This is a unit price bid form for ready mixed concrete, supplies, and placement services issued by the City of Minneapolis for Event 4356. The solicitation requests pricing for concrete production and delivery across 34 primary line items with varying design strengths ranging from 3,500 to 5,600 PSI, covering applications including roadway hand-placed concrete, bridge concrete, flatwork, curb and gutter, and specialized mixes such as self-consolidating concrete, flowable fill, and lean mix backfill. Estimated quantities span from zero to 5,874 cubic yards depending on the item, with total project quantities exceeding 11,000 cubic yards when summed across all line items. The contract term is one year from the date of contract execution, with an option for the vendor to extend prices and terms for additional years beyond April 1, 2028, subject to mutual agreement and price escalation not to exceed 5 percent. The bid form includes provisions for additives and surcharges, concrete supplies, and concrete pumping services with hourly and cubic yard-based pricing options. Successful bidders must provide both a Performance Bond and Payment Bond in the full amount of the contract and demonstrate willingness to increase quantities up to 100 percent at bid prices during the contract period.
Pricing is submitted on a unit price basis with all bids to be firm for one year from contract execution. The form specifies that the low bid will be determined based on the summation of total costs for all items, and all quantities listed are good faith estimates. Delivery terms are F.O.B. Destination as specified, with 24-hour emergency contact information required from the successful bidder. The solicitation does not identify any specific set-asides, incumbent contractor information, or dedicated funding sources within the bid form itself. Normal days and hours of operation and any price escalation terms beyond the initial five percent cap are to be negotiated and filled in by the contractor and City upon award.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SUBP_Special_Provisions_2026.pdf | ||
| Bid_Specs_Final_Event_4356.pdf | ||
| PW-READY_MIX_CONCRETE.pdf | ||
| Call_for_Bids_revised_Event_4356.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
READY MIX, SUPPLIES & PLACEMENT
| UNIT PRICE FORM |
| PW- READY MIX CONCRETE |
| EVENT 4356 |
| Company Name: | |
| Date: | |
| Do Not Include Sales Tax in your bid prices. |
| Item | ||||||||
| Number | Bid Item (See MnDOT 2461) | 28-Day Design Strength (PSI) | Estimated Quantity | Unit | Unit Price | Total Cost | ||
| 1 | 3A41-Roadway hand placed | 3900 | 10 | CY | $ - 0 | $ - 0 | ||
| 2 | 3A41 - HE | 3900 / High Early | ||||||
| (Straight Cement) | 41 | CY | $ - 0 | $ - 0 | ||||
| 3 | 3G52 - General | 4500 | 10 | CY | $ - 0 | $ - 0 | ||
| 4 | 3G52F | 4500 | 83 | CY | $ - 0 | $ - 0 | ||
| 5 | 1G52-Footings | 4500 | 4 | CY | $ - 0 | $ - 0 | ||
| 6 | 1G52F | 4500 | 10 | CY | $ - 0 | $ - 0 | ||
| 7 | 3B52 - Bridge | 4000 | 22 | CY | $ - 0 | $ - 0 | ||
| 8 | 3S52 - Approach Panels | 4000 | 71 | CY | $ - 0 | $ - 0 | ||
| 9 | 3F32 - Slipform Curb and Gutter | 4500 | 500 | CY | $ - 0 | $ - 0 | ||
| 10 | 3F52 - Hand placed flatwork | 4500 | 1,064 | CY | $ - 0 | $ - 0 | ||
| 11 | 3F52F | 4500 | 5,874 | CY | $ - 0 | $ - 0 | ||
| 12 | 3F52CO | 4500 / Colored Concrete (Pigment paid for separately) | 404 | CY | $ - 0 | $ - 0 | ||
| 13 | 3F52EX (EXPOSED AGGREGATE SPECIAL) | 4500 / Exposed Agg | 19 | CY | $ - 0 | $ - 0 | ||
| 14 | 3HE52 - Flatwork | 4500 / High Early (Straight Cement) | 3,190 | CY | $ - 0 | $ - 0 | ||
| 15 | 3RHE52 - Repairs only | 4000 / High Early (Straight Cement) | 30 | CY | $ - 0 | $ - 0 | ||
| 16 | 3R52 -Full depth concrete repairs and base | 4000 | 0 | CY | $ - 0 | $ - 0 | ||
| 17 | 3U28 (Minimum Order is 3 CYs) | 5600 / Thin patch, bridge deck, ramps | 0 | CY | $ - 0 | $ - 0 | ||
| 18 | 3YHE52-repairs bridge decks | 4000 / High Early (Straight Cement) | 0 | CY | $ - 0 | $ - 0 | ||
| 19 | 1AGROUT MIX | 4000 | 0 | CY | $ - 0 | $ - 0 | ||
| 20 | 3AGROUT MIX | 4000 | 0 | CY | $ - 0 | $ - 0 | ||
| 21 | FLOWABLE FILL (CLSM-P) | 75-400 PSI / Flowable fill pump delivery MnDOT 2519 | 0 | CY | $ - 0 | $ - 0 | ||
| 22 | FLOWABLE FILL (CLSM-T) | 75-400 PSI / Flowable fill truck delivery MnDOT 2519 | 30 | CY | $ - 0 | $ - 0 | ||
| 23 | Neat Cement (PIPE FILL) | 4000. Pumpable through a 2" hose | 6 | CY | $ - 0 | $ - 0 | ||
| 24 | SELF CONSOLIDATING CONCRETE | 4500 / Pump Placement through 3" hose | 0 | CY | $ - 0 | $ - 0 | ||
| 25 | LEAN MIX BACKFILL | MnDOT 2520 | 0 | CY | $ - 0 | $ - 0 | ||
| 26 | Interior slab Mix | 4000/Pumpable through a 4" line/Waterproof | 0 | CY | $ - 0 | $ - 0 | ||
| 27 | Patching Mix | 3500 in 3 days and 4000 in 28 days/Pumpable through a 2" line /Waterproof/Corrosion inhibitor | 0 | CY | $ - 0 | $ - 0 | ||
| 28 | 3A42F | 3 | CY | $ - 0 | $ - 0 | |||
| 29 | 3U18 | 2 | CY | $ - 0 | $ - 0 | |||
| 30 | 3YHPC-M | 5600 / Thin patch, bridge deck, ramps | 28 | CY | $ - 0 | $ - 0 | ||
| 31 | GRP3 or 7 | 20 | CY | $ - 0 | $ - 0 | |||
| 32 | 3S82 | 4000 | 7 | CY | $ - 0 | $ - 0 | ||
| 33 | G1310 (1200 psi Sand) | 1200 | 8 | CY | $ - 0 | $ - 0 | ||
| 34 | XWALL | 4000 | 10 | CY | $ - 0 | $ - 0 | ||
| SUBTOTAL ITEMS 1-34 | $ - 0 | |||||||
| Company Name: | ||||||||
| Date: |
| Additional surcharges that will be applied when requested | Estimated Quantity | Unit | Notes | Unit Price | Total Cost | ||||
| 35 | A | Adding non-chloride accelerator 1%* | 807 | CY | 4 and 5 | $ - 0 | $ - 0 | ||
| 35 | B | Adding Retarder | 16.5 | CY | 4 | $ - 0 | $ - 0 | ||
| 35 | C | Adding water reducing agents | 3 | CY | 4 | $ - 0 | $ - 0 | ||
| 35 | D | Adding high range water reducer (plasticizers) | 0 | CY | 4 | $ - 0 | $ - 0 | ||
| 35 | E | Xypex/Penetron Waterproofing Admixture, or approved MnDOT equivalent | 0 | CY | 4 | $ - 0 | $ - 0 | ||
| 35 | F | Non-metalic Fibers (Bridge Applications) - MnDOT Approved | 48 | 5 # | $ - 0 | $ - 0 | |||
| 35 | G | Master X-Seed 55 Additive | 611 | CY | 4 | $ - 0 | $ - 0 | ||
| 35 | H | Pigment, cost per cubic yard for up to 5% pigment | 455 | CY | 6 | $ - 0 | $ - 0 | ||
| 35 | I | Heating & Winter service | 1,170 | CY | 4 | $ - 0 | $ - 0 | ||
| 35 | J | Charge for excess unloading time, in excess of 10 minutes | 0 | HOUR | $ - 0 | $ - 0 | |||
| 35 | K | Charge for minimum delivery (short load charges). Short load defined less than and including 3 yards. | 177 | EACH | $ - 0 | $ - 0 | |||
| 35 | L | Split Load Charge | 5 | EACH | $ - 0 | $ - 0 | |||
| 35 | M | MnDOT Plant Inspection | 0 | EACH | $ - 0 | $ - 0 | |||
| 35 | N | Overtime charge | 0 | HOUR | $ - 0 | $ - 0 | |||
| 35 | O | Saturday delivery: 8am - 5pm (seasonal availability) | 57 | CY | $ - 0 | $ - 0 | |||
| 35 | P | Premium cost for Sunday, Holidays, and Emergency delivery in addition to above CY unit prices. Holidays are Memorial Day, Labor Day, and 4th of July. (4 hour minimum) | 0 | EACH | $ - 0 | $ - 0 | |||
| 35 | Q | Disposal Fee for returned concrete. Paid for each truck returned with at least 1 CY of concrete left. | |||||||
| *Does Not Apply to Items With Minimum Quantities* | 0 | EA | 6 | $ - 0 | $ - 0 | ||||
| 35 | R | Calcium Chloride (CALC CHLOR) | 10 | CY | $ - 0 | $ - 0 | |||
| 35 | S | GRP 3/6/7 (added to color mixes) | 251 | CY | $ - 0 | $ - 0 | |||
| 35 | T | Excess/Extra Load Charge | 6 | EACH | $ - 0 | $ - 0 | |||
| SUBTOTAL | |||||||||
| 35A-35T | $ - 0 | ||||||||
| Company Name: | |||||||||
| Date: |
| Concrete supplies - price per unit shown | Estimated Quantity | Unit | Notes | Unit Price | Total Cost | ||
| 36 | SPEC MIX Mortar Underground Utility Mortar, 80lb bag | 4,500 | EACH | $ - 0 | $ - 0 | ||
| 37 | 5 gal Tenon Cure & Seal WB 1315 | 5 | EACH | $ - 0 | $ - 0 | ||
| 38 | 1 gal Tenon X-Tender | 50 | EACH | $ - 0 | $ - 0 | ||
| 39 | 1 gal Tenon Mighty Bond | 20 | EACH | $ - 0 | $ - 0 | ||
| 40 | 5 gal Tenon Dissipating Cure WB 1315 | 5 | EACH | $ - 0 | $ - 0 | ||
| 41 | 30# Carton #3405 Polymeric-MN, 75/pallet | 16 | PALLET | $ - 0 | $ - 0 | ||
| 42 | HDPE Radius Form (1/2 X 12 IN X 16 FT) | 27 | EACH | $ - 0 | $ - 0 | ||
| 43 | Rebar, Grade 60 (#3 X 20 FT) | 397 | BAR | $ - 0 | $ - 0 | ||
| 44 | 6 Inch Form Extender Expert Kit | 2 | KIT | $ - 0 | $ - 0 | ||
| 45 | Slab Bolster Upper 1-1/2 INCH | 113 | EACH | $ - 0 | $ - 0 | ||
| 46 | 6-inch Bar Ties, 5000/bag | 2 | BAG | $ - 0 | $ - 0 | ||
| 47 | Tenon Instant Anchor Cement, 50 lb pail | 2 | PAIL | $ - 0 | $ - 0 | ||
| SUBTOTAL | |||||||
| 36-47 | $ - 0 | ||||||
| Company Name: | |||||||
| Date: |
| Concrete pumping - applied when pumping is requested | Estimated Quantity | Unit | Purpose | Unit Price | Total Cost | |||
| 48 | A | LINE PUMP LOW VOLUME (<20CY per hour) | 30 | CY | Grout pump | $ - 0 | $ - 0 | |
| 48 | B | LINE PUMP LOW VOLUME (<20CY per hour) | 16 | HOUR | Grout pump | $ - 0 | $ - 0 | |
| 48 | C | LINE PUMP HIGH VOLUME (>20CY per hour) | 20 | CY | Grout pump for larger rehab projects | $ - 0 | $ - 0 | |
| 48 | D | LINE PUMP HIGH VOLUME (>20CY per hour) | 16 | HOUR | Grout pump for larger rehab projects | $ - 0 | $ - 0 | |
| 48 | E | SMALL BOOM PUMP (up to 17 Meter or 54 foot) | 50 | CY | Concrete pump truck | $ - 0 | $ - 0 | |
| 48 | F | SMALL BOOM PUMP (up to 17 Meter or 54 foot) | 40 | HOUR | Concrete pump truck | $ - 0 | $ - 0 | |
| 48 | G | MEDIUM BOOM PUMP (>17 Meter to 34 Meter or 111 ft) | 30 | CY | Concrete pump truck | $ - 0 | $ - 0 | |
| 48 | H | MEDIUM BOOM PUMP (>17 Meter to 34 Meter or 111 ft) | 16 | HOUR | Concrete pump truck | $ - 0 | $ - 0 | |
| 48 | I | CONVEYOR TRUCK (up to 50 feet) | 30 | CY | Cost for conveyor truck | $ - 0 | $ - 0 | |
| 48 | J | CONVEYOR TRUCK (up to 50 feet) | 16 | HOUR | Cost for conveyor truck | $ - 0 | $ - 0 | |
| 48 | K | ADDITIONAL HOSE (Paid after the initial 50' of hose) | 50 | Per 25 ft | Pumping into sewer tunnels | $ - 0 | $ - 0 | |
| 48 | L | ADDITIONAL HOSE (Paid after the initial 50' of hose) | 16 | HOUR | Pumping into sewer tunnels | $ - 0 | $ - 0 | |
| 48 | M | PRIMER CEMENT OR EQUAL | 20 | BAG | For pump | $ - 0 | $ - 0 | |
| 48 | N | WINTER SERVICE CHARGE (NOV 15 - APRIL 15) | 20 | POUR | For pump | $ - 0 | $ - 0 | |
| SUBTOTAL | ||||||||
| 48A-48N | $ - 0 | |||||||
| TOTAL OF ALL BID ITEMS: | $ - 0 |
| NOTES: |
| 1. All quantities are good faith estimates |
| 2. The Low Bid will be determined based on the summation of total cost for all items |
| 3. Prices firm for 1 year from the date of contract execution |
| 4. The admixture unit price is based on CY quantity |
| 5. Unit prices of accelerator admixtures will be prorated off the unit price of 1% |
| 6. This cost includes washout charges |
| Bidder offers to extend prices and terms for ______________ additional years after April 1, 2028 at the mutual agreement of both parties. |
| If extended, contract prices will be increased based on demonstratable price escalation not to exceed 5%. |
| Normal days and hours of operation are: ____________________________________________________________ |
| Vendor agrees to increase quantities up to 100% at bid prices for contract period: Yes ____ No ____ |
| Successful bidder will be required to enter into a formal contract and provide a Performance Bond and Payment Bond in the |
| full amount of the contract. F.O.B.: Destination as specified |
24 Hour Emergency Contact Name:
24 Hour Emergency Contact Number:
&"Arial,Bold"&12&A
BID FORM
My/Our bid to produce and deliver Ready Mixed Concrete, additives, supplies,and concrete placing equipment and operator as needed for various City of Minneapolis departments and boards for 1 year from the date of contract execution, all in accordance with your specifications, is as follows:
File details come from the government source that posted it. Updated .