TTLF_Staff_Gauge_and_Platform_Options_Review_Memo_Final_-_Client_Issue_2-27-24_pckg.pdf

PDF 3 MB Posted

Attached to
Floating Modular Dock
Solicitation number
24-1038-ITQ
Issued by
Pinellas County, Clewiston City, Florida

About this file

This document is a technical memo prepared by Arcadis for Pinellas County Solid Waste regarding staff gauge and dock options for the Toytown Landfill. The project involves replacing an existing staff gauge and constructing a new dock to enable staff to read pond water levels and collect water samples. Arcadis evaluated four dock options: a fixed dock with composite decking, two prefabricated floating dock options (composite and aluminum materials), and a modular plastic floating dock. The recommended dock is a modular floating dock from EZ Dock, specifically a 6-foot by 10-foot floating dock with a 3-foot by 12-foot aluminum gangway. The staff gauge will be shore-mounted and anchored by an aluminum channel from the existing concrete weir, with an additional aluminum support beam set into the pond bottom.

The dock options were evaluated based on criteria including material durability, capacity (500-pound minimum), handrails, wildlife prevention, maintenance requirements, and a desired 30-year lifespan. Cost estimates ranged from $8,499 to $86,515, with the EZ Dock modular plastic floating dock being the lowest-cost option. Installation costs and vendor quotes were solicited from multiple marine construction companies, including Trident Marine Construction, Gulf and Bay Dockworks, Flotation Systems Inc., and AccuDocks. The final recommendation was made after considering factors such as cost, installation complexity, material quality, and the specific monitoring needs of the Toytown Landfill stormwater pond. The County has approved moving forward with the EZ Dock solution, with next steps including installation of the shore-mounted staff gauge and purchasing the modular floating dock through the County Purchasing Department.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUBJECT TO

Toytown Landfill Staff Gauge and Dock Options Review Chuck Mangio

DATE DEPARTMENT

February 27, 2024 Pinellas County Solid Waste

PROJECT NUMBER

30197151

COPIES TO NAME

Emily Davis – Pinellas Cindy Eckert Chris Tilman – Arcadis 813-732-2080, Cindy.Eckert@arcadis.com Keerthana Sreenivasan 813-353-5721, Keerthana.Sreenivasan@arcadis.com

Introduction

Pinellas County maintains the closed Toytown Landfill and as part of this effort maintains the site stormwater and groundwater monitoring system. The site includes stormwater swales and a pond with a pond water level gauge that is read manually to track pond levels. The pond depth varies throughout the year during the dry season and wet season. The County wishes to replace the staff gauge at the stormwater pond and also construct a dock to be able to read and clean a new staff gauge and collect pond water samples as needed. This memo will review the

County minimum requirements for a dock and evaluate the different dock options for the County’s review and selection.

Approach

For this, we determined County requirements, reviewed pond data for range of depths, and evaluated up to four different dock options. Data collected with the existing staff gauge cannot read pond water levels if below an elevation of 2.15 feet. The 10-year average pond water level elevation is 3.38 feet and a maximum water level elevation of 4.23 feet was reached in 2016. Based on data collected, the pond water level elevation varies by 0.2 feet to 1 foot within a year but likely varies even more due to lack of readings below the water level elevation of

2.15 feet. As a result of the variance in pond water level and increased deposit of sediment over the years, the existing staff gauge is tilted and not secured. Pinellas County wants to install and anchor a new staff gauge and a new dock that extends out into the pond for staff to access and clean the gauge and collect water samples. Two locations of the staff gauge were considered: one by the shore near the current staff gauge location and one towards the middle of the pond.

The advantages of installing the staff gauge and dock towards the middle of the pond include:

• Less impact from varying water levels even during the dry season and allowing for staff gauge readings at low water levels as well, when the near shore mounted staff gauge is out of the water.

• Less damage to staff gauge from near shore maintenance activities.

• Less steep slope of gangway to the dock, mitigating concerns of steep gangway from some vendors.

• Less wear and tear to dock as it will lie more evenly during the dry season.

mailto:Cindy.Eckert@arcadis.com mailto:Keerthana.Sreenivasan@arcadis.com

Toytown Landfill Staff Gauge and Dock Option Review

Pinellas County Solid Waste

February 27, 2024

However, the main disadvantage of installing the staff gauge towards the middle of the pond is higher costs due to a longer gangway and larger dock needed to support the gangway as well as feasibility dependent on actual depth of pond at proposed location.

Various vendors were contacted to determine and develop alternative options for a dock at both proposed locations. Capital costs, maintenance required, and useful life for each option as well as some notable advantages and disadvantages are presented below.

Design Criteria

The criteria for the staff gauge and dock include:

• Material of construction – wood and steel are not preferable unless proven to last 30 years. Prefer corrosion resistant materials.

• Capacity – should be able to hold one to two people at a time, approximate weight minimum capacity of

500 pounds

• Handrails – for safety and comfort

• Additional side grating for prevention of alligators and other wildlife climbing on to dock (optional)

• Maintenance – Low maintenance requirements

• Lifespan – 30 years

• Staff gauge – 1-inch incremental elevation measurements with a precision of 0.01 feet up to 8 feet

Other considerations:

• Material and Installation Costs

• Material Lead Time

• Construction of concrete pad for anchoring gangway and dock on the bank

• Clearing vegetation around staff gauge prior to installation of dock and gangway for ease of access

Staff Gauge and Dock Near Shore

In addition to the design criteria listed above, the following gangway and dock size were considered for a shore mounted staff gauge.

• Gangway/walkway: a 10-foot aluminum gangway that extends from the pond bank near the existing weir down the slope to the dock

• Dock Size: a minimum 10-foot-long dock (extends from gangway into the pond a few feet past the new staff gauge)

Staff Gauge Installation

Arcadis and the County discussed different shore-mounted staff gauge mounting methods and locations as well as considering other staff gauge configurations used by the County and their performance. After collaboration, it was determined that the staff gauge will be anchored by a 4x1 inch aluminum channel from the existing concrete weir and further secured on a 4x4 inch aluminum support beam anchored in concrete set into the pond bottom.

There will be an additional 2x2 inch aluminum post between the weir and the staff gauge to stabilize the long arm span. This is a similar configuration to several staff gauges in use at the Bridgeway Acres Site. The detailed vendor cost estimate for materials is included in Appendix A.

Metal Supermarkets Price

Aluminum Square tube and Channel $315

Miscellaneous $100

8’x4.875” aluminum staff gauge (oregonrule.com) $120

Total $535

The staff gauge near the shore was installed by Arcadis staff on February 5th and 6th of 2024. Photos of the newly installed staff gauge are shown below.

Dock Options Reviewed

The four dock options reviewed include:

1. Fixed dock – composite decking

2. Prefabricated floating dock of composite material

3. Prefabricated floating dock of aluminum material

4. Floating dock of plastic material, modular

Every option consists of a 10-foot aluminum gangway/walkway and a summary of the cost estimate is provided below. A summary of the considered advantages and disadvantages are listed in Table 1 below.

Table 1. Advantages and Disadvantages of each option

Options Advantages Disadvantages

1 – Fixed Dock

• Lesser wear and tear as water depth varies

• Conservative design to maximum pond depth, may make reading staff gauge at low water levels difficult

• May become submerged at extreme high water levels

• Difficulty sampling when pond levels are very low or dry

2 – Prefabricated floating dock – composite

3 – Prefabricated floating dock - aluminum

• Dock height adjusts with pond water level for easier sampling

• More stable than a modular floating dock

• Less expensive than fixed dock

(composite option)

• Harder to clear vegetation around dock and potential sediment accumulation around dock when pond is dry

4 – Modular floating dock

• Dock height adjusts with pond water level for easier sampling

• Less expensive than fixed dock

• Customizable

• Fastest schedule

• Harder to clear vegetation around dock and potential sediment accumulation around dock when pond is dry

Option 1: Fixed Dock with Composite Decking

Dock contractors such as Trident Marine Construction and Gulf and Bay DockWorks provided quotes based on the design criteria and considerations provided below. The detailed quotes provided can be found in Appendix A.

Trident Marine Construction – Quote Item Price

5x10 foot Aluminum Gangway -

10x10 feet Fixed Dock with railing -

Total $31,257

Additional Quote Details:

• Schedule: 3 to 8 working days (dawn to dusk) from mobilization.

• Includes picket railing around the perimeter of the walkway and dock.

• Dock installation included.

• All fasteners/ hardware will be galvanized or stainless steel.

• All lumber will be 0.40 ACQ treated marine grade #1 dense southern pine.

• All framing nails to be 12 D stainless ring shanked.

Gulf and Bay DockWorks – Quote Item Price

4x10 ft Aluminum Gangway Not included

12x12 ft Fixed Dock $7,728

Piling Installation $16,500

Handrail (composite) $5,760

Permitting $150

Total $30,138

Additional Quote details:

• Gangway not included in prices estimate as recommended to build a more permanent walkway due to difficulty in anchoring gangway on steep slope.

• Dock installation included.

• Anticipated to use air jetting method to install synthetic piles.

• All hardware will be stainless steel.

Figure 1 provides a layout of the proposed gangway and dock quoted by Gulf and Bay DockWorks

Figure 1. Layout of the proposed gangway and dock quoted by Gulf and Bay DockWorks

Prefabricated Floating Dock

Dock contractors such as Trident Marine Construction and Accu Dock provided quotes based on the design criteria and considerations provided below. Trident Marine construction provided a quote for an aluminum deck while Accu Dock provided a quote for a composite deck. The detailed quotes provided can be found in Appendix

A.

Option 2: Prefabricated Floating Dock – Composite Material

ACCU DOCK – Quote Item Price

3x10 ft Aluminum Gangway with Railing $1,890

5x10 ft Floating Dock with Railing (Composite) $3,200

Aluminum Railing for Dock (3 sides) $1,620

Fittings $923

Shipping $950

Total* $8,728

*Installation not included

• Deck Material composition: Wood Fiber and Polyethylene Composite. Designed to have a 12” freeboard.

• Total price includes a 5% discount of $409.

• Taxes are not included as County would be purchasing.

• Not included in quote: 4-inch schedule 40 PVC pipes that needs to be locally sourced, pouring a 4x4 foot concrete pad to allow the landside hinge to attach for the gangway to be held in place, or installation.

Figure 2. provides a layout of the proposed gangway and dock quoted by Accu Docks.

Figure 2. Layout of the proposed gangway and dock quoted by Accu Docks

Option 3: Prefabricated Floating Dock – Aluminum Material

Trident Marine Construction – Quote Item Price

5x12 ft Aluminum Gangway -

10x10 ft Aluminum Dock with railing -

Total $47,257

• Includes a 42-inch pipe rail around the dock.

• Installation included.

• Gangway and dock will have ribbed aluminum decking.

• A concrete footer will be constructed on slope to anchor gangway.

• Schedule: 3 to 8 working days (dawn to dusk) from mobilization.

• All fasteners/ hardware will be galvanized or stainless steel.

• All lumber will be 0.40 ACQ treated marine grade #1 dense southern pine.

• All framing nails to be 12 D stainless ring shanked.

Option 4: Modular plastic floating dock

Another floating dock option is the modular floating docks composed of several modular plastic pieces designed to attach together in different configurations to create a custom dock. Dock vendor such as EZ Dock provided a quote based on the design criteria and considerations provided below.

EZ DOCK – Quote Item Price

3x12 foot Aluminum Gangway $3,200

3x10 feet Dock piece (foam built)* $1,699

PVC and Galvanized Pole kit and Anchor $850

10 feet long aluminum handrail (x2) $2,100

Installation $650

Total $8,499

Additional Quote Details:

• Written estimate was not provided. Estimate based on a verbal discussion with the sales representative.

• Based on verbal discussions, maintenance is minimal and only requires pressure washing as needed.

• Representative suggests a 6x10 ft dock for better stability and would cost $10,198.

• Railing around dock not included.

Figure 3 provides an example of a modular dock and gangway with railing provided by EZ DOCK.

Figure 3. Example of gangway and dock provided by EZ DOCK

Table 2 on the following page provides a comparison of each vendor estimate for the County to consider when selecting a pond dock option.

Table 2. Dock Options Vendor Summary

Options Vendor Cost

($/sq ft) Warranty and Lifespan

Lead

Time

Material of

Construction

Dock

Dimensions

Option 1: Permanent

Dock

Trident Marine

Construction

$31,257

($208/sq ft)

1-year workmanship warranty

General lifespan: 15 to 20 years

2 weeks

Wear deck composite decking with marine grade lumber attachments

Gangway: 5’x10’

Dock: 10’10’

Option 1: Permanent

Dock

Gulf & Bay

Dockworks

$30,138

($209/sq ft)

30-year warranty on the pilings

General lifespan: 30 years

2 to 4 weeks

Fiberglass reinforced composite decking with marine grade timber framing

Gangway: Not included

Dock: 12’x12’

Option

2: Prefabricated

Floating Dock, Composite

AccuDocks

$8,728*

($109/sq ft)

*Installation not included

General lifespan: 30 years 6 to 7 weeks Wood Composite

Gangway: 3’x10’

Dock: 5’x10’

Option

3: Prefabricated

Floating Dock, Aluminum

Trident Marine

Construction

$47,257

($295/sq ft)

1-yr workmanship warranty

General lifespan: 30 to 40 years

6 to 8 weeks Aluminum

Gangway: 5’x12’

Dock: 10’x10’

Option 4: Floating

Dock EZ Docks

$8,499

($129/sq ft)

8-year warranty

General lifespan: 30 years

Approx. 2 weeks Foam Block

Gangway: 3’x12’

Dock: 3’x10’

Arcadis U.S., Inc., 4300 W Cypress Street, Suite 450, Tampa, Florida, 813 903 3100, www.arcadis.com

TTLF Staff Gauge and Platform Options Review Memo Final - Client Issue 2-27-24

Staff Gauge and Dock Towards Middle of Pond

In addition to the design criteria listed above, the following gangway and dock size were considered for a staff gauge anchored towards the middle of the pond, which would be approximately 50 feet away from the pond bank.

• Gangway/walkway – a 50-foot aluminum gangway that extends from the pond bank near the existing weir structure down the slope to the dock

• Dock Size – recommended size by vendor in order to support a longer gangway. May vary.

Staff Gauge Installation

An 8-foot staff gauge can be mounted on 2-inch x15-foot aluminum post that is driven into the pond bottom by at least 5 feet to anchor it securely. The Staff gauge will be mounted on a 2-inch x 6-inch pressure treated wood plank and attached to the aluminum post with U-bolts. This design allows for easy adjustments during surveying and easier maintenance. Feasibility of this option is also dependent on actual depth of pond at proposed location.

Market Price

Aluminum post $150

Pressure treated wood plank $11

304 SS U-bolts with mounting plates (4) $9/each ($36)

8 foot x 4.875 inch aluminum staff gauge

(oregonrule.com) $118

Total $315

Dock Options Reviewed

Three dock options were considered:

1. Fixed dock – composite decking

2. Prefabricated floating dock of composite material

3. Prefabricated floating dock of aluminum material

Feasibility of this option is also dependent on actual depth of pond at proposed location, as all options will be anchored at the proposed location and poles or piles will need to be of adequate length. Vendor estimates for a

50-foot gangway for options 1 and 2 have not been received at this time but will be included in the final technical memo submittal. The cost will be higher than the near shore options as more materials and potentially more complex construction due to location of anchor poles are piles will be required.

Option 1: Fixed dock – composite decking

Dock contractors such as Gulf and Bay Dockworks provided a quote based on the design criteria and considerations listed above. A 50-foot fixed walkway and 12-foot x 12-foot main fixed dock of composite decking was quoted for. The detailed quotes provided can be found in Appendix A.

Gulf and Bay Dockworks – Quote Item Price

4x50 foot fiberglass composite walkway $14,448

12x12 foot composite fixed dock $14,760

Piling Installation $46,200

Railing (composite material) $14,760

Total $76,678

Additional quote details:

• All framing will be marine grade pressure treated timber.

• Includes stainless steel hardware.

• Includes installation costs.

Figure 4 provides a plan view layout of the proposed walkway and dock quoted.

Figure 4. Layout of the proposed walkway and dock provided by Gulf and Bay Dockworks.

Option 2: Prefabricated floating dock and fixed gangway

Dock contractors such as Gulf and Bay Dockworks in partnership with Accudocks, and Trident Marine

Construction provided quotes based on the design criteria and considerations listed above. A 30-foot composite decking walkway, attached to a 12-foot-long floating aluminum gangway and 12-foot x 16-foot floating composite dock was quoted. The 30-foot walkway section will be fixed in order to minimize the amount of extra flotation support needed for the length of gangway required. The quote includes a 4-foot x 20-foot walkway upland. The detailed quotes provided can be found in Appendix A.

Gulf and Bay Dockworks – Quote Item Price

4x30 foot fiberglass composite walkway and 4x20 foot upland walkway $5,600

12x16 foot composite floating dock and 3x12 foot aluminum floating gangway (Accudocks) $19,553.97

Dock Installation $4,000

Piling Installation $21,000

Railing (composite material) $6,000

Total $56,303.97

• Floating dock installation includes transportation, assembly and installation using a barge.

• Floating Aluminum gangway includes non-skid decking and side railing.

• Pilings will be fortress pilings.

• All framing will be marine grade pressure treated timber.

• Includes stainless steel hardware.

• Includes installation costs.

Figure 5. provides a plan view layout of the proposed walkway and floating dock.

Figure 5. Layout of the proposed walkway and floating dock provided by Guld and Bay Dockworks and Accudocks

Trident Marine Construction – Quote Item Price

Fixed 5x38 foot dock to a 5x12 foot aluminum gangway to a 10x10 foot floating composite dock $84,353

Mobilization $500

Total $84,853

• Floating dock will be secured with roller exterior pile guides and butt piles.

• Picket railing included.

• All lumber will be marine grade treated.

Option 3: Prefabricated floating dock of aluminum material

Dock contractor such as Flotation Systems Inc. and Trident Marine Construction provided quotes based on the design criteria and considerations listed above. A 12-foot x 16-foot dock was quoted based on vendor recommendation in order to support a 50-foot gangway. The detailed quote provided can be found in Appendix A.

Flotation Systems Inc – Quote Item Price

4x50 foot Aluminum Gangway with railing $7,356

12x16 foot Aluminum Dock with railing $19,899

Anchoring System $3,440

Freight $2,575

Installation $8,500

Total $41,770

• All aluminum decking is finished using non-skid powder.

• No warranty provided.

• Installation included.

Figure 4 provides a layout of the gangway and dock proposed by Flotation Systems.

Figure 4. Layout of gangway and dock proposed by Flotation Systems

Trident Marine Construction– Quote Item Price

5x20 foot Aluminum Gangway and two 5x20 foot aluminum ribbed floating dock $86,515

Mobilization $500

Total $87,015

• Concrete footer will be constructed on land to anchor the aluminum gangway.

• Includes two sections of 20-foot floating docks with aluminum ribbed decking.

• Floating dock anchored with roller exterior pile guides.

• Includes handrails.

Summary and Conclusion

While the original scope of work included reviewing four options for a gangway and dock to access a shore mounted staff gauge, Arcadis also reviewed options if the staff gauge were to be installed in the middle of the pond. The final location of the staff gauge will be decided based upon the County’s review and consideration.

Regardless of the staff gauge location, the floating dock options will likely be most functional for staff gauge reading, cleaning, and pond sampling as they will rise or fall with the pond water level. The floating dock options are also most cost effective and have a longer general lifespan than the fixed dock option.

For a shore mounted staff gauge, of the floating dock options, the modular plastic floating dock (Option 4) is the lowest cost option, even for a larger dock. The best durability option is the prefabricated floating dock provided by

Trident Marine Construction or Accu Docks (Options 2 or 3). The cost-effective option with most of the desired features is option 2, prefabricated floating dock of composite material, as it includes aluminum railing on 3 sides of the dock to deter wildlife from loitering on the dock. But it must also be noted that this option did not include installation costs. Installation costs have been requested but has not yet been received. Based on other quotes received, the estimated installation cost could be around $700 - $1200, resulting in an estimated total for option 2 of about $9,900.

For a staff gauge installed towards the middle of the pond, further review of the options is required as vendor quotes are received, and this option is discussed further with the County to ensure it meets their needs and potential site limitations.

Based on comments received from the County after reviewing the draft memo, the County has decided to move forward with a shore mounted staff gauge anchored by an aluminum channel from the existing concrete weir and further secured by an aluminum support beam anchored in concrete set into the pond bottom. The County has decided to move forward with a modular floating dock such as EZ Dock with a 6-foot x 10-foot floating dock for increased stability.

The next steps include installing the shore mounted staff gauge as described above and purchasing a modular floating dock through the County Purchasing Department.

Appendix A

Dock Vendor Estimates

Bill to

Ship to

Arcadis Tampa, FL Email: david.welch@arcadias.com

Arcadis Tampa, FL Email: david.welch@arcadias.com

4901-AW. Rio Vista Avenue Tampa, FL 33634

Date: Oct-26-2023 Terms: Immediate

Delivery Method: Pickup Customer Rep: Beth Manuel

E-Mail: tampa@metalsupermarkets.com Phone: (813) 906-5077 Fax: (813) 906-5088

Customer Purchase Order #

Promise Date:

CUSTOMER QUOTE # 1049385

1Page 1 of

Unit Price TotalProduct Qty Length Unit

Attention: David Welch

This is not an ORDER or INVOICE Rusalka, Inc., an independent franchisee dba METAL

SUPERMARKETS TAMPA

Contact Phone: 813-523-0015 Store #: 021702

Valid Until: Oct-28-2023

Dimension

Attention: David Welch Contact Phone: 813-523-0015

Aluminum Square Tube 6063T52 4.000 X 4.000 X 0.120 / 0.125ATSQ6063/44125

IN1 120 131.411.09508 1 @ 120 IN

Alum Channel 6063T52 Sharp Corner 4.000 X 1.000 X 0.105AC6063SHC/41105

IN1 216 89.460.41417 1 @ 216 IN

Aluminum Square Tube 6063T52 2.000 X 2.000 X 0.120 / 0.125ATSQ6063/22125

IN1 120 72.600.60500 1 @ 120 IN

SUB-TOTAL 293.47

Description (Special Comments) :

Sales Tax 7.5% 22.01

315.48TOTAL

NOW OFFERING IN-HOUSE PLASMA CUTTING, BENDING & HOLE PUNCHING!

Partial selection is subject to requote, subject to availability at time of order.

For full terms and conditions of sales please refer to http://metalsupermarkets.com/terms-of-sale/

To: KEERTHANA SREENIVASAN Contact: KEERTHANA

Address: Phone: 813-353-5721

Email: KEERTHANA.SREENIVASAN@ARCADIS.COM Project Name: TOYTOWN Bid Number: 20231030CC2

Project Location: ST. PETERSBURG, FL Date: 10/30/2023

Line # Item Description Quantity Unit Unit Price Total Price

GENERAL CONDITIONS

1 MOBILIZATION 1.00 LS $500.00 $500.00

Total price for the above GENERAL CONDITIONS Items: $500.00

DOCK OPTIONS

FIXED DOCK

1 CONSTRUCT A NEW FIXED DOCK TO HAVE A 5'X10' 1.00 LS $31,257.00 $31,257.00

WALKOUT TO A 10'X10' HEAD. 2"X10" DOUBLE-OUTSIDE

FRAME, SECURED WITH 5/8" SS THROUGHBOLTS.

DECKING TO BE 1"X6" WEARDECK COMPOSITE DECKING,

FASTENED WITH SS FASTENERS. COLOR TO BE

DETERMINED BY OWNER. CONSTRUCT 50' LINEAR FEET

OF PICKET RAILING AROUND PERIMETER OF WALKOUT

AND HEAD. 4"X4" STANCHIONS, SECURED WITH 1/2" SS

LAGBOLTS. 2"X2" SPINDLES, 2"X4" KICKRAIL. TOPRAIL

TO BE 2"X4" AND 1"X6" WEARDECK COMPOSITE DECKING,

FASTENED WITH SS FASTENERS. COLOR TO MATCH DECK.

ALL PILES TO BE 2.5CCA TREATED. ALL LUMBER TO BE

MARINE GRADE. PILES TO BE WRAPPED IN .30

POLYETHYLENE STANDARD BLACK PILE WRAP, FASTENED

WITH SS RINGSHANK NAILS.

FLOATING DOCK

2 INSTALL A NEW 10'X10' ALUMINUM FLOATING DOCK ON 1.00 LS $47,257.00 $47,257.00

TWO NEW PILES, SECURED WITH 4-ROLLER EXTERIOR

PILE GUIDES, ANCHORED ON 10" BUTT PILES. CONSTRUCT

A CONCRETE FOOTER ON LAND TO ANCHOR ALUMINUM

GANGWAY. INSTALL A 5'X12' ALUMINUM GANGWAY FROM

CONCRETE FOOTER TO FLOATING DOCK, SECURED WITH

SS HARDWARE. GANGWAY AND FLOATING DOCK TO HAVE

42" THREE-LINE ALUMINUM PIPE RAIL AROUND PERIMETER,

WITH DIVERSION PLATE. GANGWAY AND FLOATING DOCK

TO HAVE ALUMINUM RIBBED DECKING. ROLLERS AND

TRANSITION PLATE AT BASE OF GANGWAY CONNECTING

TO FLOATING DOCK. ALL PILES TO BE 2.5CCA TREATED.

Total price for the above NEW items: TBD

CLARIFICATIONS:

* THIS ESTIMATE IS BASED ON A NUMBER OF DESIGN ASSUMPTIONS. NO SITE-SPECIFIC DESIGN CRITERIA OR

PROJECT SPECIFICATIONS HAVE BEEN PROVIDED TO TRIDENT MARINE CONSTRUCTION AT THE TIME THIS

ESTIMATE WAS CREATED.

* NO ENGINEERING PLANS WERE PROVIDED FOR THIS ESTIMATE.

* NO SOIL SAMPLES ARE INCLUDED IN THIS QUOTE.

* ESTIMATE DOES NOT INCLUDE PERMITTING OR ENGINEERING FEES.

* NO ELECTRIC OR PLUMBING IS INCLUDED IN THIS ESTIMATE.

Trident Marine Construction mailto:KEERTHANA.SREENIVASAN@ARCADIS.COM

Email: KEERTHANA.SREENIVASAN@ARCADIS.COM Project Name: TOYTOWN Bid Number: 20231030CC2

Project Location: ST. PETERSBURG, FL Date: 10/30/2023

Trident Marine Construction

* NO DREDGING OR BACK FILLING IS INCLUDED IN THIS ESTIMATE.

* NO BRUSH CLEARING IS INCLUDED IN THIS ESTIMATE.

* BASE BID PRICE IS ONLY AN ESTIMATE. PRICE SUBJECT TO CHANGE BASED ON UNFORESEEN SITE CONDITIONS.

* WOOD, DECKING, & MATERIALS BASED OFF PRICING THE WEEK OF 10/30/2023. FINAL CONTRACT WILL BE BASED

OFF WOOD, DECKING, & MATERIALS THE WEEK BEFORE PROJECT BEGINS / MATERIALS ARE ORDERED.

* CONTRACTOR WARRANTS ALL WORK FOR A PERIOD OF 1 YEAR FROM THE DATE OF COMPLETION.

* SCHEDULE IS 3-8 WORKING DAYS AFTER MOBILIZATION.

* BUILDING PERMIT FEES ARE NOT INCLUDED IN THE PROPOSAL.

* WATER AND ELECTRIC IS EXCLUDED FROM QUOTE

* HAZARDOUS MATERIAL TESTING AND REMOVAL IS NOT ANTICIPATED AND ARE EXCLUDED FROM OUR PROPOSAL.

* PRICE COULD RISE OR FALL DEPENDING ON THE FINISH / HARDWARE SELECTION BY OWNER AND ENGINEERING PLANS.

* DAWN TO DUSK ACCESS TO WORK SITE IS NEEDED IN ORDER TO MEET CONSTRUCTION SCHEDULE.

* ALL FASTENERS / HARDWARE WILL BE GALVANIZED OR STAINLESS STEEL.

* ALL LUMBER TO BE .40 ACQ TREATED MARINE GRADE #1 DENSE SOUTHERN PINE.

* ALL FRAMING NAILS TO BE 12D STAINLESS RING SHANKED.

* PROPOSAL IS VALID FOR 10 DAYS.

* NO POWER, WATER OR FIRE PRICES ARE QUOTED IN THIS AMOUNT.

TERMS:

* 15% OF CONTRACT PRICE DUE AT CONTRACT SIGNING.

* MATERIAL COST PAYMENT DUE PRIOR TO DELIVERY.

* REMAINING CONTRACT COST DUE AT COMPLETION.

* $250 REMOBILIZATION CHARGE IF ABOVE PAYMENT TERMS ARE NOT MET AND CONTRACTOR HAS TO DEMOBILIZE DUE

TO DELAYED PAYMENTS.

* ABOVE PRICE IS DISCOUNTED BASED ON PAYMENT BY CASH. IF PAYING BY CREDIT CARD/DEBIT CARD REGULAR

PRICING WILL APPLY AND APPROXIMATELY 4% WILL BE ADDED TO YOUR INVOICE/PAYMENT.

ACCEPTED: CONFIRMED:

The above prices, specifications and conditions are satisfactory TRIDENT MARINE CONSTRUCTION and are hereby accepted. 5302 INGRAHAM STREET

Tampa, FL 33616 t: 813.460-1333 f: 813.832-8888

Signature: _________________________________________ Signature:____________________________

Date of Acceptance: _________________________________ mailto:KEERTHANA.SREENIVASAN@ARCADIS.COM

27.871484, -82.655439 (Blue Heron Lake St.

Pete)

WFW

WWW: 165’

Parameters/Notes Incorporated/ Unincorporated Max SF Max Length Max Width Side Setbacks

Legend:

WFW: waterfront width, the property at the water front WWW: Water way width, how much water is there until the nearest land SF: square footage

Sales Rep:Jennifer Graybill

Designer: Kristen Chu

Current piling count: 0

Proposed piling count: 8

Current SF: 0

Proposed SF: 184

4’x10’ upland walkway

No seawall, just start of water

Handrail

Need to know measure-ments of where you want the dock exactly where you want it

12’x12’ dock

Gulf & Bay Dock Works

PO Box 8694 Madeira Beach, FL 33738 US +1 7272529915 office@gulfandbaydockworks.com

Estimate

ADDRESS

Keerthana Sreenivasan 3095 114th Ave N Saint Petersburg, FL 33716

ESTIMATE # 2853

DATE 10/30/2023

ACTIVITY QTY RATE

Piling Installation We will hand set fortress pilings *Rate is per piling

10 1,650.00 16,500.00

Framing & Decking Framing with marine grade pressure treated 2"x10" timber.

Decking with fiberglass reinforced composite Weardeck and stainless steel hardware.

*Rate is per square foot

184 42.00 7,728.00

Handrail - Composite Fully composite handrail *Rate is per linear foot

64 90.00 5,760.00

Permitting Fees - St.

Petersburg

Includes initial St. Petersburg permit fee & all administrative costs for Gulf & Bay to procure the city approval.

1 150.00 150.00

Disclaimer: If any work has been performed previously without being permitted, the customer will be responsible for after the fact permit fines.

Upon approval of the estimate, a formal contract will be sent. The contract will not include utility work unless otherwise specified above.

Funds are due upon receipt once work is completed. A 10% late fee will be charged every 30 days overdue.

If deposit is required, it will be invoiced separately.

TOTAL $30,138.00

Accepted By Accepted Date

10'-0" 120"

REF

5'-0" 60"

REF

1'-0"

12" REF

TYP

27' OF HD DOUBLE

ALUMINUM RAILINGS

5' x 10' x 4" HD DOCK(4) LOWER BRACKET

3' x 10' GANGWAY

NOTES:

• FINAL DESIGNS AND LAYOUT SUBJECT TO CHANGE

KEERTHANA SREENIVASAN LAYOUT

PLAN VIEW

WITH DIMENSIONS & CALLOUTS

A

B B

A

2 134

SHEET 1 OF 1

SCALE:

REV:

REF #: CHECKED:PART:

DRAWN:

DATE:

D. Saul

B. DolanLayout Keerthana Sreenivasan 10/17/2023

Tolerances are 1/16'' unless specified otherwise

1:25INVOICE #: 17130

AccuDock

1790 SW 13th Court Pompano Beach, FL 33069 +1 9547857557 info@accudock.com

Estimate

ADDRESS

Keerthana Sreenivasan

4300 W CYPRESS ST

Tampa, FL 33607 732-796-2769

SHIP TO

Keerthana Sreenivasan

4300 W CYPRESS ST

Tampa, FL 33607 732-796-2769

ESTIMATE # 17130

DATE 10/17/2023

EXPIRATION DATE 11/17/2023

SHIP VIA TRACKING NO. SALES REP DESCRIPTION

Flatbed keerthana.sreenivasan@ arcadis.c BD Stormwater Dock

DATE ACTIVITY QTY RATE AMOUNT

GAN-HP3

3' Landside Hinge Plate

1 369.00 369.00T

GANG-3X12

3' x 10' Aluminum Gangway with aluminum non skid decking and side railings

1 1,890.00 1,890.00T

GAN-CP3

3' Dock Side Connection/Hinge Plate

1 369.00 369.00T

HD-DOCK

5' x 10' Floating Dock - 4" Aluminum channel, cross members on 16" centers, 12" Installed dead load free-board, Wolf PVC decking installed - Color

TBD

1 3,200.00 3,200.00T

ATT-L00

Lower Bracket - Kayak Dock

4 185.00 740.00T

ACC-RL2

Heavy duty double aluminum railing-On 3 sides

27 60.00 1,620.00T

-Thank you for the opportunity to earn your business. Stated pricing is valid for 30 days.

-ALL SALES ARE FINAL.

-Credit Card payments are subject to 3% processing fee added to total at time of transaction

-Please Note: AccuDock is the manufacturer of floating docks and aluminum gangways/accessories. All delivery and/or installations will be provided by third party companies at an additional expense.

-All Items quoted are standard AccuDock manufacture design & build.

Any request for specific or custom alterations may incur an upcharge.

-Project specific drawings are available upon request. Additional fees may apply.

SUBTOTAL 8,188.00

DISCOUNT 5% -409.40

TAX (0%) 0.00

SHIPPING 950.00

TOTAL $8,728.60

Email:0 574-3024

Qty. Price Total

1 19,899.00$

1 7,356.00$

1 3,440.00$

Decking color: Buckskin, Silverstone, Granite Gray, Hearthstone Subtotal 30,695.00$

Roofing color: See Color Chart State Tax N/A

Bumper color: Black County Tax N/A

Post/Braces: Freight 2,575.00$

Main Floor: LockDry Installation 8,500.00$

Total 41,770.00$

Dollars

Date: 11/22/2023

Date:

Date:

St. Petersburg, FL 53716

Blue Heron Lake

City, State, Zip :

4' x 50' single span access ramp with handrails, rollers, transition plate and a duck gate.

Anchoring System: (4) 3' spud pole collars, (4) 21' spud poles, PVC caps and silencer rings

Street:

Phone:

included.

Item

12' x 16' floating platform with split handrail, pickets and (1) 3' duck gate.

nylon cleats.

***Quote for Installed Dock*** Toytown Staff Guage Dock c/o Chris TillmanSubmitted to:

Signature

Signature

Authorized Signature:

41,770.00$

Flotation Systems, Inc. Warranty must be registered within 30 days of purchase to be valid. For a complete copy of said warranty call

800-711-1785. No warranty is applied to docks sold in kit form. I accept this proposal as submitted. Payment will be made as outlined above.

NOTE: Prices quoted are subject to change without notice due to market conditions beyond the control of FSI, Inc…

***Acceptance of Proposal*** Flotation Systems, Inc. does not warrant the above listed products for any purpose except as provided in the limited lifetime warranty of

Said conditions include but are not limited to the cost of fuel, material and shipping.

2,500 *CERTIFIED FUNDS MUST BE PAID UPON INSTALLATION*:

***Unpaid balance is subject to 1.5% interest per month. Interest begins accruing upon date of installation.

Forty-One Thousand Seven Hundred Seventy and 00/100

Body of Water: Blue Heron Lake, FL

Terms: Confirmation of wire transfer or Cashier's check due upon delivery: 25,347$

13,923$ Terms: One-third (1/3) down payment upon acceptance:

We propose to hereby furnish the above listed items for the sum of:

Spud Pole Collars:

*Stainless steel hardware

*Corp approved encapsulated flotation devices

***FSI Standard Accessory Package includes:

*All aluminum decking with non-skid powder coated finish (color options listed below) www.gulfandbaymarine.com

Thank You For Your Business!

Gulf & Bay Dock Works

PO Box 8694 Madeira Beach, FL 33738 US +1 7272529915 office@gulfandbaydockworks.com

Estimate

ADDRESS

Keerthana Sreenivasan 3095 114th Ave N Saint Petersburg, FL 33716

ESTIMATE # 2853

DATE 10/30/2023

Option 1: 50' walkway with a 12'x12' main dock

Piling Installation We will hand set fortress pilings *Rate is per piling

22 2,100.00 46,200.00

Framing & Decking For the main walkway and the dock head:

Framing with marine grade pressure treated 2"x10" timber.

Decking with fiberglass reinforced composite Weardeck and stainless steel hardware.

*Rate is per square foot

344 42.00 14,448.00

Framing & Decking For the upland portion:

Framing with marine grade pressure treated 2"x10" timber.

Decking with fiberglass reinforced composite Weardeck and stainless steel hardware.

*Rate is per square foot

40 28.00 1,120.00

Handrail - Composite Fully composite handrail *Rate is per linear foot

164 90.00 14,760.00

Permitting Fees - St.

Petersburg

Includes initial St. Petersburg permit fee & all administrative costs for Gulf & Bay to procure the city approval.

fines.

Upon approval of the estimate, a formal contract will be sent. The contract will not include utility work unless otherwise specified above.

TOTAL $76,678.00

Funds are due upon receipt once work is completed. A 10% late fee will be charged every 30 days overdue.

If deposit is required, it will be invoiced separately.

27.871484, -82.655439 (Blue Heron Lake St.

Pete)

WFW

WWW: 165’

Parameters/Notes Incorporated/ Unincorporated Max SF Max Length Max Width Side Setbacks

Legend:

WFW: waterfront width, the property at the water front WWW: Water way width, how much water is there until the nearest land SF: square footage

Sales Rep:Jennifer Graybill

Designer: Kristen Chu

Current piling count: 0

Proposed piling count: 22

Current SF: 0

Proposed SF: 344

4’x10’ upland walkway

No seawall, just start of water

Need to know measurements of where you want the dock exactly where you want it

Handrail

12’x12’ dock option 1: 50’ walkway with a 12’x12’ main dock

50’

12’

4’

Gulf & Bay Dock Works

PO Box 8694 Madeira Beach, FL 33738 US +1 7272529915 office@gulfandbaydockworks.com

Estimate

ADDRESS

Keerthana Sreenivasan 3095 114th Ave N Saint Petersburg, FL 33716

ESTIMATE # 2935

DATE 12/04/2023

Option 2 30' walkway with a 12 gangway and a 12'x16' floating dock

Piling Installation We will install new fortress pilings *Rate is per piling

10 2,100.00 21,000.00

Framing & Decking Framing with marine grade pressure treated 2"x10" timber.

Decking with fiberglass reinforced composite Weardeck and stainless steel hardware.

*Rate is per square foot with 4'x 20' upland and 4'x30' over water

200 28.00 5,600.00

Floating Dock - Accudock Boomer Slip Dock with Gangway

12'x16' Boomer Slip Dock with 3'x12' gangway Includes:

-Railing around floating dock

- 3' overhead assist bar

- Wolf PVC Decking color TBD

- 3'x12' aluminum gangway with aluminum non skid decking and side railing

- 2 3' hinge plate

- gangway roller assembly

- roller pad -Compensation float

1 19,553.97 19,553.97

Floating Dock Installation Use of barge & labor to install AccuDock floating dock. Includes transportation, assembly, & installation.

1 4,000.00 4,000.00

Handrail - Composite Fully composite handrail around the walkway *Rate is per linear foot

100 60.00 6,000.00

ACTIVITY QTY RATE

Subtotal: 56,153.97

Permitting Fees - St.

Petersburg

Includes initial St. Petersburg permit fee & all administrative costs for Gulf & Bay to procure the city approval.

fines.

Upon approval of the estimate, a formal contract will be sent. The contract will not include utility work unless otherwise specified above.

Funds are due upon receipt once work is completed. A 10% late fee will be charged every 30 days overdue.

If deposit is required, it will be invoiced separately.

TOTAL $56,303.97

Legend:

WFW: waterfront width, the property at the water front WWW: Water way width, how much water is there until the nearest land SF: square footage

Sales Rep:Jennifer Graybill

Designer: Kristen Chu

Current piling count: 0

Proposed piling count: 10

Current SF: 0

Proposed SF: 440

Keerthana Sreenivasan 27.871484, -82.655439 (Blue Heron Lake St.

Pete)

WFW

WWW: 165’

Parameters/Notes Incorporated/ Unincorporated Max SF Max Length Max Width Side Setbacks

Option 2

No true seawall

4’x20’ upland Handrail

30’

12’ Aluminum gangway

16’x12’ �oating dock

Need a site visit to determine exact amount that is over the water vs overland, and before �nalizing the estimate

12’

16’

Email: KEERTHANA.SREENIVASAN@ARCARDIS.COM Project Name: TOYTOWN Bid Number: 20240102CC

Project Location: ST. PETERSBURG, FL Date: 1/2/2024

Line # Item Description Quantity Unit Unit Price Total Price

GENERAL CONDITIONS

1 MOBILIZATION 1.00 LS $500.00 $500.00

Total price for the above GENERAL CONDITIONS Items: $500.00

DOCK OPTIONS

FIXED AND FLOATING

1 CONSTRUCT A NEW FIXED DOCK TO BE 5'X38', 1.00 LS $84,353.00 $84,353.00

CONNECTING TO A 5'X12' ALUMINUM GANGWAY TO A

10'X10' FLOATING DOCK ON TWO NEW PILES, SECURED

WITH 4-ROLLER EXTERIOR PILE GUIDES, ANCHORED

ON 10" BUTT PILES. GANGWAY AND FLOATING DOCK TO

HAVE 42" THREE-LINE ALUMINUM PIPE RAIL AROUND

PERIMETER, WITH DIVERSION PLATE. GANGWAY AND

FLOATING DOCK TO HAVE ALUMINUM RIBBED DECKING.

ROLLERS AND TRANSITION PLATE AT BASE OF GANGWAY

CONNECTING TO FLOATING DOCK. FIXED DOCK TO BE

2"X10" DOUBLE-OUTSIDE FRAME, SECURED WITH SS

THROUGHBOLTS. DECKING TO BE 1"X6" WEARDECK

COMPOSITE DECKING, FASTENED WITH SS FASTENERS.

COLOR TO BE DETERMINED BY OWNER. FIXED DOCK

TO HAVE ~76' LINEAR FEET OF PICKET RAILING AROUND

PERIMETER. 4"X4" STANCHIONS, SECURED WITH 1/2" SS

LAGBOLTS. 2"X2" SPINDLES, 2"X4" KICKRAIL. TOPRAIL

TO BE 2"X4" AND 1"X6" WEARDECK COMPOSITE DECKING,

FASTENED WITH SS FASTENERS. COLOR TO MATCH DECK.

ALL PILES TO BE 2.5CCA TREATED, ALL LUMBER TO BE

MARINE GRADE.

FLOATING DOCK

2 CONSTRUCT A CONCRETE FOOTER ON LAND TO ANCHOR 1.00 LS $86,515.00 $86,515.00

ALUMINUM GANGWAY. GANGWAY TO BE 5'X20' LEADING

TO TWO 5'X20' FLOATING DOCK SECTIONS. FLOATING DOCK

SECTIONS TO BE ANCHORED ON NEW 10" BUTT PILES,

SECURED WITH 4-ROLLER EXTERIOR PILE GUIDES.

GANGWAY AND FLOATING DOCK SECTIONS TO HAVE

42" THREE-LINE ALUMINUM PIPE RAIL AROUND PERIMETER,

WITH DIVERSION PLATE. GANGWAY AND FLOATING DOCK

SECTIONS TO HAVE ALUMINUM RIBBED DECKING. ROLLERS

AND TRANSITION PLATE AT BASE OF GANGWAY CONNECTING

TO FLOATING DOCK. ALL PILES TO BE 2.5CCA TREATED.

Total price for the above NEW items: TBD

Trident Marine Construction mailto:KEERTHANA.SREENIVASAN@ARCARDIS.COM

Email: KEERTHANA.SREENIVASAN@ARCARDIS.COM Project Name: TOYTOWN Bid Number: 20240102CC

Project Location: ST. PETERSBURG, FL Date: 1/2/2024

Trident Marine Construction

CLARIFICATIONS:

* THIS ESTIMATE IS BASED ON A NUMBER OF DESIGN ASSUMPTIONS. NOT SITE-SPECIFIC DESIGN CRITERIA OR

PROJECT SPECIFICATIONS HAVE BEEN PROVIDED TO TRIDENT MARINE CONSTRUCTION AT THE TIME THIS

ESTIMATE WAS CREATED.

* NO ENGINEERING PLANS WERE PROVIDED FOR THIS ESTIMATE.

* NO SOIL SAMPLES ARE INCLUDED IN THIS QUOTE.

* ESTIMATE DOES NOT INCLUDE PERMITTING OR ENGINEERING FEES.

* NO ELECTRIC OR PLUMBING IS INCLUDED IN THIS ESTIMATE.

* NO DREDGING OR BACK FILLING IS INCLUDED IN THIS ESTIMATE.

* NO BRUSH CLEARING IS INCLUDED IN THIS ESTIMATE.

* BASE BID PRICE IS ONLY AN ESTIMATE. PRICE SUBJECT TO CHANGE BASED ON UNFORESEEN SITE CONDITIONS.

* WOOD, DECKING, & MATERIALS BASED OFF PRICING THE WEEK OF JANUARY 2, 2024. FINAL CONTRACT WILL BE BASED

OFF WOOD, DECKING, & MATERIALS THE WEEK BEFORE PROJECT BEGINS / MATERIALS ARE ORDERED.

* CONTRACTOR WARRANTS ALL WORK FOR A PERIOD OF 1 YEAR FROM THE DATE OF COMPLETION.

* SCHEDULE IS 6-10 WORKING DAYS AFTER MOBILIZATION.

* BUILDING PERMIT FEES ARE ESTIMATED AND INCLUDED IN THE PROPOSAL.

* WATER AND ELECTRIC IS EXCLUDED FROM QUOTE

* HAZARDOUS MATERIAL TESTING AND REMOVAL IS NOT ANTICIPATED AND ARE EXCLUDED FROM OUR PROPOSAL.

* PRICE COULD RISE OR FALL DEPENDING ON THE FINISH / HARDWARE SELECTION BY OWNER AND ENGINEERING PLANS.

* DAWN TO DUSK ACCESS TO WORK SITE IS NEEDED IN ORDER TO MEET CONSTRUCTION SCHEDULE.

* ALL FASTENERS / HARDWARE WILL BE GALVANIZED OR STAINLESS STEEL.

* ALL LUMBER TO BE .40 ACQ TREATED MARINE GRADE #1 DENSE SOUTHERN PINE.

* ALL FRAMING NAILS TO BE 12D STAINLESS RING SHANKED.

* PROPOSAL IS VALID FOR 10 DAYS.

* NO POWER, WATER OR FIRE PRICES ARE QUOTED IN THIS AMOUNT.

TERMS:

* 15% OF CONTRACT PRICE DUE AT CONTRACT SIGNING.

* MATERIAL COST PAYMENT DUE PRIOR TO DELIVERY.

* REMAINING CONTRACT COST DUE AT COMPLETION.

* $500 REMOBILIZATION CHARGE IF ABOVE PAYMENT TERMS ARE NOT MET AND CONTRACTOR HAS TO DEMOBILIZE DUE

TO DELAYED PAYMENTS.

* ABOVE PRICE IS DISCOUNTED BASED ON PAYMENT BY CASH. IF PAYING BY CREDIT CARD/DEBIT CARD REGULAR

PRICING WILL APPLY AND APPROXIMATELY 4% WILL BE ADDED TO YOUR INVOICE/PAYMENT.

ACCEPTED: CONFIRMED:

The above prices, specifications and conditions are satisfactory TRIDENT MARINE CONSTRUCTION and are hereby accepted. 5302 INGRAHAM STREET

Tampa, FL 33616 t: 813.460-1333 f: 813.832-8888

Signature: _________________________________________ Signature:____________________________

Date of Acceptance: _________________________________ mailto:KEERTHANA.SREENIVASAN@ARCARDIS.COM

Sheet1
Drawing View1