Two Way 2018 Tech Spec - Barton.pdf

PDF 122 KB Posted

Attached to
FC0002091 B – Barton Radio Equipment – Radio MC Reissue
Solicitation number
BPM059002
Issued by
Maryland

About this file

This is a technical specification document for the Maryland FIRST (Flexible, Integrated, Real-time, Statewide, Trusted) radio system expansion at the Barton site, involving the State of Maryland. The specification details hardware and licensing requirements for a two-way radio infrastructure upgrade at the Barton All-Gar Simulcast Cell location. The project encompasses core expansion licenses including ASTRO 25 FDMA and P25 Phase 2 TDMA trunking, six D-Series Multicarrier Radios with simulcast and TDMA capabilities, RF distribution systems with diversity receivers, network equipment including two SRX345 routers, a Nokia SAR-8 MPLS system, alarm control units, and comprehensive power distribution systems. The specification includes detailed frequency control assignments across six channels (with channels 1 and 2 designated for both transmit and receive operations at 769.21875/799.21875 MHz and 769.96875/799.96875 MHz respectively) and a full range of spare field replaceable units covering critical components such as multicarrier power amplifiers, transceivers, preselectors, and power supply rectifiers.

The specification requires a two-year warranty following installation and mandates that certain items, including the Transceiver N+1 upgrade and Advanced Power Monitor components, be provided as separate line items for pricing purposes. The equipment configuration includes redundant systems for critical functions, such as dual DSC8500 site processors with integrated GNSS timing and Rubidium modules, dual GPS antennas with surge protection, and dual inverter modules for power continuity. The power infrastructure specifies a 48-volt DC system with multiple rectifiers, battery strings rated at 125 Ah, and inverter modules rated for 1500VA to 3KVA capacity. The document reflects a comprehensive, high-reliability infrastructure build-out designed to support statewide emergency communications and public safety operations across Maryland.

View the file

Other files

File Type Posted
REISSUE FC0002091 B - RC PORFP Barton.pdf PDF
Attachment-J.-Mercury-Affidavit.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MD FIRST

Technical Specification - Hardware and Licensing ONLY

Site: Barton, All-Gar Simulcast Cell

● Core expansion licenses:

- One (1) ASTRO 25 FDMA

- One (1) P25 Phase 2 TDMA Trunking Op Site

- One (1) Phase 2 Dynamic TG Assignment site

- One (1) UNC additional device license (qty 10)

● One (1) D-Series Multicarrier Radio Sub-Site (50 Watt Variant)

- Six (6) Simulcast Trunking licenses

- Six (6) TDMA licenses

- Three (3) Dynamic Channel Assignment licenses

- Six (6) MCPA (Multi Carrier Power Amplifier)

- Two (2) year warranty after installation

- PROVIDE AS A SEPARATE LINE ITEM: Transciever N+1 UPGRADE PRICE

● RFDS Transmitter System:

- One (1) N way 4-6 Splitter Combiner

- One (1) Tx Filter with APM

- PROVIDE AS A SEPARATE LINE ITEM: One (1) Advanced Power

Monitor (site vantage)

● RFDS Receiver System with diversity:

- Two (2) Site Receiver Multi Couplers

- Two (2) Rx Preselectors

- One (1) N way 4-6 Splitter

- One (1) TxRx Dual Branch Diversity TTA System

▪ One (1) 442 Control unit/ Multicoupler unit

▪ One (1) Tower Top Amplifiers (TTA) with two antennas ports

● Two (2) DSC8500 Site Processors

- Integrated GNSS Timing reference with Rubidium module

- Two (2) GPS antennas, cables, surge suppressors and connectors

● Network:

- Two (2) Routers SRX345

● Alarm System:

- One (1) Netguardian G5 Control Unit.

- One (1) Netguardian Expansion DX G5 Unit.

- Four (4) Punch Block

● Two (2) 7.5 (Seven and Half) ft Racks

- Include the ground / cable management cage, bus bar and #2 (brown) lug

● One (1) Nokia SAR-8 – MPLS System

- Redundant Control Switch and power supply modules

- SFP Modules with fiber and Ethernet interfaces for the RF Site

- Licenses

● Power System - DC Power Plant:

- One (1) Trilogy Power System with Smartpack S 48V, 300A/500A Power Shelf

- Primary distribution: 20 Circuit Breaker Positions; Top bus bar is secondary load distribution thru LVLD; Bottom bus bar is primary load distribution

- One (1) Power Distributor Panel 19” N250120-N/L9 with 20 fuse circuits

- Five (5) Rectifiers FLATPACK2 2000W 48V

- Four (4) Batteries Enersys PowerSafe V Battery 48V Battery String 125 Ah

- Two (2) Inverter Modules 1500VA; AC Input 12A/120V 1P; DC

Input 40-60VDC 34A Nominal

- One (1) Media Inverter 2I 1Ph W/NEMA Socket 48VDC/120VAC; 3KVA Max; Min 1.5KVA; 2RU

- One (1) Rack 19" Wide, 7' High, Non-Seismic; include ground / cable management cage.

- Two (2) 50A breakers to the distribution panel. Two for each distribution panel

- One (1) 70A breaker to the inverter

- All required DC breakers for Eltek Chassis to feed individual equipment.

Barton

Frequency Control Ch BSI Transmit Receive 1 Yes WPTZ805 769.21875 799.21875 2 Yes 769.96875 799.96875 3 No 770.94375 800.94375 4 No 773.29375 803.29375 5 No 773.53125 803.53125 6 No 774.05625 804.05625

● Spares:

- One (1) DLN8062A FRU: DBR MCPA 700 MHZ

- One (1) DLN8065A FRU: XCVR 7/800 MHZ

- One (1) DLN8032A FRU: DBR MCPA FAN KIT

- One (1) DLN8074A FRU: Preselector 7/800 MHZ

- One (1) DLN1447A FRE: DSC 8500 with Rubidium

- One (1) DLN8073A FRU: 4-6 WAY Splitter 700 MHZ

- Two (2) FRU: FLATPACK2 2000W 48V

- One (1) FRU: Inverter Modules 1500VA; AC

Input 12A/120V 1P;

DC Input 40-60VDC 34A Nominal

File details come from the government source that posted it. Updated .