Unit_List_Updated_10.20.2026.pdf

PDF 7 KB Posted

Attached to
Mechanical Site Prep: Jawbone Creek Item 2
Solicitation number
RFP-2025-0154
Issued by
Tuolumne County, Santa Monica City, California

About this file

This Unit List document, related to the Jawbone Creek mechanical site preparation project, identifies ten priority treatment units totaling 835.60 acres across the Stanislaus National Forest in Tuolumne County, California, managed under a Master Stewardship Agreement between Tuolumne County and the USDA Forest Service on behalf of the Yosemite Stanislaus Solutions Collaborative. The project involves mechanical site preparation including mastication, chipping, piling, and hand thinning to support forest fuels reduction and reforestation efforts. Four priority units (K010C, K011B, K011C, and L001) comprising approximately 130.78 acres must be completed by October 31, 2027, with spring 2028 planting scheduled thereafter. The remaining six units must be completed by October 31, 2028, for fall 2028 planting. Individual unit sizes range from 1.88 acres (K011B) to 188.13 acres (L001), with elevations ranging from 4,850 to 5,900 feet and varying slopes and aspects. Proposal responses are due November 13, 2026, with questions due by October 30, 2026, and contract award tentatively scheduled for November 20, 2026, with execution on December 7, 2026. The initial contract term is two years with options for two additional three-month extension terms contingent upon adequate funding, demonstrated success, continued need, and contractor willingness.

Contractors must provide unit costs for all ten treatment units and meet minimum qualifications including three years' experience in similar forest-based fuels reduction work, current California business registration, valid Department of Industrial Relations prevailing wage registration, and at least one English-fluent foreman. Equipment must include tracked carrier units with boom-mounted masticating heads capable of handling dead snags up to 20 inches DBH and down material up to 20 inches diameter. The evaluation criteria are qualifications and experience (30 points), service delivery and methodology (30 points), and reasonable cost (40 points), with award made to the best-value proposer. No set-asides or incumbent preferences are specified. Contractors must comply with comprehensive fire prevention, best management practices, spill prevention, equipment sanitation, and riparian protection requirements. The project site at approximately 6,000 feet elevation may experience seasonal snow cover inaccessibility, requiring contractors to plan schedules accordingly to meet all deadlines.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Priority Units Unit Acres Proposed Action Planned Planting MSP Completion Due Date Elevation Slope Aspect K010A 49.41 Thin MSP for NR 10/31/2028 5900 20 S

P K010C 113.59 Reforestation Spring 2028 10/31/2027 5800 25 SE K011A 14.03 Thin MSP for NR 10/31/2028 5800 20 S

P K011B 1.88 Reforestation Spring 2028 10/31/2027 5800 20 S P K011C 15.28 Reforestation Spring 2028 10/31/2027 5800 25 S

K018A 71.96 Reforestation MSP for NR 10/31/2028 5500 20 SW K018B 165.69 Thin MSP for NR 10/31/2028 5600 25 SE

P L001 188.13 Reforestation Spring 2028 10/31/2027 5500 30 SE L002 95.88 Reforestation MSP for NR 10/31/2028 5400 25 W L003 80.41 Reforestation MSP for NR 10/31/2028 5400 30 SW L005 39.34 Thin MSP for NR 10/31/2028 4850 35 W

Total Acres 835.60

File details come from the government source that posted it. Updated .