This is a Performance Work Statement (PWS) for crane services with operator support at Tobyhanna Army Depot (TYAD) in Pennsylvania. The contractor must provide a crane and licensed operator to install a radome cap for the Large Fixed Antenna, with the work to be performed during two non-consecutive days between April 1-May 1, 2025.
The specific requirements include hoisting, swinging, and lowering a 9,000-pound radome cap that is 29 feet tall by 68 feet wide. The crane must operate at a working radius of 80 feet and lift the cap 50 feet from grade to clear an existing Satellite Communications antenna. The contractor must provide lift plans to TYAD, maintain proper security clearances, and comply with safety standards. Work hours are 0700-1700 Monday through Friday, with an estimated 6 hours of crane operator time needed. The contract will be awarded as a firm-fixed price service contract, and the contractor must report labor hours through the eCMRA system. The contractor must provide all equipment, with no government-furnished property included in the contract.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PERFORMANCE WORK STATEMENT (PWS)
Performance Work Statement
For
Crane Services for the
Large Fixed Antenna Radome at
Tobyhanna Army Depot, PA
01 Apr 2025
General Information
1. Introduction: This is a non-personal service contract to provide a crane with operator. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the
Government.
1.1 Background: The contractor shall provide a crane and operator described herein this Performance Work
Statement (PWS). In addition, the contractor shall also provide logistical support for that crane during the entire duration of this project. Tobyhanna Army Depot (TYAD) has been task with the installation of a radome for the
Large Fixed Antenna located on Tobyhanna army Depot. All work will be performed at and all deliveries will be made to:
Tobyhanna Army Depot
11 Hap Arnold Blvd.
Building 72
Tobyhanna, PA 18466
1.2 Responsibilities: The Contractor shall assume total responsibility for all requirements stated herein on the commencement date of the performance period. The Contractor shall perform as specified in this Contract and under the direction of the Contracting Officer (KO). See also Paragraph 1.1 Introduction.
1.2.1 Work Responsibility: The Contractor shall perform all work and assume responsibility for planning, programming, administering, managing, and executing all functions necessary to provide the services specified in this PWS. The Contractor shall conduct work in accordance with this PWS and all applicable United States (U.S.), and local laws, regulations, standards, provisions, and directives to include applicable publications in Section C-6.
The Contractor shall ensure that all work meets the level of service, performance standards, or tolerances specified in the PWS or in applicable referenced documents. Some services under this Contract may be performed at designated facilities, or portions of installations, by in-house Government personnel or by other contractors.
1.2.2 Administrative Responsibility: The Contractor shall perform all related administrative actions required to provide services or perform work such as material requisitioning, quality control (QC), financial control, meetings, and correspondence. The Contractor shall also maintain accurate and complete records, files, and libraries of documents to include all U.S. and local regulations, standards, provisions, codes, laws, technical manuals, and manufacturers’ instructions and recommendations that are necessary and related to the functions being performed.
The Contractor shall compile historical data, prepare required reports, and submit information as specified by the
Deliverable List presented in this PWS.
1.3 Objective: Install a radome for the Large Fixed Antenna at Tobyhanna Army Depot. The contractor shall provide crane support for the mission.
1.4 Functional Areas: Not Applicable.
DRAFT
1.5 Period of Performance:
The period of performance for the crane will be 2 non-consecutive days between:
1 Apr 2025 – 1 May 2025
The crane will be required to hoist, swing and lower the radome cap for attachment to the radome base at a working radius of 80 feet. The weight of the cap is 9,000 pounds and is 29 feet tall by 68 foot wide. The crane must hoist the radome cap 50 feet from grade to clear the already installed Satellite Communications antenna. Scheduling of the crane will be done between the crane contractor and the TYAD POC.
1.6 Management and Administration:
1.6.1 Phase in/Phase Out Period: Not Applicable
1.6.2 Contractor Management: The Contractor shall perform continual management of the functional areas contained in this PWS and shall provide a Project Manager readily available during normal duty hours. The Project
Manager shall conduct overall management coordination and shall be the central point of contact (POC) with the
Government for performance of all work under the PWS. At the Post Award conference, the Contractor shall submit to the TYAD site lead, in writing, the name, title, office, home and mobile telephone number of the Project Manager
A Contractor employee shall be designated to act for the Project Manager when work is being performed outside of duty hours, or during the Project Manager’s absence. Both the Project Manager and the Contractor employee filling in for the Project Manager, shall have full authority to act for the contractor on all Contract matters relating to daily operation of this Contract.
1.6.3 Contractor Responsiveness: The Project Manager or designated alternate shall be available for telephone communication or site attendance, with the site lead, as required by the site lead, 24 hours a day, 7 days a week during the contract period of performance. The Project Manager and any individuals designated to act in that capacity shall have full authority to contractually bind the Contractor for prompt action on matters pertaining to execution of the PWS.
1.6.4 Meetings, Conferences, and Briefings: The Contractor shall attend, participate in, and furnish input to scheduled and unscheduled meetings, conferences, and briefings that relate to the functions and services herein as required by the Government to provide effective communication and impart necessary information. The Project
Manager or designated representative shall attend meetings as requested by the Government. Meeting attendees shall at times include Contractor managerial, supervisory, and other personnel knowledgeable of the subject matter.
Meetings may start or end outside of regular duty hours.
1.6.5 Hours of Operation: The contractor is responsible for conducting business, between the hours of 0700-1700
Monday thru Friday including Federal holidays, but not when the Government facility is closed due to local or national emergencies, or similar Government directed facility closings. For other than firm fixed price contracts, the contractor will not be reimbursed when the government facility is closed for the above reasons. The Contractor must at all times maintain an adequate workforce for the uninterrupted performance of all tasks defined within this
PWS when the Government facility is not closed for the above reasons. When hiring personnel, the Contractor shall keep in mind that the stability and continuity of the workforce are essential.
1.6.6 Recognized Holidays: The contractor shall work any of the holidays if it is determined by the TYAD site lead.
New Year’s Day Labor Day
Martin Luther King Jr.’s Birthday Columbus Day
President’s Day Veteran’s Day
Memorial Day Juneteenth
Thanksgiving Day Independence Day
Christmas Day
1.6.8 Quality Control: Not Applicable:
1.6.9 Quality Assurance: Inspection and acceptance with be IAW with FAR Clause 52.212-4(a).
1.6.10 Place of Performance: Tobyhanna Army Depot, 11 Hap Arnold Blvd, Building 72, Tobyhanna, PA 18466
1.6.11 Type of Contract: The government will award a firm fixed priced service contract.
1.6.12 Security Requirements: Contractor personnel performing work under this contract must have a completed background check prior to start of any work to be performed and must maintain the level of security required for the life of the contract.
1.6.12a: See the separately attached pdf titled “SECOPS Requirements Insert for Contracts 20240715” for the current TYAD Security Requirements. See Part 6, “Applicable Publications”, Section 6.1 .
1.6.13 Key Control: Not Applicable:
1.6.14 Special Qualifications: Contractor is to provide certified/licensed crane operator for the duration of the crane tasks.
1.6.15 Contracting Officer Representative (COR): Inspection and acceptance will be IAW with FAR Clause
52.212-4(a).
1.6.16 Key Personnel: The follow personnel are considered key personnel by the government: The contractor shall provide a contract manager who shall be responsible for the performance of the work. The name of this person and an alternate who shall act for the contractor when the manager is absent shall be designated in writing to the contracting officer. The contract manager or alternate shall have full authority to act for the contractor on all contract matters relating to daily operation of this contract. The contract manager or alternate shall be available between 8:00 a.m. to 4:30p.m, Monday thru Friday except Federal holidays or when the government facility is closed for administrative reasons.
1.6.17 Identification of Contractor Employees: All contract personnel attending meetings, answering
Government telephones, and working in other situations where their contractor status is not obvious to third parties are required to identify themselves as such to avoid creating an impression in the minds of members of the public that they are Government officials. They must also ensure that all documents or reports produced by contractors are suitably marked as contractor products or that contractor participation is appropriately disclosed. Contractor personnel will be required to obtain and wear badges in the performance of this service.
1.6.18 Contractor Travel Not Applicable
1.6.19 Other Direct Costs: Not Applicable
1.6.20 Data Rights: The Government has unlimited rights to all documents/material produced under this contract.
All documents and materials, to include the source codes of any software, produced under this contract shall be
Government owned and are the property of the Government with all rights and privileges of ownership/copyright belonging exclusively to the Government. These documents and materials may not be used or sold by the contractor without written permission from the Contracting Officer. All materials supplied to the Government shall be the sole property of the Government and may not be used for any other purpose. This right does not abrogate any other
Government rights.
1.6.21 Organizational Conflict of Interest: Contractor and subcontractor personnel performing work under this contract may receive, have access to or participate in the development of proprietary or source selection information
(e.g., cost or pricing information, budget information or analyses, specifications or work statements, etc.) or perform evaluation services which may create a current or subsequent Organizational Conflict of Interests (OCI) as defined in FAR Subpart 9.5. The Contractor shall notify the Contracting Officer immediately whenever it becomes aware that such access or participation may result in any actual or potential OCI and shall promptly submit a plan to the
Contracting Officer to avoid or mitigate any such OCI. The Contractor’s mitigation plan will be determined to be acceptable solely at the discretion of the Contracting Officer and in the event the Contracting Officer unilaterally determines that any such OCI cannot be satisfactorily avoided or mitigated, the Contracting Officer may affect other remedies as he or she deems necessary, including prohibiting the Contractor from participation in subsequent contracted requirements which may be affected by the OCI.
1.6.22 Safety: See the separately attached pdf titled “SERVICE OR EQUIPMENT INSTALLATION Under
$250K CONTRACTOR SAFETY STANDARD JUNE 2024” for the current TYAD Safety Requirements. See
Part 6, “Applicable Publications”, Section 6.2.
1.6.23 Safety Plan and Program: Contractor shall submit a lift plan and safety plan to Tobyhanna Army Depot
POC.
1.6.24 Environmental Compliance: Contractor will comply with all Federal and Local environmental compliance requirements.
1.6.25 Environmental Requirements: See the separately attached pdf titled “NEPA Specs” for the current TYAD
Environmental Requirements. See Part 6, “Applicable Publications”, Section 6.3
PART 2
DEFINITIONS & ACRONYMS
2. Definitions And Acronyms:
2.1 Definitions:
Contractor - A supplier or vendor awarded a contract to provide specific supplies or service to the government.
The term used in this contract refers to the prime.
Contracting Officer - A person with authority to enter into, administer, and or terminate contracts, and make related determinations and findings on behalf of the government. Note: The only individual who can legally bind the government.
Defective Service - A service output that does not meet the standard of performance associated with the
Performance Work Statement.
Deliverable - Anything that can be physically delivered, but may include non-manufactured things such as meeting minutes or reports.
Key Personnel - Contractor personnel that are evaluated in a source selection process and that may be required to be used in the performance of a contract by the Key Personnel listed in the PWS. When key personnel are used as an evaluation factor in best value procurement, an offer can be rejected if it does not have a firm commitment from the persons that are listed in the proposal.
Physical Security - Actions that prevent the loss or damage of Government property.
Quality Assurance - The government procedures to verify that services being performed by the Contractor are performed according to acceptable standards.
Quality Assurance Surveillance Plan (QASP) - An organized written document specifying the surveillance methodology to be used for surveillance of contractor performance.
Quality Control - All necessary measures taken by the Contractor to assure that the quality of an end product or service shall meet contract requirements.
Subcontractor - One that enters into a contract with a prime contractor. The Government does not have privity of contract with the subcontractor.
Work Day - The number of hours per day the Contractor provides services in accordance with the contract.
Work Week - Monday through Friday, unless specified otherwise.
2.2 Acronyms:
ACOR Alternate Contracting Officer's Representative
AFARS Army Federal Acquisition Regulation Supplement
AR Army Regulation
CCE Contracting Center of Excellence
CFR Code of Federal Regulations
CONUS Continental United States (excludes Alaska and Hawaii)
COR Contracting Officer Representative
COTR Contracting Officer's Technical Representative
COTS Commercial-Off-the-Shelf
DA Department of the Army
DD250 Department of Defense Form 250 (Receiving Report)
DD254 Department of Defense Contract Security Requirement List
DFARS Defense Federal Acquisition Regulation Supplement
DMDC Defense Manpower Data Center
DOD Department of Defense
FAR Federal Acquisition Regulation
HIPAA Health Insurance Portability and Accountability Act of 1996
KO Contracting Officer
OCI Organizational Conflict of Interest
OCONUS Outside Continental United States (includes Alaska and Hawaii)
ODC Other Direct Costs
PIPO Phase In/Phase Out
POC Point of Contact
PRS Performance Requirements Summary
PWS Performance Work Statement
QA Quality Assurance
QAP Quality Assurance Program
QASP Quality Assurance Surveillance Plan
QC Quality Control
QCP Quality Control Program
TE Technical Exhibit
PART 3
GOVERNMENT FURNISHED PROPERTY, EQUIPMENT, AND SERVICES
3. Government Furnished Items and Services - The Government will not provide any equipment to the contractor for this contract.
3.1 Services: Not Applicable:
3.2 Facilities: Not Applicable:
3.3 Utilities: Not Applicable
3.4 Equipment: Not Applicable:
3.5 Materials: Not Applicable:
PART 4
CONTRACTOR FURNISHED ITEMS AND SERVICES
4. Contractor Furnished Items And Responsibilities:
4.1 General: The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Part 5 of this PWS.
4.2 Secret Facility Clearance: Not Applicable:
4.3 Materials: Not Applicable:
4.4 Equipment: The Contractor shall provide a crane for the mission with a licensed operator.
PART 5
SPECIFIC TASKS
5.1 Basic Services: The contractor shall provide services for:
1. The contractor will provide the recommended crane to hoist, swing and lower the radome cap for attachment to the radome base at a working radius of 80 feet. The weight of the cap is 9,000 pounds and is
29 feet tall by 68 foot wide. The crane must hoist the radome cap 50 feet from grade to clear the already installed Satellite Communications antenna.
2. Contractor will provide lift plans to the TYAD Team Lead
3. Contractor shall provide certified/licensed crane operator for the duration of the tasks.
5.2 Recurring Services: Not Applicable.
5.3 On-Demand Services: The contractor shall provide services for fuel service for crane.
5.4 Functional Areas: Not Applicable.
5.5 Task Heading: Not Applicable.
5.6 Enterprise-Wide Contractor Manpower Reporting Application (eCMRA): The contractor shall ensure
ALL contractor labor hours (including subcontractor labor hours) required for the performance of services provided under this contract are reported via a secure data collection site.
The contractor (and all subcontractors providing direct labor under this contract) shall report complete and accurate data for the labor executed during the period of performance during each Government fiscal year (FY), which runs from October 1 to September 30. The Contractor shall input the data into the appropriate eCMRA reporting tool, which can be accessed via a secure web site at http://www.ecmra.mil/. There are four separate eCMRA tools: Army, Air Force, Navy and All Other Defense Components. The appropriate eCMRA reporting tool to use is determined by the requiring activity being supported (e.g., if DISA awards a contract for an Air Force requiring activity, the contractor shall load the required reporting data in the “Department of Air Force CMRA” tool). While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. The contractor shall completely fill in all required data fields. The contractor shall enter initial data into the appropriate eCMRA tool to establish the basic contract record no later than 15 working days after receipt of contract award or http://www.ecmra.mil/ contract modification incorporating this clause. The contractor shall notify the COR when the basic contract record has been established in the appropriate eCMRA tool.
eCMRA User Manuals and Frequently Asked Questions (FAQs) are available at http://www.ecmra.mil/
Contractors may direct technical questions to the eCMRA help desk at dodcmra@pentagon.af.mil
PART 6
APPLICABLE PUBLICATIONS
6. Applicable Publications (Current Editions):
6.1: “SECOPS Requirements Insert for Contracts 20240715” (separate from this document)
6.2: “SERVICE OR EQUIPMENT INSTALLATION Under $250K CONTRACTOR SAFETY
STANDARD JUNE 2024” (separate from this document)
6.3: “NEPA Specs” (separate from this document)
PART 7
ATTACHMENT/TECHNICAL EXHIBIT LISTING
7. Attachment/Technical Exhibit List:
7.1 Technical Exhibit 1- Physical Characteristics of items to be lifted
7.2 Technical Exhibit 2- Deliverable Schedule
7.3 Estimated Workload Data
7.1 Attachment 1/Technical Exhibit 1 – Physical characteristics of items to be lifted
TECHNICAL EXHIBIT 1
Lift Item name weight/ lbs Notes
1 Radome Cap 9,000 68 food diameter and 29 feet tall http://www.ecmra.mil/ mailto:dodcmra@pentagon.af.mil
7.2 Attachment 2/Technical Exhibit 2 – Deliverables Schedule
TECHNICAL EXHIBIT 2
DELIVERABLES SCHEDULE
Deliverable Frequency # of Copies Medium/Format Submit To
Lift Plan Once
PDF file
Tobyhanna Army
Depot site lead
7.3 Attachment 3/Technical Exhibit 3 –
TECHNICAL EXHIBIT 3
ESTIMATED WORKLOAD DATA
ITEM
NAME
ESTIMATED QUANTITY
1 Crane Operator 1 6 hrs