TW F G H Rehab Div 2 Specs IFB 03.19.25.pdf

PDF 5 MB Posted

Attached to
Taxiways F, G, H and Deice Pads Pavement Rehabilitation Project
Solicitation number
202578816
Issued by
Denver County, Denver City, Colorado

About this file

This document is a Project Manual for the Denver International Airport (DEN) outlining technical specifications for the Taxiways F, G, H, and Deicing Pads A, B, and C Rehabilitation Construction project. The project involves comprehensive pavement rehabilitation, including removing and replacing existing concrete and asphalt pavements, performing electrical infrastructure updates, adjusting utility manholes, repairing underdrains, and replacing surface pavement markings. The technical specifications cover multiple construction items such as excavation, subgrade preparation, concrete and asphalt pavement installation, joint sealing, surface treatments, and electrical work. The project is structured with multiple construction phases and milestones, with a maximum total construction time of 219 calendar days, and specific time allocations for different project segments ranging from 30 to 60 calendar days per phase.

The project is funded through the airport's capital improvement program and potentially includes federal Airport Improvement Program (AIP) grant support. The technical specifications indicate a comprehensive approach to pavement rehabilitation, with detailed requirements for material quality, testing protocols, and construction methods. The contract includes provisions for quality control, material acceptance, and performance standards, with specific requirements for aggregate materials, concrete mixes, asphalt treatments, and surface finishes. Contractor qualifications include providing detailed documentation, maintaining quality control programs, and meeting specific technical and performance criteria. The project emphasizes maintaining airport operational standards, safety requirements, and minimizing disruption to airport operations during construction.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT

MANUAL

TAXIWAYS F, G, H, AND

DEICING PADS A, B, AND C

REHABILITATION

CONSTRUCTION CONTRACT NO.2025XXXXX

PART II

TECHNICAL

SPECIFICATIONS

Issued for Bid, February 21, 2025

CITY & COUNTY OF DENVER

DEPARTMENT OF AVIATION

TECHNICAL SPECIFICATIONS DENVER INTERNATIONAL AIRPORT

DIVISION 2 – GENERAL REQUIREMENTS TAXIWAYS F, G, H, AND

TABLE OF CONTENTS DEICING PADS A, B, AND C REHABILITATION

Issued for Bid Woolpert, Inc. Revision No. 0

February 21, 2025 TOC-1

TABLE OF CONTENTS

TECHNICAL SPECIFICATIONS

DIVISION 2 – TECHNICAL SPECIFICATIONS

SECTIONS TITLE

GP 10* DEFINITION OF TERMS

GP 20* PROPOSAL REQUIREMENTS AND CONDITIONS

GP 30* AWARD AND EXECUTION OF CONTRACT

GP 40* SCOPE OF WORK

GP 50* CONTROL OF WORK

GP 60* CONTROL OF MATERIALS

GP 70* LEGAL REGULATIONS AND RESPONSIBILITY TO PUBLIC

GP 80* EXECUTION AND PROGRESS

GP 90* MEASUREMENT AND PAYMENT

C-100* CONTRACTOR QUALITY CONTROL PROGRAM

C-105* MOBILIZATION

C-110* METHOD OF ESTIMATING PERCENTAGE MATERIAL WITHIN

SPECIFICATION LIMITS (PWL)

P-101 PREPARATION AND REMOVAL OF EXISTING PAVEMENTS

P-151 CLEARING AND GRUBBING

P-152 EXCAVATION, SUBGRADE AND EMBANKMENT

P-153 CONTROLLED LOW STRENGTH MATERIAL (CLSM)

P-159 CONCRETE AND ASPHALT CRUSHING

P-160 WATERING

P-403 HOT MIX ASPHALT (HMA) PAVEMENTS (BASE, LEVELING OR SURFACE

COURSE)

P-407 ASPHALT TREATED PERMEABLE BASE COURSE (ATPB)

P-501 PORTLAND CEMENT CONCRETE (PCC) PAVEMENT

P-603 BITUMINOUS TACK COAT

P-604A PREFORMED EXPANSION JOINT COMPRESSION SEALS

P-605 JOINT SEALANTS FOR CONCRETE PAVEMENTS

P-606 ADHESIVE COMPOUNDS, TWO-COMPONENT FOR SEALING WIRE AND

LIGHTS IN PAVEMENT

P-608 EMULSIFIED ASPHALT SEAL COAT

P-610 STRUCTURAL PORTLAND CEMENT CONCRETE

P-620 RUNWAY AND TAXIWAY MARKING

D-750 TRENCH DRAINS

D-751 MANHOLES, CATCH BASINS, INLETS AND INSPECTION HOLES

T-901 SEEDING

38988

CO

LORADO LICENSED

JO

N B. WEEKS

P R O F E S S I O N A L E N G I N E E R03/19/2025

46181

CO

LORADO LICENSED

JO

EL

ALAN WIECHMANNP R O F E S S I O N A L E N G I N E

E R03/19/2025

TECHNICAL SPECIFICATIONS DENVER INTERNATIONAL AIRPORT

DIVISION 2 – GENERAL REQUIREMENTS TAXIWAYS F, G, H, AND

TABLE OF CONTENTS DEICING PADS A, B, AND C REHABILITATION

Issued for Bid Woolpert, Inc. Revision No. 0

February 21, 2025 TOC-2

T-905 TOPSOILING

T-908 MULCHING

L-100 LIGHTING AND ELECTRICAL WORK

L-108 UNDERGROUND POWER CABLE FOR AIRPORTS

L-110 AIRPORT UNDERGROUND ELECTRICAL DUCT BANKS AND CONDUITS

L-125 INSTALLATION OF AIRPORT LIGHTING SYSTEMS

L-140 FIELD PHOTOMETRIC TESTING

* In case of discrepancy, the Division 1: General Requirements shall govern

TECHNICAL SPECIFICATIONS DENVER INTERNATIONAL AIRPORT

DIVISION 2 – AIRFIELD STANDARDS TAXIWAYS F, G, H, AND

GENERAL PROVISION DEICING PADS A, B, AND C REHABILITATION

AC 150/5370-10H CONSTRUCTION CONTRACT NO.2025XXXXX

Issued for Bid Woolpert, Inc. Revision No. 0

February 21, 2025 1

Part 1 – General Contract Provisions 1

Section 10 Definition of Terms 2

When the following terms are used in these specifications, in the contract, or in any documents or other 3 instruments pertaining to construction where these specifications govern, the intent and meaning shall be 4 defined as follows: 5

Paragraph

Number Term Definition

10-01 AASHTO The American Association of State Highway and

Transportation Officials.

10-02 Access Road

The right-of-way, the roadway and all improvements constructed thereon connecting the airport to a public roadway.

10-03 Advertisement A public announcement, as required by local law, inviting bids for work to be performed and materials to be furnished.

10-04 Airport Airport means an area of land or water which is used or intended to be used for the landing and takeoff of aircraft;

an appurtenant area used or intended to be used for airport buildings or other airport facilities or rights of way; airport buildings and facilities located in any of these areas, and a heliport.

10-05 Airport Improvement

Program (AIP) A grant-in-aid program, administered by the Federal

Aviation Administration (FAA).

10-06 Air Operations Area

(AOA)

The term air operations area (AOA) shall mean any area of the airport used or intended to be used for the landing, takeoff, or surface maneuvering of aircraft. An air operation area shall include such paved or unpaved areas that are used or intended to be used for the unobstructed movement of aircraft in addition to its associated runway, taxiway, or apron.

10-07 Apron Area where aircraft are parked, unloaded or loaded, fueled and/or serviced.

10-08 ASTM International

(ASTM)

Formerly known as the American Society for Testing and

Materials (ASTM).

10-09 Award The Owner’s notice to the successful bidder of the acceptance of the submitted bid.

TECHNICAL SPECIFICATIONS DENVER INTERNATIONAL AIRPORT

GENERAL PROVISION DEICING PADS A, B, AND C REHABILITATION

AC 150/5370-10H CONSTRUCTION CONTRACT NO.2025XXXXX

Issued for Bid Woolpert, Inc. Revision No. 0

February 21, 2025 2

Paragraph

Number Term Definition

10-10 Bidder Any individual, partnership, firm, or corporation, acting directly or through a duly authorized representative, who submits a proposal for the work contemplated.

10-11 Building Area An area on the airport to be used, considered, or intended to be used for airport buildings or other airport facilities or rights-of-way together with all airport buildings and facilities located thereon.

10-12 Calendar Day Every day shown on the calendar.

10-13 Certificate of Analysis

(COA)

The COA is the manufacturer’s Certificate of Compliance

(COC) including all applicable test results required by the specifications.

10-14 Certificate of

Compliance (COC) The manufacturer’s certification stating that materials or assemblies furnished fully comply with the requirements of the contract. The certificate shall be signed by the manufacturer’s authorized representative.

10-15 Change Order A written order to the Contractor covering changes in the plans, specifications, or proposal quantities and establishing the basis of payment and contract time adjustment, if any, for work within the scope of the contract and necessary to complete the project.

10-16 Contract A written agreement between the Owner and the Contractor that establishes the obligations of the parties including but not limited to performance of work, furnishing of labor, equipment and materials and the basis of payment.

The awarded contract includes but may not be limited to:

Advertisement, Contract form, Proposal, Performance bond, payment bond, General provisions, certifications and representations, Technical Specifications, Plans, Supplemental Provisions, standards incorporated by reference and issued addenda.

10-17 Contract Item (Pay

Item) A specific unit of work for which a price is provided in the contract.

10-18 Contract Time The number of calendar days or working days, stated in the proposal, allowed for completion of the contract, including authorized time extensions. If a calendar date of completion is stated in the proposal, in lieu of a number of calendar or working days, the contract shall be completed by that date.

TECHNICAL SPECIFICATIONS DENVER INTERNATIONAL AIRPORT

GENERAL PROVISION DEICING PADS A, B, AND C REHABILITATION

AC 150/5370-10H CONSTRUCTION CONTRACT NO.2025XXXXX

Issued for Bid Woolpert, Inc. Revision No. 0

February 21, 2025 3

Paragraph

Number Term Definition

10-19 Contractor The individual, partnership, firm, or corporation primarily liable for the acceptable performance of the work contracted and for the payment of all legal debts pertaining to the work who acts directly or through lawful agents or employees to complete the contract work.

10-20 Contractors Quality

Control (QC) Facilities The Contractor’s QC facilities in accordance with the

Contractor Quality Control Program (CQCP).

10-21 Contractor Quality

Control Program

(CQCP)

Details the methods and procedures that will be taken to assure that all materials and completed construction required by the contract conform to contract plans, technical specifications and other requirements, whether manufactured by the Contractor, or procured from subcontractors or vendors.

10-22 Control Strip A demonstration by the Contractor that the materials, equipment, and construction processes results in a product meeting the requirements of the specification.

10-23 Construction Safety and

Phasing Plan (CSPP) The overall plan for safety and phasing of a construction project developed by the airport operator, or developed by the airport operator’s consultant and approved by the airport operator. It is included in the invitation for bids and becomes part of the project specifications.

10-24 Drainage System The system of pipes, ditches, and structures by which surface or subsurface waters are collected and conducted from the airport area.

10-25 Engineer The individual, partnership, firm, or corporation duly authorized by the Owner to be responsible for engineering, inspection, and/or observation of the contract work and acting directly or through an authorized representative.

10-26 Equipment All machinery, together with the necessary supplies for upkeep and maintenance; and all tools and apparatus necessary for the proper construction and acceptable completion of the work.

10-27 Extra Work An item of work not provided for in the awarded contract as previously modified by change order or supplemental agreement, but which is found by the Owner’s Engineer or

DEN Project Manager to be necessary to complete the work within the intended scope of the contract as previously modified.

TECHNICAL SPECIFICATIONS DENVER INTERNATIONAL AIRPORT

GENERAL PROVISION DEICING PADS A, B, AND C REHABILITATION

AC 150/5370-10H CONSTRUCTION CONTRACT NO.2025XXXXX

Issued for Bid Woolpert, Inc. Revision No. 0

February 21, 2025 4

Paragraph

Number Term Definition

10-28 FAA The Federal Aviation Administration. When used to designate a person, FAA shall mean the Administrator or their duly authorized representative.

10-29 Federal Specifications The federal specifications and standards, commercial item descriptions, and supplements, amendments, and indices prepared and issued by the General Services

Administration.

10-30 Force Account a. Contract Force Account - A method of payment that addresses extra work performed by the Contractor on a time and material basis.

b. Owner Force Account - Work performed for the project by the Owner's employees.

10-31 Intention of Terms Whenever, in these specifications or on the plans, the words “directed,” “required,” “permitted,” “ordered,”

“designated,” “prescribed,” or words of like import are used, it shall be understood that the direction, requirement, permission, order, designation, or prescription of the

Engineer and/or DEN Project Manager is intended; and similarly, the words “approved,” “acceptable,”

“satisfactory,” or words of like import, shall mean approved by, or acceptable to, or satisfactory to the

Engineer and/or DEN Project Manager, subject in each case to the final determination of the Owner.

Any reference to a specific requirement of a numbered paragraph of the contract specifications or a cited standard shall be interpreted to include all general requirements of the entire section, specification item, or cited standard that may be pertinent to such specific reference.

10-32 Lighting A system of fixtures providing or controlling the light sources used on or near the airport or within the airport buildings. The field lighting includes all luminous signals, markers, floodlights, and illuminating devices used on or near the airport or to aid in the operation of aircraft landing at, taking off from, or taxiing on the airport surface.

10-33 Major and Minor

Contract Items A major contract item shall be any item that is listed in the proposal, the total cost of which is equal to or greater than

20% of the total amount of the award contract. All other items shall be considered minor contract items.

10-34 Materials Any substance specified for use in the construction of the contract work.

TECHNICAL SPECIFICATIONS DENVER INTERNATIONAL AIRPORT

GENERAL PROVISION DEICING PADS A, B, AND C REHABILITATION

AC 150/5370-10H CONSTRUCTION CONTRACT NO.2025XXXXX

Issued for Bid Woolpert, Inc. Revision No. 0

February 21, 2025 5

Paragraph

Number Term Definition

10-35 Modification of

Standards (MOS) Any deviation from standard specifications applicable to material and construction methods in accordance with FAA

Order 5300.1.

10-36 Notice to Proceed (NTP) A written notice to the Contractor to begin the actual contract work on a previously agreed to date. If applicable, the Notice to Proceed shall state the date on which the contract time begins.

10-37 Owner The term “Owner” shall mean the party of the first part or the contracting agency signatory to the contract. Where the term “Owner” is capitalized in this document, it shall mean airport Sponsor only. The Owner for this project is the

City and County of Denver.

10-38 Passenger Facility

Charge (PFC) Per 14 Code of Federal Regulations (CFR) Part 158 and 49

United States Code (USC) § 40117, a PFC is a charge imposed by a public agency on passengers enplaned at a commercial service airport it controls.

10-39 Pavement Structure The combined surface course, base course(s), and subbase course(s), if any, considered as a single unit.

10-40 Payment bond The approved form of security furnished by the Contractor and their own surety as a guaranty that the Contractor will pay in full all bills and accounts for materials and labor used in the construction of the work.

10-41 Performance bond The approved form of security furnished by the Contractor and their own surety as a guaranty that the Contractor will complete the work in accordance with the terms of the contract.

10-42 Plans The official drawings or exact reproductions which show the location, character, dimensions and details of the airport and the work to be done and which are to be considered as a part of the contract, supplementary to the specifications. Plans may also be referred to as 'contract drawings.’

10-43 Project The agreed scope of work for accomplishing specific airport development with respect to a particular airport.

10-44 Proposal The written offer of the bidder (when submitted on the approved proposal form) to perform the contemplated work and furnish the necessary materials in accordance with the provisions of the plans and specifications.

TECHNICAL SPECIFICATIONS DENVER INTERNATIONAL AIRPORT

GENERAL PROVISION DEICING PADS A, B, AND C REHABILITATION

AC 150/5370-10H CONSTRUCTION CONTRACT NO.2025XXXXX

Issued for Bid Woolpert, Inc. Revision No. 0

February 21, 2025 6

Paragraph

Number Term Definition

10-45 Proposal guaranty The security furnished with a proposal to guarantee that the bidder will enter into a contract if their own proposal is accepted by the Owner.

10-46 Quality Assurance (QA) Owner’s responsibility to assure that construction work completed complies with specifications for payment.

10-47 Quality Control (QC) Contractor’s responsibility to control material(s) and construction processes to complete construction in accordance with project specifications.

10-48 Quality Assurance (QA)

Inspector An authorized representative of the Engineer and/or DEN

Project Manager assigned to make all necessary inspections, observations, tests, and/or observation of tests of the work performed or being performed, or of the materials furnished or being furnished by the Contractor.

10-49 Quality Assurance (QA)

Laboratory The official quality assurance testing laboratories of the

Owner or such other laboratories as may be designated by the Engineer or DEN Project Manager. May also be referred to as Engineer’s, Owner’s, or QA Laboratory.

10-50 Resident Project

Representative (RPR) The individual, partnership, firm, or corporation duly authorized by the Owner to be responsible for all necessary inspections, observations, tests, and/or observations of tests of the contract work performed or being performed, or of the materials furnished or being furnished by the

Contractor, and acting directly or through an authorized representative.

10-51 Runway The area on the airport prepared for the landing and takeoff of aircraft.

10-52 Runway Safety Area

(RSA)

A defined surface surrounding the runway prepared or suitable for reducing the risk of damage to aircraft. See the construction safety and phasing plan (CSPP) for limits of the RSA.

10-53 Safety Plan Compliance

Document (SPCD) Details how the Contractor will comply with the CSPP.

10-54 Specifications A part of the contract containing the written directions and requirements for completing the contract work. Standards for specifying materials or testing which are cited in the contract specifications by reference shall have the same force and effect as if included in the contract physically.

TECHNICAL SPECIFICATIONS DENVER INTERNATIONAL AIRPORT

GENERAL PROVISION DEICING PADS A, B, AND C REHABILITATION

AC 150/5370-10H CONSTRUCTION CONTRACT NO.2025XXXXX

Issued for Bid Woolpert, Inc. Revision No. 0

February 21, 2025 7

Paragraph

Number Term Definition

10-55 Sponsor A Sponsor is defined in 49 USC § 47102(24) as a public agency that submits to the FAA for an AIP grant; or a private Owner of a public-use airport that submits to the

FAA an application for an AIP grant for the airport.

10-56 Structures Airport facilities such as bridges; culverts; catch basins, inlets, retaining walls, cribbing; storm and sanitary sewer lines; water lines; underdrains; electrical ducts, manholes, handholes, lighting fixtures and bases; transformers;

navigational aids; buildings; vaults; and, other manmade features of the airport that may be encountered in the work and not otherwise classified herein.

10-57 Subgrade The soil that forms the pavement foundation.

10-58 Superintendent The Contractor’s executive representative who is present on the work during progress, authorized to receive and fulfill instructions from the DEN Project Manager, and who shall supervise and direct the construction.

10-59 Supplemental

Agreement A written agreement between the Contractor and the

Owner that establishes the basis of payment and contract time adjustment, if any, for the work affected by the supplemental agreement. A supplemental agreement is required if: (1) in scope work would increase or decrease the total amount of the awarded contract by more than

25%: (2) in scope work would increase or decrease the total of any major contract item by more than 25%; (3) work that is not within the scope of the originally awarded contract; or (4) adding or deleting of a major contract item.

10-60 Surety The corporation, partnership, or individual, other than the

Contractor, executing payment or performance bonds that are furnished to the Owner by the Contractor.

10-61 Taxilane A taxiway designed for low speed movement of aircraft between aircraft parking areas and terminal areas.

10-62 Taxiway The portion of the air operations area of an airport that has been designated by competent airport authority for movement of aircraft to and from the airport’s runways, aircraft parking areas, and terminal areas.

10-63 Taxiway/Taxilane Safety

Area (TSA) A defined surface alongside the taxiway prepared or suitable for reducing the risk of damage to an aircraft. See the construction safety and phasing plan (CSPP) for limits of the TSA.

TECHNICAL SPECIFICATIONS DENVER INTERNATIONAL AIRPORT

GENERAL PROVISION DEICING PADS A, B, AND C REHABILITATION

AC 150/5370-10H CONSTRUCTION CONTRACT NO.2025XXXXX

Issued for Bid Woolpert, Inc. Revision No. 0

February 21, 2025 8

Paragraph

Number Term Definition

10-64 Work The furnishing of all labor, materials, tools, equipment, and incidentals necessary or convenient to the Contractor’s performance of all duties and obligations imposed by the contract, plans, and specifications.

10-65 Working day A working day shall be any day other than a legal holiday, Saturday, or Sunday on which the normal working forces of the Contractor may proceed with regular work for at least six (6) hours toward completion of the contract. When work is suspended for causes beyond the Contractor’s control, it will not be counted as a working day. Saturdays, Sundays and holidays on which the Contractor’s forces engage in regular work will be considered as working days.

10-66 Owner Defined terms DEN Project Manager. The Individual duly authorized by the owner to be responsible for engineering inspection of the contract work and acting directly or through an authorized representative. For the purposes of this project, the terms DEN Project Manager and Resident Project

Representative (RPR) shall be interchangeable.

END OF SECTION 10 6

TECHNICAL SPECIFICATIONS DENVER INTERNATIONAL AIRPORT

GENERAL PROVISION DEICING PADS A, B, AND C REHABILITATION

AC 150/5370-10H CONSTRUCTION CONTRACT NO.2025XXXXX

Issued for Bid Woolpert, Inc. Revision No. 0

February 21, 2025 9

Section 20 Proposal Requirements and Conditions 7

20-01 Advertisement (Notice to Bidders). This project has been advertised on the DEN Contract 8

Procurement Website. http://business.flydenver.com/bizops/bids.asp, 9

20-02 Qualification of bidders. Each bidder shall submit evidence of competency and evidence of financial 10 responsibility to perform the work to the Owner at the time of bid opening. 11

Evidence of competency, unless otherwise specified, shall consist of statements covering the bidder’s past 12 experience on similar work, and a list of equipment and a list of key personnel that would be available for the 13 work. 14

Each bidder shall furnish the Owner satisfactory evidence of their financial responsibility. Evidence of financial 15 responsibility, unless otherwise specified, shall consist of a confidential statement or report of the bidder’s 16 financial resources and liabilities as of the last calendar year or the bidder’s last fiscal year. Such statements or 17 reports shall be certified by a public accountant. At the time of submitting such financial statements or reports, 18 the bidder shall further certify whether their financial responsibility is approximately the same as stated or 19 reported by the public accountant. If the bidder’s financial responsibility has changed, the bidder shall qualify 20 the public accountant’s statement or report to reflect the bidder’s true financial condition at the time such 21 qualified statement or report is submitted to the Owner. 22

Unless otherwise specified, a bidder may submit evidence that they are prequalified with the State Highway 23

Division and are on the current “bidder’s list” of the state in which the proposed work is located. Evidence of 24

State Highway Division prequalification may be submitted as evidence of financial responsibility in lieu of the 25 certified statements or reports specified above. 26

20-03 Contents of proposal forms. The Owner's proposal forms state the location and description of the 27 proposed construction; the place, date, and time of opening of the proposals; and the estimated quantities of 28 the various items of work to be performed and materials to be furnished for which unit bid prices are asked. 29

The proposal form states the time in which the work must be completed, and the amount of the proposal 30 guaranty that must accompany the proposal. The Owner will accept only those Proposals properly executed on 31 physical forms or electronic forms provided by the Owner. Bidder actions that may cause the Owner to deem 32 a proposal irregular are given in paragraph 20-09 Irregular proposals. 33

Mobilization is limited to 5 percent of the total project cost. 34

A prebid conference is required on this project to discuss as a minimum, the following items: material 35 requirements; submittals; Quality Control/Quality Assurance requirements; the construction safety and phasing 36 plan including airport access and staging areas; and unique airfield paving construction requirements. See 37 project advertisement for date prebid. 38

20-04 Issuance of proposal forms. The Owner reserves the right to refuse to issue a proposal form to a 39 prospective bidder if the bidder is in default for any of the following reasons: 40

a. Failure to comply with any prequalification regulations of the Owner, if such regulations are cited, or 41 otherwise included, in the proposal as a requirement for bidding. 42

b. Failure to pay, or satisfactorily settle, all bills due for labor and materials on former contracts in force 43 with the Owner at the time the Owner issues the proposal to a prospective bidder. 44

c. Documented record of Contractor default under previous contracts with the Owner. 45

d. Documented record of unsatisfactory work on previous contracts with the Owner. 46

20-05 Interpretation of estimated proposal quantities. An estimate of quantities of work to be done and 47 materials to be furnished under these specifications is given in the proposal. It is the result of careful calculations 48 and is believed to be correct. It is given only as a basis for comparison of proposals and the award of the 49

TECHNICAL SPECIFICATIONS DENVER INTERNATIONAL AIRPORT

GENERAL PROVISION DEICING PADS A, B, AND C REHABILITATION

AC 150/5370-10H CONSTRUCTION CONTRACT NO.2025XXXXX

Issued for Bid Woolpert, Inc. Revision No. 0

February 21, 2025 10 contract. The Owner does not expressly, or by implication, agree that the actual quantities involved will 50 correspond exactly therewith; nor shall the bidder plead misunderstanding or deception because of such 51 estimates of quantities, or of the character, location, or other conditions pertaining to the work. Payment to the 52

Contractor will be made only for the actual quantities of work performed or materials furnished in accordance 53 with the plans and specifications. It is understood that the quantities may be increased or decreased as provided 54 in the Section 40, paragraph 40-02, Alteration of Work and Quantities, without in any way invalidating the unit 55 bid prices. 56

20-06 Examination of plans, specifications, and site. The bidder is expected to carefully examine the site 57 of the proposed work, the proposal, plans, specifications, and contract forms. Bidders shall satisfy themselves 58 to the character, quality, and quantities of work to be performed, materials to be furnished, and to the 59 requirements of the proposed contract. The submission of a proposal shall be prima facie evidence that the 60 bidder has made such examination and is satisfied to the conditions to be encountered in performing the work 61 and the requirements of the proposed contract, plans, and specifications. 62

Boring logs and other records of subsurface investigations and tests are available for inspection of bidders. It 63 is understood and agreed that such subsurface information, whether included in the plans, specifications, or 64 otherwise made available to the bidder, was obtained and is intended for the Owner’s design and estimating 65 purposes only. Such information has been made available for the convenience of all bidders. It is further 66 understood and agreed that each bidder is solely responsible for all assumptions, deductions, or conclusions 67 which the bidder may make or obtain from their own examination of the boring logs and other records of 68 subsurface investigations and tests that are furnished by the Owner. 69

20-07 Preparation of proposal. The bidder shall submit their proposal on the forms furnished by the Owner. 70

All blank spaces in the proposal forms, unless explicitly stated otherwise, must be correctly filled in where 71 indicated for each and every item for which a quantity is given. The bidder shall state the price (written in ink 72 or typed) both in words and numerals which they propose for each pay item furnished in the proposal. In case 73 of conflict between words and numerals, the words, unless obviously incorrect, shall govern. 74

The bidder shall correctly sign the proposal in ink. If the proposal is made by an individual, their name and 75 post office address must be shown. If made by a partnership, the name and post office address of each member 76 of the partnership must be shown. If made by a corporation, the person signing the proposal shall give the 77 name of the state where the corporation was chartered and the name, titles, and business address of the 78 president, secretary, and the treasurer. Anyone signing a proposal as an agent shall file evidence of their 79 authority to do so and that the signature is binding upon the firm or corporation. 80

20-08 Responsive and responsible bidder. A responsive bid conforms to all significant terms and conditions 81 contained in the Owner’s invitation for bid. It is the Owner’s responsibility to decide if the exceptions taken by 82 a bidder to the solicitation are material or not and the extent of deviation it is willing to accept. 83

A responsible bidder has the ability to perform successfully under the terms and conditions of a proposed 84 procurement, as defined in 2 CFR § 200.318(h). This includes such matters as Contractor integrity, compliance 85 with public policy, record of past performance, and financial and technical resources. 86

20-09 Irregular proposals. Proposals shall be considered irregular for the following reasons: 87

a. If the proposal is on a form other than that furnished by the Owner, or if the Owner’s form is altered, 88 or if any part of the proposal form is detached. 89

b. If there are unauthorized additions, conditional or alternate pay items, or irregularities of any kind that 90 make the proposal incomplete, indefinite, or otherwise ambiguous. 91

c. If the proposal does not contain a unit price for each pay item listed in the proposal, except in the case 92 of authorized alternate pay items, for which the bidder is not required to furnish a unit price. 93

d. If the proposal contains unit prices that are obviously unbalanced. 94

e. If the proposal is not accompanied by the proposal guaranty specified by the Owner. 95

TECHNICAL SPECIFICATIONS DENVER INTERNATIONAL AIRPORT

GENERAL PROVISION DEICING PADS A, B, AND C REHABILITATION

AC 150/5370-10H CONSTRUCTION CONTRACT NO.2025XXXXX

Issued for Bid Woolpert, Inc. Revision No. 0

February 21, 2025 11

f. If the applicable Disadvantaged Business Enterprise information is incomplete. 96

The Owner reserves the right to reject any irregular proposal and the right to waive technicalities if such waiver 97 is in the best interest of the Owner and conforms to local laws and ordinances pertaining to the letting of 98 construction contracts. 99

20-10 Bid guarantee. Each separate proposal shall be accompanied by a bid bond, certified check, or other 100 specified acceptable collateral, in the amount specified in the proposal form. Such bond, check, or collateral, 101 shall be made payable to the Owner. 102

20-11 Delivery of proposal. Each proposal shall be submitted to https://www.bidnetdirect.com. No proposal 103 will be considered unless received as specified in the advertisement or as modified by Addendum before the 104 time specified for opening all bids. Proposals received after the bid opening time shall be rejected and not 105 opened. 106

20-12 Withdrawal or revision of proposals. A bidder may withdraw or revise (by withdrawal of one proposal 107 and submission of another) a proposal provided that the bidder’s request for withdrawal is received by the 108

Owner on https://www.bidnetdirect.com before the time specified for opening bids. Revised proposals must 109 be received before the time specified for opening all bids. 110

20-13 Public opening of proposals. Proposals shall be opened, and read, publicly at the time and place 111 specified in the advertisement. Bidders, their authorized agents, and other interested persons are invited to 112 attend. Proposals that have been withdrawn (by written or telegraphic request) or received after the time 113 specified for opening bids shall be returned to the bidder unopened. 114

20-14 Disqualification of bidders. A bidder shall be considered disqualified for any of the following reasons: 115

a. Submitting more than one proposal from the same partnership, firm, or corporation under the same or 116 different name. 117

b. Evidence of collusion among bidders. Bidders participating in such collusion shall be disqualified as 118 bidders for any future work of the Owner until any such participating bidder has been reinstated by the Owner 119 as a qualified bidder. 120

c. If the bidder is considered to be in “default” for any reason specified in paragraph 20-04, Issuance of 121

Proposal Forms, of this section. 122

20-15 Discrepancies and Omissions. A Bidder who discovers discrepancies or omissions with the project 123 bid documents shall immediately notify the Owner’s Engineer of the matter. A bidder that has doubt as to the 124 true meaning of a project requirement may submit to the Owner’s Engineer a written request for interpretation 125 no later than 7 days prior to bid opening. 126

Any interpretation of the project bid documents by the Owner’s Engineer will be by written addendum issued 127 by the Owner. The Owner will not consider any instructions, clarifications or interpretations of the bidding 128 documents in any manner other than written addendum. 129

END OF SECTION 20 130

TECHNICAL SPECIFICATIONS DENVER INTERNATIONAL AIRPORT

GENERAL PROVISION DEICING PADS A, B, AND C REHABILITATION

AC 150/5370-10H CONSTRUCTION CONTRACT NO.2025XXXXX

Issued for Bid Woolpert, Inc. Revision No. 0

February 21, 2025 12

Page Intentionally Blank

TECHNICAL SPECIFICATIONS DENVER INTERNATIONAL AIRPORT

GENERAL PROVISION DEICING PADS A, B, AND C REHABILITATION

AC 150/5370-10H CONSTRUCTION CONTRACT NO.2025XXXXX

Issued for Bid Woolpert, Inc. Revision No. 0

February 21, 2025 13

Section 30 Award and Execution of Contract 131

30-01 Consideration of proposals. After the proposals are publicly opened and read, they will be compared 132 on the basis of the summation of the products obtained by multiplying the estimated quantities shown in the 133 proposal by the unit bid prices. If a bidder’s proposal contains a discrepancy between unit bid prices written in 134 words and unit bid prices written in numbers, the unit bid price written in words shall govern. 135

Until the award of a contract is made, the Owner reserves the right to reject a bidder’s proposal for any of the 136 following reasons: 137

a. If the proposal is irregular as specified in Section 20, paragraph 20-09, Irregular Proposals. 138

b. If the bidder is disqualified for any of the reasons specified Section 20, paragraph 20-14, Disqualification 139 of Bidders. 140

In addition, until the award of a contract is made, the Owner reserves the right to reject any or all proposals, 141 waive technicalities, if such waiver is in the best interest of the Owner and is in conformance with applicable 142 state and local laws or regulations pertaining to the letting of construction contracts; advertise for new 143 proposals; or proceed with the work otherwise. All such actions shall promote the Owner’s best interests. 144

30-02 Award of contract. The award of a contract, if it is to be awarded, shall be made within 150 calendar 145 days of the date specified for publicly opening proposals, unless otherwise specified herein. 146

If the Owner elects to proceed with an award of contract, the Owner will make award to the responsible bidder 147 whose bid, conforming with all the material terms and conditions of the bid documents, is the lowest in price. 148

30-03 Cancellation of award. The Owner reserves the right to cancel the award without liability to the bidder, 149 except return of proposal guaranty, at any time before a contract has been fully executed by all parties and is 150 approved by the Owner in accordance with paragraph 30-07 Approval of Contract. 151

30-04 Return of proposal guaranty. All proposal guaranties, except those of the two lowest bidders, will be 152 returned immediately after the Owner has made a comparison of bids as specified in the paragraph 30-01, 153

Consideration of Proposals. Proposal guaranties of the two lowest bidders will be retained by the Owner until such 154 time as an award is made, at which time, the unsuccessful bidder’s proposal guaranty will be returned. The 155 successful bidder’s proposal guaranty will be returned as soon as the Owner receives the contract bonds as 156 specified in paragraph 30-05, Requirements of Contract Bonds. 157

30-05 Requirements of contract bonds. At the time of the execution of the contract, the successful bidder 158 shall furnish the Owner a surety bond or bonds that have been fully executed by the bidder and the surety 159 guaranteeing the performance of the work and the payment of all legal debts that may be incurred by reason of 160 the Contractor’s performance of the work. The surety and the form of the bond or bonds shall be acceptable 161 to the Owner. Unless otherwise specified in this subsection, the surety bond or bonds shall be in a sum equal 162 to the full amount of the contract. 163

30-06 Execution of contract. The successful bidder shall sign (execute) the necessary agreements for entering 164 into the contract and return the signed contract to the Owner, along with the fully executed surety bond or 165 bonds specified in paragraph 30-05, Requirements of Contract Bonds, of this section, within 15 calendar days from 166 the date mailed or otherwise delivered to the successful bidder. 167

30-07 Approval of contract. Upon receipt of the contract and contract bond or bonds that have been executed 168 by the successful bidder, the Owner shall complete the execution of the contract in accordance with local laws 169 or ordinances, and return the fully executed contract to the Contractor. Delivery of the fully executed contract 170 to the Contractor shall constitute the Owner’s approval to be bound by the successful bidder’s proposal and 171 the terms of the contract. 172

TECHNICAL SPECIFICATIONS DENVER INTERNATIONAL AIRPORT

GENERAL PROVISION DEICING PADS A, B, AND C REHABILITATION

AC 150/5370-10H CONSTRUCTION CONTRACT NO.2025XXXXX

Issued for Bid Woolpert, Inc. Revision No. 0

February 21, 2025 14

30-08 Failure to execute contract. Failure of the successful bidder to execute the contract and furnish an 173 acceptable surety bond or bonds within the period specified in paragraph 30-06, Execution of Contract, of this 174 section shall be just cause for cancellation of the award and forfeiture of the proposal guaranty, not as a penalty, 175 but as liquidated damages to the Owner. 176

END OF SECTION 30 177

TECHNICAL SPECIFICATIONS DENVER INTERNATIONAL AIRPORT

GENERAL PROVISION DEICING PADS A, B, AND C REHABILITATION

AC 150/5370-10H CONSTRUCTION CONTRACT NO.2025XXXXX

Issued for Bid Woolpert, Inc. Revision No. 0

February 21, 2025 15

Section 40 Scope of Work 178

40-01 Intent of contract. The intent of the contract is to provide for construction and completion, in every 179 detail, of the work described. It is further intended that the Contractor shall furnish all labor, materials, 180 equipment, tools, transportation, and supplies required to complete the work in accordance with the plans, 181 specifications, and terms of the contract. 182

40-02 Alteration of work and quantities. The Owner reserves the right to make such changes in quantities 183 and work as may be necessary or desirable to complete, in a satisfactory manner, the original intended work. 184

Unless otherwise specified in the Contract, the Owner’s Engineer or DEN Project Manager shall be and is 185 hereby authorized to make, in writing, such in-scope alterations in the work and variation of quantities as may 186 be necessary to complete the work, provided such action does not represent a significant change in the character 187 of the work. 188

For purpose of this section, a significant change in character of work means: any change that is outside the 189 current contract scope of work; any change (increase or decrease) in the total contract cost by more than 25%; 190 or any change in the total cost of a major contract item by more than 25%. 191

Work alterations and quantity variances that do not meet the definition of significant change in character of 192 work shall not invalidate the contract nor release the surety. Contractor agrees to accept payment for such 193 work alterations and quantity variances in accordance with Section 90, paragraph 90-03, Compensation for Altered 194

Quantities. 195

Should the value of altered work or quantity variance meet the criteria for significant change in character of 196 work, such altered work and quantity variance shall be covered by a supplemental agreement. Supplemental 197 agreements shall also require consent of the Contractor’s surety and separate performance and payment bonds. 198

If the Owner and the Contractor are unable to agree on a unit adjustment for any contract item that requires a 199 supplemental agreement, the Owner reserves the right to terminate the contract with respect to the item and 200 make other arrangements for its completion. 201

40-03 Omitted items. The Owner, the Owner’s Engineer or the DEN Project Manager may provide written 202 notice to the Contractor to omit from the work any contract item that does not meet the definition of major 203 contract item. Major contract items may be omitted by a supplemental agreement. Such omission of contract 204 items shall not invalidate any other contract provision or requirement. 205

Should a contract item be omitted or otherwise ordered to be non-performed, the Contractor shall be paid for 206 all work performed toward completion of such item prior to the date of the order to omit such item. Payment 207 for work performed shall be in accordance with Section 90, paragraph 90-04, Payment for Omitted Items. 208

40-04 Extra work. Should acceptable completion of the contract require the Contractor to perform an item of 209 work not provided for in the awarded contract as previously modified by change order or supplemental 210 agreement, Owner may issue a Change Order to cover the necessary extra work. Change orders for extra work 211 shall contain agreed unit prices for performing the change order work in accordance with the requirements 212 specified in the order, and shall contain any adjustment to the contract time that, in the DEN Project Manager’s 213 opinion, is necessary for completion of the extra work. 214

When determined by the DEN Project Manager to be in the Owner’s best interest, the DEN Project Manager 215 may order the Contractor to proceed with extra work as provided in Section 90, paragraph 90-05, Payment for 216

Extra Work. Extra work that is necessary for acceptable completion of the project, but is not within the general 217 scope of the work covered by the original contract shall be covered by a supplemental agreement as defined in 218

Section 10, paragraph 10-59, Supplemental Agreement. 219

If extra work is essential to maintaining the project critical path, DEN Project Manager may order the 220

Contractor to commence the extra work under a Time and Material contract method. Once sufficient detail is 221

TECHNICAL SPECIFICATIONS DENVER INTERNATIONAL AIRPORT

GENERAL PROVISION DEICING PADS A, B, AND C REHABILITATION

AC 150/5370-10H CONSTRUCTION CONTRACT NO.2025XXXXX

Issued for Bid Woolpert, Inc. Revision No. 0

February 21, 2025 16 available to establish the level of effort necessary for the extra work, the Owner shall initiate a change order or 222 supplemental agreement to cover the extra work. 223

Any claim for payment of extra work that is not covered by written agreement (change order or supplemental 224 agreement) shall be rejected by the Owner. 225

40-05 Maintenance of traffic. It is the explicit intention of the contract that the safety of aircraft, as well as 226 the Contractor’s equipment and personnel, is the most important consideration. The Contractor shall maintain 227 traffic in the manner detailed in the Construction Safety and Phasing Plan (CSPP). 228

a. It is understood and agreed that the Contractor shall provide for the free and unobstructed movement 229 of aircraft in the air operations areas (AOAs) of the airport with respect to their own operations and the 230 operations of all subcontractors as specified in Section 80, paragraph 80-04, Limitation of Operations. It is further 231 understood and agreed that the Contractor shall provide for the uninterrupted operation of visual and electronic 232 signals (including power supplies thereto) used in the guidance of aircraft while operating to, from, and upon 233 the airport as specified in Section 70, paragraph 70-15, Contractor’s Responsibility for Utility Service and Facilities of 234

Others. 235

b. With respect to their own operations and the operations of all subcontractors, the Contractor shall provide 236 marking, lighting, and other acceptable means of identifying personnel, equipment, vehicles, storage areas, and 237 any work area or condition that may be hazardous to the operation of aircraft, fire-rescue equipment, or 238 maintenance vehicles at the airport in accordance with the construction safety and phasing plan (CSPP) and the 239 safety plan compliance document (SPCD). 240

c. When the contract requires the maintenance of an existing road, street, or highway during the 241

Contractor’s performance of work that is otherwise provided for in the contract, plans, and specifications, the 242

Contractor shall keep the road, street, or highway open to all traffic and shall provide maintenance as may be 243 required to accommodate traffic. The Contractor, at their expense, shall be responsible for the repair to equal 244 or better than preconstruction conditions of any damage caused by the Contractor’s equipment and personnel. 245

The Contractor shall furnish, erect, and maintain barricades, warning signs, flag person, and other traffic control 246 devices in reasonable conformity with the Manual on Uniform Traffic Control Devices (MUTCD) 247

(http://mutcd.fhwa.dot.gov/), unless otherwise specified. The Contractor shall also construct and maintain in 248 a safe condition any temporary connections necessary for ingress to and egress from abutting property or 249 intersecting roads, streets or highways. 250

40-06 Removal of existing structures. All existing structures encountered within the established lines, grades, 251 or grading sections shall be removed by the Contractor, unless such existing structures are otherwise specified 252 to be relocated, adjusted up or down, salvaged, abandoned in place, reused in the work or to remain in place. 253

The cost of removing such existing structures shall not be measured or paid for directly, but shall be included 254 in the various contract items. 255

Should the Contractor encounter an existing structure (above or below ground) in the work for which the 256 disposition is not indicated on the plans, the DEN Project Manager shall be notified prior to disturbing such 257 structure. The disposition of existing structures so encountered shall be immediately determined by the DEN 258

Project Manager in accordance with the provisions of the contract. 259

Except as provided in Section 40, paragraph 40-07, Rights in and Use of Materials Found in the Work, it is intended 260 that all existing materials or structures that may be encountered (within the lines, grades, or grading sections 261 established for completion of the work) shall be used in the work as otherwise provided for in the contract and 262 shall remain the property of the Owner when so used in the work. 263

40-07 Rights in and use of materials found in the work. Should the Contractor encounter any material such 265 as (but not restricted to) sand, stone, gravel, slag, or concrete slabs within the established lines, grades, or 266

TECHNICAL SPECIFICATIONS DENVER INTERNATIONAL AIRPORT

GENERAL PROVISION DEICING PADS A, B, AND C REHABILITATION

AC 150/5370-10H CONSTRUCTION CONTRACT NO.2025XXXXX

Issued for Bid Woolpert, Inc. Revision No. 0

February 21, 2025 17 grading sections, the use of which is intended by the terms of the contract to be embankment, the Contractor 267 may at their own option either: 268

a. Use such material in another contract item, providing such use is approved by the DEN Project Manager 269 and is in conformance with the contract specifications applicable to such use; or, 270

b. Remove such material from the site, upon written approval of the DEN Project Manager; or 271

c. Use such material for the Contractor’s own temporary construction on site; or, 272

d. Use such material as intended by the terms of the contract. 273

Should the Contractor wish to exercise option a., b., or c., the Contractor shall request the DEN Project 274

Manager’s approval in advance of such use. 275

Should the DEN Project Manager approve the Contractor’s request to exercise option a., b., or c., the 276

Contractor shall be paid for the excavation or removal of such material at the applicable contract price. The 277

Contractor shall replace, at their expense, such removed or excavated material with an agreed equal volume of 278 material that is acceptable for use in constructing embankment, backfills, or otherwise to the extent that such 279 replacement material is needed to complete the contract work. The Contractor shall not be charged for use of 280 such material used in the work or removed from the site. 281

Should the DEN Project Manager approve the Contractor’s exercise of option a., the Contractor shall be paid, 282 at the applicable contract price, for furnishing and installing such material in accordance with requirements of 283 the contract item in which the material is used. 284

It is understood and agreed that the Contractor shall make no claim for delays by reason of their own exercise 285 of option a., b., or c. 286

The Contractor shall not excavate, remove, or otherwise disturb any material, structure, or part of a structure 287 which is located outside the lines, grades, or grading sections established for the work, except where such 288 excavation or removal is provided for in the contract, plans, or specifications. 289

40-08 Final cleanup. Upon completion of the work and before acceptance and final payment will be made, 291 the Contractor shall remove from the site all machinery, equipment, surplus and discarded materials, rubbish, 292 temporary…

This is the start of the file's text. The full file is on GovTribe.