Turf Play Field.pdf
PDF 128 KB Posted
- Attached to
- Sam Case Turf Play Field
- Solicitation number
- S-P21000-00002918
- Issued by
- Lake County, Oregon
About this file
This document is a Request for Quote (RFQ) issued by the Lincoln County School District in Oregon for the installation of a 65,000 square foot synthetic turf field at the Sam Case Elementary School. The specifications include a 50 oz. Power House Slit Film Fiber Turf, 3.25 lb. per foot Crumb Rubber infill, drainage, and installation. The project is to be completed between July 18, 2022 and August 15, 2022. Quotes must be submitted by April 29, 2022 at 11:00 a.m. The project is subject to BOLI Prevailing Wage guidelines, and contractors must file a $30,000.00 Public Works bond with the Construction Contractors Board before beginning work.
The RFQ does not provide details on pricing terms, set asides, incumbents, or funding sources. However, it specifies that the Lincoln County School District will prepare the base for the synthetic turf, including excavation, drainage installation, and rock grading and leveling. Contractors are responsible for providing all other materials and labor for the turf installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Field.pdf | ||
| 223052 Notice Intent to Award~1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
April 21, 2022
LINCOLN COUNTY SCHOOL DISTRICT
REQUEST FOR QUOTE:
Sam Case Elementary School
Turf Field
DESCRIPTION: Lincoln County School District is requesting for:
• 65,000 Sq. Ft. Synthetic Turf
• Cryogenic Rubber Infill
Lincoln County School District’s Sam Case Elementary School (459 NE 12th Street Newport, OR 97365).
SPECIFICATIONS:
• 50 oz. Power House Slit Film Fiber Turf and Freight
• 3 ply Primary Backing
• 2.25” Pile Height
• 3.25 lb. per foot Crumb Rubber
• Glue and Seam Tape include Freight
• Holes for Drainage
• Installation
• Equipment rental
• Room and Board
• Contractor to start approximately 7/18/2022
• Contractor to be finished by 8/15/2022
• Attach field dimensions
Lincoln County School District to prepare base for synthetic turf:
• Exterior of turf area to have a pressure treated 2x4 for turf to be attach
• 8’ paved trach area on outside of pressure treated 2x4
• Excavate, install drainage
• Bring in rock to grade and level for turf contactor
Quotes must be submitted by Friday April 29th 2022 at 11:00 a.m.
Question on request for proposal may be submitted by email to rich.belloni@lincoln.k12.or.us, by fax to (541) 336-3702 or by mail to 295 NE Burgess Road, Toledo, OR 97391.
Proposals may be submitted by email to annette.brooks-flatt@lincoln.k12.or.us, by fax to (541) 336-3702 or in-person to 295 NE Burgess Road, Toledo, OR 97391.
NOTE:
• This project is subject to BOLI Prevailing Wage guidelines and requires submission of BOLI Form WH-38 (Certified Payroll Reports) for any person performing labor, for each week of work on this project.
• Contractors and Sub-Contractors must file a $30,000.00 Public Works bond with the Construction Contractors Board (CCB) before beginning work on a public works project.
Rich Belloni, Director of Support Services Facilities & Maintenance 295 NE Burgess Rd.
Toledo, OR 97391
(541) 336-2058 Fax (541) 336-3702
File details come from the government source that posted it. Updated .