This is a Unit List document supporting a mechanical site preparation contract opportunity issued by the County of Tuolumne in California for fuels reduction and site preparation work on approximately 796.26 acres within the Cherry West Project area. The project is authorized under a Master Stewardship Agreement between the County and the USDA Forest Service, Stanislaus National Forest, on behalf of the Yosemite Stanislaus Solutions Collaborative. The work includes mastication, piling, and associated treatments to prepare sites for reforestation across ten priority and non-priority units (K010A, K010C, K011A, K011B, K011C, K018A, K018B, L001, L002, and L003). Four priority units (K010C, K011B, K011C, and L001) totaling approximately 210.5 acres must be completed by October 31, 2027, to allow for spring 2028 planting. All remaining units must be completed by October 31, 2028, for fall 2028 planting. The project is located at approximately 6,000 feet elevation with slopes ranging from 20 to 30 degrees and various aspects, and contractors must account for potential snow cover that may restrict winter access and must schedule work accordingly to meet completion deadlines.
The Unit List specifies individual unit characteristics including acreage, proposed actions (thinning or reforestation), planned planting seasons, and site conditions such as elevation, slope gradient, and aspect direction. No pricing information, set-asides, incumbents, funding sources, or contract term details are provided in this document. The file serves as a reference guide for contractors to understand the scope and geographic distribution of work across the project area and to plan operations based on specific unit requirements and environmental conditions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Priority Units Unit Acres Proposed Action Planned Planting MSP Completion Due Date Elevation Slope Aspect K010A 49.41 Thin MSP for NR 10/31/2028 5900 20 S
P K010C 113.59 Reforestation Spring 2028 10/31/2027 5800 25 SE K011A 14.03 Thin MSP for NR 10/31/2028 5800 20 S
P K011B 1.88 Reforestation Spring 2028 10/31/2027 5800 20 S P K011C 15.28 Reforestation Spring 2028 10/31/2027 5800 25 S
K018A 71.96 Reforestation MSP for NR 10/31/2028 5500 20 SW K018B 165.69 Thin MSP for NR 10/31/2028 5600 25 SE
P L001 188.13 Reforestation Spring 2028 10/31/2027 5500 30 SE L002 95.88 Reforestation MSP for NR 10/31/2028 5400 25 W L003 80.41 Reforestation MSP for NR 10/31/2028 5400 30 SW
Total Acres 796.26