ARCH) Methods; (Per HOUR)
1 HR
0002E Drill Rig - Sonic Drilling Method to include sampling; (Per HOUR) 1 HR
0002F Drill Rig Standby Time - Sonic Drilling Method; (Per HOUR) 1 HR
0002G Drill Rig - Diamond Rock Core Drilling Method to include sampling; (Per
LINEAR FOOT)
1 LF
0002H Drill Rig Standby Time - Diamond Rock Coring Drilling Method; (Per HOUR) 1 HR
0002J Cone Penetrometer Testing (CPT) Rig; (Per LINEAR FOOT) 1 LF
0002K Cone Penetrometer Test (CPT) Rig Standby Time; (Per HOUR) 1 HR
0002L Small Direct Push Rig capable of pushing holes to 50 feet or less; (Per LINEAR
FOOT)
1 LF
0002M Large Direct Push Rig capable of pushing holes greater than 50 feet; (Per LINEAR
FOOT)
1 LF
0002N Direct Push Standby Time; (Per HOUR) 1 HR
0002P Specialty Drilling (Vibracore, barge drilling, Becker Hammer, etc.); Provide a price at the task order level (FFP).
N/A N/A Price per
Task
Order
0002Q Specialty Drilling Standby Time (Vibracore, barge drilling, Becker Hammer, etc.);
Provide a price at the task order level (FFP).
N/A N/A Price per
Task
Order
0003A Drill Rig Set-Up - Hollow Stem Auger/Mud Rotary Drilling/Diamond Rock Coring
Drilling Methods; (Lump Sum Per Boring = EACH)
1 EA
0003B Drill Rig Set-Up - Air Rotary/ODEX Drilling Method/Sonic Drilling Methods;
(Lump Sum Per Boring = EACH)
1 EA
0003C Drill Rig Set-Up - Specialty Drilling (Vibracore, barge drilling, Becker Hammer, etc.); will be negotiated per task order; (Per Set-Up = EACH)
1 EA
0004 Automatic Hammer Energy Testing of Automatic Hammer HOURS - to be conducted at the Beginning, Middle, and End of Project; (Per HOUR)
1 HR
0005 Grouting Borings per Cubic Foot (CF) of placed grout; to be calculated in the field;
(Per CUBIC FOOT)
1 CF
0006A Cementing and Drilling Out Cement, HQ Diameter Rock Coring; to be determined in the field; (Per LINEAR FOOT)
1 LF
0006B Cementing and Drilling Out Cement, Larger Than HQ Diameter Rock Coring; to be determined in the field; (Per LINEAR FOOT)
1 LF
0007A Stainless steel or brass sleeves; (50 Count Box = EACH) 1 EA
0007B Shelby Tubes; (Per Tube = EACH) 1 EA
0007C Pitcher Tubes; (Per Tube = EACH) 1 EA
0007D Shipping Boxes for Shelby Tubes; (Two Tubes per Box = EACH) 1 EA
0007E Shipping Boxes for Pitcher Tubes; (Two Tubes per Box = EACH) 1 EA
0007F Wood Storage Boxes for Diamond Rock Core Samples; (Per Box = EACH) 1 EA
0007G Metal Core Boxes for Diamond Rock Core Samples; (Per Box = EACH) 1 EA
0007H Storage Boxes for Sonic Drill Cuttings; (Per Box = EACH) 1 EA
0008A Drill borehole and install PVC screen/tube for Monitoring/Observation/Piezometer
Well, 2 inches or less in diameter; (Per LINEAR FOOT)
1 LF
0008B Drill borehole and install PVC screen/tube for Monitoring/Observation/Piezometer
Well, 4 inches in diameter; (Per LINEAR FOOT)
1 LF
0008C Drill borehole and install PVC screen/tube for Monitoring/Observation/Piezometer
Well, 6 inches in diameter; (Per LINEAR FOOT)
1 LF
0008D Drill borehole and install PVC screen/tube per Linear Foot (LF) for
Monitoring/Observation/Piezometer/Relief Wells greater than 6 inches in diameter;
will be negotiated per task order
1 LF
0008E Drill Rig Set-up - Monitoring/Observation/Piezometer/Relief Well; (Per Set-Up =
EACH)
1 EA
0008F Well Surface Completion for monitoring/observation/piezometer/relief wells -
Flush Mounted Well Completion; (Per Well = EACH)
1 EA
0008G Well Surface Completion for monitoring/ observation/piezometer/relief wells -
Above Ground Well Completion; (Per Well = EACH)
1 EA
0008H Well Development/Rehabilitation/Cleaning for monitoring/observation/piezometer/relief wells including all equipment; (Per
HOUR)
1 HR
0009A Water (Hydraulic) Pressure (Packer) Tests; to be used for Diamond Rock Coring;
(Per HOUR)
1 HR
0009B Permeability/Pumping Test including all equipment; Provide a price at the task order level (FFP).
N/A N/A Price per
Task
Order
0009C Percolation Tests; (Per Test = EACH) 1 EA
0010 Instrumentation - Piezometers, Inclinometers, and other Instrumentations; Provide a price at the task order level (FFP).
N/A N/A Price per
Task
Order
0011 Downhole Geophysical Test; Provide a price at the task order level (FFP). N/A N/A Price per
Task
Order
0012 Color Video Tape Display/Recording for Down Hole Video Camera with audio track to view sidewalls of boreholes, drains, or relief wells; (Per LINEAR FOOT)
1 LF
0013A Optical and Acoustic Televiewer Data Analysis and Reporting; (Per LINEAR
FOOT)
1 LF
0013B Optical and Acoustic Televiewer Daily Rate; (Per DAY) 1 DAY
0014 Specialized Material and Equipment; Provide a price at the task order level (FFP). N/A N/A Price per
Task
Order
0015A Backhoe/Trenching Excavation, including experienced operator, required operating expenses and necessary permits; (Per HOUR)
1 HR
0015B Backhoe/Trenching Excavation Standby Time, including experienced operator, required operating expenses and necessary permits; (Per HOUR)
1 HR
0016A Excavator (Trackhoe) Excavation, including experienced operator, required operating expenses and necessary permits; (Per HOUR)
1 HR
0016B Excavator (Trackhoe) Excavation Standby Time, including experienced operator, required operating expenses and necessary permits; (Per HOUR)
1 HR
0017 Special site access requirements or conditions (including disposal of cuttings);
Provide a price at the task order level (FFP).
N/A N/A Price per
Task
Order
0018 Technical Specialists required for unforeseen conditions; Provide a price at the task order level (FFP).
N/A N/A Price per
Task
Order
0019 Additional helper for drilling; well installation; instrumentation activities; color video taping; optical and acoustic televiewing; relief well rehabilitation; drain cleaning; crane; boom truck; CPT; backhoe; excavator; or direct push; (Per DAY)
1 DAY
0020 Subsistence for Crews; per diem for overnight stays (travel) near project site;
Provide a price at the task order level (FFP).
N/A N/A Price per
Task
Order
0021 Boring, Well, Excavation, and/or Encroachment Permits necessary to conduct work; (Per HOUR)
1 HR
0022 Labor for Preparation of Boring, Well, Excavation, and Encroachment Permits;
(Per HOUR)
1 HR
0023 APP-AHA (Accident Prevention Plan; Activity Hazard Analysis); for sites with no
HTRW concerns; (Per Task Order = EACH)
1 EA
0024 APP-SSHP (Accident Prevention Plan; Site Safety and Health Plan); for sites with potential or known HTRW concerns; (Per Task Order = EACH)
1 EA
Section C - Descriptions and Specifications
SECTION C - DESCRIPTIONS AND S
PERFORMANCE WORK STATEMENT
Performance Work Statement
1. SCOPE
This Performance Work Statement (PWS) consists of the technical services required. Work will be performed within the South Pacific Division (SPD) boundaries. This area includes California, Arizona, Nevada, Utah, New Mexico and parts of Oregon, Idaho, Wyoming, Colorado, and Texas. It is anticipated that the majority of the work will be performed in California. The prime Contractor or subcontractor shall have all necessary
Federal, State or Local Government licenses in the state where work will be performed. The following technical services are required. Provide drilling, cone penetrometer testing services, backhoe, and trackhoe excavations. The principle features of the work shall include, but are not limited to: soil drilling and sampling using
Hollow Stem flight augers, solid Stem flight augers, mud-rotary, air-rotary, and percussion drilling methods (such as
ODEX, Down-hole Casing Advance Systems, or other percussion drilling systems); sonic drilling and sampling;
rock core drilling and sampling (up to 6-inch diameter) using wire-line or conventional, diamond-impregnated drill bits; soil sampling using standard penetrometers, and other split barrel samplers up to 3-inch outside diameter
(O.D.); undisturbed soil sampling using Shelby push tubes and Pitcher barrels with Pitcher tubes; test-pit excavations utilizing backhoes and trackhoes; Cone Penetrometer Testing (CPT) and associated tests using CPT;
piezometer and inclinometer installations; hydraulic pressure testing (water pressure testing) associated with rock core drilling; observation well installation and development (includes pump tests and permeability tests); percolation tests; preparation of drill logs and trench or test-pit logs; as-built diagrams for observation well(s), piezometer(s), and inclinometer(s) installations, and all other pertinent records. The Contractor will, on occasion, furnish the services of a registered and licensed Geologist or Geotechnical Engineer. This individual will be professionally licensed in the state in which the work is being performed. The Contractor shall provide all labor, material, equipment, and supervision to perform the work set forth in Task Orders provided by the Government. A U.S. Army
Corps of Engineers’ (USACE) Geologist or Geotechnical Engineer will oversee all work, but on occasion, the
Contractor will have to provide the services of a Geologist or Geotechnical Engineer as described above. If the
Contractor is required to supply a Geologist or Geotechnical Engineer, then the USACE will supply all soil and rock logging forms and materials as well as specific directions on how to achieve precise and accurate soil or rock core logs. For projects requiring more than two drill rigs at the same time, the Contractor shall provide the services of a drill foreman to coordinate all field activities. For Projects in excess of $200,000 in value, projects requiring more than 10 personnel, projects utilizing more than one subcontractor, or projects that include special hazards, the
Contractor shall provide a separate full-time Health and Safety Officer to oversee safety of personnel during project activities.
This contract will require services for traditional Geotechnical work and explorations in hazardous, toxic, or radiologic (HTRW) site conditions. The purpose of a HTRW investigation/study is to obtain data for the detailed evaluation of alternatives. The Contractor may be required to perform various investigation activities. The activities may include, but are not limited to, the following: drilling; installation of groundwater monitoring well, piezometer or observation well; development and aquifer testing; sampling of soil, sediment, and groundwater; excavation of test pits/trenches; and sampling and testing of geotechnical materials. Sampling and analysis for a wide variety of parameters may be required to determine the physical, chemical, biological, and radiological properties. Contract deliverables for investigations may include, but are not limited to: permanent or temporary field installations (e.g., monitoring wells), reports, logs, maps, drawings, and sketches. Analysis and interpretation of data shall be performed as appropriate to accomplish the intent of the individual Task Orders (TO). Specific requirements will be included in individual TOs. Task Orders will be competed amongst all contractors awarded contracts under solicitation W91238-23-R-0008. Task Orders will be evaluated using Lowest Price Technically Acceptable procedures unless otherwise stated at the time of TO Request for Proposal (RFP). Appropriate deliverables associated with each of these activities shall be prepared and submitted to the Contracting Officer (KO) for approval as required.
The Contract Line Items (CLINs) in this statement of work will have number designations beginning with three or two zeros followed by a number. This number designation will be consecutive from the preceding CLIN number.
Sub Contract Line Items (SUBCLINs) will be used to group similar services and will have successive letter designations, e.g. A, B, C, etc. SUBCLINs I, O will not be used in accordance with regulatory guidance. Subsequent
Option Periods will begin with 1, 2, 3 or 4.
2. APPLICABLE PUBLICATIONS
The following standards are a part of this specification to the extent to which they are referenced in individual delivery/Task Orders. Other standards may be referenced as necessary and specified in individual Task Orders.
2.1 American Society for Testing and Materials (ASTM) – Standards:
C150-20 Standard Specification for Portland Cement
D1452-16 Standard Practice for Soil Investigation and Sampling by Auger Borings
D1586-18 Standard Test Method for Standard Penetration Test (SPT) and Split–Barrel Sampling of
Soils
D1587-15 Standard Practice for Thin-Walled Tube Sampling of Fine-Grained Soils for
Geotechnical Purposes
D2113-14 Standard Practice for Rock Core Drilling and Sampling of Rock for Site Exploration
D2487-17e1 Standard Practice for Classification of Soils for Engineering Purposes (Unified Soil
Classification System)
D2488-17e1 Standard Practice for Description and Identification of Soils (Visual-Manual Procedure)
D4220-14 Standard Practices for Preserving and Transporting Soil Samples
D5079-08 Standard Practices for Preserving and Transporting Rock Core Samples (withdrawn in
2017 but still may be referenced)
D5778-20 Standard Test Method for Performing Electronic Friction Cone and Piezocone
Penetration Testing of Soils
2.2 U. S. Army Corps of Engineers – Engineering Manuals and Regulations:
EM 385-1-1 Safety and Health Requirements Manual, 30 November 2014
ER 385-1-92 Safety and Occupational Health Requirements for Environmental Cleanup Projects, 1
November 2018
EM 1110-1-1804 Geotechnical Investigations, 1 January 2001
EM 1110-1-4000 Monitoring Well Design, Installation, and Documentation at Hazardous, Toxic and
Radioactive Waste Sites, 1 November 1998
EM 1110-2-3506 Grouting Technology, 31 March 2017
ER 1110-1-1807 Drilling in Earth Embankment Dams and Levees, 31 December 2014
The most current version of each manual listed in this section shall be utilized for all work performed in accordance within this statement of work.
3. PRIMARY DUTIES
This contract contains services for Geotechnical work and HTRW site conditions. Many of the services apply to both Geotechnical and HTRW work; consequently, the written explanations for the duplicate services are the same.
The CLINS for Geotechnical and HTRW work will have the same number designations. The reason for separate
CLINS is due to the cost differences between Geotechnical and HTRW work. Specific requirements for HTRW work include but are not limited to personal safety and refresher courses, specific training requirement for working with HTRW substances, personal protective equipment including respirator if necessary, sampling equipment, monitoring equipment, communication equipment, decontamination requirements for personnel and equipment. For
HTRW sites, before any work/project can begin, the Contractor shall provide to the government representative the names of all contract personnel who will be on site. The Contractor shall provide copies of the contract personnel’s
40-hour or 24-hour Training on HTRW and current 8-hour Refresher course.
4. MOBILIZATION AND DEMOBILIZATION
Mobilization shall consist of the delivery at the site of all plant, equipment, materials, and supplies to be furnished by the Contractor, and the complete assembly of all such plant and equipment, in satisfactory working order.
Demobilization shall consist of the removal from the site of all plant and equipment after completion of the work and cleanup of the site to as near the condition it was in prior to mobilization. Mobilization and demobilization includes but is not limited to delivery and removal of equipment to a work site, daily travel to a work site, per diem, and bridge or toll fees. The Contractor is also solely responsible for security against theft, destruction, and/or vandalism of the Contractor's property and/or equipment. All mobilization and demobilization costs for all equipment including (but not limited to) drill rig, backhoe/trackhoe, televiewers, subcontractors, etc. will be paid using unit price per CLIN 0001. The CLIN will be negotiated per Task Order with separate breakout line item mobilization/demobilization costs per equipment type.
5. DRILL RIG DRILLING HOURS AND SAMPLING PROCEDURES
Drilling hours for Solid Flight-Auger, Hollow Stem-Auger, Mud Rotary, Air Rotary, ODEX, ARCH, Sonic, and
Diamond Rock Core will be paid using unit price per CLINs 0002A through 0002H. Cone Penetrometer Testing will be paid using unit price per CLINs 0002J and 0002K. Direct push drilling will be paid using unit price per CLINs
0002L through 0002N. Specialty drilling will be paid using unit price per CLINs 0002P and 0002Q. To simplify the future task orders, CLINs are no longer specific to Geotechnical or HTRW projects and standby time is grouped by drilling method. A general description for each type of drilling, sampling, and special requirements is described in the following sections.
5.1 Hollow Stem-Auger, Mud Rotary, Air Rotary, ODEX, and ARCH:
The Contractor shall provide equipment capable of soil drilling and sampling to a depth of 150 feet with Hollow
Stem-Augers and/or Mud Rotary methods and 300 feet with 6-inch nominal diameter or greater ODEX, down hole casing advance, or other percussion drilling systems. For any Task Order, the Contractor shall have on hand equipment and material to allow drilling to 30 feet greater than the maximum depth required by the Task
Order, or 30 percent in excess of the maximum depth when the depth is 100 feet or greater. Augers shall be nominal 6-inch or 8-inch O.D. Hollow Stem flight auger with a minimum I.D. (inside diameter) of 3-1/4 inches.
CLINS 0002A through 0002C are intended for exploration and sampling activities. Drilling methods used to drill advance borings for the installation of monitoring wells, piezometers, or inclinometers are included under
CLINs 0007A through 0007D. Soil drilling and sampling by rotary methods will be paid at the unit price per
CLIN 0002A (Solid-Flight Auger and Hollow Stem Auger), CLIN 0002B (Mud Rotary), and CLIN 0002C
(Air Rotary/ODEX/ARCH), as described in the pricing schedule.
5.1.1 Standard Penetration Tests and Disturbed Samples:
Standard penetration tests (SPTs) shall be performed in accordance with ASTM D 1586-11 at the depth intervals prescribed in each individual Task Order. No standard penetration test shall bottom within 0.5 feet of a potential undisturbed sample zone. If no sample is retrieved at the specified interval, another sample will be taken immediately below or at a location specified to achieve representative sample material by the on-site Government Representative. The split-barrel samplers used for standard penetration tests shall be
2.0-inch O.D., 1.375-inch I.D.; 18- or 24-inches split section length and shall conform to ASTM D 1586-
11. If refusal is encountered during drilling or sampling, an attempt shall be made to identify the type and occurrence (bedrock, boulder, etc.) of the material. A disturbed sample shall be taken from each split-barrel sample and double bagged in plastic zip-lock type bags and properly labeled. Labels shall be clearly legible and be printed in indelible ink on the bag label, the sack, and the shipment boxes. Labels shall include, but are not limited to, the installation designation (i.e. base or project), project name, hole number, sample depth, date collected, type of sample, and sampler’s initials. If a change of material is encountered in any split-barrel sampler, it will be noted on the drill logs and bagged separately.
5.1.2 Three-Inch and 2.5-Inch Split-Barrel Sampling:
Three-inch O.D. and two and a half inch O.D. split barrel samples, where ordered, shall be driven up to 24 inches, in a fashion identical to that used for standard penetration tests. A 300-pound hammer may be used if approved by the Government prior to use. Blow counts shall be recorded for the entire drive with the type of hammer and the drive intervals noted on the drill log. Samples shall be retained from each split-barrel as directed by each individual Task Order. The split-barrel samplers used for larger sized penetration tests shall be 3.0-inch O.D. or 2.5-inch O.D.; 18- or 24-inches split section length and shall conform to ASTM D
1586-11. Automatic trip type hammers are required. The hammer shall deliver the equivalent energy of a
140 lb. weight experiencing a 30-inch free fall. Drill rods used for standard penetration tests shall be AWJ size or larger.
5.1.3 Standard Penetration Tests and Undisturbed Samples:
Every effort shall be made to assure a clean hole for standard penetration tests and undisturbed sampling.
Casing, if used, shall not be driven deeper than 1-foot above the depth of the next standard penetration test.
If using drilling fluid, the fluid shall be circulated long enough to assure a clean hole. Between penetration tests, bit pressure and rate of penetration shall be noted and recorded on the log. If refusal is encountered during drilling or sampling, an attempt shall be made to identify the material-causing refusal as to its type and occurrence (bedrock, limestone, boulder, granite, etc.). This information shall be recorded on the drill log. At all times during rotary drilling, drill fluid shall be maintained at the top of the hole. If heaving of the hole bottom occurs and the addition of water does not improve hole stability sufficiently, a weighted drill fluid shall be used, with density not to exceed 12 lbs/gallon. Other drilling procedures may be specified on an individual Task Order.
5.1.4 Mud Tanks:
For mud rotary drilling, the Contractor shall have available, or have ready access to, drilling fluids, such as bentonite; natural organic polymers, and a drill mud weighted with barite in case of artesian conditions, or flowing or heaving sands are encountered while drilling. These supplies shall be considered incidental to the drilling costs. The Contractor shall have a portable mud tank of a least 175-gallon capacity. Mud pits shall not be excavated into the ground without approval by the Government prior to use.
5.1.5 Drill Bits:
The Contractor shall have side or upwards discharge bits (when mud-rotary drilling is utilized) for use in zones of testing and sampling. The Contractor shall also have tri- cone roller-rock bits available for possible use if cobbles or boulders are encountered. The drill bits will be considered incidental to the drilling costs.
5.1.6 Procedures for Rotary Drilling on Embankments:
Procedures for drilling through embankments will be specified in the individual Task Orders. Unless otherwise specified, the use of drilling fluids (water or air) is not permitted when drilling through embankments, including dams and levees. ER 1110-1-1807 shall be adhered to during all phases of each
Task Order executed.
5.2 Standby Time for Rotary Drilling:
Standby time shall be any time that rotary drilling activities are delayed for the convenience of the Government at the request of the Government Representative. It is not to be used for Contractor caused delays due to inadequate personnel, equipment malfunctions, or adverse weather conditions. The standby time for the rotary drill rig will be paid at the unit price per CLIN 0002D as described in the pricing schedule.
5.3 Sonic Drilling:
Sonic drilling and sampling consists of drilling boreholes using sonic technology to an approximate depth specified for each borehole and collecting continuous samples for geologic and engineering characterization.
The samples shall be vibrated out of the core barrel into a plastic sleeve. The sleeve sample shall be cut into shorter lengths and placed in core boxes for inspection and logging by Corps personnel, then moved to storage.
The Contractor shall perform sonic drilling and have sufficient support equipment to perform the required work.
The sonic rig shall be capable of advancing cased boreholes to a specified depth using up to 8-inch O.D. casing.
The Contractor shall be prepared and will have enough casing, sample containers, and core boxes to obtain a continuous sample to the estimated maximum depth as specified at each drilling location. Continuous samples shall be vibrated from the casing into plastic sleeves, knotted, and placed in core boxes for field logging by the
Government Representative. Special care must be given to the position of the top and bottom of each run. After logging is completed, the core box, containing the sample, will be transported by the Contractor to a specified storage area on the site. Sonic drilling work will be paid at the unit price per CLIN 0002E as described in the pricing schedule.
5.4 Standby Time for Sonic Drilling:
Standby time shall be any time that sonic drilling activities are delayed for the convenience of the Government at the request of the Government Representative. It is not to be used for Contractor caused delays due to inadequate personnel, equipment malfunctions, or adverse weather conditions. The standby time for the sonic drill rig will be paid at the unit price per CLIN 0002F as described in the pricing schedule.
5.5 Diamond Core Rock Drilling:
The Contractor shall provide equipment capable of rock core drilling to 500 feet by rotary methods and the capability to core up to and including PQ diameter cores. Core sizes will be determined by the Government per individual Task Order. All effort shall be made to obtain 100% recovery, with an objective of a minimum recovery of 80%. If geologic conditions negatively impact the recovery rate, then the Contractor will immediately inform Government Representative of site conditions and propose alternatives to achieve recovery objective. Contractor shall provide adequate drilling equipment needed to achieve recovery objective. The
Contractor shall exercise care in recording water losses, rod jerks, and other unusual experiences while coring that, supplementing the core record, will enhance evaluation of the core. Fractures (mechanical or natural) in the rock shall be marked in the core boxes and on the logs. Voids and core losses will be marked in the core boxes by appropriately marked wooden/styrofoam blocks, as well as being marked on the logs. All rock core recovered shall be photographed using a digital camera with a minimum 12-megapixel resolution. The original and duplicate set of pictures shall be submitted as part of the completed boring logs. Rock cores shall be carefully handled and preserved in core boxes of wood/metal approved by the Government. Unless stated otherwise in an individual Task Order, the Government Representative shall arrange core in correct sequence and separate them by wooden/styrofoam blocks marked to indicate the top and bottom of each core run and the depth from which the core was obtained. No box shall contain core from more than one hole unless authorized by the Government. Covers shall be fastened securely to the core boxes; lids and both ends of core boxes will be labeled with the following information: (1) Project and site name or number, (2) date of recovery, (3) test hole number, (4) depth and elevation of top and bottom of the rock cores, (5) run number(s), (6) length of recovery, and sampler’s initials. The Contractor shall store the rock core until the project is completed. The cost associated with construction of suitable core boxes shall be paid for using a separate bid item. Diamond core rock drilling work will be paid at the unit price per CLIN 0002G as described in the pricing schedule.
5.6 Standby Time for Diamond Rock Core Drilling:
Standby time shall be any time that diamond core rock drilling activities are delayed for the convenience of the
Government at the request of the Government Representative. It is not to be used for Contractor caused delays due to inadequate personnel, equipment malfunctions, or adverse weather conditions. The standby time for the diamond core rock drill rig will be paid at the unit price per CLIN 0002H as described in the pricing schedule.
5.7 Cone Penetrometer Test (CPT) Drilling:
The Contractor shall provide a CPT rig to perform cone penetrometer testing of soils and data analysis as specified in individual Task Orders and per ASTM D 5778-20. The Contractor-supplied rig will be fully maintained, in good condition, complete with competent and qualified operating personnel with all the necessary accessories and supplemental equipment capable of conducting CPT’s to at least 200 feet deep. Costs are to include backfilling any and all holes advanced by the Contractor in accordance with section 8.1 (Grouting
Specifications). Any down time associated with the maintenance or repair of any piece of equipment will be solely at the Contractor’s expense. The Contractor will provide all data printouts, plots, and geotechnical interpretations to the Government. The data printouts will include, but not be limited to, depth, tip resistance, local friction, friction ratio, pore pressure, differential pore pressure, inclination, and temperature. The
Contractor will provide copies of all available data collected immediately after CPTs are completed in the field.
The interpretation and data are to be provided to the Government Representative in electronic format and hard copy at the completion of fieldwork. All electronic data shall be Microsoft Excel compatible, in comma delimited files. The CPT rig shall be equipped with all approved safety items, per EM 385-1-1. The CPT rig operator shall have the appropriate, current license(s) to operate the equipment required for this type of work.
The rental of any type of CPT rig shall include all operating expenses, such as fuel, oil, gas, accessory, and support equipment that conform to the manufacturer’s specifications for the type and size of CPT rig required.
CPT drilling work will be paid at the unit price per CLIN 0002J as described in the pricing schedule.
5.7.1 Grouting for Cone Penetrometer Test (CPT) Drilling:
Upon completion of Cone Penetration Testing, each hole shall be grouted with a bentonite-cement grout to the ground surface per section 8.1 (Grouting Specifications). Costs for grouting will be included in the cost of performing the CPTs on a linear foot basis. Holes left open will be covered with a minimum ½ - inch thick plywood board and safety cones until grouted.
5.8 Standby Time for Cone Penetrometer Test (CPT) Drilling:
Standby time shall be any time that CPT activities are delayed for the convenience of the Government at the request of the Government Representative. It is not to be used for Contractor caused delays due to inadequate personnel, equipment malfunctions, or adverse weather conditions. Standby time for the CPT rig at
Geotechnical or HTRW sites will be paid at the unit price per CLIN 0002K as described in the pricing schedule.
5.9 Direct Push Drilling:
The Direct Push rig (small and large) and support equipment shall be fully maintained and in good condition.
The Contractor is responsible for maintaining the Direct Push rig and associated equipment. Any down time associated with the maintenance or repair of any piece of equipment will be solely at the Contractor’s expense.
The Direct Push rig shall be equipped with all approved safety items, per EM 385-1-1, Safety Manual. The
Direct Push rig operator shall have the appropriate, current license(s) to operate the equipment required for this type of work. The rental of a Direct Push rig shall include all operating expenses, such as fuel, oil, gas, accessory, and support equipment that conform to the manufacturer’s specifications for the type and size of
Direct Push rig required.
5.9.1 Small Direct Push Rig:
Contractor shall provide a small Direct Push rig capable of pushing and completing holes to 50 feet or less.
Costs are to include backfilling any and all holes advanced by the Contractor in accordance with section 8.1
(Grouting Specifications). The small Direct Push rig will be paid at the unit price per CLIN 0002L as described in the pricing schedule.
5.9.2 Large Direct Push Rig:
A large Direct Push rig capable of pushing and completing holes greater than 50 feet. Costs are to include backfilling any and all holes advanced by the Contractor in accordance with section 8.1 (Grouting
Specifications). The large Direct Push rig will be paid at the unit price per CLIN 0002M as described in the pricing schedule.
5.9.3 Grouting for Direct Push Drilling:
Upon completion of Direct Push drilling, each hole shall be grouted with a bentonite-cement grout to the ground surface per section 8.1 (Grouting Specifications). Costs for grouting will be included in the cost of performing the Direct Push drilling on a linear foot basis. Holes left open will be covered with a minimum
½ - inch thick plywood board and safety cones until grouted.
5.10 Standby Time for Direct Push Drilling:
Standby time shall be any time that the Direct Push Rig activities are delayed for the convenience of the
Government at the request of the Government Representative. It is not to be used for Contractor caused delays due to inadequate personnel, equipment malfunctions, or adverse weather conditions. Direct Push Rig standby time will be paid at the unit price per CLIN 0002N as described in the pricing schedule.
5.11 Specialty Drilling:
Specialty drilling may include Vibracore, barge drilling, Becker Hammer, or other more exotic drilling methods. This drilling will be paid at the unit price per CLINS 0002P as described in the pricing schedule and shall be negotiated per each Task Order.
5.11.1 Grouting for Specialty Drilling:
Upon completion of Specialty Drilling, each hole shall be grouted with to the ground surface per section
8.1 (Grouting Specifications). Costs for grouting will be included in the cost of performing the Specialty
Drilling on a cubic foot basis, to be calculated in the field. Holes left open will be covered with a minimum
½ - inch thick plywood board and safety cones until grouted.
5.12 Standby Time for Specialty Drilling:
Standby time shall be any time that the specialty drilling rig activities are delayed for the convenience of the
Government at the request of the Government Representative. It is not to be used for Contractor caused delays due to inadequate personnel, equipment malfunctions, or adverse weather conditions. Specialty Drilling Rig standby time will be paid at the unit price per CLIN 0002Q as described in the pricing schedule.
5.13 Supplementary Holes:
Holes that are abandoned before reaching the specified or required depth, and which are rejected by the
Government Representative because of mechanical failure of the drilling equipment or negligence on the part of the Contractor, shall be supplemented by another hole adjacent to the first and at no additional cost to the
Government. The drilling method shall be the same as the rejected hole unless otherwise approved by the
Government. Upon reaching the previous depth, specified procedures for drilling, sampling, and clean out shall resume. Abandoned or rejected holes shall be grouted as specified under section 8.1 (Grouting Specifications).
5.14 General Drill Rig Requirements:
The drill rig and support equipment shall be fully maintained and in good condition. The Contractor is responsible for maintaining the drilling equipment. Any down time associated with the maintenance or repair of any piece of equipment will be solely at the Contractor’s expense. The drill rig shall be operated by competent and qualified personnel. The driller and at least one helper shall have the appropriate, current license(s) to operate the equipment required for this type of work. The rental of any type of drill rig shall include all operating expenses, such as fuel, oil, gas, accessories, and support equipment that conform to the manufacturer’s specifications for the type and size of drill rig required.
6. DRILL RIG SET-UP
Drill Site set-ups include all labor, material, and equipment to move the drill rig and all supporting equipment from one drill site to another. The CLIN will be employed when movement from one site to another is difficult and requires more than one (1) hour to move all materials and equipment from one site to another. Drill rig set-ups for
Hollow Stem-Auger, Mud Rotary, and Diamond Rock Core drilling will be paid using unit price per CLIN 0003A.
Air Rotary, ARCH, ODEX, and Sonic drilling will be paid using unit price per CLIN 0003B.
Specialty drilling will be paid using unit price per CLIN 0003C, which will be negotiated with each task order depending on the type of equipment proposed for use.
7. AUTOMATIC HAMMER ENERGY TESTING
The Contractor shall provide all supplies necessary to perform automatic hammer energy testing of an automatic hammer. The testing shall be conducted at the beginning, middle, and end of selected projects as identified on a
Task Order basis. The automatic hammer energy testing will be paid at the unit price per CLIN 0004 as described in
8. GROUTING BORINGS
Grouting borings advanced by Hollow Stem-Auger, Mud Rotary, Air Rotary, ODEX, ARCH, Diamond Rock Core, and Sonic Drilling will be paid at the unit price per CLIN 0005 as described in the pricing schedule. CPT, Direct
Push, and Specialty Drilling CLINs include grouting and are therefore not addressed in this section.
8.1 Grouting Specifications:
All borings not utilized for instrumentation, groundwater monitoring well, observation well or piezometer installation shall be grouted from the bottom of the hole to the top using a tremie or grout pipe unless otherwise directed by the Task Order. For geotechnical drilling, holes that do not exceed 20 feet in depth and do not encounter water may be grouted by free-falling the grout unless local regulations and permit conditions specify otherwise. In most cases, upon completion of drilling, each hole shall be grouted to the ground surface. The
Contractor will be paid only for the amount of grout introduced into the drill holes based on a cubic foot measurement. Costs are to include all materials and labor needed to complete the grouting process, and cleanup if needed. It is emphasized that payment for drilling hours will not include drill rig usage during the grouting phase. Holes will normally be grouted immediately upon completion of drilling, but should it be necessary to temporarily leave the hole open, it will be required that the hole be covered with a minimum of 1/2 – inch thick plywood sheet or steel hole cover and traffic cones. After grouting, the hole will normally be allowed to settle overnight, topped with grout the following day, then filled with soil cuttings, tamped, and covered with concrete or asphalt patch if required. The Contractor shall ensure that all holes are backfilled with grout prior to leaving the site.
8.1.1 Bentonite-Cement Grout:
Per EM 1110-2-3506, the grout mixture should be composed of approximately 4 to 7 percent bentonite and
93 to 96 percent Portland cement. Water used for sealing mixtures shall be clean and of potable quality.
Some sites may require a slightly different grout formula based upon local regulatory requirements. In those cases the mix will be as specified in the individual Task Order.
8.1.2 Grout Mixing:
Grout mixing shall be done thoroughly by mixing with a paddle-type mechanical mixer, high shear mixer, or recirculating through a pump to ensure that the mixture is uniform and there are no lumps.
8.2 Grouting Inspections:
Some counties require “Grouting Permits” and inspections during the grout phase. The Contractor will be responsible for obtaining all permits and for coordinating inspection times with the appropriate County Grout
Inspector, per section 22.
8.3 Cementing and Drilling Out Cement, HQ:
All weathered core loss zones and broken rock zones that interfere with drilling operations or result in substantial loss of drill water return, as determined by the Government Representative, shall be cemented when and as directed with quick setting cement. Generally, cementing of such zones will be directed when the bottom of the broken zone is reached or at a maximum of five feet of drilling after the water loss. When directed by the
Government Representative, minor quantities of overfill and redrilling of two to five feet above the water loss zone will be allowed and paid for to prevent excessive water takes in fractures and cavities. When not directed, it shall be at the Contractor’s expense. Each time before cementing, the hole shall be pressure tested. After cement has set sufficiently, the hole shall be drilled out and coring continued. The cost of drilling out cement will be paid for as a linear foot measurement at the unit price per CLIN 0006A for HQ to smaller diameter core and CLIN 0006B for larger than HQ diameter core.
9. SAMPLE MATERIAL AND CONTAINERS
9.1 Stainless Steel or Brass Sleeves:
The Contractor will provide clean stainless steel or brass sleeves and tight-fitting plastic end caps for collecting soil samples from boreholes using 2.5-inch and 3-inch O.D. split spoon samplers. The sleeves will be paid per
CLIN 0007A (in groups of 50 count) as described in the pricing schedule.
9.2 Shelby Tube Undisturbed Samples:
Undisturbed samples, when ordered, shall be taken with a Shelby Tube pushed a distance of 24 inches utilizing the drill rig hydraulic system. Undisturbed sampling equipment shall consist of 3-inch, 5-inch, and 6-inch nominal diameter, thin-walled galvanized steel Shelby Tubes. Tubes shall be new and rust-free with smooth interiors and at least 2.5 feet long. Tubes shall be in accordance with ASTM D 1587-15. Piston type samplers may be required in soft or sensitive materials. The Contractor shall have all attachments in order to push the tube in a vertical position. Standard penetration tests shall not be performed at the undisturbed sampling depths.
Thin-walled tube, undisturbed sampling shall be performed in accordance with ASTM D 1587-15, except that the sampling tubes shall be pushed rather than driven. All undisturbed samples will be sealed in the tube with microcrystalline wax (bee’s wax), end capped, and taped with duct or electrical tape. Samples retained in this fashion shall have at least 1.0 foot of recovered material and no obvious damage to the tube (e.g. crimped ends, deflections, etc.) in order to be considered undisturbed. With the tubes sealed with wax, capped, and taped, the outside of the tube shall be wiped clean and properly labeled. This label shall be clearly legible and be printed in indelible ink or paint pen on the outside of the tube. The label shall include, but is not limited to, the installation designation (i.e. base or project), project name, hole number, sample depth, date collected, type of sample, sample designation, sampler’s initials, and “up” orientation. End caps shall be placed on both ends of the tube and wrapped with duct or electrical tape. Samples collected in this manner shall be shipped to the designated laboratory or storage facility in an appropriate shipping crate. Shipment of undisturbed samples shall be done in such a fashion as to minimize opportunities for disturbance and, in cold weather conditions, the prevention of sample freezing. Shelby Tubes will be paid at the unit price per CLIN 0007B as described in the pricing schedule.
9.3 Pitcher Barrel Undisturbed Samples:
When an undisturbed sample is required and Shelby Tubes are not feasible, Pitcher Barrel drilling using Pitcher
Tubes will suffice. Pitcher Tubes are attached to the Pitcher Barrel using Allen set screws, two each. The tube sits in front of the Pitcher Barrel, is spring loaded, and when pressure is placed on the tube, it will slide up inside the Pitcher Barrel. The barrel has hard-faced cutting teeth on the drill bit. The teeth cut the formation, which goes inside the tube.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .