This is a Scope of Services document from the Village of Schaumburg, Illinois, detailing specifications for turf and parkway restoration services. The scope encompasses restoration work resulting from utility repairs, stump removal, weather-related damage, motor vehicle damage, and special events, with nine distinct restoration types: Gravel-Sod, Gravel-Seed, Dirt and Organic Material-Sod, Dirt and Organic Material-Seed, Minimal Turf/No Spoils-Sod, Minimal Turf/No Spoils-Seed, Special Event Sod, Special Event Seed, and Special Event Seed Blanket Removal. Historical data indicates significant variability in project volumes across restoration types, with Fiscal Year 24/25 quantities ranging from 140 to 3,587 square yards per category and Fiscal Year 25/26 quantities ranging from 186 to 3,417 square yards. Work orders are issued monthly through digital asset management software, with completion required by month-end before payment authorization. The sealed bid submission deadline for Invitation for Bid 2026-IFB-070 is Friday, December 11, 2026, at 10:00 a.m. via the Village's OpenGov e-Procurement Portal.
All contract pricing shall be unit-priced per square yard and must include all labor, materials, tools, equipment, spoil removal, topsoil installation, site grading, leveling, lawn trimming, and watering as incidental costs with no additional charges authorized. Topsoil specifications require fertile, friable natural loam capable of sustaining plant growth, with minimum depths of twelve inches for Gravel and Dirt/Organic Material areas and four inches for Minimal Turf/No Spoils areas. Sod must be obtained from Illinois Department of Agriculture-inspected local nurseries and delivered within twenty-four hours of cutting, while seed specifications require an equal blend of three varieties from Conserve FS applied at seven pounds per 1,000 square feet. Sodded areas require ten waterings by the contractor beginning within four hours of installation, with water supplied by the Village at no charge. The Contract Administrator reserves authority to reject non-compliant materials and completed work, and payment is withheld until inspection, verification of compliance, and formal acceptance.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Turf_and_Parkway_Restoration_Services.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Village of Schaumburg Scope of Services:
General Specifications for Turf and Parkway Restoration Services
During typical utility repairs, a section of the parkway grass is removed. When the repairs are completed, the excavated area is filled to grade or higher with excavation spoil or with CA-6, grade 8 gravel/backfill. This spoil or gravel/backfill is then allowed to settle before the area is restored with black dirt and sod, or black dirt and seed. Spoil or gravel/backfill is to be removed from the area so that the area can be restored with a minimum of twelve (12") inches of black dirt. These parkway areas generally consist of gravel spoils but on occasion are backfilled with existing soil spoils and can range in size from ten to fifty square yards but may on occasion be smaller or larger. The Village will specify the method of repair.
During typical stump removal, the stump is ground below grade. The spoils are returned to the hole. The spoils are to be removed from the area so that the area can be restored to a minimum depth of twelve (12) inches of black dirt. Stump removal sites shall be restored with black dirt and sod, or black dirt and seed. These areas typically consist of dirt and organic material spoils and are usually two square yards but may on occasion be smaller or larger. The Village will specify the method of repair.
Parkway areas are frequently damaged by snowplows or salt during snow and ice control operations, as well as by motor vehicles as a result of motor vehicles and machinery leaving the roadway and driving on turf. These damaged areas shall be restored with black dirt and seed or black dirt and sod. These types of restorations typically have little to no spoils and require only minor turf removal and minimal regrading of the area. The Village will specify the method of repair.
Turf grass on village-maintained properties can also, on occasion, be damaged as a result of special events such as festivals, concerts, recycling events, or other village sponsored activities. Turf damaged as a result of special events shall be restored with black dirt and sod, or black dirt and seed. The Village will specify the method of repair. In the event of a Special Event Seed restoration, the netting may need to be removed by the contractor at a later date.
This work shall be paid for at the contract unit price per square yard depending on the primary spoil type. Gravel - Sod Restoration; Gravel - Seed Restoration; Dirt and Organic Material – Seed Restoration; Dirt and Organic Material – Sod Restoration; Minimal Turf/No Spoils – Sod Restoration; Minimal Turf/No Spoils - Seed Restoration; Special Events – Seed Restoration; and Special Event – Sod Restoration are the spoil/restoration type options and each price shall include all labor, materials, tools and, equipment used to complete the restoration work. The necessary work of removing spoils, adding or removing topsoil, raking and grading of topsoil, leveling of site, trimming of the surrounding lawn area, and watering shall be considered incidental to this contract and shall be included in the contract unit price.
The nine (9) types of restoration outlined in the Bid contract are:
1) Gravel - Sod: The contractor shall remove the necessary gravel from the excavated area and install a minimum of twelve inches of black dirt and restore the area to grade with sod. Areas where gravel is removed shall be filled with topsoil before leaving location. Under no circumstances shall holes be left open. In addition, these areas will require subsequent watering.
2) Gravel – Seed: The contractor shall remove the necessary gravel from the excavated area and install a minimum of twelve inches of black dirt and restore the area to grade with the proper amount and blend of grass seed. Areas where gravel is removed shall be filled with topsoil before leaving location. Under no circumstances shall holes be left open. In addition, these areas are required to be matted.
3) Dirt and Organic Material – Sod: The contractor shall remove the necessary spoil from the excavated area and install a minimum of twelve inches of black dirt and restore the area to grade with sod. Areas where spoil is removed shall be filled with topsoil before leaving location. Under no circumstances shall holes be left open. In addition, these areas will require subsequent watering.
4) Dirt and Organic Material – Seed: The contractor shall remove the necessary spoil from the excavated area and install a minimum of twelve inches of black dirt and restore the area to grade with the proper amount and blend of grass seed. Areas where spoil is removed shall be filled with topsoil before leaving location. Under no circumstances shall holes be left open. In addition, these areas are required to be matted.
5) Minimal Turf/No Spoils - Sod: The contractor shall remove the necessary damaged turf and install the necessary black dirt to the area and restore the area with sod. In addition, these areas will require subsequent watering.
6) Minimal Turf/No Spoils - Seed: The contractor shall remove damaged turf from area and install black dirt to grade and cover with the proper amount and blend of grass seed. In addition, these areas are required to be matted.
7) Special Event Sod: The contractor shall remove the necessary damaged sod and debris as marked, install the necessary black dirt and restore the area with sod. In addition, these areas will require subsequent watering.
8) Special Event Seed: The contractor shall remove necessary spoils and install the necessary black dirt to grade, and cover with the proper amount and blend of seed. In addition, these areas are required to be matted. The contractor will be asked to provide separate prices for matting removal once seed has been established.
9) Special Event Seed Blanket Removal: The contractor shall remove the previously installed seed blanket from the restoration site. This will only occur at the specific request of the contract administrator and will not happen at all Special Event Seed locations.
All debris and spoil from the restoration operations shall be cleaned up before the work crew leaves the site. No debris or spoil shall be stockpiled in the street for any reason. Debris and spoil are to be loaded onto a truck immediately. All lawn areas shall be raked clean, all streets and sidewalks shall be swept, and all debris and spoil shall be removed from the site. Areas are to be left in a condition equal to that which existed prior to the time when the damage occurred. Any and all necessary removal and hauling of unused material and all clean-up of the area shall be incidental to the contract.
The Contract Administrator will indicate the work area in the detailed instructions in a digital asset management work order. The typical work area will consist of an irregularly shaped area with an exposed gravel or soil surface. When necessary, the restoration area will be marked out on site with paint. The contractor shall remove the backfill as needed and trim the adjacent lawn area to produce a smooth transition between the restored area and the undamaged surrounding area. Either sod or seed, as directed by the Contract Administrator, shall be placed in the area to be restored, and watering shall be accomplished in accordance with these specifications. When directed by the Contract Administrator, any defective or unacceptable sod or seed installed by the contractor shall be removed, replaced and watered in accordance with these specifications at no additional charge.
At the beginning of each month the contractor will receive work assignments utilizing digital asset management software. The assignments will consist of a list of the addresses or areas to be restored with either black dirt and sod, or black dirt and seed. This work is required to be completed by the end of the month before payment will be issued. The contractor may request an extension to complete that month’s work if special circumstances cause such an extension to be necessary. An extension may only be granted if the Contract Administrator deems it reasonable or necessary.
Areas will be inspected at each specified location after restoration is completed and the contractor will certify that the completed work complies with the contract specifications. The Contract Administrator reserves the right to reject any material or completed work which does not comply with these specifications. Payment for any and all work will not be made until the restoration site has been completed, inspected, and accepted.
All work orders given to the contractor will show the estimated size of the area to be restored and the type of restoration required. If the final restoration size differs from the estimate, the contractor shall notify the Contract Administrator and provide updated totals in the digital asset management software. The village will not accept larger restoration totals that are the result of damages to the turf caused by the contractor during the restoration process.
PREPARATION OF SITES
Gravel & Dirt and Organic Material Areas: Before commencing the work, examine the site to determine that it is free of conditions which might be detrimental to proper and timely completion of the work. Start of work shall indicate acceptance of the site.
Equipment necessary for the preparation of the ground surface and for handling and placing required material shall be on hand, in good condition, before the work is started.
Place topsoil over the areas to be sodded/seeded, to a depth of not less than twelve inches after settlement and compaction; place to greater depth where necessary to meet established finish grades. Irregularities in the surface of subgrade resulting from placing topsoil or other operations shall be corrected and finish surfaces worked to a uniform grade to match the existing grade of the parkway. Subgrade shall be clear of sticks and stones over one inch in diameter, plants and their roots, and debris.
Fine grade the surface of the topsoil to a uniform finish, free of objectionable materials and suitable for planting.
Minimal Turf/No Spoils: Before commencing the work, examine the site to determine that it is free of conditions which might be detrimental to proper and timely completion of the work. Start of work shall indicate acceptance of the site.
Equipment necessary for the preparation of the ground surface and for handling and placing required material shall be on hand, in good condition, before the work is started.
Place topsoil over the area to be sodded/seeded to a depth of not less than 4 inches (4”) after removal of damaged sod and debris from the site. Place topsoil where necessary to meet established finished grades around the damaged area. Irregularities in the surface of subgrade resulting from placing topsoil or other operations shall be corrected to finish surfaces worked to a uniform grade. Subgrade topsoil shall be clear of sticks and stones over one inch in diameter, plants and their roots and debris.
Topsoil: The topsoil should be fertile, friable, natural loam, capable of sustaining vigorous plant growth. Topsoil shall be of uniform composition throughout and without admixtures of subsoil, and shall be free from lumps, stones, stumps, roots, other objects larger than one inch in diameter, toxic substances, and other material or substance which might be harmful to plant growth. It shall be a loamy mixture having at least ninety percent (90%) passing the Number 10 (ten) sieve.
SPECIFICATION FOR SOD AREAS
Sod: Sod shall be obtained from a local recognized sod nursery which shall furnish upon request a certified copy of inspection as required by the State of Illinois, Department of Agriculture, Division of Plant Industry. Sod shall conform to industry norms and standards. Both the sod nursery and final sod product must be approved by the Contract Administrator prior to installation.
Delivery and Storage of Sod: Care shall be taken to retain the native soil on the roots during the process of stripping, transporting, and placing sod. Sod shall be cut and transported only when moisture conditions are favorable for correct handling and shall be protected by a suitable canvas or other wind-resistant material while in transit. Dumping of sod from vehicles onto the areas of delivery will not be permitted. Sod shall be delivered within twenty-four (24) hours from time of cutting. Sod which has been damaged in transit or in handling, including drying out, shall be rejected and removed from the site immediately.
Placement of Sod: Sources of sod shall be identified within fifteen (15) days prior to removal of sod and shall be approved by the Contract Administrator. Sod shall be inspected periodically during laying operations and portions thereof, which fail to meet the requirements, shall be rejected.
A starter fertilizer, approved by the Contract Administrator, shall be spread on the topsoil and lightly raked into the soil before placing of the sod. Moisten soil surface immediately before laying sod. Use a fine spray which will not disturb finished surface.
Sod shall be laid smoothly, edge to edge, in close contact on the prepared surface, with joints staggered. Sod shall be pressed into setting bed immediately by tamping or rolling with approved equipment to eliminate air pockets and to produce an even surface. Where grades are such that the flow of water will be over sodded areas and onto paved areas, surface of the soil in the sod after compaction shall be flush with the pavement or drainage structures. Edges of sodded areas shall be smoothed and shaped to conform with the surrounding area.
Sod placed in ditches with grades steeper than one percent (1%) and on slopes three to one (3:1) and steeper shall be secured using sod staples. The sod staples shall be spaced not over two feet (2’) apart in each strip measured lengthwise of the strip. Sod staples shall be driven down until no part of the installed staple protrudes above the surface of the sod.
Watering Sod: After the installation of new sod, the contractor will deliver a watering letter to each resident. This letter will be supplied by the Contract Administrator and will explain the contractors watering responsibility as well as the after care that is to be completed by the resident. All sodded areas shall receive ten (10) waterings by the Contractor as part of the Contract, with the first watering being within four (4) hours of the initial installation of the sod. The remainder of the waterings will be daily for five (5) consecutive days followed by every other day waterings until ten (10) waterings have been completed. Any changes to the watering schedule must be approved by the Contract Administrator. No extra charges for the watering will be authorized. The water will be supplied by the Village at no charge and will be made available only at the Public Works Complex, 714 South Plum Grove Road. Fire hydrants or hose bibs at residential or commercial sites shall not be used for landscape watering purposes. Water shall be applied to a sodded restoration area at the rate of five (5) gallons per square yard. The contractor shall track the dates and times each location was watered and enter this information into the digital asset management software.
SPECIFICATION FOR SEED AREAS
Seed: All seed used shall be from the vendor Conserve FS. An equal blend of the following three varieties; Field of Dreams Reseeder, Field of Dreams Glamour, and Drought Beater RTF shall be mixed together and applied at a rate of 7lbs per 1000 square feet. Seed tags shall be provided to the Contract Administrator upon request. Any deviation from this seed specification must be approved by the Contract Administrator.
Watering Instructions: For seed restorations the contractor will distribute watering instructions to all adjoining property owners indicating that waterings should be provided by the property owners to continue growth of the restored area. This letter will be provided by the Contract Administrator.
Matting Material: Shall conform to industry norms and standards and be approved by the Contract Administrator prior to the start of the contract.
HISTORICAL DATA
In Fiscal Year 24/25 and Fiscal Year 25/26 the following quantities were utilized:
| Fiscal Year 24/25 |
| Quantities |
| Fiscal Year 25/26 |
| Quantities |
| Gravel Sod Restoration |
| 3,587 sq yds |
| Gravel Sod Restoration |
| 3,417 sq yds |
| Gravel Seed Restoration |
| 2,427 sq yds |
| Gravel Seed Restoration |
| 1,217 sq yds |
Dirt and Organic Material Sod Restoration
| 2,010 sq yds |
| Dirt and Organic Material |
Sod Restoration 280 sq yds
| Dirt and Organic Material Seed Restoration |
| 2,896 sq yds |
| Dirt and Organic Material Seed Restoration |
| 952 sq yds |
| Minimal Turf/No Spoils Sod Restoration |
| 2,025 sq yds |
| Minimal Turf/No Spoils |
Sod Restoration 220 sq yds
| Minimal Turf/No Spoils Seed Restoration |
| 1,035 sq yds |
| Minimal Turf/No Spoils Seed Restoration |
| 2,269 sq yds |
Special Events Sod Restoration
| 140 sq yds |
| Special Events |
Sod Restoration 186 sq yds
Special Events Seed Restoration
| 217 sq yds |
| Special Events |
Seed Restoration 886 sq yds