Two-Step IFB 37843 BC WRD Add 2.pdf
PDF 107 KB Posted
- Attached to
- IFB-37843 Two-Step BC WRD Pipeline
- Solicitation number
- ITB-02044
- Issued by
- Clay County, Florida
About this file
This document is an Addendum for a Two-Step Invitation for Bid (IFB) from the St. Johns River Water Management District (the District) for the Black Creek Water Resource Development Pipeline Construction project. The project involves the construction of approximately 17+ miles of 30" ductile iron raw water transmission main, including excavation, backfill, dewatering, horizontal directional drilling, jacking and boring, and other piping appurtenances. The estimated construction cost range for this project is $60,000,000 - $74,000,000. The initial qualification submittals are due by 2:00 p.m. on July 19, 2022, and the competitive sealed bids are due by 2:00 p.m. on August 12, 2022. The addendum provides clarifications on the minimum qualifications, including requirements for the respondent to have completed at least two similar projects with at least 8 miles of 16" or larger pipe and a project value of at least $10,000,000 each, as well as specific requirements for jack and bore and horizontal directional drill crossings. It also provides a revised subcontractor form and revised similar projects forms.
The addendum indicates that the District will consider joint ventures, as long as the joint venture is registered with the Florida Secretary of State prior to the bid submittal date. The District reserves the right to reject any bid if the evidence submitted by the respondent fails to satisfy the District that the respondent is properly qualified to carry out the obligations of the contract.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DATE: June 30, 2022
TO: Interested Firms
FROM: Kendall Matott, Sr. Procurement Specialist
SUBJECT: Two-Step Invitation for Bid 37843, Addendum 2 Black Creek Water Resource Development Pipeline Construction
Please be advised of the following changes to the subject Two-Step Invitation for Bid:
1. The time and date for the submittal of qualifications submittals remains: 2:00 p.m., July 19, 2022.
2. The time and date for the receipt of competitive sealed bids remains: 2:00 p.m., August 12, 2022.
3. Question: Will the District accept joint ventures and the combined experience of both firms to meet the minimum qualifications?
Answer: Yes. Please note that the joint venture must be registered with the Florida Secretary of State for doing business in the State of Florida prior to the date set for receipt of Bid Responses. Respondent must certify that all persons or entities having an interest as principal in the Bid or in substantial performance of the Work have been identified in the Bid forms.
4. On Page 7, delete Paragraph 8. MINIMUM QUALIFICATIONS in its entirety and replace it with the following:
“8. MINIMUM QUALIFICATIONS
Respondent must use the “Qualification” forms (General, Similar Projects, and Client References) provided in these documents to document the minimum qualifications listed below. If Respondent fails to include these forms and the Respondent-provided documentation requested below with the Bid, Respondent’s Bid may be considered non-responsive.
a. Respondent (or a combination of the firm or project manager assigned to the work) must have successfully completed at least two projects of a similar nature (water or wastewater transmission line) prior to the date for receipt of Qualification Submittals.
1. Both Similar Projects must include a minimum of eight miles of 16” or larger ductile iron, HDPE or PVC pipe.
2. Each Similar Project cited must have had a project value of at least $10,000,000.
3. Respondent must have performed approximately 50% of the work with its employees on each Similar Project.
4. For each Similar Project cited, Respondent is responsible to provide all the information requested. Respondent is cautioned to ensure that the contact information (names, email addresses, and phone numbers) is correct, and that the proposed contact is amenable to speak
2-Step IFB 37843 Addendum 2
- 2 -with District representatives and/or respond to a written inquiry. The District will contact the individuals named to verify the similar project information as it relates to this solicitation. If the information provided by Respondent is not of a similar nature, cannot be verified by the District, or the proposed contact person fails to respond to the District’s inquiry, Respondent’s bid may be considered non-responsive.
(Complete the District-provided forms)
b. Respondent (or a combination of the firm or project manager assigned to the work) must have successfully completed at least one project of a similar nature (water or wastewater transmission line) prior to the date for receipt of Qualification Submittals that include both items 8.b.1 and 8.b.2. OR at least two projects of a similar nature (water or wastewater transmission line) prior to the date for receipt of Qualification Submittals: one project for item 8.b.1 and another project for item 8.b.2.
1. At least one of the two projects must have included a jack and bore crossing under a utility line, roadway, railroad, or waterbody) for a minimum 16” diameter carrier pipe.
2. At least one of the two projects must have included a horizontal directional drill crossing under a utility line, roadway, railroad, or waterbody) for a minimum 16” diameter carrier pipe.
(Complete the District-provided forms)
Note: As an alternative, the qualification requirements of 8.b.1 and 8.b.2 may be satisfied as part of the two Similar Projects under 8.a. above.
c. Respondent shall currently employ both a Florida Licensed General Contractor OR a Florida Licensed Underground Utility Contractor who shall serve as Respondent’s qualifying agents and who shall have at least four years of experience on projects of the nature specified under subparagraph (a) above.
(Respondent-provided documentation – license), and (Respondent-provided documentation to substantiate experience)
d. Respondent must provide three client references. Up to two of the client references may be from the similar projects listed in response to subparagraph (a), above. For each client reference cited, Respondent is responsible to provide all the information requested. Respondent is cautioned to ensure that the contact information (names, email addresses, and phone numbers) is correct, and that the proposed contact is amenable to speak with District representatives and/or respond to a written inquiry. The District will contact the references to verify the information as it relates to this solicitation. If the information provided by Respondent cannot be verified by the District, or the proposed contact person fails to respond to the District’s inquiry, Respondent’s bid may be considered non-responsive.
(Complete the District-provided forms)
Irrespective of the minimum qualifications stated above, the District may make such investigations as it deems necessary to determine the ability of the Respondent to perform the Work. The District reserves the right to reject any Bid if the evidence submitted by such Respondent and/or the District’s independent investigation of such Respondent fails to satisfy the District that such Respondent is properly qualified to carry out the obligations of the Agreement and complete the Work in a manner acceptable to the District within the time period specified.”
- 3 -
5. On Page 7, delete Paragraph 10. SUBCONTRACTS in its entirety and replace it with the following:
“10. SUBCONTRACTS
Respondent must submit with its Bid a list of all known subcontractors for each portion of the Work exceeding $250,000. Acceptance of the Bid does not constitute approval of the subcontractors identified with the Bid.”
6. Delete Page 17, PROPOSED SUBCONTRACTORS form in its entirety and replace it with the attached REVISED PROPOSED SUBCONTRACTORS form.
7. Delete Pages 21 and 22, QUALIFICATIONS — SIMILAR PROJECTS forms in its entirety and replace it with the attached REVISED QUALIFICATIONS — SIMILAR PROJECTS forms.
8. Add Pages 22a and 22b, QUALIFICATIONS — J&B/HDD PROJECTS forms.
NOTE: Please acknowledge receipt of this Addendum in your submittal.
If you have any questions regarding this addendum, contact Kendall Matott at (386) 312-2324 or via email at kmatott@sjrwmd.com.
- 17 -
REVISED PROPOSED SUBCONTRACTORS
Include this form in the Bid Package (attach additional sheets if necessary)
Respondent must submit with its Bid a list of all known subcontractors for each portion of the Work exceeding $250,000. Acceptance of the Bid does not constitute approval of the subcontractors identified with the Bid.
1. Name and address of subcontractor:
Description of work:
Estimated value of Work:
2. Name and address of subcontractor:
3. Name and address of subcontractor:
4. Name and address of subcontractor:
5. Name and address of subcontractor:
6. Name and address of subcontractor:
- 21 -
REVISED QUALIFICATIONS — SIMILAR PROJECTS
Include this form in the Qualifications Submittal
Respondent must have successfully completed at least two projects of a similar nature (pipeline construction of at least eight miles of large diameter pipe) prior to the date set for receipt of Submittal Qualifications, as described in Paragraph 8 – MINIMUM QUALIFICATIONS of the INSTRUCTIONS TO RESPONDENTS.
Each Similar Project cited must have had a project value of at least $10,000,000. Respondent must have performed approximately 50% of the work with its employees on each Similar Project.
Completed Similar Project 1:
Agency/company:
Current contact person at agency/company:
Telephone: _______________ Fax: _________________ Email:
Address of agency/company:
Name of project:
Description:
Pipe size(s) and miles of pipe installed:
Jack and Bore / Horizontal Directional Drilling (pipe sizes and description of crossing):
Percentage of work Respondent performed its own employees (must be approximately 50%):
Project value: ___________ Start date: _____________ Completion date:
(min. $10,000,000) (month/year) (month/year = prior to July 19, 2022)
Name(s) of assigned personnel:
Project Manager:
Project/Construction Superintendent:
Contractor Quality Control Manager, if applicable:
Safety Officer, if applicable:
Others:
- 22 -
REVISED QUALIFICATIONS — SIMILAR PROJECTS (continued)
Include this form in the Qualifications Submittal
Completed Similar Project 2:
Agency/company:
Current contact person at agency/company:
Telephone: _______________ Fax: _________________ Email:
Address of agency/company:
(min. $10,000,000) (month/year) (month/year = prior to July 19, 2022)
Name(s) of assigned personnel:
Project Manager:
Project/Construction Superintendent:
Project/Construction Superintendent:
Contractor Quality Control Manager, if applicable:
- 22a -
QUALIFICATIONS — J&B/HDD PROJECTS
Include this form in the Qualifications Submittal
Respondent (or a combination of the firm or project manager assigned to the work) must have successfully completed at least two projects of a similar nature (water or wastewater transmission line) prior to the date for receipt of Qualification Submittals that include items a jack and bore crossing under a utility line, roadway, railroad, or waterbody) for a minimum 16” diameter carrier pipe; and a horizontal directional drill crossing under a utility line, roadway, railroad, or waterbody) for a minimum 16” diameter carrier pipe.
Completed Project w/Jack and Bore Crossing):
Current contact person at agency/company:
Telephone: _______________ Fax: _________________ Email:
Address of agency/company:
(month/year) (month/year = prior to July 19, 2022)
Name(s) of assigned personnel:
Project Manager:
Project/Construction Superintendent:
- 22b -
QUALIFICATIONS — J&B/HDD PROJECTS (continued)
Include this form in the Qualifications Submittal
Completed Project w/Horizontal Directional Drill Crossing):
Current contact person at agency/company:
Telephone: _______________ Fax: _________________ Email:
Address of agency/company:
(month/year) (month/year = prior to July 19, 2022)
Name(s) of assigned personnel:
Project Manager:
Safety Officer, if applicable:
| “8. MINIMUM QUALIFICATIONS |
| 1. Both Similar Projects must include a minimum of eight miles of 16” or larger ductile iron, HDPE or PVC pipe. |
| 2. Each Similar Project cited must have had a project value of at least $10,000,000. |
| 3. Respondent must have performed approximately 50% of the work with its employees on each Similar Project. |
| 4. For each Similar Project cited, Respondent is responsible to provide all the information requested. Respondent is cautioned to ensure that the contact information (names, email addresses, and phone numbers) is correct, and that the proposed contact... |
| 1. At least one of the two projects must have included a jack and bore crossing under a utility line, roadway, railroad, or waterbody) for a minimum 16” diameter carrier pipe. |
| 2. At least one of the two projects must have included a horizontal directional drill crossing under a utility line, roadway, railroad, or waterbody) for a minimum 16” diameter carrier pipe. |
| “10. SUBCONTRACTS |
| REVISED PROPOSED SUBCONTRACTORS |
| REVISED QUALIFICATIONS — SIMILAR PROJECTS |
| QUALIFICATIONS — J&B/HDD PROJECTS |
| QUALIFICATIONS — J&B/HDD PROJECTS (continued) |