TTLF_Staff_Gauge_and_Platform_Options_Review_Memo_Final_-_Client_Issue_2-27-24_pckg.pdf
PDF 3 MB Posted
- Attached to
- Floating Modular Dock
- Solicitation number
- 24-1038-ITQ
- Issued by
- Pinellas County, Clewiston City, Florida
About this file
This document is a technical memo prepared by Arcadis for Pinellas County Solid Waste regarding staff gauge and dock options for the Toytown Landfill. The project involves replacing an existing staff gauge and constructing a new dock to enable staff to read pond water levels and collect water samples. Arcadis evaluated four dock options: a fixed dock with composite decking, two prefabricated floating dock options (composite and aluminum materials), and a modular plastic floating dock. The recommended dock is a modular floating dock from EZ Dock, specifically a 6-foot by 10-foot floating dock with a 3-foot by 12-foot aluminum gangway. The staff gauge will be shore-mounted and anchored by an aluminum channel from the existing concrete weir, with an additional aluminum support beam set into the pond bottom.
The dock options were evaluated based on criteria including material durability, capacity (500-pound minimum), handrails, wildlife prevention, maintenance requirements, and a desired 30-year lifespan. Cost estimates ranged from $8,499 to $86,515, with the EZ Dock modular plastic floating dock being the lowest-cost option. Installation costs and vendor quotes were solicited from multiple marine construction companies, including Trident Marine Construction, Gulf and Bay Dockworks, Flotation Systems Inc., and AccuDocks. The final recommendation was made after considering factors such as cost, installation complexity, material quality, and the specific monitoring needs of the Toytown Landfill stormwater pond. The County has approved moving forward with the EZ Dock solution, with next steps including installation of the shore-mounted staff gauge and purchasing the modular floating dock through the County Purchasing Department.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Floating_Modular_Dock_(Addendum_#1_Revision).pdf | ||
| Floating_Dock_Installation_Area_Photo.pdf | ||
| Floating_Dock_Installation_Area_Photo.JPG | JPG image | |
| Non-Competitive_Oversight_Committee_Justification_Form.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SUBJECT TO
Toytown Landfill Staff Gauge and Dock Options Review Chuck Mangio
DATE DEPARTMENT
February 27, 2024 Pinellas County Solid Waste
PROJECT NUMBER
30197151
COPIES TO NAME
Emily Davis – Pinellas Cindy Eckert Chris Tilman – Arcadis 813-732-2080, Cindy.Eckert@arcadis.com Keerthana Sreenivasan 813-353-5721, Keerthana.Sreenivasan@arcadis.com
Introduction
Pinellas County maintains the closed Toytown Landfill and as part of this effort maintains the site stormwater and groundwater monitoring system. The site includes stormwater swales and a pond with a pond water level gauge that is read manually to track pond levels. The pond depth varies throughout the year during the dry season and wet season. The County wishes to replace the staff gauge at the stormwater pond and also construct a dock to be able to read and clean a new staff gauge and collect pond water samples as needed. This memo will review the
County minimum requirements for a dock and evaluate the different dock options for the County’s review and selection.
Approach
For this, we determined County requirements, reviewed pond data for range of depths, and evaluated up to four different dock options. Data collected with the existing staff gauge cannot read pond water levels if below an elevation of 2.15 feet. The 10-year average pond water level elevation is 3.38 feet and a maximum water level elevation of 4.23 feet was reached in 2016. Based on data collected, the pond water level elevation varies by 0.2 feet to 1 foot within a year but likely varies even more due to lack of readings below the water level elevation of
2.15 feet. As a result of the variance in pond water level and increased deposit of sediment over the years, the existing staff gauge is tilted and not secured. Pinellas County wants to install and anchor a new staff gauge and a new dock that extends out into the pond for staff to access and clean the gauge and collect water samples. Two locations of the staff gauge were considered: one by the shore near the current staff gauge location and one towards the middle of the pond.
The advantages of installing the staff gauge and dock towards the middle of the pond include:
• Less impact from varying water levels even during the dry season and allowing for staff gauge readings at low water levels as well, when the near shore mounted staff gauge is out of the water.
• Less damage to staff gauge from near shore maintenance activities.
• Less steep slope of gangway to the dock, mitigating concerns of steep gangway from some vendors.
• Less wear and tear to dock as it will lie more evenly during the dry season.
mailto:Cindy.Eckert@arcadis.com mailto:Keerthana.Sreenivasan@arcadis.com
Toytown Landfill Staff Gauge and Dock Option Review
Pinellas County Solid Waste
February 27, 2024
However, the main disadvantage of installing the staff gauge towards the middle of the pond is higher costs due to a longer gangway and larger dock needed to support the gangway as well as feasibility dependent on actual depth of pond at proposed location.
Various vendors were contacted to determine and develop alternative options for a dock at both proposed locations. Capital costs, maintenance required, and useful life for each option as well as some notable advantages and disadvantages are presented below.
Design Criteria
The criteria for the staff gauge and dock include:
• Material of construction – wood and steel are not preferable unless proven to last 30 years. Prefer corrosion resistant materials.
• Capacity – should be able to hold one to two people at a time, approximate weight minimum capacity of
500 pounds
• Handrails – for safety and comfort
• Additional side grating for prevention of alligators and other wildlife climbing on to dock (optional)
• Maintenance – Low maintenance requirements
• Lifespan – 30 years
• Staff gauge – 1-inch incremental elevation measurements with a precision of 0.01 feet up to 8 feet
Other considerations:
• Material and Installation Costs
• Material Lead Time
• Construction of concrete pad for anchoring gangway and dock on the bank
• Clearing vegetation around staff gauge prior to installation of dock and gangway for ease of access
Staff Gauge and Dock Near Shore
In addition to the design criteria listed above, the following gangway and dock size were considered for a shore mounted staff gauge.
• Gangway/walkway: a 10-foot aluminum gangway that extends from the pond bank near the existing weir down the slope to the dock
• Dock Size: a minimum 10-foot-long dock (extends from gangway into the pond a few feet past the new staff gauge)
Staff Gauge Installation
Arcadis and the County discussed different shore-mounted staff gauge mounting methods and locations as well as considering other staff gauge configurations used by the County and their performance. After collaboration, it was determined that the staff gauge will be anchored by a 4x1 inch aluminum channel from the existing concrete weir and further secured on a 4x4 inch aluminum support beam anchored in concrete set into the pond bottom.
There will be an additional 2x2 inch aluminum post between the weir and the staff gauge to stabilize the long arm span. This is a similar configuration to several staff gauges in use at the Bridgeway Acres Site. The detailed vendor cost estimate for materials is included in Appendix A.
Metal Supermarkets Price
Aluminum Square tube and Channel $315
Miscellaneous $100
8’x4.875” aluminum staff gauge (oregonrule.com) $120
Total $535
The staff gauge near the shore was installed by Arcadis staff on February 5th and 6th of 2024. Photos of the newly installed staff gauge are shown below.
Dock Options Reviewed
The four dock options reviewed include:
1. Fixed dock – composite decking
2. Prefabricated floating dock of composite material
3. Prefabricated floating dock of aluminum material
4. Floating dock of plastic material, modular
Every option consists of a 10-foot aluminum gangway/walkway and a summary of the cost estimate is provided below. A summary of the considered advantages and disadvantages are listed in Table 1 below.
Table 1. Advantages and Disadvantages of each option
Options Advantages Disadvantages
1 – Fixed Dock
• Lesser wear and tear as water depth varies
• Conservative design to maximum pond depth, may make reading staff gauge at low water levels difficult
• May become submerged at extreme high water levels
• Difficulty sampling when pond levels are very low or dry
2 – Prefabricated floating dock – composite
3 – Prefabricated floating dock - aluminum
• Dock height adjusts with pond water level for easier sampling
• More stable than a modular floating dock
• Less expensive than fixed dock
(composite option)
• Harder to clear vegetation around dock and potential sediment accumulation around dock when pond is dry
4 – Modular floating dock
• Dock height adjusts with pond water level for easier sampling
• Less expensive than fixed dock
• Customizable
• Fastest schedule
• Harder to clear vegetation around dock and potential sediment accumulation around dock when pond is dry
Option 1: Fixed Dock with Composite Decking
Dock contractors such as Trident Marine Construction and Gulf and Bay DockWorks provided quotes based on the design criteria and considerations provided below. The detailed quotes provided can be found in Appendix A.
Trident Marine Construction – Quote Item Price
5x10 foot Aluminum Gangway -
10x10 feet Fixed Dock with railing -
Total $31,257
Additional Quote Details:
• Schedule: 3 to 8 working days (dawn to dusk) from mobilization.
• Includes picket railing around the perimeter of the walkway and dock.
• Dock installation included.
• All fasteners/ hardware will be galvanized or stainless steel.
• All lumber will be 0.40 ACQ treated marine grade #1 dense southern pine.
• All framing nails to be 12 D stainless ring shanked.
Gulf and Bay DockWorks – Quote Item Price
4x10 ft Aluminum Gangway Not included
12x12 ft Fixed Dock $7,728
Piling Installation $16,500
Handrail (composite) $5,760
Permitting $150
Total $30,138
Additional Quote details:
• Gangway not included in prices estimate as recommended to build a more permanent walkway due to difficulty in anchoring gangway on steep slope.
• Dock installation included.
• Anticipated to use air jetting method to install synthetic piles.
• All hardware will be stainless steel.
Figure 1 provides a layout of the proposed gangway and dock quoted by Gulf and Bay DockWorks
Figure 1. Layout of the proposed gangway and dock quoted by Gulf and Bay DockWorks
Prefabricated Floating Dock
Dock contractors such as Trident Marine Construction and Accu Dock provided quotes based on the design criteria and considerations provided below. Trident Marine construction provided a quote for an aluminum deck while Accu Dock provided a quote for a composite deck. The detailed quotes provided can be found in Appendix
A.
Option 2: Prefabricated Floating Dock – Composite Material
ACCU DOCK – Quote Item Price
3x10 ft Aluminum Gangway with Railing $1,890
5x10 ft Floating Dock with Railing (Composite) $3,200
Aluminum Railing for Dock (3 sides) $1,620
Fittings $923
Shipping $950
Total* $8,728
*Installation not included
• Deck Material composition: Wood Fiber and Polyethylene Composite. Designed to have a 12” freeboard.
• Total price includes a 5% discount of $409.
• Taxes are not included as County would be purchasing.
• Not included in quote: 4-inch schedule 40 PVC pipes that needs to be locally sourced, pouring a 4x4 foot concrete pad to allow the landside hinge to attach for the gangway to be held in place, or installation.
Figure 2. provides a layout of the proposed gangway and dock quoted by Accu Docks.
Figure 2. Layout of the proposed gangway and dock quoted by Accu Docks
Option 3: Prefabricated Floating Dock – Aluminum Material
Trident Marine Construction – Quote Item Price
5x12 ft Aluminum Gangway -
10x10 ft Aluminum Dock with railing -
Total $47,257
• Includes a 42-inch pipe rail around the dock.
• Installation included.
• Gangway and dock will have ribbed aluminum decking.
• A concrete footer will be constructed on slope to anchor gangway.
• Schedule: 3 to 8 working days (dawn to dusk) from mobilization.
• All fasteners/ hardware will be galvanized or stainless steel.
• All lumber will be 0.40 ACQ treated marine grade #1 dense southern pine.
• All framing nails to be 12 D stainless ring shanked.
Option 4: Modular plastic floating dock
Another floating dock option is the modular floating docks composed of several modular plastic pieces designed to attach together in different configurations to create a custom dock. Dock vendor such as EZ Dock provided a quote based on the design criteria and considerations provided below.
EZ DOCK – Quote Item Price
3x12 foot Aluminum Gangway $3,200
3x10 feet Dock piece (foam built)* $1,699
PVC and Galvanized Pole kit and Anchor $850
10 feet long aluminum handrail (x2) $2,100
Installation $650
Total $8,499
Additional Quote Details:
• Written estimate was not provided. Estimate based on a verbal discussion with the sales representative.
• Based on verbal discussions, maintenance is minimal and only requires pressure washing as needed.
• Representative suggests a 6x10 ft dock for better stability and would cost $10,198.
• Railing around dock not included.
Figure 3 provides an example of a modular dock and gangway with railing provided by EZ DOCK.
Figure 3. Example of gangway and dock provided by EZ DOCK
Table 2 on the following page provides a comparison of each vendor estimate for the County to consider when selecting a pond dock option.
Table 2. Dock Options Vendor Summary
Options Vendor Cost
($/sq ft) Warranty and Lifespan
Lead
Time
Material of
Construction
Dock
Dimensions
Option 1: Permanent
Dock
Trident Marine
Construction
$31,257
($208/sq ft)
1-year workmanship warranty
General lifespan: 15 to 20 years
2 weeks
Wear deck composite decking with marine grade lumber attachments
Gangway: 5’x10’
Dock: 10’10’
Option 1: Permanent
Dock
Gulf & Bay
Dockworks
$30,138
($209/sq ft)
30-year warranty on the pilings
General lifespan: 30 years
2 to 4 weeks
Fiberglass reinforced composite decking with marine grade timber framing
Gangway: Not included
Dock: 12’x12’
Option
2: Prefabricated
Floating Dock, Composite
AccuDocks
$8,728*
($109/sq ft)
*Installation not included
General lifespan: 30 years 6 to 7 weeks Wood Composite
Gangway: 3’x10’
Dock: 5’x10’
Option
3: Prefabricated
Floating Dock, Aluminum
Trident Marine
Construction
$47,257
($295/sq ft)
1-yr workmanship warranty
General lifespan: 30 to 40 years
6 to 8 weeks Aluminum
Gangway: 5’x12’
Dock: 10’x10’
Option 4: Floating
Dock EZ Docks
$8,499
($129/sq ft)
8-year warranty
General lifespan: 30 years
Approx. 2 weeks Foam Block
Gangway: 3’x12’
Dock: 3’x10’
Arcadis U.S., Inc., 4300 W Cypress Street, Suite 450, Tampa, Florida, 813 903 3100, www.arcadis.com
TTLF Staff Gauge and Platform Options Review Memo Final - Client Issue 2-27-24
Staff Gauge and Dock Towards Middle of Pond
In addition to the design criteria listed above, the following gangway and dock size were considered for a staff gauge anchored towards the middle of the pond, which would be approximately 50 feet away from the pond bank.
• Gangway/walkway – a 50-foot aluminum gangway that extends from the pond bank near the existing weir structure down the slope to the dock
• Dock Size – recommended size by vendor in order to support a longer gangway. May vary.
Staff Gauge Installation
An 8-foot staff gauge can be mounted on 2-inch x15-foot aluminum post that is driven into the pond bottom by at least 5 feet to anchor it securely. The Staff gauge will be mounted on a 2-inch x 6-inch pressure treated wood plank and attached to the aluminum post with U-bolts. This design allows for easy adjustments during surveying and easier maintenance. Feasibility of this option is also dependent on actual depth of pond at proposed location.
Market Price
Aluminum post $150
Pressure treated wood plank $11
304 SS U-bolts with mounting plates (4) $9/each ($36)
8 foot x 4.875 inch aluminum staff gauge
(oregonrule.com) $118
Total $315
Dock Options Reviewed
Three dock options were considered:
1. Fixed dock – composite decking
2. Prefabricated floating dock of composite material
3. Prefabricated floating dock of aluminum material
Feasibility of this option is also dependent on actual depth of pond at proposed location, as all options will be anchored at the proposed location and poles or piles will need to be of adequate length. Vendor estimates for a
50-foot gangway for options 1 and 2 have not been received at this time but will be included in the final technical memo submittal. The cost will be higher than the near shore options as more materials and potentially more complex construction due to location of anchor poles are piles will be required.
Option 1: Fixed dock – composite decking
Dock contractors such as Gulf and Bay Dockworks provided a quote based on the design criteria and considerations listed above. A 50-foot fixed walkway and 12-foot x 12-foot main fixed dock of composite decking was quoted for. The detailed quotes provided can be found in Appendix A.
Gulf and Bay Dockworks – Quote Item Price
4x50 foot fiberglass composite walkway $14,448
12x12 foot composite fixed dock $14,760
Piling Installation $46,200
Railing (composite material) $14,760
Total $76,678
Additional quote details:
• All framing will be marine grade pressure treated timber.
• Includes stainless steel hardware.
• Includes installation costs.
Figure 4 provides a plan view layout of the proposed walkway and dock quoted.
Figure 4. Layout of the proposed walkway and dock provided by Gulf and Bay Dockworks.
Option 2: Prefabricated floating dock and fixed gangway
Dock contractors such as Gulf and Bay Dockworks in partnership with Accudocks, and Trident Marine
Construction provided quotes based on the design criteria and considerations listed above. A 30-foot composite decking walkway, attached to a 12-foot-long floating aluminum gangway and 12-foot x 16-foot floating composite dock was quoted. The 30-foot walkway section will be fixed in order to minimize the amount of extra flotation support needed for the length of gangway required. The quote includes a 4-foot x 20-foot walkway upland. The detailed quotes provided can be found in Appendix A.
Gulf and Bay Dockworks – Quote Item Price
4x30 foot fiberglass composite walkway and 4x20 foot upland walkway $5,600
12x16 foot composite floating dock and 3x12 foot aluminum floating gangway (Accudocks) $19,553.97
Dock Installation $4,000
Piling Installation $21,000
Railing (composite material) $6,000
Total $56,303.97
• Floating dock installation includes transportation, assembly and installation using a barge.
• Floating Aluminum gangway includes non-skid decking and side railing.
• Pilings will be fortress pilings.
• All framing will be marine grade pressure treated timber.
• Includes stainless steel hardware.
• Includes installation costs.
Figure 5. provides a plan view layout of the proposed walkway and floating dock.
Figure 5. Layout of the proposed walkway and floating dock provided by Guld and Bay Dockworks and Accudocks
Trident Marine Construction – Quote Item Price
Fixed 5x38 foot dock to a 5x12 foot aluminum gangway to a 10x10 foot floating composite dock $84,353
Mobilization $500
Total $84,853
• Floating dock will be secured with roller exterior pile guides and butt piles.
• Picket railing included.
• All lumber will be marine grade treated.
Option 3: Prefabricated floating dock of aluminum material
Dock contractor such as Flotation Systems Inc. and Trident Marine Construction provided quotes based on the design criteria and considerations listed above. A 12-foot x 16-foot dock was quoted based on vendor recommendation in order to support a 50-foot gangway. The detailed quote provided can be found in Appendix A.
Flotation Systems Inc – Quote Item Price
4x50 foot Aluminum Gangway with railing $7,356
12x16 foot Aluminum Dock with railing $19,899
Anchoring System $3,440
Freight $2,575
Installation $8,500
Total $41,770
• All aluminum decking is finished using non-skid powder.
• No warranty provided.
• Installation included.
Figure 4 provides a layout of the gangway and dock proposed by Flotation Systems.
Figure 4. Layout of gangway and dock proposed by Flotation Systems
Trident Marine Construction– Quote Item Price
5x20 foot Aluminum Gangway and two 5x20 foot aluminum ribbed floating dock $86,515
Mobilization $500
Total $87,015
• Concrete footer will be constructed on land to anchor the aluminum gangway.
• Includes two sections of 20-foot floating docks with aluminum ribbed decking.
• Floating dock anchored with roller exterior pile guides.
• Includes handrails.
Summary and Conclusion
While the original scope of work included reviewing four options for a gangway and dock to access a shore mounted staff gauge, Arcadis also reviewed options if the staff gauge were to be installed in the middle of the pond. The final location of the staff gauge will be decided based upon the County’s review and consideration.
Regardless of the staff gauge location, the floating dock options will likely be most functional for staff gauge reading, cleaning, and pond sampling as they will rise or fall with the pond water level. The floating dock options are also most cost effective and have a longer general lifespan than the fixed dock option.
For a shore mounted staff gauge, of the floating dock options, the modular plastic floating dock (Option 4) is the lowest cost option, even for a larger dock. The best durability option is the prefabricated floating dock provided by
Trident Marine Construction or Accu Docks (Options 2 or 3). The cost-effective option with most of the desired features is option 2, prefabricated floating dock of composite material, as it includes aluminum railing on 3 sides of the dock to deter wildlife from loitering on the dock. But it must also be noted that this option did not include installation costs. Installation costs have been requested but has not yet been received. Based on other quotes received, the estimated installation cost could be around $700 - $1200, resulting in an estimated total for option 2 of about $9,900.
For a staff gauge installed towards the middle of the pond, further review of the options is required as vendor quotes are received, and this option is discussed further with the County to ensure it meets their needs and potential site limitations.
Based on comments received from the County after reviewing the draft memo, the County has decided to move forward with a shore mounted staff gauge anchored by an aluminum channel from the existing concrete weir and further secured by an aluminum support beam anchored in concrete set into the pond bottom. The County has decided to move forward with a modular floating dock such as EZ Dock with a 6-foot x 10-foot floating dock for increased stability.
The next steps include installing the shore mounted staff gauge as described above and purchasing a modular floating dock through the County Purchasing Department.
Appendix A
Dock Vendor Estimates
Bill to
Ship to
Arcadis Tampa, FL Email: david.welch@arcadias.com
Arcadis Tampa, FL Email: david.welch@arcadias.com
4901-AW. Rio Vista Avenue Tampa, FL 33634
Date: Oct-26-2023 Terms: Immediate
Delivery Method: Pickup Customer Rep: Beth Manuel
E-Mail: tampa@metalsupermarkets.com Phone: (813) 906-5077 Fax: (813) 906-5088
Customer Purchase Order #
Promise Date:
CUSTOMER QUOTE # 1049385
1Page 1 of
Unit Price TotalProduct Qty Length Unit
Attention: David Welch
This is not an ORDER or INVOICE Rusalka, Inc., an independent franchisee dba METAL
SUPERMARKETS TAMPA
Contact Phone: 813-523-0015 Store #: 021702
Valid Until: Oct-28-2023
Dimension
Attention: David Welch Contact Phone: 813-523-0015
Aluminum Square Tube 6063T52 4.000 X 4.000 X 0.120 / 0.125ATSQ6063/44125
IN1 120 131.411.09508 1 @ 120 IN
Alum Channel 6063T52 Sharp Corner 4.000 X 1.000 X 0.105AC6063SHC/41105
IN1 216 89.460.41417 1 @ 216 IN
Aluminum Square Tube 6063T52 2.000 X 2.000 X 0.120 / 0.125ATSQ6063/22125
IN1 120 72.600.60500 1 @ 120 IN
SUB-TOTAL 293.47
Description (Special Comments) :
Sales Tax 7.5% 22.01
315.48TOTAL
NOW OFFERING IN-HOUSE PLASMA CUTTING, BENDING & HOLE PUNCHING!
Partial selection is subject to requote, subject to availability at time of order.
For full terms and conditions of sales please refer to http://metalsupermarkets.com/terms-of-sale/
To: KEERTHANA SREENIVASAN Contact: KEERTHANA
Address: Phone: 813-353-5721
Email: KEERTHANA.SREENIVASAN@ARCADIS.COM Project Name: TOYTOWN Bid Number: 20231030CC2
Project Location: ST. PETERSBURG, FL Date: 10/30/2023
Line # Item Description Quantity Unit Unit Price Total Price
GENERAL CONDITIONS
1 MOBILIZATION 1.00 LS $500.00 $500.00
Total price for the above GENERAL CONDITIONS Items: $500.00
DOCK OPTIONS
FIXED DOCK
1 CONSTRUCT A NEW FIXED DOCK TO HAVE A 5'X10' 1.00 LS $31,257.00 $31,257.00
WALKOUT TO A 10'X10' HEAD. 2"X10" DOUBLE-OUTSIDE
FRAME, SECURED WITH 5/8" SS THROUGHBOLTS.
DECKING TO BE 1"X6" WEARDECK COMPOSITE DECKING,
FASTENED WITH SS FASTENERS. COLOR TO BE
DETERMINED BY OWNER. CONSTRUCT 50' LINEAR FEET
OF PICKET RAILING AROUND PERIMETER OF WALKOUT
AND HEAD. 4"X4" STANCHIONS, SECURED WITH 1/2" SS
LAGBOLTS. 2"X2" SPINDLES, 2"X4" KICKRAIL. TOPRAIL
TO BE 2"X4" AND 1"X6" WEARDECK COMPOSITE DECKING,
FASTENED WITH SS FASTENERS. COLOR TO MATCH DECK.
ALL PILES TO BE 2.5CCA TREATED. ALL LUMBER TO BE
MARINE GRADE. PILES TO BE WRAPPED IN .30
POLYETHYLENE STANDARD BLACK PILE WRAP, FASTENED
WITH SS RINGSHANK NAILS.
FLOATING DOCK
2 INSTALL A NEW 10'X10' ALUMINUM FLOATING DOCK ON 1.00 LS $47,257.00 $47,257.00
TWO NEW PILES, SECURED WITH 4-ROLLER EXTERIOR
PILE GUIDES, ANCHORED ON 10" BUTT PILES. CONSTRUCT
A CONCRETE FOOTER ON LAND TO ANCHOR ALUMINUM
GANGWAY. INSTALL A 5'X12' ALUMINUM GANGWAY FROM
CONCRETE FOOTER TO FLOATING DOCK, SECURED WITH
SS HARDWARE. GANGWAY AND FLOATING DOCK TO HAVE
42" THREE-LINE ALUMINUM PIPE RAIL AROUND PERIMETER,
WITH DIVERSION PLATE. GANGWAY AND FLOATING DOCK
TO HAVE ALUMINUM RIBBED DECKING. ROLLERS AND
TRANSITION PLATE AT BASE OF GANGWAY CONNECTING
TO FLOATING DOCK. ALL PILES TO BE 2.5CCA TREATED.
Total price for the above NEW items: TBD
CLARIFICATIONS:
* THIS ESTIMATE IS BASED ON A NUMBER OF DESIGN ASSUMPTIONS. NO SITE-SPECIFIC DESIGN CRITERIA OR
PROJECT SPECIFICATIONS HAVE BEEN PROVIDED TO TRIDENT MARINE CONSTRUCTION AT THE TIME THIS
ESTIMATE WAS CREATED.
* NO ENGINEERING PLANS WERE PROVIDED FOR THIS ESTIMATE.
* NO SOIL SAMPLES ARE INCLUDED IN THIS QUOTE.
* ESTIMATE DOES NOT INCLUDE PERMITTING OR ENGINEERING FEES.
* NO ELECTRIC OR PLUMBING IS INCLUDED IN THIS ESTIMATE.
Trident Marine Construction mailto:KEERTHANA.SREENIVASAN@ARCADIS.COM
Email: KEERTHANA.SREENIVASAN@ARCADIS.COM Project Name: TOYTOWN Bid Number: 20231030CC2
Project Location: ST. PETERSBURG, FL Date: 10/30/2023
Trident Marine Construction
* NO DREDGING OR BACK FILLING IS INCLUDED IN THIS ESTIMATE.
* NO BRUSH CLEARING IS INCLUDED IN THIS ESTIMATE.
* BASE BID PRICE IS ONLY AN ESTIMATE. PRICE SUBJECT TO CHANGE BASED ON UNFORESEEN SITE CONDITIONS.
* WOOD, DECKING, & MATERIALS BASED OFF PRICING THE WEEK OF 10/30/2023. FINAL CONTRACT WILL BE BASED
OFF WOOD, DECKING, & MATERIALS THE WEEK BEFORE PROJECT BEGINS / MATERIALS ARE ORDERED.
* CONTRACTOR WARRANTS ALL WORK FOR A PERIOD OF 1 YEAR FROM THE DATE OF COMPLETION.
* SCHEDULE IS 3-8 WORKING DAYS AFTER MOBILIZATION.
* BUILDING PERMIT FEES ARE NOT INCLUDED IN THE PROPOSAL.
* WATER AND ELECTRIC IS EXCLUDED FROM QUOTE
* HAZARDOUS MATERIAL TESTING AND REMOVAL IS NOT ANTICIPATED AND ARE EXCLUDED FROM OUR PROPOSAL.
* PRICE COULD RISE OR FALL DEPENDING ON THE FINISH / HARDWARE SELECTION BY OWNER AND ENGINEERING PLANS.
* DAWN TO DUSK ACCESS TO WORK SITE IS NEEDED IN ORDER TO MEET CONSTRUCTION SCHEDULE.
* ALL FASTENERS / HARDWARE WILL BE GALVANIZED OR STAINLESS STEEL.
* ALL LUMBER TO BE .40 ACQ TREATED MARINE GRADE #1 DENSE SOUTHERN PINE.
* ALL FRAMING NAILS TO BE 12D STAINLESS RING SHANKED.
* PROPOSAL IS VALID FOR 10 DAYS.
* NO POWER, WATER OR FIRE PRICES ARE QUOTED IN THIS AMOUNT.
TERMS:
* 15% OF CONTRACT PRICE DUE AT CONTRACT SIGNING.
* MATERIAL COST PAYMENT DUE PRIOR TO DELIVERY.
* REMAINING CONTRACT COST DUE AT COMPLETION.
* $250 REMOBILIZATION CHARGE IF ABOVE PAYMENT TERMS ARE NOT MET AND CONTRACTOR HAS TO DEMOBILIZE DUE
TO DELAYED PAYMENTS.
* ABOVE PRICE IS DISCOUNTED BASED ON PAYMENT BY CASH. IF PAYING BY CREDIT CARD/DEBIT CARD REGULAR
PRICING WILL APPLY AND APPROXIMATELY 4% WILL BE ADDED TO YOUR INVOICE/PAYMENT.
ACCEPTED: CONFIRMED:
The above prices, specifications and conditions are satisfactory TRIDENT MARINE CONSTRUCTION and are hereby accepted. 5302 INGRAHAM STREET
Tampa, FL 33616 t: 813.460-1333 f: 813.832-8888
Signature: _________________________________________ Signature:____________________________
Date of Acceptance: _________________________________ mailto:KEERTHANA.SREENIVASAN@ARCADIS.COM
27.871484, -82.655439 (Blue Heron Lake St.
Pete)
WFW
WWW: 165’
Parameters/Notes Incorporated/ Unincorporated Max SF Max Length Max Width Side Setbacks
Legend:
WFW: waterfront width, the property at the water front WWW: Water way width, how much water is there until the nearest land SF: square footage
Sales Rep:Jennifer Graybill
Designer: Kristen Chu
Current piling count: 0
Proposed piling count: 8
Current SF: 0
Proposed SF: 184
4’x10’ upland walkway
No seawall, just start of water
Handrail
Need to know measure-ments of where you want the dock exactly where you want it
12’x12’ dock
Gulf & Bay Dock Works
PO Box 8694 Madeira Beach, FL 33738 US +1 7272529915 office@gulfandbaydockworks.com
Estimate
ADDRESS
Keerthana Sreenivasan 3095 114th Ave N Saint Petersburg, FL 33716
ESTIMATE # 2853
DATE 10/30/2023
ACTIVITY QTY RATE
Piling Installation We will hand set fortress pilings *Rate is per piling
10 1,650.00 16,500.00
Framing & Decking Framing with marine grade pressure treated 2"x10" timber.
Decking with fiberglass reinforced composite Weardeck and stainless steel hardware.
*Rate is per square foot
184 42.00 7,728.00
Handrail - Composite Fully composite handrail *Rate is per linear foot
64 90.00 5,760.00
Permitting Fees - St.
Petersburg
Includes initial St. Petersburg permit fee & all administrative costs for Gulf & Bay to procure the city approval.
1 150.00 150.00
Disclaimer: If any work has been performed previously without being permitted, the customer will be responsible for after the fact permit fines.
Upon approval of the estimate, a formal contract will be sent. The contract will not include utility work unless otherwise specified above.
Funds are due upon receipt once work is completed. A 10% late fee will be charged every 30 days overdue.
If deposit is required, it will be invoiced separately.
TOTAL $30,138.00
Accepted By Accepted Date
10'-0" 120"
REF
5'-0" 60"
REF
1'-0"
12" REF
TYP
27' OF HD DOUBLE
ALUMINUM RAILINGS
5' x 10' x 4" HD DOCK(4) LOWER BRACKET
3' x 10' GANGWAY
NOTES:
• FINAL DESIGNS AND LAYOUT SUBJECT TO CHANGE
KEERTHANA SREENIVASAN LAYOUT
PLAN VIEW
WITH DIMENSIONS & CALLOUTS
A
B B
A
2 134
SHEET 1 OF 1
SCALE:
REV:
REF #: CHECKED:PART:
DRAWN:
DATE:
D. Saul
B. DolanLayout Keerthana Sreenivasan 10/17/2023
Tolerances are 1/16'' unless specified otherwise
1:25INVOICE #: 17130
AccuDock
1790 SW 13th Court Pompano Beach, FL 33069 +1 9547857557 info@accudock.com
Estimate
ADDRESS
Keerthana Sreenivasan
4300 W CYPRESS ST
Tampa, FL 33607 732-796-2769
SHIP TO
Keerthana Sreenivasan
4300 W CYPRESS ST
Tampa, FL 33607 732-796-2769
ESTIMATE # 17130
DATE 10/17/2023
EXPIRATION DATE 11/17/2023
SHIP VIA TRACKING NO. SALES REP DESCRIPTION
Flatbed keerthana.sreenivasan@ arcadis.c BD Stormwater Dock
DATE ACTIVITY QTY RATE AMOUNT
GAN-HP3
3' Landside Hinge Plate
1 369.00 369.00T
GANG-3X12
3' x 10' Aluminum Gangway with aluminum non skid decking and side railings
1 1,890.00 1,890.00T
GAN-CP3
3' Dock Side Connection/Hinge Plate
1 369.00 369.00T
HD-DOCK
5' x 10' Floating Dock - 4" Aluminum channel, cross members on 16" centers, 12" Installed dead load free-board, Wolf PVC decking installed - Color
TBD
1 3,200.00 3,200.00T
ATT-L00
Lower Bracket - Kayak Dock
4 185.00 740.00T
ACC-RL2
Heavy duty double aluminum railing-On 3 sides
27 60.00 1,620.00T
-Thank you for the opportunity to earn your business. Stated pricing is valid for 30 days.
-ALL SALES ARE FINAL.
-Credit Card payments are subject to 3% processing fee added to total at time of transaction
-Please Note: AccuDock is the manufacturer of floating docks and aluminum gangways/accessories. All delivery and/or installations will be provided by third party companies at an additional expense.
-All Items quoted are standard AccuDock manufacture design & build.
Any request for specific or custom alterations may incur an upcharge.
-Project specific drawings are available upon request. Additional fees may apply.
SUBTOTAL 8,188.00
DISCOUNT 5% -409.40
TAX (0%) 0.00
SHIPPING 950.00
TOTAL $8,728.60
Email:0 574-3024
Qty. Price Total
1 19,899.00$
1 7,356.00$
1 3,440.00$
Decking color: Buckskin, Silverstone, Granite Gray, Hearthstone Subtotal 30,695.00$
Roofing color: See Color Chart State Tax N/A
Bumper color: Black County Tax N/A
Post/Braces: Freight 2,575.00$
Main Floor: LockDry Installation 8,500.00$
Total 41,770.00$
Dollars
Date: 11/22/2023
Date:
Date:
St. Petersburg, FL 53716
Blue Heron Lake
City, State, Zip :
4' x 50' single span access ramp with handrails, rollers, transition plate and a duck gate.
Anchoring System: (4) 3' spud pole collars, (4) 21' spud poles, PVC caps and silencer rings
Street:
Phone:
included.
Item
12' x 16' floating platform with split handrail, pickets and (1) 3' duck gate.
nylon cleats.
***Quote for Installed Dock*** Toytown Staff Guage Dock c/o Chris TillmanSubmitted to:
Signature
Signature
Authorized Signature:
41,770.00$
Flotation Systems, Inc. Warranty must be registered within 30 days of purchase to be valid. For a complete copy of said warranty call
800-711-1785. No warranty is applied to docks sold in kit form. I accept this proposal as submitted. Payment will be made as outlined above.
NOTE: Prices quoted are subject to change without notice due to market conditions beyond the control of FSI, Inc…
***Acceptance of Proposal*** Flotation Systems, Inc. does not warrant the above listed products for any purpose except as provided in the limited lifetime warranty of
Said conditions include but are not limited to the cost of fuel, material and shipping.
2,500 *CERTIFIED FUNDS MUST BE PAID UPON INSTALLATION*:
***Unpaid balance is subject to 1.5% interest per month. Interest begins accruing upon date of installation.
Forty-One Thousand Seven Hundred Seventy and 00/100
Body of Water: Blue Heron Lake, FL
Terms: Confirmation of wire transfer or Cashier's check due upon delivery: 25,347$
13,923$ Terms: One-third (1/3) down payment upon acceptance:
We propose to hereby furnish the above listed items for the sum of:
Spud Pole Collars:
*Stainless steel hardware
*Corp approved encapsulated flotation devices
***FSI Standard Accessory Package includes:
*All aluminum decking with non-skid powder coated finish (color options listed below) www.gulfandbaymarine.com
Thank You For Your Business!
Gulf & Bay Dock Works
PO Box 8694 Madeira Beach, FL 33738 US +1 7272529915 office@gulfandbaydockworks.com
Estimate
ADDRESS
Keerthana Sreenivasan 3095 114th Ave N Saint Petersburg, FL 33716
ESTIMATE # 2853
DATE 10/30/2023
Option 1: 50' walkway with a 12'x12' main dock
Piling Installation We will hand set fortress pilings *Rate is per piling
22 2,100.00 46,200.00
Framing & Decking For the main walkway and the dock head:
Framing with marine grade pressure treated 2"x10" timber.
Decking with fiberglass reinforced composite Weardeck and stainless steel hardware.
*Rate is per square foot
344 42.00 14,448.00
Framing & Decking For the upland portion:
Framing with marine grade pressure treated 2"x10" timber.
Decking with fiberglass reinforced composite Weardeck and stainless steel hardware.
*Rate is per square foot
40 28.00 1,120.00
Handrail - Composite Fully composite handrail *Rate is per linear foot
164 90.00 14,760.00
Permitting Fees - St.
Petersburg
Includes initial St. Petersburg permit fee & all administrative costs for Gulf & Bay to procure the city approval.
fines.
Upon approval of the estimate, a formal contract will be sent. The contract will not include utility work unless otherwise specified above.
TOTAL $76,678.00
Funds are due upon receipt once work is completed. A 10% late fee will be charged every 30 days overdue.
If deposit is required, it will be invoiced separately.
27.871484, -82.655439 (Blue Heron Lake St.
Pete)
WFW
WWW: 165’
Parameters/Notes Incorporated/ Unincorporated Max SF Max Length Max Width Side Setbacks
Legend:
WFW: waterfront width, the property at the water front WWW: Water way width, how much water is there until the nearest land SF: square footage
Sales Rep:Jennifer Graybill
Designer: Kristen Chu
Current piling count: 0
Proposed piling count: 22
Current SF: 0
Proposed SF: 344
4’x10’ upland walkway
No seawall, just start of water
Need to know measurements of where you want the dock exactly where you want it
Handrail
12’x12’ dock option 1: 50’ walkway with a 12’x12’ main dock
50’
12’
4’
Gulf & Bay Dock Works
PO Box 8694 Madeira Beach, FL 33738 US +1 7272529915 office@gulfandbaydockworks.com
Estimate
ADDRESS
Keerthana Sreenivasan 3095 114th Ave N Saint Petersburg, FL 33716
ESTIMATE # 2935
DATE 12/04/2023
Option 2 30' walkway with a 12 gangway and a 12'x16' floating dock
Piling Installation We will install new fortress pilings *Rate is per piling
10 2,100.00 21,000.00
Framing & Decking Framing with marine grade pressure treated 2"x10" timber.
Decking with fiberglass reinforced composite Weardeck and stainless steel hardware.
*Rate is per square foot with 4'x 20' upland and 4'x30' over water
200 28.00 5,600.00
Floating Dock - Accudock Boomer Slip Dock with Gangway
12'x16' Boomer Slip Dock with 3'x12' gangway Includes:
-Railing around floating dock
- 3' overhead assist bar
- Wolf PVC Decking color TBD
- 3'x12' aluminum gangway with aluminum non skid decking and side railing
- 2 3' hinge plate
- gangway roller assembly
- roller pad -Compensation float
1 19,553.97 19,553.97
Floating Dock Installation Use of barge & labor to install AccuDock floating dock. Includes transportation, assembly, & installation.
1 4,000.00 4,000.00
Handrail - Composite Fully composite handrail around the walkway *Rate is per linear foot
100 60.00 6,000.00
ACTIVITY QTY RATE
Subtotal: 56,153.97
Permitting Fees - St.
Petersburg
Includes initial St. Petersburg permit fee & all administrative costs for Gulf & Bay to procure the city approval.
fines.
Upon approval of the estimate, a formal contract will be sent. The contract will not include utility work unless otherwise specified above.
Funds are due upon receipt once work is completed. A 10% late fee will be charged every 30 days overdue.
If deposit is required, it will be invoiced separately.
TOTAL $56,303.97
Legend:
WFW: waterfront width, the property at the water front WWW: Water way width, how much water is there until the nearest land SF: square footage
Sales Rep:Jennifer Graybill
Designer: Kristen Chu
Current piling count: 0
Proposed piling count: 10
Current SF: 0
Proposed SF: 440
Keerthana Sreenivasan 27.871484, -82.655439 (Blue Heron Lake St.
Pete)
WFW
WWW: 165’
Parameters/Notes Incorporated/ Unincorporated Max SF Max Length Max Width Side Setbacks
Option 2
No true seawall
4’x20’ upland Handrail
30’
12’ Aluminum gangway
16’x12’ �oating dock
Need a site visit to determine exact amount that is over the water vs overland, and before �nalizing the estimate
12’
16’
Email: KEERTHANA.SREENIVASAN@ARCARDIS.COM Project Name: TOYTOWN Bid Number: 20240102CC
Project Location: ST. PETERSBURG, FL Date: 1/2/2024
Line # Item Description Quantity Unit Unit Price Total Price
GENERAL CONDITIONS
1 MOBILIZATION 1.00 LS $500.00 $500.00
Total price for the above GENERAL CONDITIONS Items: $500.00
DOCK OPTIONS
FIXED AND FLOATING
1 CONSTRUCT A NEW FIXED DOCK TO BE 5'X38', 1.00 LS $84,353.00 $84,353.00
CONNECTING TO A 5'X12' ALUMINUM GANGWAY TO A
10'X10' FLOATING DOCK ON TWO NEW PILES, SECURED
WITH 4-ROLLER EXTERIOR PILE GUIDES, ANCHORED
ON 10" BUTT PILES. GANGWAY AND FLOATING DOCK TO
HAVE 42" THREE-LINE ALUMINUM PIPE RAIL AROUND
PERIMETER, WITH DIVERSION PLATE. GANGWAY AND
FLOATING DOCK TO HAVE ALUMINUM RIBBED DECKING.
ROLLERS AND TRANSITION PLATE AT BASE OF GANGWAY
CONNECTING TO FLOATING DOCK. FIXED DOCK TO BE
2"X10" DOUBLE-OUTSIDE FRAME, SECURED WITH SS
THROUGHBOLTS. DECKING TO BE 1"X6" WEARDECK
COMPOSITE DECKING, FASTENED WITH SS FASTENERS.
COLOR TO BE DETERMINED BY OWNER. FIXED DOCK
TO HAVE ~76' LINEAR FEET OF PICKET RAILING AROUND
PERIMETER. 4"X4" STANCHIONS, SECURED WITH 1/2" SS
LAGBOLTS. 2"X2" SPINDLES, 2"X4" KICKRAIL. TOPRAIL
TO BE 2"X4" AND 1"X6" WEARDECK COMPOSITE DECKING,
FASTENED WITH SS FASTENERS. COLOR TO MATCH DECK.
ALL PILES TO BE 2.5CCA TREATED, ALL LUMBER TO BE
MARINE GRADE.
FLOATING DOCK
2 CONSTRUCT A CONCRETE FOOTER ON LAND TO ANCHOR 1.00 LS $86,515.00 $86,515.00
ALUMINUM GANGWAY. GANGWAY TO BE 5'X20' LEADING
TO TWO 5'X20' FLOATING DOCK SECTIONS. FLOATING DOCK
SECTIONS TO BE ANCHORED ON NEW 10" BUTT PILES,
SECURED WITH 4-ROLLER EXTERIOR PILE GUIDES.
GANGWAY AND FLOATING DOCK SECTIONS TO HAVE
42" THREE-LINE ALUMINUM PIPE RAIL AROUND PERIMETER,
WITH DIVERSION PLATE. GANGWAY AND FLOATING DOCK
SECTIONS TO HAVE ALUMINUM RIBBED DECKING. ROLLERS
AND TRANSITION PLATE AT BASE OF GANGWAY CONNECTING
TO FLOATING DOCK. ALL PILES TO BE 2.5CCA TREATED.
Total price for the above NEW items: TBD
Trident Marine Construction mailto:KEERTHANA.SREENIVASAN@ARCARDIS.COM
Email: KEERTHANA.SREENIVASAN@ARCARDIS.COM Project Name: TOYTOWN Bid Number: 20240102CC
Project Location: ST. PETERSBURG, FL Date: 1/2/2024
Trident Marine Construction
CLARIFICATIONS:
* THIS ESTIMATE IS BASED ON A NUMBER OF DESIGN ASSUMPTIONS. NOT SITE-SPECIFIC DESIGN CRITERIA OR
PROJECT SPECIFICATIONS HAVE BEEN PROVIDED TO TRIDENT MARINE CONSTRUCTION AT THE TIME THIS
ESTIMATE WAS CREATED.
* NO ENGINEERING PLANS WERE PROVIDED FOR THIS ESTIMATE.
* NO SOIL SAMPLES ARE INCLUDED IN THIS QUOTE.
* ESTIMATE DOES NOT INCLUDE PERMITTING OR ENGINEERING FEES.
* NO ELECTRIC OR PLUMBING IS INCLUDED IN THIS ESTIMATE.
* NO DREDGING OR BACK FILLING IS INCLUDED IN THIS ESTIMATE.
* NO BRUSH CLEARING IS INCLUDED IN THIS ESTIMATE.
* BASE BID PRICE IS ONLY AN ESTIMATE. PRICE SUBJECT TO CHANGE BASED ON UNFORESEEN SITE CONDITIONS.
* WOOD, DECKING, & MATERIALS BASED OFF PRICING THE WEEK OF JANUARY 2, 2024. FINAL CONTRACT WILL BE BASED
OFF WOOD, DECKING, & MATERIALS THE WEEK BEFORE PROJECT BEGINS / MATERIALS ARE ORDERED.
* CONTRACTOR WARRANTS ALL WORK FOR A PERIOD OF 1 YEAR FROM THE DATE OF COMPLETION.
* SCHEDULE IS 6-10 WORKING DAYS AFTER MOBILIZATION.
* BUILDING PERMIT FEES ARE ESTIMATED AND INCLUDED IN THE PROPOSAL.
* WATER AND ELECTRIC IS EXCLUDED FROM QUOTE
* HAZARDOUS MATERIAL TESTING AND REMOVAL IS NOT ANTICIPATED AND ARE EXCLUDED FROM OUR PROPOSAL.
* PRICE COULD RISE OR FALL DEPENDING ON THE FINISH / HARDWARE SELECTION BY OWNER AND ENGINEERING PLANS.
* DAWN TO DUSK ACCESS TO WORK SITE IS NEEDED IN ORDER TO MEET CONSTRUCTION SCHEDULE.
* ALL FASTENERS / HARDWARE WILL BE GALVANIZED OR STAINLESS STEEL.
* ALL LUMBER TO BE .40 ACQ TREATED MARINE GRADE #1 DENSE SOUTHERN PINE.
* ALL FRAMING NAILS TO BE 12D STAINLESS RING SHANKED.
* PROPOSAL IS VALID FOR 10 DAYS.
* NO POWER, WATER OR FIRE PRICES ARE QUOTED IN THIS AMOUNT.
TERMS:
* 15% OF CONTRACT PRICE DUE AT CONTRACT SIGNING.
* MATERIAL COST PAYMENT DUE PRIOR TO DELIVERY.
* REMAINING CONTRACT COST DUE AT COMPLETION.
* $500 REMOBILIZATION CHARGE IF ABOVE PAYMENT TERMS ARE NOT MET AND CONTRACTOR HAS TO DEMOBILIZE DUE
TO DELAYED PAYMENTS.
* ABOVE PRICE IS DISCOUNTED BASED ON PAYMENT BY CASH. IF PAYING BY CREDIT CARD/DEBIT CARD REGULAR
PRICING WILL APPLY AND APPROXIMATELY 4% WILL BE ADDED TO YOUR INVOICE/PAYMENT.
ACCEPTED: CONFIRMED:
The above prices, specifications and conditions are satisfactory TRIDENT MARINE CONSTRUCTION and are hereby accepted. 5302 INGRAHAM STREET
Tampa, FL 33616 t: 813.460-1333 f: 813.832-8888
Signature: _________________________________________ Signature:____________________________
Date of Acceptance: _________________________________ mailto:KEERTHANA.SREENIVASAN@ARCARDIS.COM
| Sheet1 |
| Drawing View1 |