Project 23-601. 20 N Roof MSI Building – Replace Air Cooled Chiller
Solicitation number
UCHC4-178521127
Issued by
Hartford County, Connecticut

About this file

This is an Invitation to Bid (ITB) issued by UConn Health Center for Project 23-601.20 N Roof MSI Building – Replace Air Cooled Chiller. The project involves replacing an air-cooled chiller on the MSI building roof at 120 Dowling Way in Farmington, CT, along with replacing chilled glycol pumps, associated VFDs, and the glycol feed system in the 1st Floor Mechanical Room. The bid period runs from October 25, 2023 to November 20, 2023, with vendor Q&A permitted from October 25 to November 3, 2023. A non-mandatory pre-bid walkthrough is scheduled for October 30, 2023 at 1:00 PM in the Main Lobby of the Musculoskeletal Institute. The scope includes structural modifications, control system integration, and power feed modifications, with the chiller having been pre-purchased by UConn Health Center.

The bid uses Free On Board Destination delivery terms with vendor-specified payment terms. The solicitation is open to all vendors and requires careful coordination of shutdowns and downtime with UHC staff. The project includes sequential replacement planning for both the chiller and system pumps to maintain operations. No line items are specified in the bid documentation. The bid package includes multiple documents including bid specifications, site plans, COVID updates, and addendums, though no estimated total value is provided in the documentation.

View the file

Other files

File Type Posted
UCHC4-178521127_Aug_30_24_solicitation_doc.pdf PDF
UCHC4-178521127_Dec_23_24_solicitation_doc.pdf PDF
UCHC4-178521127_Feb_24_25_solicitation_doc.pdf PDF
UCHC4-178521127_May_12_25_solicitation_doc.pdf PDF
UCHC4-178521127_Mar_17_25_solicitation_doc.pdf PDF
UCHC4-178521127_Nov_4_24_solicitation_doc.pdf PDF
UCHC4-178521127_Nov_11_24_solicitation_doc.pdf PDF
UCHC4-178521127_Apr_28_25_solicitation_doc.pdf PDF
UCHC4-178521127_Feb_10_25_solicitation_doc.pdf PDF
UCHC4-178521127_Sep_16_24_solicitation_doc.pdf PDF
UCHC4-178521127_Jan_20_25_solicitation_doc.pdf PDF
UCHC4-178521127_Dec_30_24_solicitation_doc.pdf PDF
UCHC4-178521127_Nov_18_24_solicitation_doc.pdf PDF
UCHC4-178521127_Aug_23_24_solicitation_doc.pdf PDF
solicitation_summary.pdf PDF
UCHC4-178521127_Oct_28_24_solicitation_doc.pdf PDF
UCHC4-178521127_Apr_7_25_solicitation_doc.pdf PDF
UCHC4-178521127_May_5_25_solicitation_doc.pdf PDF
UCHC4-178521127_Jan_6_25_solicitation_doc.pdf PDF
UCHC4-178521127_Jun_9_25_solicitation_doc.pdf PDF
UCHC4-178521127_Mar_31_25_solicitation_doc.pdf PDF
UCHC4-178521127_Oct_21_24_solicitation_doc.pdf PDF
UCHC4-178521127_Jun_30_25_solicitation_doc.pdf PDF
UCHC4-178521127_Feb_3_25_solicitation_doc.pdf PDF
UCHC4-178521127_Feb_17_25_solicitation_doc.pdf PDF
UCHC4-178521127_Jan_27_25_solicitation_doc.pdf PDF
UCHC4-178521127_Mar_24_25_solicitation_doc.pdf PDF
UCHC4-178521127_Aug_26_24_solicitation_doc.pdf PDF
UCHC4-178521127_Oct_14_24_solicitation_doc.pdf PDF
UCHC4-178521127_Sep_30_24_solicitation_doc.pdf PDF
UCHC4-178521127_Apr_14_25_solicitation_doc.pdf PDF
UCHC4-178521127_Sep_23_24_solicitation_doc.pdf PDF
UCHC4-178521127_Oct_7_24_solicitation_doc.pdf PDF
UCHC4-178521127_Dec_2_24_solicitation_doc.pdf PDF
UCHC4-178521127_May_19_25_solicitation_doc.pdf PDF
UCHC4-178521127_Jan_13_25_solicitation_doc.pdf PDF
UCHC4-178521127_Jun_16_25_solicitation_doc.pdf PDF
UCHC4-178521127_Sep_9_24_solicitation_doc.pdf PDF
UCHC4-178521127_Nov_25_24_solicitation_doc.pdf PDF
Show all 39

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation Number: UCHC4-178521127

Project 23-601.20 N Roof MSI Building – Replace Air Cooled

Chiller

Invitation to Bid (ITB)

UConn Health Center

October 25, 2023 - November 20, 2023

Page:2

General Header Information

UCHC4-178521127

No. UCHC4-178521127 Title: Project 23-601.20 N Roof MSI Building – Replace Air Cooled Chiller Start Date: October 25, 2023 at 8:00:00 AM EDT End Date: November 20, 2023 at 2:00:00 PM EST Vendor Q&A Start Date: October 25, 2023 at 8:15:00 AM EDT Vendor Q&A End Date: November 03, 2023 at 2:00:00 PM EDT Estimated Total Value:

Who can respond to this bid? : All Vendors Description: This project is located at the UConn Musculoskeletal Institute, 120

Dowling Way, Farmington, CT and involves the removal and installation of an air cooled chiller on the MSI building roof (Building N), replacement of the chilled glycol pumps in the ceiling below and associated VFDs, and replacement of the glycol feed system in the 1st Floor Mechanical Room. Modifications to the controls are anticipated to integrate the replaced equipment as are modifications to the power feeds to serve the replaced equipment. Structural modifications to accommodate the new chiller are needed. A plan to replace the chiller over a set schedule of days should be anticipated. Similarly, a plan to replace the system pumps one at a time to maintain one active should be anticipated. All shutdowns and downtime needs to be carefully coordinated with UHC staff. The chiller has been pre-purchased by UHC. The contractor shall assume delivery and installation of the chiller.

Delivery Terms: Free On Board Destination Payment Terms: Vendor Specified Contact Information: UConn Health Center

Jonathan Wenger 16 Munson Road Farmington CT, 06030 United States Tel: 8606798174 jwenger@uchc.edu

Contact Details: If you have any questions, please contact:

Jonathan Wenger 16 Munson Road Farmington CT, 06030 United States Tel: 8606798174 jwenger@uchc.edu

Selected Categories:

Page:3

Header Custom Fields:

This bid has no questions defined.

UCHC4-178521127

Prebid Walkthrough Opportunity

Non Mandatory Prebid Walkthrough A Prebid walkthrough will be held on Monday October 30th at 1:00 PM. Contractors are to meet in the Main Lobby of Musculoskeletal Institute (Building N) – refer to the campus map. Parking in available in Garage 1. Please adhere to all parking requirements as directed.

Attendance is strongly recommended but not required to submit a response to this bid.

Page:4

Documents:

23070-MES Bid Issue.pdf

UCH SITE 2019 pdf.pdf

UCHC4 178521127 ITB 00 03 W9 05 09 Covid Update.pdf

Volume 1.pdf

Volume 2.pdf

UCHC4 178521127 ITB 10 Addendum.pdf

Page:5

Item Specifications Solicitation has been designated as having no line items.