Two_Way_2018_Tech_Spec_-_Barton.pdf
PDF 122 KB Posted
- Attached to
- Canceled FC0002091 Barton RF Site - MD FiRST
- Solicitation number
- BPM056293
- Issued by
- Maryland
About this file
This is a technical specification document for MD FiRST (Maryland's FirstNet-related communications infrastructure) detailing hardware and licensing requirements for the Barton RF Site, an all-garbled simulcast cell operated by the State of Maryland. The specification outlines a comprehensive radio communications system including core expansion licenses (ASTRO 25 FDMA, P25 Phase 2 TDMA, Dynamic TG Assignment, and UNC device licenses), D-Series Multicarrier Radio equipment with six simulcast trunking licenses and TDMA licenses, and three dynamic channel assignment licenses. The system includes dual D-Series multichannel power amplifiers with two-year post-installation warranty, an RFDS transmitter system with splitter combiner and transmission filter, an RFDS receiver system with dual diversity featuring two site receiver multicouplers and preselectors, two DSC8500 site processors with integrated GNSS timing and Rubidium modules, network infrastructure including two SRX345 routers, alarm systems with Netguardian controls, two seven-and-a-half-foot equipment racks, and extensive power distribution components. The specification identifies six operational frequency channels with specific transmit and receive frequencies, designating channels 1 and 2 as active with frequencies ranging from 769.21875 MHz to 799.96875 MHz.
The document specifies a complete DC power plant solution utilizing a Trilogy Power System with 48V/300A-500A capacity, five 2000W rectifiers, four 48V 125Ah battery strings, dual 1500VA inverter modules, and comprehensive circuit breaker distribution with 20 fuse circuit positions. Spare parts requirements include multiple field replaceable units (FRUs) covering critical components such as MCPA modules, transceivers, site processors with Rubidium timing, splitter combiners, and power supply modules to ensure system redundancy and operational continuity. The specification does not indicate pricing terms, set-asides, or funding sources, focusing exclusively on hardware and licensing components required for system installation and operation at the Barton site.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FC0002091_RC_PORFP.pdf | ||
| Attachment-J.-Mercury-Affidavit.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MD FIRST
Technical Specification - Hardware and Licensing ONLY
Site: Barton, All-Gar Simulcast Cell
● Core expansion licenses:
- One (1) ASTRO 25 FDMA
- One (1) P25 Phase 2 TDMA Trunking Op Site
- One (1) Phase 2 Dynamic TG Assignment site
- One (1) UNC additional device license (qty 10)
● One (1) D-Series Multicarrier Radio Sub-Site (50 Watt Variant)
- Six (6) Simulcast Trunking licenses
- Six (6) TDMA licenses
- Three (3) Dynamic Channel Assignment licenses
- Six (6) MCPA (Multi Carrier Power Amplifier)
- Two (2) year warranty after installation
- PROVIDE AS A SEPARATE LINE ITEM: Transciever N+1 UPGRADE PRICE
● RFDS Transmitter System:
- One (1) N way 4-6 Splitter Combiner
- One (1) Tx Filter with APM
- PROVIDE AS A SEPARATE LINE ITEM: One (1) Advanced Power
Monitor (site vantage)
● RFDS Receiver System with diversity:
- Two (2) Site Receiver Multi Couplers
- Two (2) Rx Preselectors
- One (1) N way 4-6 Splitter
- One (1) TxRx Dual Branch Diversity TTA System
▪ One (1) 442 Control unit/ Multicoupler unit
▪ One (1) Tower Top Amplifiers (TTA) with two antennas ports
● Two (2) DSC8500 Site Processors
- Integrated GNSS Timing reference with Rubidium module
- Two (2) GPS antennas, cables, surge suppressors and connectors
● Network:
- Two (2) Routers SRX345
● Alarm System:
- One (1) Netguardian G5 Control Unit.
- One (1) Netguardian Expansion DX G5 Unit.
- Four (4) Punch Block
● Two (2) 7.5 (Seven and Half) ft Racks
- Include the ground / cable management cage, bus bar and #2 (brown) lug
● One (1) Nokia SAR-8 – MPLS System
- Redundant Control Switch and power supply modules
- SFP Modules with fiber and Ethernet interfaces for the RF Site
- Licenses
● Power System - DC Power Plant:
- One (1) Trilogy Power System with Smartpack S 48V, 300A/500A Power Shelf
- Primary distribution: 20 Circuit Breaker Positions; Top bus bar is secondary load distribution thru LVLD; Bottom bus bar is primary load distribution
- One (1) Power Distributor Panel 19” N250120-N/L9 with 20 fuse circuits
- Five (5) Rectifiers FLATPACK2 2000W 48V
- Four (4) Batteries Enersys PowerSafe V Battery 48V Battery String 125 Ah
- Two (2) Inverter Modules 1500VA; AC Input 12A/120V 1P; DC
Input 40-60VDC 34A Nominal
- One (1) Media Inverter 2I 1Ph W/NEMA Socket 48VDC/120VAC; 3KVA Max; Min 1.5KVA; 2RU
- One (1) Rack 19" Wide, 7' High, Non-Seismic; include ground / cable management cage.
- Two (2) 50A breakers to the distribution panel. Two for each distribution panel
- One (1) 70A breaker to the inverter
- All required DC breakers for Eltek Chassis to feed individual equipment.
Barton
Frequency Control Ch BSI Transmit Receive 1 Yes WPTZ805 769.21875 799.21875 2 Yes 769.96875 799.96875 3 No 770.94375 800.94375 4 No 773.29375 803.29375 5 No 773.53125 803.53125 6 No 774.05625 804.05625
● Spares:
- One (1) DLN8062A FRU: DBR MCPA 700 MHZ
- One (1) DLN8065A FRU: XCVR 7/800 MHZ
- One (1) DLN8032A FRU: DBR MCPA FAN KIT
- One (1) DLN8074A FRU: Preselector 7/800 MHZ
- One (1) DLN1447A FRE: DSC 8500 with Rubidium
- One (1) DLN8073A FRU: 4-6 WAY Splitter 700 MHZ
- Two (2) FRU: FLATPACK2 2000W 48V
- One (1) FRU: Inverter Modules 1500VA; AC
Input 12A/120V 1P;
DC Input 40-60VDC 34A Nominal